BACKGROUND
211th Monitoring Network Meeting ● June 13th - 15th, 2017
Traverse City, Michigan, USA
Background: Cranfield Field, Mississippi
• SECARB’s Phase II Gulf Coast Stacked Storage Project
• Monitoring Wells Studied in an EOR Setting CFU 31F-2 and CFU 31F-3, 7 years old
• Injection commenced December 1, 2009 and continued into June 2015. Breakthrough was seen in CFU31F-2 on December 12, 2009 (12 days after injection).
3
Cranfield CFU31F-2 and CFU31F-3 Construction
• 7-in 26lb N80 to ~10,200ft
• 7 5/8-in Bluebox 2500 from ~10,200 to ~10,700ft
• 7-in 26lb N80 to ~10,700ft to TD (~10,790ft)
• Electrodes and other jewelry in the well
• 12 ¼-inch bit (large cemented annulus)
• Production reservoir ~10,435ft to ~10,518ft (CFU31F-2)
4
193.7mm (7-5/8 in) Bluebox 2500 fiberglass casing from 3,116.1 to 3,259.5 m (10,223 to 10,694 ft)
177.8 mm (7 in) LT&C float shoe from 3,283.4 to 3,283.9 m (10,772 to 10,774 ft)
Tuscaloosa D and E sand perforations from 3,185.2 to 3,205.9 m (10,450 to 10,518 ft) with 0-degree phasing, 2 shots per foot. Tuscaloosa D and E sand and CO2 zonebetween 3,181.5 and 3,205.9 m (10,438 and 10,518 ft) (denoted by pink shading)
Casing mounted distributed thermal perturbation sensor system consisting of two 6.35 mm (¼ in) encapsulated TEC lines with 8 American wire gauge (AWG) insulated heating conductors from surface to 3,108.0 m (10,197 ft) splicing into 6.35 mm (¼ in) encapsulated TEC lines with 3 x 18 AWG insulated heating conductors from 3,103.5 to 3,221.1 m (10,182 to 10,568 ft) and a single 6.35mm (¼ in) encapsulated TEC line with two fiber optic strands from surface to 3,259.8 m (10,695 ft)
177.8 mm (7 in) LT&C 13Cr80 casing seal receptacle between 3,182.4 and 3,184.0 m (10,441 and 10,446 ft), over wrapped with fiberglass and crossed over to 193.7 mm (7-5/8 in) fiberglass 14 electrical resistivity tomography electrodes with 6.35 mm
(¼ in) encapsulated TEC single conductor lines running to DAC/TEC splitters. The top electrode is at 3,164.1 m (10,381 ft) and the bottom electrode is at 3,221.7 m (10,570 ft) with approximately 4.5 m (15 ft) spacing between electrodes
177.8 mm (7 in) LT&C float collar from 3,259.5 to 3,260.0 m (10,694 to 10,696 ft)
Pressure/temperature gauge at 3,061.4 m (10,044 ft) with10.67 mm (0.42 in) OD 7-conductor direct attach copper(DAC) cable to surface
177.8 mm 34.23 kg/m (7 in 26 lb/ft), N-80 grade casing between 0 and 3,106.8 m (0 and 10,193 ft)
Two tubing encapsulated cable (TEC) splitters running on 177.8 mm 34.23 kg/m (7 in 26 lb/ft) N80 casing pup joints between 3,106.8 and 3,114.8 m (10,193 and 10,219 ft) with 10.67mm (0.42 in) OD 7-conductor DAC cables to surface.
