Peace Corps Micronesia Welcome Book | March 2013 (June 2013 "CCD") fmwb401
WELCOME TO THE - Denver...WELCOME TO THE PUBLIC OPEN HOUSE CCD I-25/Broadway Interchange Project...
Transcript of WELCOME TO THE - Denver...WELCOME TO THE PUBLIC OPEN HOUSE CCD I-25/Broadway Interchange Project...
WELCOMETO THE
PUBLIC OPEN HOUSE
CCD I-25/Broadway Interchange Project 08-277-00 5/5/11
Public Outreach
CCD I-25/Broadway Interchange Project 08-277-00 5/5/11
Project Updates and Information:
Project Team Contact Information:
Project Improvement MapCCD I-25/Broadway Interchange Project 08-277-00 3/24/11 (Update)
DRAFT
Multi-Use Trail
Pedestrian Facilities
Roadway Improvements
10 Foot Shared Bike/Pedestrian Facility
LegendLegend
✱
✱
N o r t h
N o t t o S c a l e
RTDI-25 &
BroadwayStation
GATES
LIONSTONE
ALEXAN
Building 41
Ford Building
Alternate D4Alternate D4Exposition AlignmentExposition Alignment
Exposit
ion
Exposit
ion
LincolnLincolnLincolnLincoln
Sherman
GrantGrant
BroadwayBroadway
Ohio
Ohio
StationSBSBOn-RampOn-Ramp
nNBNB
On-RampOn-RampNBNBOff-RampOff-Ramp
Kentucky
Kentucky
Kentucky
Kentucky
Tennessee
Tennessee A
riz
ona
Ariz
ona
CMLCMLLight RailLight Rail
Ligh
t Rail
Ligh
t Rail
Mis
sis
sip
pi
Mis
sis
sip
pi
LoganLogan
ShermanSherman
GrantGrant
LoganLogan
NewNewExpositionExposition
AccessAccess
New KentuckyNew KentuckyAccessAccess
25
SOUTH BROADWAY:SOUTH OF MISSISSIPPI AVE
SOUTH BROADWAY:NORTH OF MISSISSIPPI AVE
VIEW LOOKING NORTHVIEW LOOKING NORTH
Typical SectionsCCD I-25/Broadway Interchange Project 08-277-00 - 5/5/2011
N o r t h
N o t t o S c a l e
CCD I-25/Broadway Interchange Project 08-277-00 5/5/11
Broadway Typical Sections
FHU
FHU
FHU
FHU
FHU
FHU
FHU
FHU
FHU
11’Traffic Lane
11’Traffic Lane
11’Traffic Lane
11’Traffic Lane
11’Turn Lane
Proposed Broadway - North of Mississippi
11’Parking
(Future TrafficLane)
11’Parking
(Future TrafficLane)
10’Sidewalk
2.5’
10’Sidewalk
5’ AmenityZone
11’Traffic Lane
11’Traffic Lane
11’Turn Lane
5’ AmenityZone
2.5’
11’Traffic Lane
11’Traffic Lane
11’Traffic Lane
11’Traffic Lane
11’Turn Lane
Proposed Broadway - South of Mississippi
11’Parking
(Future TrafficLane)
8’Sidewalk
2.5’
8’Sidewalk
5’ AmenityZone
11’Traffic Lane
11’Traffic Lane
11’Turn Lane
5’ AmenityZone
2.5’
MISSISSIPPI AVE:WEST OF SOUTH BROADWAY
VIEW LOOKING WEST
MISSISSIPPI AVE:EAST OF SOUTH BROADWAY
VIEW LOOKING WEST
EXPOSITION AVE:EAST OF SOUTH BROADWAY
VIEW LOOKING WEST
Typical SectionsCCD I-25/Broadway Interchange Project 08-277-00 - 5/5/2011
N o r t h
N o t t o S c a l e
CCD I-25/Broadway Interchange Project 08-277-00 5/5/11
Mississippi Typical Sections
FHU
FHU
5’ AmenityZone
5’ AmenityZone
4’ AsphaltVaries from 0’ - 10’
11’Traffic Lane
11’Traffic Lane
11’Turn Lane
Proposed Mississippi - West of Broadway
2.5’
2.5’Existing 1.5’
11’Walk
7’StripedMedian
11’Turn Lane
26’+_
2.5’
11’Traffic Lane
10’Walk
11’Traffic Lane
11’Turn Lane
