Welcome 1
Tinbergen Building Redevelopment
Welcome Thank you for attending today’s exhibition. This is the first in a series of two events on the plans for redevelopment of the site currently occupied by the Tinbergen Building.
The Tinbergen Building is located in a prominent position in the Science Area on the junction of St Cross Road and South Parks Road. It was the University’s largest teaching and research building, accommodating the Departments of Zoology and Experimental Psychology and also teaching laboratories for the Department of Biochemistry.
The building had to be closed in early 2017 due to the discovery of asbestos throughout the structure and in inaccessible areas. It was not possible to remove this while the building was occupied. A decision has been taken to demolish the existing building and the University intends to create a new, world-class centre for life and mind sciences. The provisionally-named Life and Mind Building will be the largest building project the University has ever undertaken and will significantly improve the way psychological and biological science is undertaken in Oxford, helping scientists to solve some of our major global challenges. The new building will be home to the Department of Experimental Psychology and a new Department of Biology, combining the existing departments of Plant Sciences and Zoology.
The event today will show you:
• The background to the project• The planning application for various enabling works required, including demolition• The constraints and opportunities of the site • The vision for the new building • The design process being undertaken for the new building and evolving concepts • The proposed timeline
We are inviting you to view the proposals and talk with members of the University and project team, who are available to answer any queries you might have.
Your viewsThe design process is very much ongoing and we welcome your comments and feedback on our emerging thoughts and designs.
Please submit any comments to us either in hard copy today or by post, or online via our website: www.ox.ac.uk/lifeandmind
Thank you for attending and for your input today.
Aerial view of the Tinbergen Building within the Oxford University Science AreaPlan of Oxford University’s Science Area and the Keble Triangle, highlighting the Tinbergen site
KEBLE TRIANGLE
SCIENCE AREA
Tinbergen Site
Tinbergen Building 2017
A new home for two University departments: Experimental Psychology and a new department of Biology combining Zoology and Plant Sciences.
South Parks Road St Cross Road
EXPERIMENTAL PSYCHOLOGY
PLANT SCIENCES
ZOOLOGY
BIOLOGY
LIFE &
MIND
Project Background
Tinbergen Building Redevelopment
The construction of the Chemistry Teaching Laboratories (CTL) as an extension to the Tinbergen Building was approved in 2016 as part of a wider planning permission for refurbishment and alterations.
In February 2017, during this refurbishment works, the University reluctantly, at short notice, closed the Tinbergen Building due to the discovery of asbestos-containing materials (ACM) throughout the structure and in inaccessible areas. It was not possible to remove this while the building was occupied.
Construction of the CTL extension was completed in 2018 and it will be retained as part of the redevelopment of the site.
Following the discovery of asbestos, two pieces of work were undertaken:
1. Temporary buildingsThe Tinbergen Building accommodated nearly 2000 academic staff, postgraduate students, undergraduates and administrative staff. There was a quick response to find short-term solutions for teaching and research and now medium-term solutions are in place in the form of modular buildings at the Radcliffe Observatory Quarter site on Walton Street and at the University Club behind the Tinbergen Building. These temporary buildings will be in place while the University develops plans for and constructs a new building on the site.
2
Zoology modular building opened 2018
Chemistry Teaching Laboratories
2. Asbestos removal worksThe University appointed Erith in Summer 2018 to commence asbestos-containing materials (ACM) removal works within the Tinbergen Building. The ACMs exist within the internal fabric of the building as well as being captured within the concrete frame and the fixings between the cladding panels and the frame itself. Whilst safe for occupants during use, due to the ACMs being encapsulated inside linings and other exposed finishes of the room surfaces, the asbestos needs to be removed to cleanse the site and enable the redevelopment to progress.
Phase 1 of the ACM removal works is ongoing and includes a strip-out of the internal elements of the building and removal of ACMs within these areas. Some ACMs will remain within the structure and complete removal will require demolition, which will be phase 2.
Erith removing ACMs under controlled conditions
DemolitionAfter very detailed consideration of all options for the building’s future, the University concluded that its design and layout no longer accommodated the needs of modern teaching and research. On that basis, demolition and rebuilding offers the best outcome for our students and staff. It also enables the continuation of the important international research that has taken place over many decades in the Tinbergen Building, and represents the best possible value for money.
