Welcome to HRC Bagh

Workshop on Safer Building Through Improving

Steel Detailing

Page 3: Welcome to HRC Bagh Workshop on Safer Building Through Improving Steel Detailing.

Objective• To understand the recommended practices

with reference to earthquake resistant techniques to make their houses safe;

• To improve steel detailing in in building construction;

• To sensitize the stakeholders to adopt earthquake safer techniques;

• To ensure the effective technology transfer to the target groups.

Page 4: Welcome to HRC Bagh Workshop on Safer Building Through Improving Steel Detailing.
Page 5: Welcome to HRC Bagh Workshop on Safer Building Through Improving Steel Detailing.

WELCOME

Bagh Seismic zone

Page 6: Welcome to HRC Bagh Workshop on Safer Building Through Improving Steel Detailing.

Destruction In Earthquake

Page 7: Welcome to HRC Bagh Workshop on Safer Building Through Improving Steel Detailing.

7

RC Frame Buildings

DHQH Bagh

Page 8: Welcome to HRC Bagh Workshop on Safer Building Through Improving Steel Detailing.

8

RC Frame Buildings

Page 9: Welcome to HRC Bagh Workshop on Safer Building Through Improving Steel Detailing.

9

RC Frame Buildings

Margalla Tower

Page 10: Welcome to HRC Bagh Workshop on Safer Building Through Improving Steel Detailing.

Earthquake 2005

Ring Spacing

Page 11: Welcome to HRC Bagh Workshop on Safer Building Through Improving Steel Detailing.

Ring Problem

Page 12: Welcome to HRC Bagh Workshop on Safer Building Through Improving Steel Detailing.

Our Practice?

Page 13: Welcome to HRC Bagh Workshop on Safer Building Through Improving Steel Detailing.

Spacing of StirrupsEffects

Page 14: Welcome to HRC Bagh Workshop on Safer Building Through Improving Steel Detailing.

Common Practice

New

Page 15: Welcome to HRC Bagh Workshop on Safer Building Through Improving Steel Detailing.

Recommended Spacing

Ring Spacing= 4″

Page 16: Welcome to HRC Bagh Workshop on Safer Building Through Improving Steel Detailing.

Recommended Shape of Seismic Stirrup

3″

135°

Such stirrups do not open even during strong shaking

Page 17: Welcome to HRC Bagh Workshop on Safer Building Through Improving Steel Detailing.

Column “L” AND Base

Page 18: Welcome to HRC Bagh Workshop on Safer Building Through Improving Steel Detailing.

Deficient Length of “L”

Page 19: Welcome to HRC Bagh Workshop on Safer Building Through Improving Steel Detailing.

19

Proper Column Base

“L” Should be= 12 inch

Page 20: Welcome to HRC Bagh Workshop on Safer Building Through Improving Steel Detailing.

Beam To Column Joint

Page 21: Welcome to HRC Bagh Workshop on Safer Building Through Improving Steel Detailing.

Wrong Practices

Page 22: Welcome to HRC Bagh Workshop on Safer Building Through Improving Steel Detailing.

Results

Page 23: Welcome to HRC Bagh Workshop on Safer Building Through Improving Steel Detailing.

Beam To Column Joint at lintel Level

Page 24: Welcome to HRC Bagh Workshop on Safer Building Through Improving Steel Detailing.

Our Practice

MistakeResult

Page 25: Welcome to HRC Bagh Workshop on Safer Building Through Improving Steel Detailing.

Interior Beam-Column Joint

Beam long bar should passed from the center of column

0‘-6"

Page 26: Welcome to HRC Bagh Workshop on Safer Building Through Improving Steel Detailing.

Wrong Practice

Is it ok?

Page 27: Welcome to HRC Bagh Workshop on Safer Building Through Improving Steel Detailing.

Proper Plinth Corner Joint

Page 28: Welcome to HRC Bagh Workshop on Safer Building Through Improving Steel Detailing.

Band To Column Joint at corner

Page 29: Welcome to HRC Bagh Workshop on Safer Building Through Improving Steel Detailing.

Right way at middle/ Junction

Minimum= 2 Feet

Page 30: Welcome to HRC Bagh Workshop on Safer Building Through Improving Steel Detailing.

OVERLAPPING

Page 31: Welcome to HRC Bagh Workshop on Safer Building Through Improving Steel Detailing.

31

Length of vertical bar not Length of vertical bar not sufficient for 2sufficient for 2ndnd Storey Storey

Practice still continued

Page 32: Welcome to HRC Bagh Workshop on Safer Building Through Improving Steel Detailing.

Why column fails?

Page 33: Welcome to HRC Bagh Workshop on Safer Building Through Improving Steel Detailing.

Proper way of Lapping

Min 4‘-0"

Sufficient lapping lengthSufficient lapping length

Within lapping length, Within lapping length, stirrups at closer spacingstirrups at closer spacing

Location at mid Location at mid heightheight

Not more than 50 % bars Not more than 50 % bars lapped at a sectionlapped at a section

Page 34: Welcome to HRC Bagh Workshop on Safer Building Through Improving Steel Detailing.

Our Practice (New)

Lap length is 15”

Page 35: Welcome to HRC Bagh Workshop on Safer Building Through Improving Steel Detailing.

Overlapping in Beam

Recommended Overlap should be equal to= 60 x D

Page 36: Welcome to HRC Bagh Workshop on Safer Building Through Improving Steel Detailing.

Identify Reasons?

Page 37: Welcome to HRC Bagh Workshop on Safer Building Through Improving Steel Detailing.

Framing around opening

NewAfter Remedy

Page 38: Welcome to HRC Bagh Workshop on Safer Building Through Improving Steel Detailing.

Infill Walls Connection With? Before OCT 2005

Page 39: Welcome to HRC Bagh Workshop on Safer Building Through Improving Steel Detailing.

39

Tie-up of Walls

Page 40: Welcome to HRC Bagh Workshop on Safer Building Through Improving Steel Detailing.

40

Tie-up of Walls

Page 41: Welcome to HRC Bagh Workshop on Safer Building Through Improving Steel Detailing.

Why crack develop?Beam bar not bent up near support to overcome negative movement

Page 42: Welcome to HRC Bagh Workshop on Safer Building Through Improving Steel Detailing.

Why crack develop?

Page 43: Welcome to HRC Bagh Workshop on Safer Building Through Improving Steel Detailing.

Bent up bars

Page 44: Welcome to HRC Bagh Workshop on Safer Building Through Improving Steel Detailing.

What is Our Practice

Construct beam and slab togetherConstruct beam and slab together

Page 45: Welcome to HRC Bagh Workshop on Safer Building Through Improving Steel Detailing.

Commonly used steel reinforcementCommonly used steel reinforcementMild Steel Mild Steel High Strength Deformed Bar High Strength Deformed Bar

Should be free from loose mill scale, loose Should be free from loose mill scale, loose rust, coat of paints and oils, cracks, rust, coat of paints and oils, cracks, surface flaws, laminations etcsurface flaws, laminations etcShould comply with requirement of Should comply with requirement of dimension and weight dimension and weight Should not break while bendingShould not break while bending

Steel ReinforcementSteel Reinforcement

Page 46: Welcome to HRC Bagh Workshop on Safer Building Through Improving Steel Detailing.

Simple Steel Quality Test

Making close hook 4d and bent the bar at 180 degree then straight it. Good quality bar doesn't break, while bad quality steel breaks.

Page 47: Welcome to HRC Bagh Workshop on Safer Building Through Improving Steel Detailing.

SpacersConcrete Cover

Column= 1.5″

Beam= 1.5″

Slab=3/4″

Foundation=3″