177.8 mm 34.23 kg/m (7 in 26 lb/ft), N-80 steel casingbetween 3,260.0 and 3,283.4 m (10,696 and 10,772 ft)
12-1/4 inch hole to 3,288.8 m (10,790 ft)
CFU31F-2
WellSlurr
y CementMass
(sacks)Yield
(ft3/sack)Volume (bbls)
Density (ppg)
CFU31F-2 Lead 35:65:6 565 1.48 148.5 12.8
CFU31F-2 TailClass H + Silica
Flour 440 1.91 149.69 16.2CFU31F-3 Lead 35:65:6 770 1.48 202.38 12.8
CFU31F-3 TailClass H + Silica
Flour 465 1.91 158.19 16.2
Cement SlurriesFiberglass Casing
Potential Migration Pathways
511th Monitoring Network Meeting ● June 13th - 15th, 2017
Traverse City, Michigan, USA
Figure from Duguid et al. [1]
Typical cement
• CO2 dissociation
• CO2 + H2O ↔ H2CO3* ↔ H+ + HCO3
- ↔ 2H+ + CO32-
• Cement dissolution
• Ca(OH)2(s) + 2H+ + CO32- → CaCO3(s) + 2H2O
• Ca3Si2O7H•4H2O(s) + 2H+ + CO32- → CaCO3(s) + SiOxOHx(s)
• Ca(OH)2(s) + H+ + HCO3- → CaCO3(s) + 2H2O
• Ca3Si2O7H•4H2O(s) + H+ + HCO3- → CaCO3(s) + SiOxOHx(s)
• Calcium carbonate dissolution
• CO2 + H2O + CaCO3(s) ↔ Ca2+ + 2HCO3-
• 2H+ + CaCO3(s) ↔ CO2 + Ca2+ + H2O
Precipitation of CaCO3blocks connected pores and reduces permeability
Opens pores blocked by CaCO3 precipitation and additional porosity created by the dissolution of cement reaction products
Phase Abbreviation Percent Ca3Si2O7•4H2O C-S-H 50-70 Ca(OH)2 CH 20-25 3(3CaO•Al2O3•CaSO4•12H2O) AFm 4CaO•(Al,Fe2O3)•13H2O AFt
10-15
Carbonation Reactions
Composition
METHODS
711th Monitoring Network Meeting ● June 13th - 15th, 2017
Traverse City, Michigan, USA
Data Collection• Logging Tools• USIT* ultrasonic imager tool
(2009)• Isolation Scanner* cement
evaluation service(2015)• DSLT* Digital Sonic Logging Tool
(2009)• SCMT* slim cement mapping tool
(2015)
• Testing and Sampling Tools• CHDT* cased hole dynamics
tester• MSCT* mechanical sidewall
coring tool
Perforation for VIT test
Point permeability measurement
CHDT Sample Point
Sidewall Core Sample
Fluid Sample Point
VIT Interval
Wellbore
Well Cement
Geologic Formation
LEGEND
Lab Analyses on Core Samples
11th Monitoring Network Meeting ● June 13th - 15th, 2017Traverse City, Michigan, USA9
• Micro Computed Tomography (Micro-CT) Analysis with a TriFoil Imaging eXplore CT 120 Small Animal X-Ray CT Scanner with a
Custom generator producing 5 kW peak power. The analyzer had a feature detectability of 4 microns. The energy was between 40–120 kV with a maximum current of 50 mA.
• Laser Ablation Inductively Coupled Plasma Mass Spectroscopy (LA-ICP-MS) Analysis with a Perkin Elmer Nexion 350D ICP-MS and a Photo Machines Excite He1Ex
193nm Laser with a 50 x 50 mm spot size. A NIST 612 standard was used before and after the scans on each sample to account for machine drift. Lines were collected at 20mm/s.
• Environmental Scanning Electron Microscopy (ESEM) with Energy Dispersive X-ray Spectroscopy (EDS) Analysis with a FEI QUANTA 200 SEM in ESEM Mode. The analysis was conducted on
portions of the sectioned samples that were polished to 1 micron prior to analysis. Excitation energy ranged from 10 to 20 KV.
• X-ray Diffraction (XRD) Analysis with a Rigaku MiniFlex 600 analyzer. The samples were run using a 40Kv
voltage and a 15mA current. The radiation source was an interlock CU tube. Scans were run from 5 to 80 degrees at 1 degree per minute.