Site inspection under controlled conditions
Planning Application
Tinbergen Building Redevelopment
The project is running to tight timescales due to the need to re-accommodate the Departments of Zoology and Experimental Psychology in a permanent building. In order to deliver the new building as quickly as possible, an initial planning application is required, to be submitted in June 2019, for a series of enabling works as detailed below.
These will enable the demolition works to be completed in around 12 months and reduce any delays to the start of construction. The works are also required to safeguard surrounding buildings.
The planning application will also seek consent for the demolition of the Tinbergen Building.
3
Location of temporary electrical substation Top: current setting Bottom: with temporary substation shown
Area of Tinbergen to be demolished
1. Electricity substationThe current electricity substation for the site lies beneath the existing building. This will need to be temporarily relocated for the demolition and redevelopment works. The substation will be temporarily located on the area of lawn to the east of the Biomedical Services Building.
2. New entrance to Peter Medawar Building
Proposed First Floor: demolition of link to Tinbergen building
Link to Tinbergen building demolished
Peter
Tinbergen Building
South Parks Road St Cross Road
Medawar Building
UPUP
Entrance Lobby
Office
Stairs
Corridor
Lift Lobby
Lobby
Lift
Store
Room
WC
Plant Room
WCStore
Riser
Plant RoomStair
Goods Entrance
C190 SR3GLAZED CYLINDRICAL PORTAL
EXTERNAL RENDER SYSTEM TO MATCH EXISTING ON BLOCK CAVITY WALL
EXTERNAL RENDER SYSTEM TO MATCH EXISTING ON BLOCK CAVITY WALL
Entrance Lobby
MAIN ENTRANCE
C190 SR3GLAZED CYLINDRICAL PORTAL
EXTERNAL RENDER SYSTEM TO MATCH EXISTING ON BLOCK CAVITY WALL
Office
Room
Stair
Plant Room
Room
Lift Lobby
New Entrance Lobby
Lift
3412
NEW FIRE DOOR TO REVISED LOBBY STAIR & OFFICE ARRANGEMENT
EXTERNAL CCTV
EXTERNAL CCTV
StoreWC
StoreWC
NEW ELECTRICAL SOCKET TO SOFFITABOVE
KEY
ALL DIMENSIONS INDICATIVE ONLYSITE SURVEY REQUIRED ALL DIMENSIONS IN MM UNLESS OTHERWISE STATEDDO NOT SCALE OFF DRAWINGPRINT IN COLOUR
INDICATIVE HOARDING LINE BY OTHERS
SCOPE OF WORKS
NOTE
COMPONENTS DEMOLISHED AS PART OF TINBERGEN DEMOLITION (outside of scope)
TINBERGEN REDEVELOPMENT SITE (outside of scope)
NEW CARPET FLOOR FINISH
RENDER PANEL TO MATCH EXISTING
1. CCTV LOCATIONS TBC BY SPECIALIST2. EXTERNAL PAVING AND DRAINAGE AMENDMENTS TBC BY DRAINAGE ENGINEERTO NEW AND EXISTING ENTRANCES 3. ALL STRUCTURAL OPENINGS AND INTERNAL WALLRELOCATIONS TO BE CONFIRMED BY SE PRIOR TO CONSTRUCTION4. BEFORE REMOVING EXISTING VENTILATION TO SOUTH ENTRANCE LOBBY REQUIREMENTS TO BE CONFIRMED BY SPECIALIST 5. BUILDING FIRE STRATEGY TBC BY UNIVERSITY FIRE OFFICER & BUILDING CONTROL
DRAWING TITLE:
Cantay HousePark End Street Oxford OX1 1JDT +44 (0) 1865 248045E [email protected]
JOB TITLE:
SCALE: DRAWING SHEET SIZE:
REVISION:DRAWING NUMBER:JOB CODE:
A1
www.adp-architecture.com
CHECK ALL DIMENSIONS AND VERIFY ON SITE. REPORT ANY ERRORS OR OMISSIONS
As indicated
2S2 P
UPPER GF (20)GENERAL ARRANGEMENTEXISTING & PROPOSED PLANS
PETER MEDAWAR BUILDINGTEMPORARY ENTRANCE WORKSJOB NAME LINE 3
CD03519 0001
DRAFT
CRD-00-GF-DR-A-1020
REVISION DATE DESCRIPTION ARCHITECT PARTNER
S2 P 1 07.05.19 FOR COMMENT GM ADPS2 P 2 08.05.19 FOR INFORMATION GM ADP
1 : 100Existing upper Ground1 1 : 100
Proposed Upper Ground2
New front entrance
Existing entrance to be blocked off
Proposed Upper Ground Floor: changes to front entrance
The Peter Medawar Building is located to the west of the Tinbergen Building, as identified on the plan above. As its current entrance faces directly onto the Tinbergen Building, this needs to be relocated to the northern elevation of the building to safeguard pedestrian access.
