Wellesley newsletter Winter 2013

4
WINTER 2013 WELCOME & INTRODUCTION ALDERSHOT URBAN EXTENSION WELLESLEY | GRAINGER NEWSLETTER FOR THE ALDERSHOT URBAN EXTENSION Welcome to the fifth edition of the Wellesley newsletter. Grainger has been working closely with local stakeholders and the community on the proposals for Wellesley, the Aldershot Urban Extension. This has resulted in the submission of a Hybrid planning Application to Rushmoor Borough Council. This comprises of an outline planning application for the whole development plus a detailed planning application for the first 228 new homes. John Beresford, Development Director for the AUE scheme at Grainger, said: “We are pleased to submit this major planning application, which, if approved, will help revitalise and improve Aldershot as a whole. By working closely with the community, the Council, the MoD, HCA and other stakeholders, we believe our proposal will bring long-term economic benefits to the wider Aldershot community, while providing much-needed, good quality new homes, new schools and fantastic green open spaces and amenities.” THE VISION Wellesley will be a new area of Aldershot, integrated but distinctive, that will enhance and add to the vitality of the town. It will be an attractive and desirable place for users and residents and will provide new facilities for the wider community. Wellesley will take its character from its history, its fine stock of historic buildings and its mature landscape. Drawing on these assets it will develop its own architectural and landscape legacy as it grows over time. Wellesley will build on the established pattern of streets, cycleways and footpaths to provide safe and permeable links to the town and to the wider countryside. It will also enhance the existing mature landscape to provide a network of green spaces to provide recreation, increase biological diversity and put all residents in contact with nature. The way the new development is used and constructed, its ease of access, the provision of public transport and its servicing will come together to promote an efficient use of energy in accordance with the latest and most advanced practice. Wellesley will grow organically and in a logical sequence. Community facilities will be provided at each stage. Each area will have its own character and interest created from its location, use and individual design but will be managed to contribute creatively to a coherent over-all identity. The participation of the existing community and new residents will be encouraged to establish a sense of community and ownership. KEY FEATURES The protection and early delivery of the Cambridge Military Hospital as a landmark and a principal defining feature of the area. A new active neighbourhood centre at the crossroads of Queens Avenue and Alison’s Road incorporating the 4th Division Headquarters Building. Proposals include new retail, leisure and business space to support and service the community and act as a focal point. This provision is an important component of the Sustainability Strategy, intended to reduce the need to travel within the Wellesley area. The scale of the facilities is such that the Neighbourhood Centre will complement rather than compete with the Aldershot town centre and North Camp village centre. The refurbishment of the Smith Dorrien House and the Maida Gymnasium as a gateway to the area on the principal access from the town centre. The creation of a heritage trail providing access to historically significant monuments and memorials. The delivery of a new large open space at the centre of the development, in the form of a central park will respond to the existing road pattern and the historic Stanhope Lines. The restoration and developed of the canal frontage to enhance its nature conservation value while providing a recreational asset. The delivery of significant new areas devoted to SANGS (Suitable Alternative Natural Green Space), allotments and sports fields for existing and new communities.

Transcript of Wellesley newsletter Winter 2013

Page 1: Wellesley newsletter Winter 2013

WINTER 2013

WElcomE & INTRoducTIoN

AldERSHoT uRBAN EXTENSIoN WEllESlEY | GRAINGER

NEWSlETTER foR THE AldERSHoT uRBAN EXTENSIoN

Welcome to the fifth edition of the Wellesley newsletter.

Grainger has been working closely with local stakeholders and the community on the proposals for Wellesley, the Aldershot urban Extension. This has resulted in the submission of a Hybrid planning Application to Rushmoor Borough council. This comprises of an outline planning application for the whole development plus a detailed planning application for the first 228 new homes.

John Beresford, development director for the AuE scheme at Grainger, said:

“We are pleased to submit this major planning application, which, if approved, will help revitalise and improve Aldershot as a whole. By working closely with the community, the council, the mod, HcA and other stakeholders, we believe our proposal will bring long-term economic benefits to the wider Aldershot community, while providing much-needed, good quality new homes, new schools and fantastic green open spaces and amenities.”

THE VISIoN

Wellesley will be a new area of Aldershot, integrated but distinctive, that will enhance and add to the vitality of the town. It will be an attractive and desirable place for users and residents and will provide new facilities for the wider community.

Wellesley will take its character from its history, its fine stock of historic buildings and its mature landscape. drawing on these assets it will develop its own architectural and landscape legacy as it grows over time.

Wellesley will build on the established pattern of streets, cycleways and footpaths to provide safe and permeable links to the town and to the wider countryside. It will also enhance the existing mature landscape to provide a network of green spaces to provide recreation, increase biological diversity and put all residents in contact with nature.

