Welcome to
![Page 2: Welcome [] · KMF divided into HIGH GRADE and ...](https://reader031.fdocuments.us/reader031/viewer/2022020114/5b51e3dc7f8b9a6b118cad02/html5/thumbnails/2.jpg)
Presentation 12 April 2005 Presentation 12 April 2005
ASSMANG MANGANESE
![Page 3: Welcome [] · KMF divided into HIGH GRADE and ...](https://reader031.fdocuments.us/reader031/viewer/2022020114/5b51e3dc7f8b9a6b118cad02/html5/thumbnails/3.jpg)
CONTENTS CONTENTS l Introduction and Geology l Ore Resources l Mining Processes & Capabilities l Recent History l The Future
![Page 4: Welcome [] · KMF divided into HIGH GRADE and ...](https://reader031.fdocuments.us/reader031/viewer/2022020114/5b51e3dc7f8b9a6b118cad02/html5/thumbnails/4.jpg)
Assmang Assmang Introduction Introduction
Assmang’s manganese mining operations are
situated in the Northern Cape
Province of South Africa.
Cato Ridge
Port Elizabeth
Black Rock Mine Operations
Cape Town
J ohann esburg
Durban
![Page 5: Welcome [] · KMF divided into HIGH GRADE and ...](https://reader031.fdocuments.us/reader031/viewer/2022020114/5b51e3dc7f8b9a6b118cad02/html5/thumbnails/5.jpg)
Introduction to Introduction to ASSMANG ASSMANG
l Operates in the Northern Cape Province
l High Grade Manganese at Nchwaning
l Low Grade Manganese at Gloria
l Exports ore through Port Elizabeth and Durban l Supplies Assmang Subsidiary Feralloys plant at Cato Ridge
Beeshoek
Black Rock
![Page 6: Welcome [] · KMF divided into HIGH GRADE and ...](https://reader031.fdocuments.us/reader031/viewer/2022020114/5b51e3dc7f8b9a6b118cad02/html5/thumbnails/6.jpg)
KMF divided into HIGH GRADE and LOW GRADE areas
Two major grades required by
World Market: High + 48 Mn Low + 38 Mn
Inhomogeneous grade
distribution within each area
Mamatwan *
Wessels * * Nchwaning 2
Gloria *
Nchwaning 3 *
Preparation for converting to the new mining licence has reached an advanced stage
![Page 7: Welcome [] · KMF divided into HIGH GRADE and ...](https://reader031.fdocuments.us/reader031/viewer/2022020114/5b51e3dc7f8b9a6b118cad02/html5/thumbnails/7.jpg)
STRATIGRAPHIC STRATIGRAPHIC COLUMN OF COLUMN OF THE KMF THE KMF
![Page 8: Welcome [] · KMF divided into HIGH GRADE and ...](https://reader031.fdocuments.us/reader031/viewer/2022020114/5b51e3dc7f8b9a6b118cad02/html5/thumbnails/8.jpg)
HOTAZEL HOTAZEL FORMATION FORMATION
NO 1 Mn OREBODY
NO 2 Mn OREBODY
Mn MARKER Manganese Orebodies 6 m thick.