In addition to this an existing link between the Peter Medawar Building and the Tinbergen building at first floor level needs to be demolished as shown on the adjacent plan.
To retain a ramped access to the Peter Medawar Building, the existing stairs will need to be temporarily adjusted to accommodate the loss of the existing ramp adjacent to the redevelopment works.
1:100 @ A1, 1:200 @ A3EAST ELEVATION1
1010
CLIENT
ISSUE DATE DRAWN CHECKED DESCRIPTION
PROJECT
DRAWING TITLE
DRAWING NO.
JOB NUMBER
SIZE & SCALE
REVISIONDRAWING STATUS
Notes:
Drawings are based on survey data and may not accurately represent whatis physically present.
Do not scale from this drawing. All dimensions are to be verified on sitebefore proceeding with the work.
All dimensions are in millimeters unless noted otherwise.
Purcell shall be notified in writing of any discrepancies.
First Issue
239887-PUR-00-ZZ-DR-A-1010
© PURCELL 2019. PURCELL ® IS THE TRADING NAME OF PURCELL ARCHITECTURE LTD.104 Gloucester Green, Oxford, OX1 2BU
239887
1010
P01.01
University of Oxford
Life and Mind Building - Chemistry Interface
East ElevationAs Existing
A1L
08-05-19 RO
S0 - Work In Progress
2 m0 1 m 4 m3 m 5 m 10 m
Existing Tinbergen buildingto be demolished Indicative demolition
cut line
Planning Application
Tinbergen Building Redevelopment
4
Existing chemistry extension onto sports pitch
3. Access to Chemistry Teaching LaboratoriesThe current pedestrian access to the CTL is located on the western side of the Tinbergen Building and will share a border with the redevelopment site. It is therefore necessary to relocate the entrance whilst the site is being redeveloped.
The proposal is to enter the building via the sports pitch, using existing steps. A footpath is therefore proposed along the front of the CTL to accommodate pedestrian access from St Cross Road. A ramp is proposed to accommodate wheelchair access as shown in the diagrams below.
4. Diversion of the CTL flues
Existing Proposed
Existing CTL flues Plan showing the temporary location of the CTL flues (aerial photo taken while CTL was in construction)
Elevation drawing from St Cross Rd illustrating temporary relocation of CTL flues at the front of the CTL building
Chemistry Teaching
Laboratories
CTL flues
Access from St Cross Rd
Area shown in diagrams below
SOCIAL HUB
EXISTING CCTV POLE RELOCATED. INDICATIVELOCATION ONLY
EXISTING LOW LEVEL PLANTINGEXISTING LOW LEVEL PLANTING GRAVEL
EXTERNALTERRACE
EXISTINGSTEPPED SEATING
EXISTING STEPPED SEATINGEXISTING GLAZED BOX
SPORTS FIELD
----
EXISTING FLUES
DRAWING TITLE:
Cantay HousePark End Street Oxford OX1 1JDT +44 (0) 1865 248045E [email protected]
JOB TITLE:
SCALE: DRAWING SHEET SIZE:
REVISION:DRAWING NUMBER:JOB CODE:
A1
www.corde.co.uk
CHECK ALL DIMENSIONS AND VERIFY ON SITE. REPORT ANY ERRORS OR OMISSIONS
1 : 100
1S2 P
SOUTH ELEVATIONAS EXISTING
CHEMISTRY TEACHING LABTEMPORARY ENTRANCE & RAMP ACCESS
CD0319 A-1010
FOR COMMENT
CRD-00-ZZ-DR-
REVISION DATE DESCRIPTION DRAWN CHECKED
S2 P 1 08.05.19 For Comment CRD
1 : 100SOUTH ELEVATION AS EXISTING1
0 5 m
1 : 100GROUND FLOOR PLAN - AS EXISTING2
NOTE:
ALL DIMENSIONS INDICATIVE ONLYSITE SURVEY REQUIREDALL DIMENSIONS IN MM UNLESS OTHERWISE STATEDDO NOT SCALE OFF DRAWINGPRINT IN COLOUR
FIRE STRATEGY IN DEMOLITION AND PERMENANT COMPETITION TBC BY UNIVERSITY FIRE OFFICER AND BUILDING CONTROL.
