Welcome to the Public Informational Meeting

Albany Avenue (Route 44) Operational,

Safety, and Streetscape Improvements Project

State Project No. 63-633

Page 2: Welcome to the Public Informational Meeting Albany Avenue ... · Maintenance and protection of traffic Utilities Rights-of-way ... * Fatality was a pedestrian at the intersection
Page 3: Welcome to the Public Informational Meeting Albany Avenue ... · Maintenance and protection of traffic Utilities Rights-of-way ... * Fatality was a pedestrian at the intersection

Project History/Background

Purpose and Need

9 SLOSSS locations

500 vehicle and pedestrian accidents

2006-2010 project design parameters/improvements established

2009 project deemed unfundable based on funding constraints at CTDOT

2010 combine Albany Avenue Safety Improvement Project And Albany

Avenue Clean Water Project (MDC)

Reduce overall construction duration

Reduce interruption of adjacent homes and businesses

Reduce impacts on traffic, pedestrian, and transit flow

Required full depth road reconstruction

Page 4: Welcome to the Public Informational Meeting Albany Avenue ... · Maintenance and protection of traffic Utilities Rights-of-way ... * Fatality was a pedestrian at the intersection

Project History/Background

2010 TIGER Grant Funding Application submitted

Scope included Safety and MDC Work ($50 million)

Funding not obtained

2012 MDC designed alternative for the Albany Avenue Clean Water Project

2013 project back on track as stand alone project

Replaced most full depth road reconstruction with mill and overlay

2013 CTDOT agreed to fund full project at $29 million

2013 CTDOT/City of Hartford MOU challenges

Fall 2014 relaunch of the Project

January 7, 2015 PD submission to CTDOT/City of Hartford

February 26, 2015 PD Review Meeting

Page 5: Welcome to the Public Informational Meeting Albany Avenue ... · Maintenance and protection of traffic Utilities Rights-of-way ... * Fatality was a pedestrian at the intersection
Page 6: Welcome to the Public Informational Meeting Albany Avenue ... · Maintenance and protection of traffic Utilities Rights-of-way ... * Fatality was a pedestrian at the intersection

Overview

Purpose and Need

Geometric modifications

Traffic circulation modifications

Traffic signals/capacity analysis

Maintenance and protection of traffic

Utilities

Rights-of-way

Landscape architecture

Construction costs/schedule

Page 7: Welcome to the Public Informational Meeting Albany Avenue ... · Maintenance and protection of traffic Utilities Rights-of-way ... * Fatality was a pedestrian at the intersection

Purpose and Need

Crash Data 2008 – 2010 (500 Accidents)

Property Damage Only 339 67.8%

Personal Injury 160 32.0%

Fatality * 1 0.2%

Crash Data 2008 – 2010 (500 Accidents)

Turning Accidents 159 31.8%

Rear-Ends 156 31.2%

Side Swipe 88 17.6%

Pedestrian 17 3.4%

Other 80 16.0%

* Fatality was a pedestrian at the intersection of Garden Street and Albany Avenue

9 SLOSSS Locations

500 Accidents

Page 8: Welcome to the Public Informational Meeting Albany Avenue ... · Maintenance and protection of traffic Utilities Rights-of-way ... * Fatality was a pedestrian at the intersection

Project Elements

Operational improvements

Intersection realignments

Traffic calming (bulbouts)

Traffic circulation changes

Traffic signal improvements

Pavement mill/overlay

Streetscape features

Sidewalk/pavers

Period lighting

Street trees

Street amenities

Bus shelters

Page 9: Welcome to the Public Informational Meeting Albany Avenue ... · Maintenance and protection of traffic Utilities Rights-of-way ... * Fatality was a pedestrian at the intersection

Geometric Modifications - Typical Sections

Page 10: Welcome to the Public Informational Meeting Albany Avenue ... · Maintenance and protection of traffic Utilities Rights-of-way ... * Fatality was a pedestrian at the intersection

Geometric Modifications

Homestead Avenue/Westbourne Parkway

Vine Street/Burton Street Blue Hills Avenue/Milford Street

Page 11: Welcome to the Public Informational Meeting Albany Avenue ... · Maintenance and protection of traffic Utilities Rights-of-way ... * Fatality was a pedestrian at the intersection

Traffic Circulation

Operational improvements

Traffic circulation modifications

Roadway Existing Proposed

Sterling Street Two-way traffic One-way northbound

Lenox Street One-way southbound One-way northbound

Cabot Street One-way northbound One-way southbound

Edgewood Street (north leg) One-way northbound One-way southbound

Magnolia Street (south leg) One-way southbound One-way northbound

Irving Street (north leg) Two-way traffic One-way northbound

Irving Street (south leg) One-way northbound One-way southbound

Page 12: Welcome to the Public Informational Meeting Albany Avenue ... · Maintenance and protection of traffic Utilities Rights-of-way ... * Fatality was a pedestrian at the intersection

Traffic Signal Improvements

Traffic signal replacements (7 intersections) Albany Avenue @ Homestead Avenue/Westbourne Parkway

Albany Avenue @ Blue Hills Avenue (Route 187)/Milford Street

Albany Avenue @ Woodland Street

Albany Avenue @ Sigourney Street

Albany Avenue @ Vine Street/Burton Street

Albany Avenue @ Magnolia Street

Albany Avenue @ Garden Street

Traffic signal installation (4 new intersections) Albany Avenue @ Oakland Terrace

Albany Avenue @ Sterling Street

Albany Avenue @ Edgewood Street

Woodland Street @ Bravo Plaza Driveway

Traffic signal removals (1 intersection) Albany Avenue @ Lenox Street

Page 13: Welcome to the Public Informational Meeting Albany Avenue ... · Maintenance and protection of traffic Utilities Rights-of-way ... * Fatality was a pedestrian at the intersection

Maintenance and Protection of Traffic

No disruption to travel lanes EXCEPT between 9:00 AM and 3:00 PM

Maintain 1 lane of travel in each direction for Albany Avenue

Alternating 1 way allowed on side streets

Work zone will be restricted to 750 feet or one block whichever is

shorter and only one side of the road

Secondary operations allowed if restricted to parking lanes

and sidewalks

Milling and paving as night time operations (9:00 PM – 5:00 AM)

Milling and paving not to run concurrently

Maintain access for businesses, bikes, pedestrians, etc.

