Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

download Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

of 296

Transcript of Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    1/296

    Addendums

    Date To

    Powered By

    Contact No

    2/15/2009 2/21/2009

    MARMUL IAP TEAM

    243-86454 & 243-86040

    Date from

    Activities KPI Summary

    Week 07-2009 Marmul Activities KPI

    CNF work orders not TECO

    Corr. Scheduled in the past

    PMs Scheduled in the past

    Corr. Latest Allowed Finish Date in thepast

    PMs Latest Allowed Finish Date in thepast

    Marmul Overall

    Maintenance

    Engineering

    KPI-3b Exectd. According To Plan Crtd. AfterFreez

    KPI-3a Comp. Pre-Existing Activities - Not in Plan

    2009 Weekly Marmul Activities KPI Summary

    KPI-2 Activities Completed Ahead of Plan

    KPI-4 Activities Re-scheduled Later ThanPlanned

    KPI-1 Work Executed According to Plan

    Other Infrastructure ( inspect'n, power &Telecom)

    WRM ( Hoist / CTU )

    Well Engineering ( Rigs )

    Activities listAnalysisKPIs

    Operation

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    2/296

    MARMUL WEEK 10/2009

    Back to Main Menu

    Action Party Work Center

    Planned

    in Frozen

    Period

    Executed

    in Frozen

    Period

    KPI-1

    Executed

    According

    to Plan

    KPI-1

    Plan %

    KPI-1

    Actual %

    KPI-2

    Executed

    Ahead of

    Plan

    KPI-2

    Plan

    %

    KPI-2

    Actual %

    KPI-3A

    Executed b

    Not in Plan

    Created

    Before Fre

    Overall Result Overall Result 402 512 348 86.57 67.97 10 2.49 1.95

    EMC Eng. OM01/MARECIV2 14 14 14 100.00 100.00

    ODC Eng. OM01/MAREELE1 2 2 2 100.00 100.00

    EMC Eng. OM01/MAREELE2 3 4 3 100.00 75.00

    EMC Eng. OM01/MAREMEC2 4 5 4 100.00 80.00

    EMC Maint. OM01/MARMELE2 65 66 65 100.00 98.48

    OSO/41M OM01/MARMINS2 31 33 31 100.00 93.94

    OSO/14M OM01/MARMMEC2 38 55 38 100.00 69.09

    OSO/68M OM01/MARMWSH2 4 5 4 100.00 80.00

    OM01/SWERIG19 OM01/MAROOPER 5 5 5 100.00 100.00

    OM01/SWERIG56 OM01/STAAST1 14 43 14 100.00 32.56

    OM01/MARMELEC OM01/STMCONS 13 13 13 100.00 100.00

    OM01/SPCONT2 OM01/SWERIG19 1 1 1 100.00 100.00

    OM01/OSDPTENG OM01/SWERIG88 1 1 100.00 X

    OM01/SWSS OM01/SWSWPH14 1 4 1 100.00 25.00

    OM01/SWSWPH14 OM01/SWSWPH25 1 2 1 100.00 50.00OM01/SWSWPH6 OM01/SWSWSHP1 30 36 30 100.00 83.33

    OSO/46M OM01/MARMMECH 18 26 17 94.44 65.38

    OSO/64M OM01/MARMSTA2 9 10 8 88.89 80.00

    EMC Maint. OM01/MARMELEC 42 73 37 88.10 50.68 3 7.14 4.11

    EMC Maint. OM01/MARMINST 31 45 27 87.10 60.00 2 6.45 4.44

    OM01/SWERIG70 OM01/STINSP2 10 10 8 80.00 80.00 2 20.00 20.00

    OM01/SWERIG88 OM01/STIPALG1 15 15 12 80.00 80.00

    OM01/SWERIG38 OM01/SPCONT2 4 7 3 75.00 42.86 1 25.00 14.29

    OM01/SWSWSHP1 OM01/STIPPLN 3 3 2 66.67 66.67

    OM01/SWSWPH18 OM01/SWERIG70 2 1 1 50.00 100.00

    OM01/SWSWPH35 OM01/SWSWPHXX 2 1 50.00 X

    OM01/SWERIG26 OM01/OSDPTENG 9 4 4 44.44 100.00

    OM01/STMMECH OM01/SWERIG38 4 2 1 25.00 50.00

    EMC Eng. OM01/MAREMEC1 4

    OM01/STMO OM01/MARMWSHP 1

    OM01/MARMMEC2 OM01/STMELEC 2

    OM01/MARMINST OM01/STMMECH 1 1

    OM01/STIPPLN OM01/SWERIG26 2 1

    OM01/STIPALG1 OM01/SWERIG28 1 2 1 100.00 50.00

    OM01/SWSWPHXX OM01/SWERIG87 1

    OM01/OIETRI OM01/SWSCCT22 1

    OM01/SWERIG28 OM01/SWSEWL3 1

    OM01/SWERIG87 OM01/SWSNCPXX 9 3

    OM01/SWSCCT22 OM01/SWSS 3 2

    OM01/SWSNCPXX OM01/SWSWLU12 1 9 1 100.00 11.11

    OM01/SWSWLU12 OM01/SWSWPH18 1 2

    OM01/SWSWPH25 OM01/SWSWPH26 1

    OM01/SWSWPH26 OM01/SWSWPH27 2

    OM01/SWSWPH27 OM01/SWSWPH35 2 1

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    3/296

    Marmul Maintenance KPI week 07-2009

    Work Center

    Planned

    in Frozen

    Period

    Executed

    in Frozen

    Period

    KPI-1

    Executed

    According

    to Plan

    KPI-1

    Plan %

    KPI-1

    Actual %

    KPI-2

    Executed

    Ahead of Plan

    KPI-2

    Plan %

    KPI-2

    Actual %

    KPI-3A

    Executed but

    Not in Plan-

    Created

    Before Freeze

    KPI-3A

    Plan %

    KPI-3A

    Actual %

    Overall Result 278 381 262 94.24 68.77 7 2.52 1.84 47 16.91 12.34OM01/MARMELE2 65 66 65 100.00 98.48 2 3.08 3.03