PLANNING BOUNDARY LINE TBC.
DESIGN PROGRESSED INDEPENDENTLY OF THE TIMBERGEN REDEVELOPMENT PROJECT
SOCIAL HUB
EXISTING CCTV POLE RELOCATED. INDICATIVELOCATION ONLY
EXISTING LOW LEVEL PLANTINGEXISTING LOW LEVEL PLANTING GRAVEL
EXTERNALTERRACE
EXISTINGSTEPPED SEATING
EXISTING STEPPED SEATINGEXISTING GLAZED BOX
SPORTS FIELD
----
EXISTING FLUES
DRAWING TITLE:
Cantay HousePark End Street Oxford OX1 1JDT +44 (0) 1865 248045E [email protected]
JOB TITLE:
SCALE: DRAWING SHEET SIZE:
REVISION:DRAWING NUMBER:JOB CODE:
A1
www.corde.co.uk
CHECK ALL DIMENSIONS AND VERIFY ON SITE. REPORT ANY ERRORS OR OMISSIONS
1 : 100
1S2 P
SOUTH ELEVATIONAS EXISTING
CHEMISTRY TEACHING LABTEMPORARY ENTRANCE & RAMP ACCESS
CD0319 A-1010
FOR COMMENT
CRD-00-ZZ-DR-
REVISION DATE DESCRIPTION DRAWN CHECKED
S2 P 1 08.05.19 For Comment CRD
1 : 100SOUTH ELEVATION AS EXISTING1
0 5 m
1 : 100GROUND FLOOR PLAN - AS EXISTING2
NOTE:
ALL DIMENSIONS INDICATIVE ONLYSITE SURVEY REQUIREDALL DIMENSIONS IN MM UNLESS OTHERWISE STATEDDO NOT SCALE OFF DRAWINGPRINT IN COLOUR
FIRE STRATEGY IN DEMOLITION AND PERMENANT COMPETITION TBC BY UNIVERSITY FIRE OFFICER AND BUILDING CONTROL.
PLANNING BOUNDARY LINE TBC.
DESIGN PROGRESSED INDEPENDENTLY OF THE TIMBERGEN REDEVELOPMENT PROJECT
SOCIAL HUB
EXISTING CCTV POLE RELOCATED. INDICATIVELOCATION ONLY
EXISTING LOW LEVEL PLANTINGEXISTING LOW LEVEL PLANTING GRAVEL
EXTERNALTERRACE
EXISTINGSTEPPED SEATING
EXISTING STEPPED SEATINGEXISTING GLAZED BOX
SPORTS FIELD
----
EXISTING FLUES
DRAWING TITLE:
Cantay HousePark End Street Oxford OX1 1JDT +44 (0) 1865 248045E [email protected]
JOB TITLE:
SCALE: DRAWING SHEET SIZE:
REVISION:DRAWING NUMBER:JOB CODE:
A1
www.corde.co.uk
CHECK ALL DIMENSIONS AND VERIFY ON SITE. REPORT ANY ERRORS OR OMISSIONS
1 : 100
1S2 P
SOUTH ELEVATIONAS EXISTING
CHEMISTRY TEACHING LABTEMPORARY ENTRANCE & RAMP ACCESS
CD0319 A-1010
FOR COMMENT
CRD-00-ZZ-DR-
REVISION DATE DESCRIPTION DRAWN CHECKED
S2 P 1 08.05.19 For Comment CRD
1 : 100SOUTH ELEVATION AS EXISTING1
0 5 m
1 : 100GROUND FLOOR PLAN - AS EXISTING2
NOTE:
ALL DIMENSIONS INDICATIVE ONLYSITE SURVEY REQUIREDALL DIMENSIONS IN MM UNLESS OTHERWISE STATEDDO NOT SCALE OFF DRAWINGPRINT IN COLOUR
FIRE STRATEGY IN DEMOLITION AND PERMENANT COMPETITION TBC BY UNIVERSITY FIRE OFFICER AND BUILDING CONTROL.