Coordination with CTTransit

Project scheduler supplied by contractor

Page 14: Welcome to the Public Informational Meeting Albany Avenue ... · Maintenance and protection of traffic Utilities Rights-of-way ... * Fatality was a pedestrian at the intersection

Utilities

Utilities notified of the project - April 2013

Utilities were submitted PD Plans - January 2015

Proposed test pit plan to be prepared and submitted

Utility Meeting to be held Spring 2015

City of Hartford to perform utility test pits to keep on schedule

Page 15: Welcome to the Public Informational Meeting Albany Avenue ... · Maintenance and protection of traffic Utilities Rights-of-way ... * Fatality was a pedestrian at the intersection

Rights of Way

Easements

Intersection

realignments/widening

Right of access required

Bravo Plaza driveway

Rights to construct

Grading/concrete sidewalk

Driveway closures

Vacant lots/access management

Page 16: Welcome to the Public Informational Meeting Albany Avenue ... · Maintenance and protection of traffic Utilities Rights-of-way ... * Fatality was a pedestrian at the intersection
Page 17: Welcome to the Public Informational Meeting Albany Avenue ... · Maintenance and protection of traffic Utilities Rights-of-way ... * Fatality was a pedestrian at the intersection
Page 18: Welcome to the Public Informational Meeting Albany Avenue ... · Maintenance and protection of traffic Utilities Rights-of-way ... * Fatality was a pedestrian at the intersection

Construction Cost Estimate

Funding ($29,000,000)

$2,430,000 STPH Program

$26,570,000 NHPP Program

Schedule (construction-Spring 2017 to Fall 2018)

One construction contract (two construction seasons)

Funding allocated over 2 fiscal years

Total Construction Items: $28,040,000

ROW Costs: $855,000

Total Project Costs: $28,895,000

Page 19: Welcome to the Public Informational Meeting Albany Avenue ... · Maintenance and protection of traffic Utilities Rights-of-way ... * Fatality was a pedestrian at the intersection

Next Steps/Schedule

Utility Meeting/Test Pits – Spring/Summer 2015

Public Information Meeting – April 22, 2015

Submit Semi Final Design – January 2016

Submit Final Design for Review – May 2016

Submit FDP – August 2016

Submit revised documents as needed (DCD) – October 2016

Advertise project – November 2016

Begin construction – April 2017

Estimated 2 construction seasons

Page 20: Welcome to the Public Informational Meeting Albany Avenue ... · Maintenance and protection of traffic Utilities Rights-of-way ... * Fatality was a pedestrian at the intersection

Welcome to the Public Informational Meeting

Albany Avenue (Route 44) Operational,

Safety, and Streetscape Improvements Project

State Project No. 63-633

Page 21: Welcome to the Public Informational Meeting Albany Avenue ... · Maintenance and protection of traffic Utilities Rights-of-way ... * Fatality was a pedestrian at the intersection

THIS SEPERATES THE END OF

PRESENTATION AND THE

EXTRA SLIDES

Page 22: Welcome to the Public Informational Meeting Albany Avenue ... · Maintenance and protection of traffic Utilities Rights-of-way ... * Fatality was a pedestrian at the intersection

Roadway Design - Pavement

MILL / REPAVE

3” MILLING

2” PMA S0.5 LEVEL 3

1” HMA S.025 LEVEL 2

FULL DEPTH

2” PMA S0.5 LEVEL 3

3” HMA S0.5 LEVEL 3

6” HMA S1.0 LEVEL 3

Page 23: Welcome to the Public Informational Meeting Albany Avenue ... · Maintenance and protection of traffic Utilities Rights-of-way ... * Fatality was a pedestrian at the intersection

Drainage

Utilize existing catch basins

New catch basins at bulbouts

Replace catch basins when compromised

Drainage design – limited to gutter flow analysis

Negligible increase in impervious area

Complex due to combined system and lack of information

Upgrading drainage would result in major cost and schedule impacts

Drainage infrastructure currently owned and maintained by MDC

MDC, City of Hartford, and CTDOT District Maintenance report no flooding

issues in this section of albany avenue

Sedimentation erosion control measures at fill slopes

Geotextile sacks at catch basins

Page 24: Welcome to the Public Informational Meeting Albany Avenue ... · Maintenance and protection of traffic Utilities Rights-of-way ... * Fatality was a pedestrian at the intersection

Utilities

Utilities present

Comcast, CNG, Fibertech, MDC, Eversource Energy, Frontier

Overhead utility impacts

Only present on side streets

Relocation/removal needed to facilitate intersection realignment

Underground utility impacts

Drainage installation

Bulbouts

Intersection realignment

Traffic signal/lighting foundations

CNG has planned upgrades to their facilities

Page 25: Welcome to the Public Informational Meeting Albany Avenue ... · Maintenance and protection of traffic Utilities Rights-of-way ... * Fatality was a pedestrian at the intersection

Landscape Architecture

Bus Shelters Street Trees/LightingBulbouts Imprint Crosswalks