    OM01/MARMINS2 31 33 31 100.00 93.94 2 6.45 6.06

    OM01/MARMMEC2 38 55 38 100.00 69.09 9 23.68 16.36

    OM01/MARMWSH2 4 5 4 100.00 80.00 1 25.00 20.00

    OM01/STAAST1 14 43 14 100.00 32.56 8 57.14 18.60

    OM01/STMCONS 13 13 13 100.00 100.00

    OM01/MARMMECH 18 26 17 94.44 65.38 2 11.11 7.69

    OM01/MARMSTA2 9 10 8 88.89 80.00 1 11.11 10.00

    OM01/MARMELEC 42 73 37 88.10 50.68 3 7.14 4.11 12 28.57 16.44

    OM01/MARMINST 31 45 27 87.10 60.00 2 6.45 4.44 8 25.81 17.78

    OM01/STINSP2 10 10 8 80.00 80.00 2 20 20

    OM01/MARMWSHP 1 1 0.00 100.00

    OM01/STMELEC 2

    OM01/STMMECH 1 1 1 100.00 100.00

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    4/296

    Hours for

    KPI-5

    / Plan %

    Hours for

    KPI-5

    / Actual %

    0.14 0.10

    1.17 0.75

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    5/296

    Marmul Engineering KPI week 07-

    Work Center

    Planned

    in Frozen

    Period

    Executed

    in Frozen

    Period

    KPI-1

    Executed

    According

    to Plan

    KPI-1

    Plan %

    KPI-1

    Actual %

    KPI-2

    Executed

    Ahead of Plan

    KPI-2

    Plan %

    KPI-2

    Actual %

    KPI-3A

    Executed but

    Not in Plan-

    Created

    Before Freeze

    Overall Result 26 26 26 100.00 100

    OM01/MARECIV2 12 12 12 100.00 100

    OM01/MAREELE1 1 1 1 100.00 100

    OM01/MAREELE2 2 1 2 100.00 200

    OM01/MAREINS2 1 1 1 100.00 100

    OM01/MAREMEC2 10 11 10 100.00 91

    Work Center

    Planned

    in Frozen

    Period

    Executed

    in Frozen

    Period

    KPI-1

    Executed

    According

    to Plan

    KPI-1

    Plan %

    KPI-1

    Actual %

    KPI-2

    Executed

    Ahead of Plan

    KPI-2

    Plan %

    KPI-2

    Actual %

    KPI-3A

    Executed but

    Not in Plan-

    Created

    Before Freeze

    Overall Result 278 381 262 94.24 68.77 7 2.52 1.84 4

    OM01/MARMELE2 65 66 65 100.00 98.48

    OM01/MARMELEC 42 73 37 88.10 50.68 3 7.14 4.11 1

    OM01/MARMINS2 31 33 31 100.00 93.94

    OM01/MARMINST 31 45 27 87.10 60.00 2 6.45 4.44

    OM01/MARMMEC2 38 55 38 100.00 69.09

    OM01/MARMMECH 18 26 17 94.44 65.38

    OM01/MARMSTA2 9 10 8 88.89 80.00

    OM01/MARMWSH2 4 5 4 100.00 80.00

    OM01/MARMWSHP 1

    OM01/STAAST1 14 43 14 100.00 32.56

    OM01/STINSP2 10 10 8 80.00 80.00 2 20.00 20.00OM01/STMCONS 13 13 13 100.00 100.00

    OM01/STMELEC 2

    OM01/STMMECH 1 1

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    6/296

    Marmul OPERATIO

    Work Center

    Planned

    in Frozen

    Period

    Executed

    in Frozen

    Period

    KPI-1

    Executed

    According

    to Plan

    KPI-1

    Plan %

    KPI-1

    Actual %

    KPI-2

    Execute

    d

    Ahead

    of Plan

    Overall Result 5 5 5 100.00 100.00

    OM01/MAROOPER 5 5 5 100.00 100.00

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    7/296

    KPI week 07-2009

    KPI-2

    Plan %

    KPI-2

    Actual %

    KPI-3A

    Executed but

    Not in Plan-

    Created

    Before Freeze

    KPI-3A

    Plan %

    KPI-3A

    Actual %

    KPI-3B

    Execute

    d but

    Not in

    Plan-

    KPI-3B

    Plan %

    KPI-3B

    Actual %

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    8/296

    KPI-4

    Execute

    d Late or

    Resched

    . Later

    KPI-4

    Plan %

    K

    P

    I-

    4

    A

    KPI-5

    Planned but

    Deleted

    KPI-5

    Plan %

    KPI-5

    Actual %

    Plan

    Hour

    s

    in

    Perio

    Actual

    Hours

    in Period

    KPI-1

    Hours

    Executed

    According

    to Plan

    Hours

    for KPI-1

    / Plan %

    5.0 5.0 5.0 100.00

    5.0 5.0 5.0 100.00

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    9/296

    Hours

    for KPI-1

    / Actual %

    KPI-2

    Hours

    Executed

    Ahead of

    Plan

    Hours

    for KPI-2

    / Plan %

    Hours

    for KPI-2

    / Actual

    %

    KPI-3A

    Hours

    Executed

    Not in

    Plan

    Hours for

    KPI-3A

    / Plan %

    Hours for

    KPI-3A

    / Actual %

    KPI-3B

    Hours

    Executed

    Not in

    Plan

    Hours for

    KPI-3B

    / Plan %

    100.00

    100.00

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    10/296

    Hours for

    KPI-3B

    / Actual %

    KPI-4

    Executed

    Late or

    Resched.

    Later

    Hours for

    KPI-4

    / Plan %

    Hours for

    KPI-4

    / Actual %

    KPI-5

    Hours

    Planned

    but

    Deleted

    Hours

    for

    KPI-5

    / Plan %

    Hours for

    KPI-5

    / Actual %

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    11/296

    Other Infrastructure ( inspect'

    Work Center

    Planned

    in Frozen

    Period

    Executed

    in Frozen

    Period

    KPI-1

    Executed

    According

    to Plan

    KPI-1

    Plan %

    KPI-1

    Actual %

    KPI-2

    Executed

    Ahead of Plan

    KPI-2

    Plan %

    Overall Result 18 18 14 77.78 77.78

    OM01/STIPALG1 15 15 12 80.00 80.00

    OM01/STIPPLN 3 3 2 66.67 66.67

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    12/296

    , pipeline Mntce, automation, power & Te

    KPI-2

    Actual %

    KPI-3A

    Executed but

    Not in Plan-

    Created

    Before Freeze

    KPI-3A

    Plan %

    KPI-3A

    Actual %

    KPI-3B

    Executed but

    Not in Plan-

    Created

    After Freeze

    KPI-3B

    Plan %

    KPI-3B

    Actual %

    KPI-4

    Executed

    Late or

    Resched.