8’Walk
Proposed Mississippi - East of Broadway
2.5’
Median or Turn lanesVaries 1-18’
11’Turn Lane
2.5’
Current 30% Design vs. Conceptual Design
DRAFTChanges UnderChanges UnderConsiderationConsideration
CCD I-25/Broadway Interchange Project 08-277-01 5/5/11
LEGEND
Conceptual DesignCurrent Design Design Overlap
Exposit
ion
Exposit
ion
ShermanSherman
Ohio
Ohio
Kentucky
Kentucky
Kentucky
Kentucky
Tennessee
Tennessee
Ariz
ona
Ariz
ona
CMLML
Light RailLight Rail
Ligh
t Rail
Ligh
t Rail
Mis
sis
sip
pi
Mis
sis
sip
pi
ShermanSherman
GrantGrant GrantGrant
LoganLoganLoganLogan
LincolnLincolnLincolnLincoln
BroadwayBroadway
N o r t h
N o t t o S c a l e
RTDI-25 &
BroadwayStation
GATES
LIONSTONE
ALEXAN
Building 41
Ford Building
25
1
2
4
3
5
14
13
8
69
10
12
11
1 Exposition - Lincoln toBroadway Improvements
2 Exposition Extension - Modified Alignment
3 SB Broadway to SB I-25On-Ramp Dedicated RightTurn Lane - Added
4 NB Broadway at Ohio -Modified Alignment
5
6
Kentucky West of Broadway -Modified Alignment
Broadway S. of Tennessee -Modified Alignment -Building 41
7 Broadway East and WestSidewalk - Widened
8 Mississippi North Sidewalk -Widened
9 Water Quality Pond - West -Under Consideration
10 Water Quality Ponds - East
11 SB I-25 On-Ramp Structure -Lengthen from 2 Spans to4 Spans
12 SB I-25 On-Ramp PedestrianUnderpass - Widen from18 feet to 49 feet
13 Broadway/MississippiModified Turn Radius
14 Broadway/MississippiSidewalk - Bulbout atNE Corner
7
7
Alternate D4Exposition Alignment
Right-of-Way ComparisonCCD I-25/Broadway Interchange Project 08-277-00 5/5/11
DRAFT
Environmental AssessmentRight-of-Way and ProposedRight-of-Way
LegendLegend
Environmental AssessmentRight-of-Way Not Requiredfor Current Design
Proposed Right-of-Wayin Addition toEnvironmentalAssessment
Parcels Under Evaluation
25
N o r t h
N o t t o S c a l e
RTDI-25 &
BroadwayStation
GATES
LIONSTONE
ALEXAN
Building 41
Exposit
ion
Exposit
ion
LincolnLincolnLincolnLincoln
ShermanSherman
GrantGrant
BroadwayBroadway
Ohio
Ohio
Kentucky
Kentucky
Kentucky
Kentucky
Tennessee
Tennessee A
riz
ona
Ariz
ona
CMLCMLLight RailLight Rail
Ligh
t Rail
Ligh
t Rail
Mis
sis
sip
pi
Mis
sis
sip
pi
LoganLogan
ShermanSherman
GrantGrant
LoganLogan
B
B
B
B
B
Incorporate rich transportation history of the area with interpretive
stories through text inscribed in the Transportation Trail pavement
Reuse of 1,178 l.f. of existing stone curbs within project limits in landscaped and pedestrian areas
Drought-tolerant street trees
Safe pedestrian crossings with adequate refuge space
Reduce walking time from Ohio/Lincoln to Broadway LRT Station
Drought-tolerant native plants
Water quality ponds increase porous landscape infiltration areas
and are sized to treat runoff greater than the project needs to achieve
regional stormwater detention
Salvaged material incorporated into landscape art concepts