Parting between No1 and No 2 orebody = 20 m
No 2 body lower in Mn and Higher in Fe
![Page 9: Welcome [] · KMF divided into HIGH GRADE and ...](https://reader031.fdocuments.us/reader031/viewer/2022020114/5b51e3dc7f8b9a6b118cad02/html5/thumbnails/9.jpg)
GLORIA MINING AREA GLORIA MINING AREA
CURRENT MINING DEVELOPMENT
![Page 10: Welcome [] · KMF divided into HIGH GRADE and ...](https://reader031.fdocuments.us/reader031/viewer/2022020114/5b51e3dc7f8b9a6b118cad02/html5/thumbnails/10.jpg)
NCHWANING MINING AREA NCHWANING MINING AREA
CURRENT MINING DEVELOPMENT
![Page 11: Welcome [] · KMF divided into HIGH GRADE and ...](https://reader031.fdocuments.us/reader031/viewer/2022020114/5b51e3dc7f8b9a6b118cad02/html5/thumbnails/11.jpg)
CONTENTS CONTENTS l Introduction and Geology l Ore Resources
– Gloria – Nchwaning Orebody No 1 – Nchwaning Orebody No 2
l Mining Processes & Capabilities l Recent History l The Future
![Page 12: Welcome [] · KMF divided into HIGH GRADE and ...](https://reader031.fdocuments.us/reader031/viewer/2022020114/5b51e3dc7f8b9a6b118cad02/html5/thumbnails/12.jpg)
GLORIA MINING AREA RESOURCES GLORIA MINING AREA RESOURCES
GRADE DISTRIBUTION Mn < 36 %
Mn 36 38 %
Mn > 38 %
GRADE Measured Indicated Inferred Total > 38% 7,690,930 65,128,908 38,597,425 111,417,263 36 38% 1,864,250 17,608,171 10,435,152 29,907,573 < 36% 31,126 243,452 21,220,071 21,494,649 TOTAL 9,586,306 82,980,531 70,252,648 162,819,485
![Page 13: Welcome [] · KMF divided into HIGH GRADE and ...](https://reader031.fdocuments.us/reader031/viewer/2022020114/5b51e3dc7f8b9a6b118cad02/html5/thumbnails/13.jpg)
NCHWANING MINING AREA NCHWANING MINING AREA – – No 1 Ore body No 1 Ore body
Mn < 46 % Mn 46 48 % Mn > 48 %
GRADE Measured Indicated Inferred Total > 48% 3,299,083 63,780,416 67,079,499 46 48% 1,564,436 10,999,802 12,564,238 < 46% 3,983,415 64,588,325 68,571,740 TOTAL 8,846,934 139,368,543 148,215,477
![Page 14: Welcome [] · KMF divided into HIGH GRADE and ...](https://reader031.fdocuments.us/reader031/viewer/2022020114/5b51e3dc7f8b9a6b118cad02/html5/thumbnails/14.jpg)
NCHWANING MINING AREA NCHWANING MINING AREA – – No 2 Ore body No 2 Ore body
Mn < 46 % Mn 46 48 %
GRADE Measured Indicated Inferred Total > 48% 0 46 48% 1,845,834 1,845,834 < 46% 180,112,897 180,112,897 TOTAL 181,958,731 181,958,731
![Page 15: Welcome [] · KMF divided into HIGH GRADE and ...](https://reader031.fdocuments.us/reader031/viewer/2022020114/5b51e3dc7f8b9a6b118cad02/html5/thumbnails/15.jpg)
CONTENTS CONTENTS l Introduction and Geology l Ore Resources l Mining Processes & Capabilities l Recent History l The Future
![Page 16: Welcome [] · KMF divided into HIGH GRADE and ...](https://reader031.fdocuments.us/reader031/viewer/2022020114/5b51e3dc7f8b9a6b118cad02/html5/thumbnails/16.jpg)
ROOM & PILLAR MINING ( 7 x 7 m pillars, 8 m wide Roadways)
BLASTING ON DAY SHIFT ( Face advance between 3.3 and 4.0 m)
12 t LHD & 25 t BELL TRUCKS MOVE ORE TO NEAREST CONVEYOR
UNDERGROUND CRUSHING TO –150 mm
![Page 17: Welcome [] · KMF divided into HIGH GRADE and ...](https://reader031.fdocuments.us/reader031/viewer/2022020114/5b51e3dc7f8b9a6b118cad02/html5/thumbnails/17.jpg)
WASHING & SCREENING PLANT ON SURFACE
ORE IS SPLIT INTO VARIOUS SIZE FRACTIONS
SURFACE STOCKPILES @ 300 – 400 t EACH TRACKED ON COMPUTER
SELECTED SURFACE STOCKPILES LOADED ONTO TRAINS
![Page 18: Welcome [] · KMF divided into HIGH GRADE and ...](https://reader031.fdocuments.us/reader031/viewer/2022020114/5b51e3dc7f8b9a6b118cad02/html5/thumbnails/18.jpg)
INSTALLED CAPACITIES INSTALLED CAPACITIES l Total current hoisting capabilities are 5.8 mtpa – Nch 2 vertical # @ 1.6 Mtpa (High Grade) – Nch 3 decline @ 2.8 Mtpa (High Grade) – Gloria decline @ 1.4 Mtpa (Low Grade)