RESULTS
1011th Monitoring Network Meeting ● June 13th - 15th, 2017
Traverse City, Michigan, USA
Control Line in CFU31F-2
1111th Monitoring Network Meeting ● June 13th - 15th, 2017
Traverse City, Michigan, USA
• Control lines visible in the microdebonding image tracks in both wells as a vertical micro-debondedor fluid-filled features
• Not visible in the fiberglass section
• Visible in 2009 and 2015 ultrasonic logs
CFU31F-2 7900 ft
1211th Monitoring Network Meeting ● June 13th - 15th, 2017
Traverse City, Michigan, USA
• Crack with visible reaction front perpendicular to the wellbore
• Micro-CT shows filled and unfilled portions of the crack
CFU31F-2 Log Analysis at 7900 ft
1311th Monitoring Network Meeting ● June 13th - 15th, 2017
Traverse City, Michigan, USA
• CBLs show a decrease in amplitude (increased bond)
• Ultrasonic logs show a decrease in solid behind the casing
CFU31F-2 7900-ft XRD
1411th Monitoring Network Meeting ● June 13th - 15th, 2017
Traverse City, Michigan, USA
Phase name
Zone 1
Zone 2
Weight %
Weight %
Quartz 20 42Tilleyite 26 18
Tobermorite M 11 5.8Calcium Silicate
Hydrate 10 10Brownmillerite, Fe-
rich 10 7.2Calcite 19 10Halite 4.7 6
Zone 1
Zone 2
CFU31F-2 9800 ft
1511th Monitoring Network Meeting ● June 13th - 15th, 2017
Traverse City, Michigan, USA
• Visible reaction fronts in the casing side of the sample
• Micro-CT shows multiple reaction fronts
CFU31F-2 Log Analysis at 9800 ft
1611th Monitoring Network Meeting ● June 13th - 15th, 2017
Traverse City, Michigan, USA
• CBLs show an increase in amplitude (decreased bond)
• Ultrasonic logs show a decrease in solid behind the casing
Reaction Fronts in MSCT sample at 9800 ft
1711th Monitoring Network Meeting ● June 13th - 15th, 2017
Traverse City, Michigan, USA
1 mm1 mm
4 mm
6 mm
0.5 mm
0-2 mm
CFU31F-2 9800-ft LA-ICP-MS 2
1811th Monitoring Network Meeting ● June 13th - 15th, 2017
Traverse City, Michigan, USA
0.001
0.01
0.1
1
10
100
1000
10000
0 1000 2000 3000 4000 5000 6000
Rat
ios
Distance (microns)
CFU31F-2 9800 Line 8Ca/Si Ca/Al Ca/Fe
CFU31F-2 9800-ft XRD
1911th Monitoring Network Meeting ● June 13th - 15th, 2017
Traverse City, Michigan, USA
Phase name
Zone 1 Zone 2 Zone 3Weight
%Weight
%Weight
%Tobermorite 2.3 40 25
Quartz 18.4 25.5 24Calcite 63 10.3 22
Aragonite 11.7 - -Vaterite 0.7 - 2
Zeolite UTD-1 2.2 - -Brownmillerite - 5.6 13
Tilleyite - 7 14Srebrodolskite 1.4 2.8 -
Calcium Silicate Hydrate - 7.3 -
Gehlenite - 1.4 -
Zone 1Zone 2
Zone 3
CFU31F-3 10380 ft
2011th Monitoring Network Meeting ● June 13th - 15th, 2017
Traverse City, Michigan, USA
• Cored control line• Reaction fronts leading
away from control line/cement-casing interface
• Micro-CT shows multiple reaction fronts
10380-ft Cement Sectioned
2111th Monitoring Network Meeting ● June 13th - 15th, 2017
Traverse City, Michigan, USA
ESEMXRD
LA-ICP-MS
CFU31F-3 10380-ft LA-ICP-MS
2211th Monitoring Network Meeting ● June 13th - 15th, 2017
Traverse City, Michigan, USA
0.0001
0.001
0.01
0.1
1
10
100
1000
10000
0 1000 2000 3000 4000 5000Rat
ios
Distance (microns)
CFU31F-3 10380 ft Line 1Ca/Si Ca/Al Ca/Fe
CFU31F-3 10380-ft XRD
2311th Monitoring Network Meeting ● June 13th - 15th, 2017
Traverse City, Michigan, USA
Phase nameZone 1 Zone 2 Zone 3
Weight % Weight % Weight %Halite 2.3 15 15.2Quartz 8.4 10.7 19Calcite 84 15 12Vaterite - 19 -Faujasite-Ca, dehydrated - 3 -Tobermorite M 4.2 - 16.2Tobermorite 9A - 38 -Tilleyite 0.4 - 19Brownmillerite, Fe-rich 0.1 - 7.1Wollastonite, ferroan 1A 0.6 - 11
Zone 1
Zone 2
Zone 3
Fiberglass Casing Degradation
2411th Monitoring Network Meeting ● June 13th - 15th, 2017
Traverse City, Michigan, USA
DISCUSSION
2511th Monitoring Network Meeting ● June 13th - 15th, 2017
Traverse City, Michigan, USA
Discussion• Control lines and hardware are visible as low acoustic impedance
features between the CO2 reservoir at the log top-of-cement indicating that they are not bonded to the casing and could represent a migration pathway.
• Deterioration of the acoustic impedance and CBL signals in the logs is evident over much of the section that was relogged in 2015.
• Each of the cores collected in each well showed carbonation. Both XRD and LA-ICP-MS indicate carbonation occurring at the cement-casing and
cement-formation interfaces.