Consolidate street trees in pits for efficient water use and optimal plant growth
Improved sidewalk, crosswalk and pedestrian ramp connectivity
Limit uplighting in non-covered areas
B-Cycle Station recommended at Broadway LRT Station
Durable and flexible streetscape concept reinforces district identity
Full shelters and lighting provided at bus stops to promote transit ridership and walkability
Increase trees in project area from 93 to 362
Use 20-30% fly ash in concrete to reduce pollution and materials sent to landfills
Traffic signals are coordinated and lanes are configured to reduce idling of vehicle engines
Recycle or salvage 100% of asphalt and concrete pavements from existing roadway in project area
Use of concrete instead of asphalt to reduce heat island effect
SHRUB BED (20,220 SF PERVIOUS)
MEDIANRECYCLED MSE PANEL AS PAVER
BUS STOP SHELTER (5)
OPEN-CELL CONCRETE (35,200 SF PERVIOUS)
TREE GRATES AT TREES IN AMENITY ZONE
LAWN OR NATIVE GRASS (85,630 SF PERVIOUS)
CRUSHED STONE PAVING (86,850 SF PERVIOUS)
AMENITY ZONE
LEGEND
CONCRETE WALKPROPOSED TREE (362)
B
N o r t h
N o t t o S c a l e
Sustainable StrategiesCCD I-25/Broadway Interchange Project 08-277-00 - 5/5/2011
LLLLLLLLLogogananoooggaaann LLLLLLLogogoggananannoooogggggaaaannnnn
GGGGGGGGGrarantntrrraaannnnnttttt GGGGGGGrararaantntntrrrraaaaannnnnnnttttttt
LLLLLLLigigightht iiiigggghhgghththhttht RRRRRaiaillaiaiaaiaiilliilll
CCCCCMMMMMLLLLL
LLLLLLLLigigigighthththttt
igigigigiigiggghhhggggh
ththththhthttttRRRRRRRRRaiiaiailllaiaiaia llaiaiiiailllaiillllllilllaiaiillllIII 2-2-2-2-252255525-2-2222-2-255255525552255552255
EEEExpxppos
itiiioiooo
nnnnxxxpppp
oossitii
iiiiiitt
iiioooonnnnooooonnnnn
OOOOOOOhihihi
ooohhhhiiii
oooo
KKKKKKKenenenn
tututkckkyyy
eeeennnnnttuuu
cckkkkkyyyyyykkyyyy
KKKKKKKKenenenen
tutututuuckkckckckc
yyyyyyyyyyeeeeennnn
tttttuuuuuuccccckkkkkkkkkkk
yyyyyyyyykkyyyyyyyy
TTTTTTenenennenee
sssssssseeeeee
eeeennnnnnneeee
sssssssssseeeeeeee
Mi
Mii
Mi
Mi
Mi
Miis
sssisisiiiiii
isisisisiipppppppppppppppp
iiiiiiMMMMMM
iiiiiiiissssssiiiiiiii
sssiisisisiippppppp
ssssiiiiiiippppppppppppppp
iiiiiiiippppppppiiiiiiiii
ShShherrmamamm nnnSSShhheerrrmamamammmmmmaaaannnnnnnnn ShShherermamamannnSSShhhheeerrrmamamammmmaaaannnnnnn
Alexan
Gates
Lionstone
RTDI-25 and Broadway Station
LLLLLLLiinincocolnlnllniiiinnncccooolnlllnlllllnnn LLLLLLLininincococollnlniiiinnnnccccoooollllnnn
BBBBBBBBBroroadadwawayyyyyrrroooaaaddwawayydddwawawwaawayyyayyyyaayyyyy
Denver Design District
LEGEND
To Trail and River
To Washington Park
To Washington Park
To F
utur
e D
evel
opm
ent
To Future Development
To RTD Station
To Washington Park
To D
ownt
own
To S
outh
Bro
adw
ay
Bus
ines
ses
PRIMARY ROUTE
ACOMA ROUTE (FUTURE)
CCD DESIGNATED BIKE ROUTE D-9
SECONDARY ROUTE
CONNECTION TO SOUTH PLATTE TRAIL
N o r t h
N o t t o S c a l e
Multi-Use Paths: Pedestrian and Bike ConnectionsCCD I-25/Broadway Interchange Project 08-277-00 - 5/5/2011
