WELCOME TO Our Presentation. Topic Labor Cost The Workforce Behind This Presentation NameID Sunayan...

19
WELCOME TO Our Presentation

Transcript of WELCOME TO Our Presentation. Topic Labor Cost The Workforce Behind This Presentation NameID Sunayan...

Page 1: WELCOME TO Our Presentation. Topic Labor Cost The Workforce Behind This Presentation NameID Sunayan Kanti PaulBBA 02707063 MD. Mehedi AliBBA 02707102.

WELCOME TO

Our Presentation

Page 2: WELCOME TO Our Presentation. Topic Labor Cost The Workforce Behind This Presentation NameID Sunayan Kanti PaulBBA 02707063 MD. Mehedi AliBBA 02707102.

Topic

Labor Cost

Page 3: WELCOME TO Our Presentation. Topic Labor Cost The Workforce Behind This Presentation NameID Sunayan Kanti PaulBBA 02707063 MD. Mehedi AliBBA 02707102.

The Workforce Behind This Presentation

Name IDSunayan Kanti Paul BBA 02707063

MD. Mehedi Ali BBA 02707102

Sayeda Amena Akhter BBA02707050

Umme Tasnuba BBA 02707065

MD.Mahbub Hossain BBA 02707093

Page 4: WELCOME TO Our Presentation. Topic Labor Cost The Workforce Behind This Presentation NameID Sunayan Kanti PaulBBA 02707063 MD. Mehedi AliBBA 02707102.

Labor Cost

Labor cost represents the human contribution to production . It is an important cost factor requiring constant measurement, control and analysis.

Page 5: WELCOME TO Our Presentation. Topic Labor Cost The Workforce Behind This Presentation NameID Sunayan Kanti PaulBBA 02707063 MD. Mehedi AliBBA 02707102.

Illustration

Labor cost consists

Basic Pay Fringe Benefits

Page 6: WELCOME TO Our Presentation. Topic Labor Cost The Workforce Behind This Presentation NameID Sunayan Kanti PaulBBA 02707063 MD. Mehedi AliBBA 02707102.

Basic Pay : The basic pay for work performed is called the base rate or job rate.

Fringe Benefits : Fringe cost contains incremental pay, holiday pay, vacation pay, overtime premium pay, and cost living adjustment , must be added to the base rate in order to arrived at the full labor cost.

Page 7: WELCOME TO Our Presentation. Topic Labor Cost The Workforce Behind This Presentation NameID Sunayan Kanti PaulBBA 02707063 MD. Mehedi AliBBA 02707102.

Incentive Wage Plan

Incentive wage plan is a work system where workers can get their extra benefits for the extra output than the standard one.

Page 8: WELCOME TO Our Presentation. Topic Labor Cost The Workforce Behind This Presentation NameID Sunayan Kanti PaulBBA 02707063 MD. Mehedi AliBBA 02707102.

ImplementationFor the succession of this plan there are some conditions and situations where these must be applied.

Such-In which a worker can increase output.More pay for output above standard.Set fair standards so that extra efforts will result in bonus pay.Result in immediate reward every payday.

Page 9: WELCOME TO Our Presentation. Topic Labor Cost The Workforce Behind This Presentation NameID Sunayan Kanti PaulBBA 02707063 MD. Mehedi AliBBA 02707102.

Purpose of Incentive Wage Plan

For a company or organization To increase output To reduce unit cost To increase efficiency ratio

of productivity To increase business

profits

For workers To earn a higher wage

Page 10: WELCOME TO Our Presentation. Topic Labor Cost The Workforce Behind This Presentation NameID Sunayan Kanti PaulBBA 02707063 MD. Mehedi AliBBA 02707102.

Types of Incentive Wage Plan

Straight Piecework Plan : According to this plan, workers get or organization pays wages above the base rate for production above the standards.

100% Bonus Plan :The main focus of this plan on the time instead of price per piece. The worker is paid for the standard time at the hourly rate if the job or unit is completed in standard time or less.