l Current surface plant capacities are 4.5 Mpta – Gloria Surface plant @ 1.83 Mtpa – Nchwaning surface plant @ 2.67 Mtpa
l Ore loading and Rail capacity ± 3.5 Mtpa l Estimated capacity of Port Elizabeth Harbour ± 4.2 Mtpa
![Page 19: Welcome [] · KMF divided into HIGH GRADE and ...](https://reader031.fdocuments.us/reader031/viewer/2022020114/5b51e3dc7f8b9a6b118cad02/html5/thumbnails/19.jpg)
CONTENTS CONTENTS l Introduction and Geology l Ore Resources l Mining Processes & Capabilities l Recent History
– Financials – Nchwaning 3 project
l The Future
![Page 20: Welcome [] · KMF divided into HIGH GRADE and ...](https://reader031.fdocuments.us/reader031/viewer/2022020114/5b51e3dc7f8b9a6b118cad02/html5/thumbnails/20.jpg)
OPERATING PROFIT/REVENUE OPERATING PROFIT/REVENUE RATIO RATIO
46.58%
39.05%
44.28%
54.75%
45.53%
28.81%
0.00%
10.00%
20.00%
30.00%
40.00%
50.00%
60.00%
98/99 99/00 00/01 '01/02 '02/03 '03/04
![Page 21: Welcome [] · KMF divided into HIGH GRADE and ...](https://reader031.fdocuments.us/reader031/viewer/2022020114/5b51e3dc7f8b9a6b118cad02/html5/thumbnails/21.jpg)
OPERATING PROFIT (R 000) OPERATING PROFIT (R 000)
R234,557
R168,202
R239,416
R401,312
R333,545
R207,227
R0 R50,000 R100,000 R150,000 R200,000 R250,000 R300,000 R350,000 R400,000 R450,000
98/99 99/00 00/01 '01/02 '02/03 '03/04
![Page 22: Welcome [] · KMF divided into HIGH GRADE and ...](https://reader031.fdocuments.us/reader031/viewer/2022020114/5b51e3dc7f8b9a6b118cad02/html5/thumbnails/22.jpg)
REVENUE (R 000) REVENUE (R 000)
R503,603
R430,740
R540,718 R732,997
R732,529
R719,314
R0
R100,000
R200,000
R300,000
R400,000
R500,000
R600,000
R700,000
R800,000
98/99 99/00 00/01 '01/02 '02/03 '03/04
![Page 23: Welcome [] · KMF divided into HIGH GRADE and ...](https://reader031.fdocuments.us/reader031/viewer/2022020114/5b51e3dc7f8b9a6b118cad02/html5/thumbnails/23.jpg)
RECENT COST/TON FIGURES RECENT COST/TON FIGURES R170
R163
R140 R158 R175
R168
R0 R20 R40 R60 R80 R100 R120 R140 R160 R180
98/99 99/00 00/01 '01/02 '02/03 '03/04
![Page 24: Welcome [] · KMF divided into HIGH GRADE and ...](https://reader031.fdocuments.us/reader031/viewer/2022020114/5b51e3dc7f8b9a6b118cad02/html5/thumbnails/24.jpg)
RECENT SALES PROFILE RECENT SALES PROFILE
1,475,060
1,360,171
1,444,961
1,403,615
1,581,560
1,794,155
0 200,000 400,000 600,000 800,000
1,000,000 1,200,000 1,400,000 1,600,000 1,800,000
98/99 99/00 00/01 '01/02 '02/03 '03/04
![Page 25: Welcome [] · KMF divided into HIGH GRADE and ...](https://reader031.fdocuments.us/reader031/viewer/2022020114/5b51e3dc7f8b9a6b118cad02/html5/thumbnails/25.jpg)
RECENT CAPITAL RECENT CAPITAL EXPENDITURE EXPENDITURE Rm Rm
80 93
85 110
218
0
50
100
150
200
250
99/00 00/01 '01/02 '02/03 '03/04
![Page 26: Welcome [] · KMF divided into HIGH GRADE and ...](https://reader031.fdocuments.us/reader031/viewer/2022020114/5b51e3dc7f8b9a6b118cad02/html5/thumbnails/26.jpg)
NCHWANING 3 – Objectives
l Achieve a 20% reduction in unit operating cost
l Loader and hauler operations are to be separated
l Underground facilities required to handle multiple grades simultaneously
l Minimize ore handling between face and surface plant
![Page 27: Welcome [] · KMF divided into HIGH GRADE and ...](https://reader031.fdocuments.us/reader031/viewer/2022020114/5b51e3dc7f8b9a6b118cad02/html5/thumbnails/27.jpg)
Nchwaning 3
Shaft infra structure
l WHY ? – To replace diminishing reserves
– Establish low cost mine
– Provide for Future Growth
l WHAT ? – Men & Material Shaft
5.6m dia & 419m deep
– Vent shaft 5.6m raisebored
– Decline 4.4 x 8.2m x 2200 m @ 11.5
degrees
![Page 28: Welcome [] · KMF divided into HIGH GRADE and ...](https://reader031.fdocuments.us/reader031/viewer/2022020114/5b51e3dc7f8b9a6b118cad02/html5/thumbnails/28.jpg)