The way the new development is used and constructed, its ease of access, the provision of public transport and its servicing will come together to promote an efficient use of energy in accordance with the latest and most advanced practice.

Wellesley will grow organically and in a logical sequence. community facilities will be provided at each stage. Each area will have its own character and interest created from its location, use and individual design but will be managed to contribute creatively to a coherent over-all identity. The participation of the existing community and new residents will be encouraged to establish a sense of community and ownership.

KEY fEATuRES• The protection and early delivery of the cambridge

military Hospital as a landmark and a principal defining feature of the area.

• A new active neighbourhood centre at the crossroads of Queens Avenue and Alison’s Road incorporating the 4th division Headquarters Building. Proposals include new retail, leisure and business space to support and service the community and act as a focal point. This provision is an important component of the Sustainability Strategy, intended to reduce the need to travel within the Wellesley area. The scale of the facilities is such that the Neighbourhood centre will complement rather than compete with the Aldershot town centre and North camp village centre.

• The refurbishment of the Smith dorrien House and the maida Gymnasium as a gateway to the area on the principal access from the town centre.

• The creation of a heritage trail providing access to historically significant monuments and memorials.

• The delivery of a new large open space at the centre of the development, in the form of a central park will respond to the existing road pattern and the historic Stanhope lines.

• The restoration and developed of the canal frontage to enhance its nature conservation value while providing a recreational asset.

• The delivery of significant new areas devoted to SANGS (Suitable Alternative Natural Green Space), allotments and sports fields for existing and new communities.

Page 2: Wellesley newsletter Winter 2013

AldERSHoT uRBAN EXTENSIoN WEllESlEY | GRAINGER

The masterplan illustrates a number of key principles to facilitate the delivery of a quality development. It’s important that the master plan is not set in stone because over the life of the development it will need to evolve as life changes. Any future improvements to the master plan will be developed with Rushmoor Borough council.

Proposals Include:• up to 3,850 new homes• 35% affordable homes• Refurbishment of 6 listed buildings including:• cambridge military Hospital• 4th division Headquarters• Smith dorrien• maida Gymnasium• observatory• fitzwygram House• A new heritage trail• 2 new primary schools• day care facilities• A local centre with new offices and local shops• Pub/restaurant• community and leisure facilities• Household waste recycling centre• Approximately 2.4 ha of employment area• Approximately 110 ha of SANGS • New play areas and a local park• Allotments• Public access to sports fields

mASTERPlAN

Page 3: Wellesley newsletter Winter 2013

s

ew

N

Date

Title

Drawn by

HPA 08

Maida, Phase 1 House Tenure Plan (PA)

GB,AM,BP

Scale

Drawing No.

Rev. DescriptionDate Initials

Maida, Phase 1 House Tenure Plan (PA)

Proposed 3.5m wide

footpath/cycleway

Future bus stop

112.

29.

30.

Existing footway to be

removed at later date

Existing footway to be

widened to 2m.

Future vehicle crossoversubject to future application

Hospital Road

Hope Grant's Road

Que

en's

Aven

ue

The Maida Gymnasium

The Smith Dorrien

Block of flats 3(6 flats)

Bloc

k of

flat

s 2

(4 fl

ats)

Scarlett's Road

Que

en's

Aven

ue

Fire

Stati

on R

oad

O

O

F

F

O

O

K

J

J

J

J

L1

O

C

J

J

J

J

F

J

J

J

J

K

D

D

N

L

O

F F

J

J

J

J

L

N

O

16.

17.

18.

19.20.

21.

22.

23.

24.

28.

31.

32.

36.

37.38.

39.

44.

50.

53.

54.

55.

56.

57.

59.

60.

61.

62.

63.

64.

65.

66.

67.

68.

69.

70.

71.

83.

72.

73.74.

75.76.

77.78.

79.80.

81.82.

86.

87.

88.

89.

90.

91.

94.

95.

96.

97.

98.

99.

100.

101.

102.

103.

104.

106.

105.

109.

110.

111.

113.

218.219.

125.

-128

.129.

130.

131.

132.

137.

138.-143.

144.

145.

146.

147.

148.

149.

150.

154.

151.

152.

153.

156.

157.

158.

160.

161.162.

163. 164.

165.166. 167.

168.

169.

170.

171.172.

173.

176.

177.

178.

179.

180.

181.

182.

193.

194.195.

198.

199.

114.

115.

116.

117.

118.

119.

120.

121.

122.

33.

34.

35.

45.

47.

48.

49.51.

52.