Page 11: WELCOME TO Our Presentation. Topic Labor Cost The Workforce Behind This Presentation NameID Sunayan Kanti PaulBBA 02707063 MD. Mehedi AliBBA 02707102.

Group Bonus Plan : This plans, like those designed for individual incentive, are intended to encourage production at rates above a minimum standard.

Page 12: WELCOME TO Our Presentation. Topic Labor Cost The Workforce Behind This Presentation NameID Sunayan Kanti PaulBBA 02707063 MD. Mehedi AliBBA 02707102.

Particular Plan Under Particular Situation

Straight Piecework Plan : 4 minutes is the standard time required for producing one unit, the standard rate is 15 pieces per hour, workers base pay is $6.36 per hour.

Piece Rate = = $.424

Units Per Guaranteed Additional Total Labor Cost

Hour Payment Payment Payment Per Unit

12 $6.36 -- $6. 36 0.530

15 ,, -- $6. 36 0.424

19 ,, 1.68 $8. 04 0.423

$6.36

15

Page 13: WELCOME TO Our Presentation. Topic Labor Cost The Workforce Behind This Presentation NameID Sunayan Kanti PaulBBA 02707063 MD. Mehedi AliBBA 02707102.

•100% Bonus Plan :

Hours Effici- * L.C. Consu- Actual Standard ency Base Total PerWorker med Output Output Ratio(b) Rate(a) a*b Earened Unit

X 40 540 600 . 90 $7.50 --- $300 $.5556

Y 40 660 600 1.10 ,, --- 330 $.5000

Z 40 800 600 1.33 ,, --- 399 $.4988

*Efficiency Ratio =

*When the efficiency ratio is above 1 then this is applicable otherwise no bonus is earned

Actual

Standard

Page 14: WELCOME TO Our Presentation. Topic Labor Cost The Workforce Behind This Presentation NameID Sunayan Kanti PaulBBA 02707063 MD. Mehedi AliBBA 02707102.

•Group Bonus Plan:

Here, Worker = 10

Actual hours = 80

Regular Group Wage = $800

Each is paid $10 an hour for a regular 8 hour shift

Units Standard Bonus (Hrs. Total Group Labor Cost Produced Hours saved@ $10) Earnings Per Unit

350 70 $ 0 800 $2.286

425 85 $ 50 850 $2.000

Page 15: WELCOME TO Our Presentation. Topic Labor Cost The Workforce Behind This Presentation NameID Sunayan Kanti PaulBBA 02707063 MD. Mehedi AliBBA 02707102.

Learning Curve Theory

The learning curve theory specify that every time the cumulative quantity of units produced is doubled, the cumulative average time per unit is reduced by a given percentage.

Page 16: WELCOME TO Our Presentation. Topic Labor Cost The Workforce Behind This Presentation NameID Sunayan Kanti PaulBBA 02707063 MD. Mehedi AliBBA 02707102.

Other Stimulations

Overtime Earnings : It consists two elements such-

a) The regular pay due for the employee's work and

b) The overtime premium pay

Page 17: WELCOME TO Our Presentation. Topic Labor Cost The Workforce Behind This Presentation NameID Sunayan Kanti PaulBBA 02707063 MD. Mehedi AliBBA 02707102.

Bonus Payment : It can be paid to employee in such ways – fixed amount or a percentage of profits, a fraction of one month wages or some other calculated amount.

Vacation Pay : It is given on the vacation.

Page 18: WELCOME TO Our Presentation. Topic Labor Cost The Workforce Behind This Presentation NameID Sunayan Kanti PaulBBA 02707063 MD. Mehedi AliBBA 02707102.

Organization for Labor Cost Accountingand Control

The employment history of each worker – date hired, wage rate, vacation, sickness, promotions, tardiness and so on.

The establishment of labor time and cost standards for comparative purpose.

Productivity in relation to type of wage payment. The output of accomplishment of each worker. Total labor cost in each department for each

payroll period.

Labor costing procedures involve :