LA-ICP-MS shows increases in Ca/Si that are likely calcium carbonate fronts and decreases in Ca/Si near the edges of the sample that indicate calcium depletion.
11th Monitoring Network Meeting ● June 13th - 15th, 2017Traverse City, Michigan, USA26
Discussion• The core collected at 10380 ft consisted of casing, control line, and
cement. The cement portion of the core showed visible reaction fronts moving into the sample from the control line / casing side. XRD conducted on the sample show carbonation in each of the zones analyzed.
The carbonation is highest adjacent to the control line / casing interface, with 84 percent calcite, and smallest near the formation with 12 percent calcite.
• The degradation of the fiberglass casing in the reservoir CO2 zone can be seen in both the logs and the casing samples collected. The logs show the worst damage in the CO2 zone with less damage above the CO2 zone and the least damage below the CO2 zone.
11th Monitoring Network Meeting ● June 13th - 15th, 2017Traverse City, Michigan, USA27
CONCLUSIONS
2811th Monitoring Network Meeting ● June 13th - 15th, 2017
Traverse City, Michigan, USA
CONCLUSIONS• High carbonation along the interfaces and the geometry of the damage
to the fiberglass casing indicate that CO2 is migrating along the casing. buoyant CO2 will migrate up from the reservoir causing more damage above the CO2
zone than below the CO2 zone.
• Time-lapse comparison of cement bond amplitude data and acoustic impedance maps imply a deterioration of cement bond or cement along much of the long-string section.
• Analysis of sidewall cores using XRD and LA-ICP-MS validates the log interpretation by confirming the degradation of cement (carbonation) along the casing-cement interface..
11th Monitoring Network Meeting ● June 13th - 15th, 2017Traverse City, Michigan, USA29
CONCLUSIONS• The ultrasonic image maps also clearly identify the control lines and
monitoring technology attached to the outside of the casing. The sidewall core through the control line at 10380 ft confirms that CO2 is migrating along the control line. Study of other wells with external lines should be conducted to see of the results of
the this study are normal or an exception.
11th Monitoring Network Meeting ● June 13th - 15th, 2017Traverse City, Michigan, USA30
REFERENCES
3111th Monitoring Network Meeting ● June 13th - 15th, 2017
Traverse City, Michigan, USA
REFERENCES
1. Duguid, A., Carey, J.W., Celia, M., Chuganov, N., Gasda, S., Ramakrishnan, T.S., Stamp, V., and Wang, J., “Baseline integrity property measurement of legacy oil and gas wells for carbon storage projects,” Greenhouse Gases Science and Technology, In Press.
2. Duguid A, Butsch R, Carey JW, Celia M, Chugunov N, Gasda S, Ramakrishnan TS, Stamp V, and Wang J, Pre-injection Baseline Data Collection to Establish Existing Wellbore Leakage Properties, 11th International Conference on Greenhouse Gas Technologies, Kyoto, Japan, September 2012, Energy Procedia, 2013:37:5661 – 5672.
3. Carey JW, Wigand M, Chipera SJ, WoldeGabriel G, Pawar R, Lichtner PC, Wehner SC, Raines MA, Guthrie GD Analysis and performance of oil well cement with 30 years Of CO2 exposure from the SACROC Unit, West Texas, USA. International J of Greenhouse Gas Control 2007:1:75–85.
11th Monitoring Network Meeting ● June 13th - 15th, 2017Traverse City, Michigan, USA32
800.201.2011 | [email protected] | www.battelle.org+1.614.561.4468 | [email protected]
Cranfield Field
34
CFU31F-2
CFU31F-3
CFU31F-1
CFU31F-2 7900-ft LA-ICP-MS
3511th Monitoring Network Meeting ● June 13th - 15th, 2017
Traverse City, Michigan, USA
1.00E-03
1.00E-02
1.00E-01
1.00E+00
1.00E+01
1.00E+02
1.00E+03
1.00E+04
1.00E+05
0 1000 2000 3000 4000 5000 6000
Rat
io
Distance (microns)
CFU31F-2 7900ft Line 1Ca/Si Ca/Al Ca/Fe
CFU31F-2 9800-ft LA-ICP-MS 1
3611th Monitoring Network Meeting ● June 13th - 15th, 2017
Traverse City, Michigan, USA
0.001
0.01
0.1
1
10
100
1000
10000
0 1000 2000 3000 4000 5000
Rat
ios
Distance (microns)
CFU31F-2 9800 Line 7Ca/Si Ca/Al Ca/Fe
Jewelry and Control Lines (10200 ft)
37
Cable
Splitter
Splitter
Cables
Cables