    Later

    4

    3

    1

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    13/296

    lecom)

    KPI-4

    Plan %

    KPI-4

    Actual %

    KPI-5

    Planned

    but

    Deleted

    KPI-5

    Plan %

    KPI-5

    Actual %

    Plan

    Hours

    in Period

    Actual

    Hours

    in Period

    KPI-1

    Hours

    Execute

    d

    Accordi

    Hours

    for KPI-1

    / Plan %

    Hours

    for KPI-1

    / Actual %

    22.22 22.22 110.0 0.0 0.0 0.00 X

    20.00 20.00 110.0 0.0 0.0 0.00 X

    33.33 33.33 0.0 0.0 0.0 X X

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    14/296

    KPI-2

    Hours Executed

    Ahead of Plan

    Hours

    for KPI-2

    / Plan %

    Hours

    for KPI-2

    / Actual %

    KPI-3A

    Hours Executed

    Not in Plan

    Created Before Freeze

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    15/296

    Hours for

    KPI-3A

    / Plan %

    Hours for

    KPI-3A

    / Actual %

    KPI-3B

    Hours

    Executed

    Not in

    Plan

    Hours for

    KPI-3B

    / Plan %

    Hours for

    KPI-3B

    / Actual %

    KPI-4

    Executed

    Late or

    Resched.

    Later

    Hours for

    KPI-4

    / Plan %

    Hours for

    KPI-4

    / Actual %

    KPI-5

    Hours

    Planned

    but

    Deleted

    0.0 0.00 X

    0.0 0.00 X

    0.0 X X

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    16/296

    Hours for

    KPI-5

    / Plan %

    Hours for

    KPI-5

    / Actual %

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    17/296

    Work Center

    Plannedin Frozen

    Period

    Executedin Frozen

    Period

    KPI-1Executed

    According

    to Plan

    KPI-1Plan %

    KPI-1Actual %

    KPI-2Executed

    Ahead of

    Plan

    KPI-2Plan %

    KPI-2Actual %

    Overall Result 62 65 37 59.68 56.92 1 1.61 1.54

    OM01/SWSWPH14 1 4 1 100.00 25.00

    OM01/SWSWPH25 1 2 1 100.00 50.00

    OM01/SWSWSHP1 30 36 30 100.00 83.33

    OM01/SWSWPHXX 2 1 50.00 X

    OM01/OSDPTENG 9 4 4 44.44 100.00OM01/SWSCCT22 1

    OM01/SWSEWL3 1

    OM01/SWSNCPXX 9 3

    OM01/SWSS 3 2

    OM01/SWSWLU12 1 9 1 100.00 11.11

    OM01/SWSWPH18 1 2

    OM01/SWSWPH26 1

    OM01/SWSWPH27 2

    OM01/SWSWPH35 2 1

    WRM (Hoist / CTU) IAP KPI w

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    18/296

    KPI-3AExecuted

    but

    Not in Plan-

    Created

    Before

    Freeze

    KPI-3APlan %

    KPI-3AActual %

    KPI-3BExecuted

    but

    Not in Plan-

    Created

    After Freeze

    KPI-3BPlan %

    KPI-3BActual %

    KPI-4Executed

    Late or

    Resched.

    Later

    KPI-4Plan %

    KPI-4Actual %

    KPI-5Planned

    but

    Deleted

    KPI-5Plan %

    23 37.10 35.38 3 4.84 4.62 24 38.71 36.92

    3 300.00 75.00

    1 100.00 50.00

    3 10.00 8.33 3 10.00 8.33

    1 50.00 X

    5 55.56 125.001 100.00 X

    1 100.00 X

    3 33.33 100.00 9 100.00 300.00

    2 66.67 100.00 3 100.00 150.00

    8 800.00 88.89

    2 200.00 100.00 1 100.00 50.00

    1 100.00 X

    1 0.00 50.00

    2 100.00 200.00

    ek 10-2009

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    19/296

    KPI-5Actual %

    PlanHours

    in

    Perio

    d

    ActualHours

    in Period

    KPI-1Hours

    Executed

    According

    to Plan

    Hoursfor KPI-1

    / Plan %

    Hours

    for

    KPI-

    1

    /

    Actu

    KPI-2Hours

    Executed

    Ahead of

    Plan

    Hoursfor KPI-2

    / Plan %

    Hoursfor KPI-2

    / Actual

    %

    KPI-3AHours

    Executed

    Not in

    Plan

    Created

    Before

    Hours forKPI-3A

    / Plan %

    Hours fKPI-3A

    / Actual

    #### 226.0 90.0 3.02 #### 12.0 0.40 5.31 114.0 3.82 50

    40.0 0.0 0.0 0.00 X 0.0 0.00

    56.0 0.0 0.0 0.00 X 0.0 0.00

    184.0 100.0 90.0 48.91 #### 0.0 0.00 0

    120.0 0.0 0.00 X

    #### 0.0 0.0 0.00 X0.0

    0.0

    78.0 18.0 18.0 23.08 100

    0.0 0.0 0.0 X

    0.0 108.0 12.0 X 11.11 96.0 X 88

    168.0 0.0 0.0 0.00

    0.0

    0.0 0.0 X

    176.0 0.0

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    20/296

    KPI-3BHours

    Executed

    Not in

    Plan

    Created

    After

    Hours forKPI-3B

    / Plan %

    Hours forKPI-3B

    / Actual

    %

    KPI-4Executed

    Late or

    Resched.

    Later

    Hours forKPI-4

    / Plan %

    Hours forKPI-4

    / Actual

    %

    KPI-5Hours

    Planned

    but

    Deleted

    Hours forKPI-5

    / Plan %

    Hours forKPI-5

    / Actual

    %

    10.0 0.34 4.42 0.0 0.00 0.00

    10.0 5.43 10.00

    0.0 0.00 X

    0.0 0.00 X0.0 X X

    0.0 X X

    0.0 0.00 0.00

    0.0 X X

    0.0 0.00 X

    0.0 X X

    0.0 0.00 X

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    21/296

    Work Center

    Plannedin Frozen

    Period

    Executedin Frozen

    Period

    KPI-1Executed

    According

    to Plan

    KPI-1Plan %

    KPI-1Actual %

    KPI-2Executed

    Ahead of

    Plan

    KPI-2Plan %

    KPI-2Actual %

    Overall Result 12 7 4 33.33 57.14 1 8.33 14.29

    OM01/SWERIG19 1 1 1 100.00 100.00

    OM01/SWERIG88 1 1 100.00 X

    OM01/SWERIG70 2 1 1 50.00 100.00OM01/SWERIG38 4 2 1 25.00 50.00

    OM01/SWERIG26 2 1

    OM01/SWERIG28 1 2 1 100.00 50.00

    OM01/SWERIG87 1

    Week-07/09 Marmul W

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    22/296

    KPI-3AExecuted

    but

    Not in Plan-

    Created

    Before

    Freeze

    KPI-3APlan %

    KPI-3AActual %

    KPI-3BExecuted

    but

    Not in Plan-

    Created

    After Freeze

    KPI-3BPlan %

    KPI-3BActual %

    KPI-4Executed

    Late or

    Resched.