LLLLLLLLLogogogannnaaooooggggaaaann LLLLLoggganooggaann
GGGGGGGGGGGGrarararrr ntnrrrrrrraaannnnnnnttttt GGGGGGGGrarantnttntrrraaannnnnnnnnttttttttt
LLLighth iigghhgghththhtht RRRailaiaiaiailliill
CCCCCCCCCCCMMMMMMMMLLLLLLL
LLLLLLLLLLLLLLigigigigigighththththtt
igigigigigigigigigigigghhhhhhgggggh
ththththhththththtttRRRRRRRRRRRRRRaiaiaiaiailllllaiaiaiaiaiailaiaiaiaiaillllaiillllllillllllaiaiillllllIIIIII 2-2-2-2-25255525-2-2222-2-255225555552555552225555552255
EEEEEEExpxpxposoo
itiioiooiooo
nnnnxxxxpppp
oooossitti
iiiiiittt
iiiiiooonnnnnnoooooonnnnnnn
OOOhihh
ohhii
oo
KKKennnnnn
tuttckkkckck
yyyeennnnnnn
tttuuccckkkkk
yyyyykkyyyy
KKKKKKKKKKKenenenennen
tututututututuuckckckckkckckkc
yyyyyyyyyeeeeennnnn
tttttttuuuuuuuuuccccccckkkkkkkkkkkkkkkkkkkk
yyyyyyyyyyykkyyyyyyyy
TTTenn
enenssssss
eeeeenn
nnnneeessssssss
eeeeeeeeeeeeeee
Mi
Mi
Mi
Mis
ssssisisisisi
sisiiippppppppppppppppppppppppppp
iiiiiiMMMM
iiiisssssssiiiiii
sssssiiiiiippppppppppssiiiiiiipppppppppppppppppp
iiiiiiippppppppppiiiiiiii
ShShShhheererrrmamamamamamannnSSShheerrrrrmamamammmmmmmmmmaaaaaannnnnnn ShSS ermaamaaanSSSShheerrmammaaammmmaaaaaannn
Alexan
Gates
Lionstone
RTDI-25 and Broadway Station
Denver Design District
LLLLLLininiinincocoooooooolnlnlnlnlnlnlniiiiinnnnccooooooooolnlnlnlnlnlnlnnnlnlllllllllnnnnnnnnnnn LLLincolniinnccoollnn
BBBrorr adaaaaaaaaaaa wawwwwwwwwwwww yyrrrrooaaaaaaaaaadwawwwwwwwwwww yddwawawwwwwwwwwwwwawayyayaayy
Broadway/I-25 Interchange OverviewCCD I-25/Broadway Interchange Project 08-277-00 5/5/11
DRAFT
ExistingExistingConditionsConditions
PlannedPlannedImprovementsImprovements
Broadway/I-25 Interchange OverviewCCD I-25/Broadway Interchange Project 08-277-00 5/5/11
DRAFT
ExistingExisting ProposedProposed
View from Lincoln &View from Lincoln &Ohio - Looking SWOhio - Looking SW
View from CML - View from CML - Looking EastLooking East
View from I-25 -View from I-25 -Looking SouthLooking South
View from BroadwayView from BroadwayUnder I-25 -Under I-25 -Looking SouthLooking South
25
N o r t h
N o t t o S c a l e
RTDI-25 &
BroadwayStation
GATES
FordBuilding
Exposition
Lin
coln
Lin
coln
Sherman
Broadw
ay
Broadw
ay
OhioOhio
KentuckyKentucky
KentuckyKentucky
TennesseeCM
LC
MLig
ht R
ail
Lig
ht R
ail
2
Light R
ail
Grant
Grant
Logan
Logan
Historic Trolley Track - Mitigation Concepts
Proposed Historic Interpretation Locations
Examples of Historic Interpretation Locations
Interpretive Signage
Special Concrete Finishes -Trails/Sidewalks
nessee
Light
HistoricHistoricSignsSigns
Inlaid Rail - for Trails/Sidewalks
Final design of the project will determine appropriate mitigation for the historic
Broadway Trolley Line
CCD I-25/Broadway Interchange Project 08-277-00 5/5/11
DRAFT
man
HistoricHistoricInterpretiveInterpretiveSignSign
HistoricHistoricInterpretiveInterpretiveSignSign
Trolley Trolley TrailTrail