PLANNING BOUNDARY LINE TBC.
DESIGN PROGRESSED INDEPENDENTLY OF THE TIMBERGEN REDEVELOPMENT PROJECT
Existing stepped seating
Existing glazed box
Key clamp balustrade
Cladding to match existing grey tile
Temporary ramp
New canopy
New signage zone
2no. sections of curtain walling removed and replaced with automated double doors
The existing flues for the CTL create a major constraint for the redevelopment of the site. The flues currently pass over the existing Tinbergen building and need to be diverted to safeguard the demolition works and avoid any disturbance to the CTL. It is proposed that they are temporarily located at the front of the CTL. They will then be permanently designed into the new building.
Temporary CTL flues
Existing CTL flues
CTL building
St Cross Rd
Redeveloping the site
Tinbergen Building Redevelopment
5
Links to Science Area
South Parks Road
St C
ross
Roa
d
Access to nature
Currently ablind corner
Main arrival (Northside)
SitePotential arrival
Panoramic views to College grounds
Panoramic views to University Parks
New cycle &
pedestrian route
Approach from Station
Service Access
Service Entry
Panoramic views to Oxford’s spires and Radcliffe Camera
Re-located CTL building entry
Approach to Botanic Garden
Site location
Opportunities and constraints
1. Conservation Areas
Area map showing the Tinbergen site location in relation to Oxford city centre
3. Green Belt 4. Flood Risk
2. Grade II Listed (University Parks)
An initial analysis was undertaken to review the site in context with the wider city and surrounding areas. This includes surveying potential risks that might impact the building, as well as the opportunities that the redevelopment of the site offers.
The site is situated adjacent to the Central Oxford Conservation Area and is in close proximity to the green belt, Grade II Listed University Parks and the River Cherwell. These constraints are shown in the diagrams 1 to 4 below.
The new building will be designed to respect the setting of the Conservation Area and University Parks so that it makes a positive contribution to the streetscape of South Parks Road and St Cross Road.
Opportunities to improve the site include:
• Access to nature• Key views from the site• Cycle and pedestrian routes• Access to / from the site• Sun exposure and shading• Links to Science Area
We have identified the following planning constraints for the site:
• Proximity of the Conservation Area • Proximity of University Parks • Building heights and protected
Oxford view cones• Relationship with existing roads
and buildings
Tinbergen site
Vision for the New Building
Tinbergen Building Redevelopment
6The Life and Mind Building will become the new home for two University departments: Experimental Psychology and a new department of Biology, combining Zoology and Plant Sciences.
The new Life and Mind Building will provide the opportunity to:
• transform the way psychological and biological science is done in Oxford
• enable more multidisciplinary collaboration and sharing of knowledge and ideas to happen than ever before
• help scientists to solve some of our major global challenges through a greater understanding of biology and human behaviour
• transform the education experience for students at Oxford in terms of teaching and research facilities and provide new courses and study options
• enable the University to attract and retain the most talented academics and researchers and the funding to support their work in a competitive global market
• significantly expand the University’s outreach to schools and the public, providing opportunities for art, exhibitions, lectures and conferences and for public participation in our important research.
Exploration and engagementInitial concepts were developed using both physical and computer models to assess the benefits of each configuration and identify the most suitable options.
Concepts were tested with stakeholders for their advantages and disadvantages in relation to the aspirations for the new building. They were further assessed through daylight simulation for their impact on public space and internal comfort.
Throughout the process the building’s impact on its unique setting as well as the ability to generate public space and engagement were important considerations.
Each department has identified their requirements for the new building. They would like to share some spaces, invite the public into the building and create zones for separate research groups and teaching.
Through a series of workshops with all three departments, we have identified the areas they require and how much space this will take up within the building.
In total the University requires an internal area of 26,000 sqm. This will provide space for a mix of science areas, office accommodation as well as teaching and public space.