NCHWANING 3 PROJECT STATUS
l Project Start Date was June 1999 l Planned completion date August 2003 l Revised completion date March 2005 l Planned capital cost R 517 million l Revised capital cost R 775 million l Delays and Additional costs due to:
– Design changes – Delays due to water and ground conditions – Main contractor defaulting
![Page 29: Welcome [] · KMF divided into HIGH GRADE and ...](https://reader031.fdocuments.us/reader031/viewer/2022020114/5b51e3dc7f8b9a6b118cad02/html5/thumbnails/29.jpg)
26 May 2004 First production of high grade ore from the underground mining operation
![Page 30: Welcome [] · KMF divided into HIGH GRADE and ...](https://reader031.fdocuments.us/reader031/viewer/2022020114/5b51e3dc7f8b9a6b118cad02/html5/thumbnails/30.jpg)
NCHWANING 3 PROJECT Contingency plan
l In order to offset the negative effects of the delayed project a temporary ore pass was introduced
l This allowed for 409 633 production tons since 26 May 2004
l All the production was specifically suited to Cato Ridge, resulting in improved efficiencies.
![Page 31: Welcome [] · KMF divided into HIGH GRADE and ...](https://reader031.fdocuments.us/reader031/viewer/2022020114/5b51e3dc7f8b9a6b118cad02/html5/thumbnails/31.jpg)
Current Current Underground Underground Development Development
Decline Shaft
Persons Shaft Ventilation Shaft
Workshop
Crusher
Upper Silo Tunnel
Lower Silo Tunnel
Run of Mine Bunkers
![Page 32: Welcome [] · KMF divided into HIGH GRADE and ...](https://reader031.fdocuments.us/reader031/viewer/2022020114/5b51e3dc7f8b9a6b118cad02/html5/thumbnails/32.jpg)
The commissioning of the Nchwaning 3 mine marks the beginning of a new era in the long history of Assmang. The future of Assmang as a reliable supplier of high
quality manganese ore is assured.
![Page 33: Welcome [] · KMF divided into HIGH GRADE and ...](https://reader031.fdocuments.us/reader031/viewer/2022020114/5b51e3dc7f8b9a6b118cad02/html5/thumbnails/33.jpg)
CONTENTS CONTENTS l Introduction and Geology l Ore Resources l Mining Processes & Capabilities l Recent History l The Future
![Page 34: Welcome [] · KMF divided into HIGH GRADE and ...](https://reader031.fdocuments.us/reader031/viewer/2022020114/5b51e3dc7f8b9a6b118cad02/html5/thumbnails/34.jpg)
THE FUTURE THE FUTURE l ASSMANG have access to an excellent high grade orebody on the No 1 manganese seam.
l ASSMANG can relatively easily access and mine the No 2 medium grade orebody to supply blast and electric furnaces.
l ASSMANG has made significant capital investments to position for future demand.
l Sales volumes are increasing while operating costs are improving.
l ASSMANG is actively pursuing continuous improvement policies
![Page 35: Welcome [] · KMF divided into HIGH GRADE and ...](https://reader031.fdocuments.us/reader031/viewer/2022020114/5b51e3dc7f8b9a6b118cad02/html5/thumbnails/35.jpg)
FUTURE PLANS FUTURE PLANS l ASSMANG aims to be a reliable supplier of high grade ore for the next 30 years.
l ASSMANG aims to significantly grow market share in China by supplying medium grade to the blast and electric furnaces.
l This strategy could see a doubling of ore output within the next 6 to 8 years.
l ASSMANG is committed to optimising the available ore resources by constructing DMS and Sinter facilities by 2010.
l ASSMANG will remain aggressively involved in the logistics of ore transport and shipping to ensure the anticipated volume growth
![Page 36: Welcome [] · KMF divided into HIGH GRADE and ...](https://reader031.fdocuments.us/reader031/viewer/2022020114/5b51e3dc7f8b9a6b118cad02/html5/thumbnails/36.jpg)
CONCLUSION CONCLUSION l At ASSMANG energy is not
everything … …. it is the only thing.
l We do it better !