    Later

    KPI-4Plan %

    KPI-4Actual %

    KPI-5Planned

    but

    Deleted

    KPI-5Plan %

    2 16.67 28.57 7 58.33 100.00

    1 50.00 100.001 25.00 50.00 3 75.00 150.00

    2 100.00 200.00

    1 100.00 50.00

    1 100.00 X

    ll Engineering ( Rigs ) IAP KPI

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    23/296

    KPI-5Actual %

    PlanHours

    in

    Period

    ActualHours

    in Period

    KPI-1Hours

    Executed

    According

    to Plan

    Hoursfor KPI-1

    / Plan %

    Hours

    for

    KPI-

    1

    /

    Actu

    al %

    KPI-2Hours

    Executed

    Ahead of

    Plan

    Hoursfor KPI-2

    / Plan %

    Hoursfor KPI-2

    / Actual

    %

    KPI-3AHours

    Executed

    Not in

    Plan

    Created

    Before

    Freeze

    Hours forKPI-3A

    / Plan %

    3,292.0 0.0 0.0 0.00 X 0.0 0.00 X 0.0 0.00

    280.0 0.0 0.0 0.00 X

    896.0 0.0 0.00 X

    188.0 0.0 0.0 0.00 X348.0 0.0 0.0 0.00 X 0.0 0.00

    168.0 0.0

    84.0 0.0 0.0 0.00 X 0.0 0.00

    1,328.0

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    24/296

    Hours forKPI-3A

    / Actual %

    KPI-3BHours

    Executed

    Not in

    Plan

    Created

    After

    Freeze

    Hours forKPI-3B

    / Plan %

    Hours forKPI-3B

    / Actual

    %

    KPI-4Executed

    Late or

    Resched.

    Later

    Hours forKPI-4

    / Plan %

    Hours forKPI-4

    / Actual

    %

    KPI-5Hours

    Planned

    but

    Deleted

    Hours forKPI-5

    / Plan %

    Hours forKPI-5

    / Actual

    %

    X 0.0 0.00 X

    0.0 0.00 XX 0.0 0.00 X

    0.0 0.00 X

    X

    0.0 0.00 X

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    25/296

    PDO Detail Data: Exectd. According To Plan Crtd. After Freez

    Work Center Order Activities/O eration Sub-O er T e Header Short Text O eration ShOM01/MAREMEC2 20611381 0010 # 71PO RA008 BP POST SUPPORT BROKEN(NET 64) RA008 BP PO