155

115

115

116

116

117

117

118

118

119

119

120

120

122

102

110

109

110

109

11383

83

80

80

81

81

78

78

79

79

76

76

77

77

74

74

75

75

72

72

73

73

82

82

71

71

70

70

168

165

168167

163

164

162

161

165

167

163

164

162

160

155

193194

195196

193194

195196

170

170

172

172

171

171

197

197

198

198

148

148

145144

144

179

178

179

178

175

129

130

131

182

218219

67

67

68

68 69

69

101

101

99

99

98

98

97

97

96

9594

9392

9190

96

9594

9392

9190

88

88

89

86

87

89

86

87

63

64

61

62

59

60

57

58

55

56

65

66

65

66

35

34 35

34

33

32

31

51

50

51

50

33

32

53

52

53

52

39

38

37

36

39

38

37

36

16

17

20

21

44

21

16

17

19

20

45

46

48

45

46

48

23

24

22

23

24

28

115116

117

118119

120

104

103

107

110

109

122

102

24

129

130

131

149

148

218219

125

126

127

V

V

28

M

23

31

154

V

182

137

V

VV

VV

V

155.

156

152

192.

200.

201.

190

190191

191

199

200

201

202

199

200

201

202

O191.

202.

203

203

144

G

133.

134.

135.

136.

132

133

134

135

132

133

134

135

181

123F

124

123

175.

189

150

150

H

189.

189

186.186

186

H

146

145

H

184.184

184

138

142

143

106

105

111112

111112

111112

292930

Block of flats 4

(14 flats)

Block of flats 5(9 flats)

114

157

157

159159.

C

156

156

190.

196.

J 174.

173

L

197.

187.

151

154

154

H

188.

188

188

152

152

107.

108108.

84.

84

8485

85

L2

L1

25

26

25

26

26.

25.

27

27

I27.

25

26

27

28

46.

49

4947

47

L1

1918

43.

43

18

1.-15.

Block of flats 1(15 flats)

42.

F 40.

42

41

40

41

40 41.

42

183. C

183

13914

0

141

V

V

V

V

V

22

22

G

G

G

G

G

G

GG

G

O

85.

F

F

FF

F

125

126

H

173

160

203.

204-217. 220-228.

155

185.H

D

D

O

OO

OO

O

O

O

O

O

O

O

O

O

O

O

O

O O

O

O

OO

L92.

93.

L

121

121

121

169

169

161

166

166

192

192

174176

177

177

180

180181

123

124

124

127

128

136

136

137

145

146

147

147

185

185

149

149

151

151

187

187

174

153

153

I

I

I

I

I

C

V

158

OO

58.

VV

57

58

90

54

90

54

63

64

61

62

59

60

55

56

M

ML

L

O

O

D

D

D

I

I

I

I

I

I

D

D

108

107

108

107

105106

105106

104

103

104

103

113

153

147

102

113

122

158

114

158

114

175

176

30

VV

146

3029

157

D

D

A

A

A

A

B

B

B

B

A

B

B

B

B

B

B

B

B

B

B

K

KK

K

K

K

K

KK

K

K

K

K

K

K

K

K

K

K

K

K

K

K

K

K

K

K

KK

K

K

K

K

K

K

0 10 20 30 40 50

Scale 1:500

IntermediateUnits

AffordableUnits

1 bed apartment

2 bed apartment

2 bed house

3 bed house

4 bed house

13

6

7

6

10

5

14

12

7-

32 48

(L)

(F, N, O)

(K)

(BF 1)

(BF 1)

(H, O)

(K)

(BF 2, 3, 5)

(BF 2, 5)

1:500 @ A014.12.2012

Affordable

Intermediate

Open Market

The identification of the first phase was carefully chosen due to:

• close proximity to the town centre and the Health centre

• Available transport services within walking distance of Aldershot train station and the Gold bus route

• opportunities for the early provision of community facilities at Smith dorrien

• Existing access off Queens Avenue

The design of the 228 units in phase 1 focuses on the needs of families and creating a safe, secure and attractive environment which will eventually become the hallmark for Wellesley. It creates a series of residential neighbourhoods connected by a network of green spaces, parks and recreation areas and punctuated by carefully chosen and refurbished historic buildings.

PHASE 1

Page 4: Wellesley newsletter Winter 2013

AldERSHoT uRBAN EXTENSIoN WEllESlEY | GRAINGER

NEWSlETTER foR THE AldERSHoT uRBAN EXTENSIoN

You can view the full planning application on Rushmoor Borough councils website www.rushmoor.gov.uk/planningaccess or you can see them in paper copy at Aldershot library and the council offices, farnborough. comments can be emailed to [email protected] or in writing to the Head of Planning at the council offices. comments must be in writing and must be received by friday 29th march 2013.

Visit our website;www.wellesleyaldershot.co.uk

The Wellesley project office address is:Smith dorrien House, Queens Avenue,Aldershot Gu11 2BT

for press enquiries please contact Kurt mueller, director of corporate Affairs at Grainger via email at;[email protected] or via telephone at 020 7795 4700.