Concept A (preferred) Concept B Concept C
Aspirations for the new Life and Mind Building
Offices
Academics
Support
Lecture
Meeting
Seminar
Computer
Imaging
Herbarium
Greenhouses
Workshops
Arrival, Cafe & Restaurant, Hubs,
Library, Study
General Laboratories
Teaching Labs
EP research
Research Support & Shared Specialist
Teach & Meet
Social & Study
Laboratories (incl. Teaching)
Support & Specialist
Structure, Circulation & Plant
Offices & Write-up
Functional components of the new building and their relative size
Tinbergen Building Redevelopment
Emerging Ideas 7
Elsfield
Crescent Road
Boar’s Hill
Port Meadow
Jack Straws Lane
Oxford Brookes
South Park
Rose Hill
Raleigh Park
A34 Hinksey Hill
Elsfield
Extending public space into the site allows the building to be entered at its centre, with sunlight reaching the approach.
Setting back from South Parks Road allows daylight to the centre of the compact building form. New views are created from the Science Area to College grounds.
The design reduces the bulk of the building that faces towards the University Parks and allows daylight into the lower floor. The roof scape design responds to the spires of Oxford.
Site plan showing access, views and potential use of a public plaza.
Openings and stairs to the lower ground floor provide access to the outside, views and light. Terraces within the atrium maximise its use for study, work and social engagement, and support way-finding.
Life and Mind Building
We have assessed all Oxford View Cones views with the existing building (outline black lines shown above) and the proposed building (highlighted in blue). This illustration shows the view from Elsfield.
St Cross Rd
Sou
th P
arks
Rd
Oxford View ConesOxford has a Views Policy that was first introduced in 1962. This is important because it is there to protect the character of the city’s skyline not only within the city itself, but from surrounding viewpoints, villages and towns.
Across the region these points are known as the Oxford View Cones. When a new building is designed, city planners review the impact it may have on the view cones, assessing the benefits that the building may bring to the city, the local community, as well as Oxford’s skyline. By using computer generated models, we can look at how the existing building sits within the city skyline from a variety of viewing points. Oxford View Cones
Elsfield
Crescent Road
Boar’s Hill
Port Meadow
Jack Straws Lane
Oxford Brookes
South Park
Rose Hill
Raleigh Park
A34 Hinksey Hill
Port Meadow
Raleigh Park
A34 Hinksey Hill
Rose Hill
Crescent Road
South Park
Oxford Brookes
Jack Straw Lane
Elsfield
Elsfield
Crescent Road
Boar’s Hill
Port Meadow
Jack Straws Lane
Oxford Brookes
South Park
Rose Hill
Raleigh Park
A34 Hinksey Hill
Elsfield
Crescent Road
Boar’s Hill
Port Meadow
Jack Straws Lane
Oxford Brookes
South Park
Rose Hill
Raleigh Park
A34 Hinksey Hill
Elsfield
Crescent Road
Boar’s Hill
Port Meadow
Jack Straws Lane
Oxford Brookes
South Park
Rose Hill
Raleigh Park
A34 Hinksey Hill
Elsfield
Crescent Road
Boar’s Hill
Port Meadow
Jack Straws Lane
Oxford Brookes
South Park
Rose Hill
Raleigh Park
A34 Hinksey HillCarfax TowerTinbergen site
Next Steps
Tinbergen Building Redevelopment
April
The timeline below sets out the next steps for the project.
A further public consultation event will take place in October 2019 and will concentrate on the proposed designs and technical considerations of the new building.
May
June
September
October
November
JanuaryWorkshop with Oxford Design Review Panel (ODRP)Review of ODRP feedback
First Public Consultation 17/18 May
Review Public Consultation feedback
Decision on enabling works planning application expected
Second Public Consultation
Complete phase 1 internal asbestos removal works
Proposed start of demolition works
Second workshop with ODRP
Review ODRP feedback
Review Public Consultation feedback
Enabling works begin on site
Submit full planning application for enabling works application (including demolition)
Submit full planning application for new building
20202019
8
June
December
February
May
Decision on new building planning application expected
Proposed completion of demolition works
Proposed commencement of above ground construction works on new building
Expected completion of new building
2021
2024
Complete
Complete
✓
✓