    OM01/MARMELE2 20611523 0020 # 72FC LLF,QT-17 NEED ELECTRICAL RESET 17 M3/D REPLACE TH

    OM01/MARMELEC 20610898 0010 # 72FC MM112 ELEC RESET REQUIRED 41M3/D. MM112 ELEC

    20610899 0010 # 72FC MM473 CABLE CONNECTION FOR HOIST MM473 CAB

    20610900 0010 # 72FC MM571TRIP ON ELECTRICAL FAULT NET 01M3 MM571TRIP

    20610905 0010 # 72FC V-36179 ( K-3614 ) FOUNDATION BOLTS BROK ELECTRICAL

    0030 # 72FC V-36179 ( K-3614 ) FOUNDATION BOLTS BROK ELECTRICAL

    20610981 0020 # 72FC HWL CLUSTER DE-WAX CHEMICAL TRIPPED HWL CLUST

    20611049 0030 # 72FC A-3213 READING HIGH GROSS. ELECTRICAL

    0040 # 72FC A-3213 READING HIGH GROSS. ELECTRICAL

    20611377 0010 # 72FC MM560 PCP NEEDS ELE ISO FOR WPH MM560 PCP

    20611378 0010 # 72FC GAS LEAK IN GIC K-3614 ELECTRICAL

    0050 # 72FC GAS LEAK IN GIC K-3614 ELECTRICAL

    20611482 0010 # 72FC MM487 PCP NEEDS ELE DEISO AFTER WPH MM487 PCP

    20611523 0010 # 72FC LLF,QT-17 NEED ELECTRICAL RESET 17 M3/D LLF,QT-17 N

    20611666 0020 # 72FC MM206 COOLING FAN NEED TO REPLACED MM206 COO

    20611667 0010 # 72FC MM391 PCP ELE ISO FOR WPH MM391 PCP

    20611684 0020 # 72FC MM187 WRONG INDICATION.NET 7M3/D MOTOR NOT

    20611811 0020 # 72FC MM070 TRIPPED ON POC CONTROL ALARM ASSISTANC

    20611812 0010 # 72FC MM560 PCP NEEDS ELE DE-ISO AFTER WPH MM560 PCP

    OM01/MARMINST 20610981 0030 # 72FC HWL CLUSTER DE-WAX CHEMICAL TRIPPED HWL CLUST

    20611379 0015 # 72FC V-36104 PCV 100% AND REQUIRES CLEANING CABLE REM

    0025 # 72FC V-36104 PCV 100% AND REQUIRES CLEANING CABLE INST

    20611525 0010 # 72FC HWL CLUSTER IAC OIL LEAK HWL CLUST

    20611672 0020 # 72FC DAF 05 CHOKE VALVE CLEANING VALVE STRO

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    26/296

    20611379 0020 # 72FC V-36104 PCV 100% AND REQUIRES CLEANING V-36104 PC

    20611672 0030 # 72FC DAF-05 CHOKE VALVE CLEANING DAF-05 CHO

    20611713 0010 # 72FC K-2529 B MAINTENANCE REQUIRED ALARM K-2529 B M

    OM01/STAAST1 20610910 0010 # 72FC MM236 BP COMMUNICATION FAILURE 28M3/D. MM236 BP

    20610911 0010 # 72FC MM348 BP LOAD CELL FAILURE 83M3/D. MM348 BP

    20610912 0010 # 72FC MM367 BP COMMUNICATION FAILURE 3M3/D. MM367 BP

    20610913 0010 # 72FC QT-38 LOAD CELL FAIL (34M3/D) QT-38 LOA

    20611048 0010 # 72FC MM473 COMMUNICATION FAILURE 37M3/D. MM473 COM

    20611049 0010 # 72FC A-3213 READING HIGH GROSS. A-3213 REA

    20611380 0010 # 72FC ZMD-05 RTU FAULTY ( 9 M3/D). ZMD-05 RT

    20611534 0010 # 72FC MSV PROBLEM ON G STN QR-735 MSV PROB

    20611682 0010 # 72FC A-9517 NO COMMS A-9517 NO

    20611683 0010 # 72FC MM464 POS SW FAILED.NET 30 M3/D MM464 POS

    20611684 0010 # 72FC MM187 WRONG INDICATION.NET 7M3/D MM187 WR

    20611712 0010 # 72FC 23-QR-736 READING ZERO 23-QR-736

    20611811 0010 # 72FC MM070 TRIPPED ON POC CONTROL ALARM MM070 TRI

    OM01/SWSWSHP1 20611043 0010 # 72FC MM 353 COOLING FAN DAMAGED. MM 353 CO

    20611666 0010 # 72FC MM206 COOLING FAN NEED TO REPLACED MM206 COO

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    27/296

    PDO Detail Data: Comp. Pre-Existing Activities - Not in Plan

    Work Center Order Activities/O eration Sub-O er T e HeaOM01/MARMELE2 Marmul MNTCE. Electrical - EMC 20580701 0045 # 72WP Y1

    OM01/MARMELEC Marmul MNTCE. Electrical - PDO core 20609388 0020 # 72FC LIF

    20610845 0020 # 72FC TL-

    20610885 0010 # 72FC MM

    30027698 0040 0050 NT01 OP

    30043379 0030 # NT01 MU

    30045843 0080 # NT01 Q-O

    30045872 0010 0070 NT01 MM# NT01 MM

    OM01/MARMINST Marmul MNTCE. INSTRUMENTS - PDO core 20609791 0040 # 72FC DW

    30042628 0070 # NT01 EPC

    30043379 0040 # NT01 MU

    30045843 0090 # NT01 Q-O

    30045872 0010 0090 NT01 MM

    0100 # NT01 MM

    OM01/MARMMEC2 Marmul MNTCE. Mechanical - EMC 20581346 0080 # 72FC MA

    20599396 0030 # 72FC P15

    20609380 0010 # 72FC F24

    20609464 0020 # 71PO OP

    20609648 0020 # 72FC LLF

    20609649 0020 # 72FC LLF

    20609842 0020 # 72FC LLF

    20610846 0010 # 71PO "OP20610848 0010 # 71PO "OP

    0020 # 71PO "OP

    20610852 0010 # 71PO "OP

    0020 # 71PO "OP

    0030 # 71PO "OP

    0040 # 71PO "OP

    OM01/MARMMECH Marmul MNTCE. Mechanical - PDO core 20600031 0020 # 72FC TL-

    20603449 0020 # 72FC MA

    20609791 0020 # 72FC DW

    20610550 0020 # 72FC K-1

    OM01/OIETRI Power Operations Transmission-Infra 20509702 0010 # 72FP M6

    20509703 0010 # 72FP M6

    20509721 0010 # 72FP M6

    20509722 0010 # 72FP M6

    OM01/OSDPTENG OSD Production Technology 20585243 0040 # 72WC MM

    0050 # 72WC MM

    0060 # 72WC MM

    0070 # 72WC MM

    0080 # 72WC MM

    0090 # 72WC MM

    0100 # 72WC MM

    20588806 0020 # 72WC MM

    0030 # 72WC MM

    0040 # 72WC MM

    0050 # 72WC MM

    0060 # 72WC MM

    0070 # 72WC MM

    0080 # 72WC MM

    0100 # 72WC MM

    OM01/SPCONT2 Prod. Chem. Services (Contractor) South 20578935 0010 # 72FP W1

    20578937 0010 # 72FP W1

    OM01/STAAST1 Automation Sys Tech - Cont 20610839 0010 # 72FC RA

    20610840 0010 # 72FC TL0

    20610843 0010 # 72FC ZM

    20610844 0010 # 72FC TL0

    20610845 0010 # 72FC TL-

    30043379 0050 # NT01 MU

    30045843 0100 # NT01 Q-O

    30045872 0010 0080 NT01 MM

    0110 # NT01 MM

    OM01/STIPALG1 PIPLINE INTEGRITY MANAGEMENT CONTRAC 20517321 0010 # 72FC SO

    20603094 0010 # 72FP W1

    0040 # 72FP W1

    0050 # 72FP W1

    0060 # 72FP W1

    OM01/STMMECH Workshop Mechanical Technician 20587629 0020 # 72FC K3620599396 0010 # 72FC P15

    OM01/STMO MO / Major overhaul activity group 20599396 0020 # 72FC P15

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    28/296

    PDO Detail Data: Activities Completed Ahead of PlanWork Center Order Activities/O eration Sub-O er Plan Start P Plan EOM01/MARMINST Marmul MNTCE. INSTRUMENTS - PDO co 20552236 0110 # 15/02/2009 21/02/2

    OM01/SPCONT2 Prod. Chem. Services (Contractor) South 20578979 0010 # 15/02/2009 21/02/2

    20589739 0010 # 15/02/2009 21/02/2

    OM01/SWSWPHXX Planning Hoist 20602209 0010 # 15/02/2009 21/02/2

    Overall Result

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    29/296

    PDO Detail Data: Activities Re-scheduled Later Than Plan

    Work Center Order Activities/O eration Sub-O er Plan Start P Plan End P T e HeaOM01/MARMELEC 20533353 0040 # 15/02/2009 21/02/2009 72FP Y1 C

