WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September...

29
WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012.

Transcript of WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September...

Page 1: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012.

WELCOME Asia BRTS Conference 2012

Ahmedabad

BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE.

6-8 September 2012.

Page 2: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012.

We would like to share with you

11 About Pimpri Chinchwad CityAbout Pimpri Chinchwad City

22 Institutional set up and key responsibilityInstitutional set up and key responsibility

33

44

Information about BRTS projects Information about BRTS projects

BRTS system BRTS system

Page 3: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012.

About Pimpri Chinchwad City

Page 4: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012.

• Located towards North of Pune

• Area of 181 sq. kms.

• Population: 1.7 million (approx)

• PCMC received “BEST CITY “ award 0n 13th December From GOI for its best performance in JnNURM

Pimpri Chinchwad at a Glance

• Area under Green Cover: 27%

• Aual Bunndget (2012-2013): Rs. 2862

Crs.

• Credit Rating: AA+ (SO) by CRISIL

Ratings (S&P)

Page 5: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012.

Vibrant city in the state of Maharashtra, India

• Strong industrial base

– Small & medium industrial units of about 6,000

– Large industrial units of about 50

– Auto and ancillary industrial Hub

Page 6: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012.

Presence of International IT Firms

Page 7: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012.

Social and recreational facilities• Strong Social Infrastructure with Municipal Hospitals and

Dispensaries, Public Gardens, Libraries, Auditoriums, Play grounds etc.

• Strong educational infrastructure including Municipal Schools, Medical, Engineering, IT and Management institutes.

Page 8: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012.

Population growth• The city has a population of about 1.7 millions growing over

7.2% p.a. (national average 2.1%) • Growth is fuelled by prospects of economic activity, good

quality of infrastructure services and strong connectivity to the industrial capital of India i.e. Mumbai

Population Growth

0

200,000

400,000

600,000

800,000

1,000,000

1,200,000

1951 1961 1971 1981 1991 2001

Year

Pop

ula

tion

PopulationGrowth ofPCMC

Page 9: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012.

Urban Sprawl Patterns & Future Growth Scenario - 2031

NOTE: MAP NOT TO SCALE

Pune CityHinjewadi IT Park

Talwade IT Park

Dehu

Talgaon

Chakan New International

Airport

Mumbai-Pune Exp Way

Projected Population for PCMC 29 lakhs (CDP) in 2031

Stage Year Area (Sq. km) % Increase

I 1991 70.64 -

II 2001 87.69 24.13

III 2007 173.07 97.37

Scenario 1 2021 288.30 66.58

Scenario 2 2031 371.10 28.72

Page 10: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012.

Institutional Set-up

Key Responsibilities

Page 11: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012.

Institutional set up• Pimpri – Chinchwad Municipal Corporation (PCMC) constituted in the

year 1982

• The body constitutes of

– Elected wing headed by – Mayor

– Administrative wing headed by – Municipal Commissioner

• We manage about 181 sq.kms of area through 4 Ward offices

• We have over 40 departments with a workforce of about 7500

employees

Page 12: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012.

Institutional set up

• We are fully e-governed Corporation• We have received International Organization of Standard

(ISO) Certification (ISO 9001:2008) for Quality Management System in March 2012.

Page 13: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012.

Responsible for• Area planning

• Infrastructure planning, implementation and operation & maintenance

of services in the areas of

• Water Supply,

• Sewerage and Sanitation,

• Solid Waste Management,

• Roads and Transportation,

• Street lighting,

• Health and recreational facilities,

• Education (134 primary and 18 secondary schools)

• Preservation of natural heritage (river conservation),

• Development of housing facility for urban poor/ slums.

Page 14: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012.

Vision

To make Pimpri Chinchwad, a city of and for the next generation

Economically vibrant, attracting top business houses

And to meet the requirements of all its citizens

A city to Live, Spend and Entertain

Page 15: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012.

Key initiatives taken • Promoting development

– Corridor densification along Bus Rapid Transit

System (BRTS), leveraging TDR

• Providing infrastructure ahead of its time

– Implementing Rs. 26000 Millions projects

sanctioned by JNNURM

– Providing water security

– Investments in sanitation and waste management

• Making the city slum free

– Slum rehabilitation and EWS housing to provide

32,000 houses

• E Initiatives for better governance

– Wi fi city

– GIS based dynamic administration

Water Supply

Total

Project Cost(` in Millions)

Project Cost(` in Millions)

49874987

2600026000

24012401Sewerage

Solid waste management 704704

80328032BRTS & purchase of city transport buses

Housing for slums 86318631

11631163Storm water drainage

9292E-governance

Infrastructure ProjectsInfrastructure Projects

Page 16: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012.

PROJECTS EXECUTED

Pune – Mumbai Road

Subway at VallabhnagarIntersection at Finolex Pimpri

Grade Separator at Pimpri

Page 17: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012.

INFORMATION OF BRTS PROJECT

Page 18: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012.

BRTS PROJECTS IN PCMC AREA

AUNDH RAWET ROAD Length = 14.50 Km. Tender Cost =191.40

KALEWADI ROAD Length = 10.275 Km. Tender Cost =219.20

NASHIK PHATA ROAD Length = 7.90 Km. Tender Cost =206.80

PUNE MUMBAI ROAD Length = 11.90 Km. Tender Cost =120.74

Total BRTS Corridor Length = 44.575 Km.

First Intersection

Second Intersection

Page 19: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012.

1. OLD MUMBAI PUNE CORRIDOR (DAPODI TO BHAKTI SHAKTI) – 12 KM

2. AUNDH – RAVET – 14.5 KM

3. NASHIK PHATA – WAKAD – 8 KM

4. KALEWADI PHATA – DEHU ROAD – 10.5 KM

Total Length = 45 km

BRTS Phase- I Corridors

Page 20: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012.
Page 21: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012.

BRT SYSTEM

Page 22: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012.

Cross Section of 45 m Wide BRTS Road

Page 23: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012.

Principal elements for considerationConvenient boarding and alightingEfficient fare collectionComfortable and attractive stationsEasy safe signalized/dedicated approaches to Bus StationsModal integrationExcellence in customer service

Bus Rapid Transit Bus Stations

Page 24: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012.

Conceptual Layout

BRTS STATIONS -60.0 X 4.0 M SIZE FOR BOTH SIDE DOCKING

Page 25: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012.

“Think Railway Stations, Use Bus Stations!”

BRT Bus Stations can give the same quality of service as Metro/Railway Stations to a large number of citizens across the city.

Page 26: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012.

Hybrid BRT ! – On & Off the Corridor

RIGHT SIDE LEVEL BOARDING ON THE CORRIDOR LIKE METRO RAIL

LEFT SIDE STEPPED BOARDING OFF THE CORRIDOR ( OUTSIDE BRT CORRIDOR)

Page 27: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012.

BRT station side entry from right side door

Page 28: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012.

BUS STATION DESIGN AND COMPONENTS

Page 29: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012.

PCMC, PIMPRI, PUNE