Weekly Report Jun 27 to Jul 03
Transcript of Weekly Report Jun 27 to Jul 03
-
8/4/2019 Weekly Report Jun 27 to Jul 03
1/13
Weekly ReportName LAKSHMI KANTH RA
Emp ID 82003243
Desigation Residential Engineer
Formal\Contract contract
Reporting Manager FAIZULLAH ASHR
Weekly report PeriodActivities Performed during the wee
Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
Remarks
Major issues faced during the week The sites are getting fluctuated at
Customer Appreciations (if any) :-
Self Rating (0-10)
-
8/4/2019 Weekly Report Jun 27 to Jul 03
2/13
HALA
NGN.
AF
k
the same time of similar ABPM.
-
8/4/2019 Weekly Report Jun 27 to Jul 03
3/13
Weekly ReportName LAKSHMI KANTH RA
Emp ID 82003243
Desigation Residential Engineer
Formal\Contract contract
Reporting Manager FAIZULLAH ASHR
Weekly report PeriodActivities Performed during the wee
Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
Remarks
Major issues faced during the week
List the names of all other resources whom you had taken help from in
Customer Appreciations (if any) :-
Self Rating (0-10)
-
8/4/2019 Weekly Report Jun 27 to Jul 03
4/13
HALA
NGN.
AF
k
resolving the issues:
-
8/4/2019 Weekly Report Jun 27 to Jul 03
5/13
Weekly ReportName
Emp ID
Desigation
Formal\Contract
Reporting Manager
Weekly report PeriodActivities Performed during the wee
Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
Remarks
Major issues faced during the week
List the names of all other resources whom you had taken help from in
-
8/4/2019 Weekly Report Jun 27 to Jul 03
6/13
Customer Appreciations (if any) :-
Self Rating (0-10)
-
8/4/2019 Weekly Report Jun 27 to Jul 03
7/13
k
resolving the issues
-
8/4/2019 Weekly Report Jun 27 to Jul 03
8/13
-
8/4/2019 Weekly Report Jun 27 to Jul 03
9/13
Weekly ReportName R.Lakshmi Kant
Emp ID 82003243
Desigation Residential Engineer
Formal\Contract contract
Reporting Manager FAIZULLAH ASHR
Weekly report Period 19/06/11 to 27/06Activities Performed during the wee
Monday
Tuesday
Wednesday traced the CAT_5 cable connectivity and rectified the f
Thursday
Friday
Saturday configurations of TID , TID MASK , TID name for the giv
Remarks
Major issues faced during the week:
Customer Appreciations (if any) :-
Self Rating (0-10)
checked the E1 electrical connectivity and rectified faurectified)
checked the media connectivity and rectified one SFPrectified(40 e1's rectified)
properly routed the front side optical cabling Iin MSG 9and back side cabling of msg 9000
checked the conf g in MSG side, and stm connectivityframe
-
8/4/2019 Weekly Report Jun 27 to Jul 03
10/13
h
NGN.
AF
/11k
ulty ones and RJ 45 connector faults
en trunks at SS
lty E1 in 1st shelf(total 10 e1's
port and traced the electrical E1's &
000, and router Zxr10 ethernet cabling
connected to the optical distribution
-
8/4/2019 Weekly Report Jun 27 to Jul 03
11/13
Weekly ReportName R.Laksh
Emp ID 8200
Desigation Residential E
Formal\Contract cont
Reporting Manager FAIZULLA
Weekly report Period 27/06/11 toActivities Performed during the
Monday checking out mahabub nagar conf's
Tuesday checking out mahabub nagar connected
Wednesday crated the sdca confg at the msg level
Thursday giving training to mahabub nagar peopl
Friday created sdca's related configuratin in ss
Saturday
Remarks
Major issues faced during the week:
Customer Appreciations (if any) :-
Self Rating (0-10)
created sdca's related configuratin in ssmahabub nagar 5ess
-
8/4/2019 Weekly Report Jun 27 to Jul 03
12/13
i Kanth
3243
gineer- NGN.
ract
ASHRAF
03/07/2011eek
e1's loop and connectivity
about msg conf's
side for kolapur, alampur and atmakur
side for kodangal, amangal and
-
8/4/2019 Weekly Report Jun 27 to Jul 03
13/13
Weekly Data to be filled by Engineers
WK1 WK2 WK3 WK4 WK5
# of Call logs raised
# of call logs resolved within SLA
# of call logs resolved outside SLA
# of TT raised
# of TT resolved within SLA
# of TT resolved outside SLA# of Internal Meetings held
# of External Meetings held
# of Technical Documents submitted
* Whichever activity is not applicable please Mark as "NA"