    OM01/MARMMEC2 20609053 0020 # 15/02/2009 21/02/2009 72FC MM

    OM01/OSDPTENG 20406249 0010 # 15/02/2009 21/02/2009 72WC MAR

    20406250 0010 # 15/02/2009 21/02/2009 72WC MAR

    20406251 0010 # 15/02/2009 21/02/2009 72WC MAR

    20406253 0010 # 15/02/2009 21/02/2009 72WC MAR

    OM01/STIPALG1 20589563 0010 # 15/02/2009 21/02/2009 72FP M1

    OM01/STIPPLN 20589563 0020 # 15/02/2009 21/02/2009 72FP M1

    OM01/STMMECH 20609841 0010 # 15/02/2009 21/02/2009 72FC PUM

    20610065 0010 # 15/02/2009 21/02/2009 72FC MEC

    OM01/SWERIG28 30043534 3478 # 15/02/2009 21/02/2009 NT99 WE

    4780 # 15/02/2009 21/02/2009 NT99 WE

    30047136 0010 # 15/02/2009 21/02/2009 NT01 SHU

    OM01/SWERIG87 30043534 0143 # 15/02/2009 21/02/2009 NT99 WE

    5501 # 15/02/2009 21/02/2009 NT99 WE

    OM01/SWSCCT22 20554593 0110 # 15/02/2009 21/02/2009 72WC TL-6

    OM01/SWSNCPXX 20580607 0010 # 15/02/2009 21/02/2009 72WP Y1 W

    20580608 0010 # 15/02/2009 21/02/2009 72WP Y1 W

    20580610 0010 # 15/02/2009 21/02/2009 72WP Y1 W

    20580621 0010 # 15/02/2009 21/02/2009 72WP Y1 W

    20580623 0010 # 15/02/2009 21/02/2009 72WP Y1 W

    20580717 0010 # 15/02/2009 21/02/2009 72WP Y1 W

    20580760 0010 # 15/02/2009 21/02/2009 72WP Y1 W20580762 0010 # 15/02/2009 21/02/2009 72WP Y1 W

    20591020 0010 # 15/02/2009 21/02/2009 72WP Y1 W

    OM01/SWSS 20588064 0020 # 15/02/2009 21/02/2009 72WC MM

    OM01/SWSWLU12 20603112 0010 # 15/02/2009 21/02/2009 72WC TL-9

    OM01/SWSWPH18 20595924 0010 # 15/02/2009 21/02/2009 72WC MAU

    OM01/SWSWPH25 20599431 0010 # 15/02/2009 21/02/2009 72WC Q-5

    OM01/SWSWPH35 30043534 6345 # 15/02/2009 21/02/2009 NT99 WE

    6346 # 15/02/2009 21/02/2009 NT99 WE

    OM01/SWSWPH6 20596202 0010 # 15/02/2009 21/02/2009 72WC REP

    OM01/SWSWPHXX 20531082 0010 # 15/02/2009 21/02/2009 72WP Y4 S

    20591990 0010 # 15/02/2009 21/02/2009 72WC PCP

    20610815 0010 # 15/02/2009 21/02/2009 72WC MM

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    30/296

    PDO Detail Data: Work Executed According to Plan

    Work Center Order

    Activities

    /Operatio

    nOM01/MARECIV2 Marmul ENG. Civil - EMC 20490559 0010

    0030

    20550286 0010

    20585943 001020585945 0010

    20594681 0010

    20596283 0010

    20600039 0020

    20603447 0020

    20608119 0010

    20608367 0010

    20609082 0010

    OM01/MAREELE1 Marmul ENG. Electrical - ODC 30045950 0030

    OM01/MAREELE2 Marmul ENG. Electrical - EMC 20587124 0010

    20609793 0010

    OM01/MAREINS2 Marmul ENG. INSTRUMENTS - EMC 20610439 0010

    OM01/MAREMEC2 Marmul ENG. Mechanical - EMC 20562598 0010

    20563975 0010

    20564018 001020564021 0010

    20581349 0020

    0030

    20586400 0010

    20592492 0010

    20601421 0010

    20610194 0020

    OM01/MARMELE2 Marmul MNTCE. Electrical - EMC 20495386 0020

    0045

    20495401 0020

    0045

    20495402 0020

    0045

    20495414 0020

    0045

    20495560 0104

    0110

    20495562 0104

    0110

    20495565 0104

    0110

    20495566 0104

    0110

    20495567 0104

    0110

    20495568 0104

    0110

    20495569 0104

    0110

    20495572 0104

    0110

    20495585 0020

    0045

    20495628 0104

    0110

    20495634 0104

    0110

    20495635 0104

    0110

    20495641 0104

    0110

    20580701 0020

    OM01/MARMELEC Marmul MNTCE. Electrical - PDO core 20509757 0070

    20533344 0030

    20533353 0030

    20533354 0030

    0040

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    31/296

    20610650 0010

    30045188 0010

    OM01/MARMMECH Marmul MNTCE. Mechanical - PDO core 20509238 0030

    20533344 0050

    20533353 0060

    20533354 0060

    20581530 0050

    20608778 0010

    20609270 0010

    20609377 0010

    20609388 001020609463 0010

    20609790 0010

    20609791 0010

    20609840 0010

    20610431 0010

    20610434 0010

    30042628 0110

    0190

    OM01/MARMSTA2 Marmul MNTCE. Static - EMC 20447604 0040

    20508623 0020

    0030

    0050

    20508631 0020

    0030

    005020509757 0020

    0030

    0050

    20519100 0020

    0030

    0050

    20519101 0020

    0030

    0050

    20519108 0020

    0030

    0050

    20551970 0020

    0030

    0050

    20603901 0010

    OM01/MAROOPER Marmul Facility Operations - PDO core 20603097 0010

    20603098 0010

    OM01/OSDPTENG OSD Production Technology 20585243 0120

    OM01/SPCONT2 Prod. Chem. Services (Contractor) South 20578826 0010

    20578829 0010

    20578930 0010

    20578932 0010

    20578978 0010

    20589734 0010

    20601618 0010

    20602800 0010

    OM01/STAAST1 Automation Sys Tech - Cont 20552366 0010

    0020

    OM01/STINSP2 Static Inspection (Contractor) - South 20388375 0010

    20388376 0010

    20433963 0010

    0020

    20508623 0040

    20508631 0040

    20508657 0010

    20509757 0040

    20519100 0040

    20519101 0040

    20519108 0040

    20527194 0010

    20551970 0040

    20552594 0010

    20567275 0010

    OM01/STIPALG1 PIPLINE INTEGRITY MANAGEMENT CONTRACT 20603094 0070

    20604102 0010

    OM01/STIPPLN SERVICE TI PIPELINE PLANNING 20589563 0030

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    32/296

    Planne

    r groupMain work center Order Priority Short text

    M01 MARMELEC 20585404 7 Replace faulty CTs on K3613-TXM01 MARMELEC 20585405 7 replce faulty control card for 8303B-BC

    M01 MARMINST 20610643 3 V-2407 level control mismatch

    MES MARMINST 20533337 3 Y1 HEATER PACKAGE MAINTENANCE

    MES MARMMECH 20463940 6 Gas Packing on all cylinders modificatio

    M01 MARMMECH 20572209 3 MAM-01 bulk MOV stuck on close posit ion

    M01 MARMMECH 20584723 4 P-36101 leak from mechanical seal

    M01 MARMMECH 20592944 2 GIC K-3614 gas leak in lubricator cyl 1.

    MES MARMMECH 20460270 1 INTERNAL INSPECTION OF ATMOSPH. TANK

    MES MARMMECH 20596672 1 Mechanical assistance in GRC K-3612

    MES MARMMECH 20557081 1 K-3614 3rd stage disch pilot valve leak

    M01 MARMMECH 20599708 4 K-3614 lube oil fan cooler problem

    M01 MARMMECH 20599590 4 N2 compressor K-3621B oi l filter alarm

    MES MARMMECH 20600111 3 gas leak from drain pump P-3605

    M01 MARMMECH 20602608 3 K3612-KR Installation of valvesMES MARMMECH 20509757 1 OVERHAUL INSPECT AND TESTING RV AND PVV

    MES MARMMECH 20551970 1 OVERHAUL INSPECT AND TESTING RV AND PVV

    MES MARMMECH 20583521 3 M6 WELL BEAM PUMP MAINTENANCE

    M01 MARMMECH 20610065 6 Mechanical seal refurbishment.

    MES MARMMECH 20519777 3 Y1 WELL BEAM PUMP MAINTENANCE (X)

    M01 MARMMECH 20612813 2 K2529 B V-belt damagged

    M01 MARMMECH 20612811 2 GBC K-3613 cylinder lubricator problem

    MES MARMSCAD 20609053 5 MM346: load cell failure (9m3/d)

    MES MAROOPER 20546933 3 Isolation Harweel-Birba Pig launcher

    MES MAROOPER 20538743 4 THL.STN access hump to be cut and level

    MES MAROOPER 20575673 4 Ghafeer-2 Access Road Repairing

    MOS MAROOPER 20561178 4 SAK-02 celler grating missing

    MES MAROOPER 20587636 2 ZAZ-17 CELLAR GRATINGS MISSING

    MES MAROOPER 20577762 6 Creating Foundation for new Wax tanksMES MAROOPER 20585945 6 Ramp required to transfer chemical drums

    MES MAROOPER 20585943 6 Ramp required to transfer lube oil drums

    MES MAROOPER 20609793 3 LLF,QT-17 HV cable backfilling 17 M3/D

    MES MAROOPER 20550286 4 LLF MM304 Samson Pose ladder is damage

    MES MAROOPER 20564019 4 LLF,Q-39ESP well need proper sample poit

    MES MAROOPER 20565510 5 LLF,QT-24 need proper sample point

    M01 OSDHRGEN 20166422 3 PROVIDE SUNSHADE FOR VARIOUS SCHOOL

    MES OSDHRGEN 20339273 3 Resheet Shelim R/A - -Suqra (15 Km)

    MES OSDHRGEN 20339272 3 Resheet Shuwaimeiah - Gonoot (8 Km)

    MES OSDHRGEN 20339274 3 Resheet Suqra road -Shirbithat (15.4 Km)

    MES OSDHRGEN 20339270 3 Resheet Thumrait road - Demeet (8 Km)

    M01 OSDHRGEN 20367685 4 Resheet Wadi shirbithat -Minji (13.4 Km)

    MES OSDHRGEN 20339269 3 Resheet Wadi shirbithat -Minji (13.4 Km)

    MES OSDHRGEN 20339268 3 Reseet Minji - jabal top (7.2 Km)M01 OSDOPENG 20162610 2 QE-3 UNDERGROUND F/L LEAK ,

    M01 OSDOPENG 20162117 4 RENEWAL OF OFF-PLOT PIPE

    M01 OSDOPENG 20162116 4 RENEWAL OF OFF-PLOT PIPE

    M01 OSDOPENG 20184272 3 REPLACE RDX FOR QHR - QT HEADER

    M01 OSDOPENG 20166473 2 replace launcher of 10" QHR/THL p/l

    M01 OSDOPENG 20263234 5 Q-26-SOLVENT &ACID WASH

    M01 OSDOPENG 20313025 3 QAHARIR-51-ACID STIM

    M01 OSDOPENG 20311784 3 QAHARIR-48-ACID&SOLVENT WASH

    M01 OSDOPENG 20311783 3 QAHARIR-45-ACID&SOLVENT WASH

    CNF Work order

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    33/296

    M01 OSDOPENG 20346406 2 LAY LLRTP FOR THAMOUD 9 WELL

    MES OSDOPENG 20338020 2 "MM-392"

    M01 OSDOPENG 20338081 2 "MM-393"

    M01 OSDOPENG 20338084 2 "MM-395"

    M01 OSDOPENG 20351888 2 TL-83 MPLT operation

    M01 OSDOPENG 20352750 3 Rahab-34 MPLT,SRT,PFO

    MES OSDOPENG 20166438 2 Replace receiver of 10" QHR/MMPS p/l

    MES OSDOPENG 20166441 2 Replace the receiver of 10" Qata/QHR p/l

    M01 OSDOPENG 20350107 3 Rahab-28 MPLT,SRT,PFO

    MES OSDPROG 20383492 3 MM295 VFC connection and installat ion

    M01 OSDPROG 20357364 5 MM-212 Well Abandonment

    M01 OSDPROG 20357369 5 MM-227 Well Abandonment

    M01 OSDPROG 20357301 5 MM-105 Well Abandonment

    M01 OSDPROG 20357367 5 MM-217 Well Abandonment,,

    MES OSDPROG 20445415 5 Marmul-13 Well Abandonment

    MES OSDPROG 20445418 5 Marmul-72 Well Abandonment

    MES OSDPROG 20446081 4 MM-240 BP re-opening

    MES OSDPROG 20450529 6 Visual inspection of WSW in Marmul

    M01 OSDPROG 20465140 3 MM-224 Integrity Test

    MES OSDPROG 20410057 7 MML A Closed-In Well Maintainance

    M01 OSDPROG 20502874 2 MM-331 LOP - LFL PCP Replacement

    MES OSDPROG 20410058 7 MML B Closed-In well Maintainance

    MES OSDPROG 20410059 7 MML C MML C MM036 MML C MM036

    MES OSDPROG 20410060 7 MML D Closed-In well Maintainance

    M01 OSDPROG 20503353 3 MM-443 , PCP replacement program

    MES OSDPROG 20410083 7 MML E well maintainance

    MES OSDPROG 20410085 7 MML G Closed-In Well Maintainance

    MES OSDPROG 20409773 7 Marmul GNR CI-Wells Maintainance

    MES OSDPROG 20410056 7 MM GWR Closed_in Well Maintainance

    MES OSDPROG 20410088 7 QAH Closed-In well Maintainance

    MES OSDPROG 20410095 7 Water well Closed-In well Maintainance

    MES OSDPROG 20410089 7 QATA Closed-In well maintainance

    MES OSDPROG 20409771 7 AL DHABI Closed-In well Maintenance

    MES OSDPROG 20410090 7 RAH Closed-In Well Maintanance

    MES OSDPROG 20410097 7 ZMD Closed-In well MaintananceMES OSDPROG 20410092 7 TMD Closed-In Well Maintainance

    MES OSDPROG 20410091 7 THL Closed-In well Maintanance

    M01 OSDPROG 20505694 3 MM-408 Loss Of Production

    M01 OSDPROG 20505326 3 MM-301 Loss Of Production

    M01 OSDPROG 20514234 1 MM-351 LOP

    M01 OSDPROG 20517386 7 Q-23 PCP LOP

    M01 OSDPROG 20489449 4 MM-487 Sand Clean Out with CCT

    M01 OSDPROG 20493707 3 MM-340 PCP Flush

    M01 OSDPROG 20494536 4 MM-179 BP LFL Replacement

    M01 OSDPROG 20476604 3 MM-411 Reduce Of Production

    M01 OSDPROG 20475638 3 MM-441 Reduce Of Production

    M01 OSDPROG 20522489 3 MM-066 Loss Of Production

    M01 OSDPROG 20525360 7 QT-37 LOP, Plng worn out

    M01 OSDPROG 20529660 3 MM-253 , BP repair M01 OSDPROG 20449060 6 RA036 PLT

    M01 OSDPROG 20521227 1 MM-051 BP upsize

    M01 OSDPROG 20521228 3 MM-073 BP upsize

    M01 OSDPROG 20465143 3 MM-173 Integrity Test

    M01 OSDPROG 20516626 3 MM-405 ESP Upsize

    M01 OSDPROG 20516627 3 MM-407 ESP upsize

    M01 OSDPROG 20539811 3 PCP failure

    M01 OSDPROG 20543427 3 MM-450 Reduce of Production

    M01 OSDPROG 20545138 3 MM-141 Loss Of Production

    M01 OSDPROG 20545869 7 MM-053 LOP

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    34/296

    M01 OSDPROG 20553500 3 MM-141 Loss Of Production

    M01 OSDPROG 20539838 3 MM-65 FOT & SRT

    M01 OSDPROG 20547233 3 MM-300 Pull the completion

    M01 OSDPROG 20555454 3 MM-054 Loss of production

    M01 OSDPROG 20560013 3 MM-525 Backflush

    M01 OSDPROG 20563943 3 MM-525 Backflush

    M01 OSDPROG 20555732 3 MM-037 PCP downsize

    M01 OSDPROG 20546151 3 MM-433 install a dual wellhead

    M01 OSDPROG 20569423 3 MM-391 Loss of Production

    M01 OSDPROG 20569382 3 MM-440 Parted rods

    M01 OSDPROG 20565253 3 MM-522 Loss Of Production

    M01 OSDPROG 20571853 3 MM-541 PCP repair

    M01 OSDPROG 20568260 3 MM-525 Pull rotor

    M01 OSDPROG 20569238 3 MM-073 Plunger stuck

    M01 OSDPROG 20569543 3 MM-455 Reduce of production

    M01 OSDPROG 20576220 3 MM-440 Loss of production/Tbg leak

    M01 OSDPROG 20569531 3 MM-343 Reduce Of Production

    M01 OSDPROG 20571147 3 MM-552 PCP repaire

    M01 OSDPROG 20571901 3 MM-537 upsize, re perforation & RST log

    M01 OSDPROG 20577707 3 MM-473 back flush

    MES OSDPROG 20561660 3 MM-37 Tubing leak

    M01 OSDPROG 20575751 3 MM-376 Loss of Production

    M01 OSDPROG 20580707 1 Y3 SIT for Well Type 1 HP

    M01 OSDPROG 20580641 1 Y1 WIT For Well Type-6 WI

    M01 OSDPROG 20580636 1 Y1 WIT For Well Type-6 WI

    M01 OSDPROG 20580542 1 Y1 WIT For Well Type-6 WI

    M01 OSDPROG 20591872 3 MM-565 back flush

    M01 OSDPROG 20519712 1 Y1 WIT for Well type 2 LP

    M01 OSDPROG 20527683 1 Y3 SIT for Well Type 2 LP

    M01 OSDPROG 20563306 5 MM-450 Convert PCP to ESP

    M01 OSDPROG 20476044 2 MM-487 Backflush

    MES OSDPROG 20601627 3 MM-197 PPR

    M01 OSDPROG 20590520 1 Y3 SIT for Well Type 1 HP

    M01 OSDPROG 20537122 1 Y3 SIT for Well Type 1 HP

    M01 OSDPROG 20535270 1 Y3 SIT for Well Type 1 HPM01 OSDPROG 20609695 1 Y3 SIT for Well Type 1 HP

    M01 OSDPTENG 20391567 4 MM-148-Repair Casing

    N01 OSDPTENG 20360528 5 Marmul-170 well Abandonment

    M01 OSDPTENG 20419491 3 RA-09 repair Pump/remove selective comp.

    M01 OSDPTENG 20547295 7 TL-123 LOP repair

    M01 OSDPTENG 20403622 3 RA-32 Acid Stimulation

    M01 OSDPTENG 20429472 3 RA-28 Foam cleanout and Acid Stim

    M01 OSDPTENG 20436263 3 Rahab-29 ROP

    M01 OSDPTENG 20436470 3 Rahab-08 Pump Upsize

    M01 OSDPTENG 20450383 6 RA-42 LOP LFL

    M01 OSDPTENG 20438125 3 TL-78 Pump upsize

    M01 OSDPTENG 20461009 5 MM-159 Well Integrity Test

    M01 OSDPTENG 20456744 6 RA-43 CTU cleanout

    M01 OSDPTENG 20456745 6 RA-44 CTU cleaningM01 OSDPTENG 20461449 5 QRM-1 Abandonment

    M01 OSDPTENG 20516007 7 TL-80Temp survey for geothermal gradient

    M01 OSDPTENG 20455426 4 RA-42 convert from BP to PCP

    M01 OSDPTENG 20429503 3 Rahab-10 IGP perforations

    M01 OSDPTENG 20469029 7 Rahab-29 LOP

    M01 OSDPTENG 20470091 3 TL-121 cleanout and LOP

    M01 OSDPTENG 20476281 3 MM-304 to fix pump sticking problem

    M01 OSDPTENG 20470297 3 MM-112 BP upsize

    M01 OSDPTENG 20443779 7 ZMD-4 integrity repair

    M01 OSDPTENG 20471682 7 Rahab-29 LOP

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    35/296

    M01 OSDPTENG 20471637 7 Rahab-37 Re-Perforation

    M01 OSDPTENG 20476696 7 MM-107 Pump Repair

    M01 OSDPTENG 20444848 3 MM-304 acid stim&recopletion

    M01 OSDPTENG 20478044 4 MM-421SRT & Fall Off Survey

    M01 OSDPTENG 20481860 3 TL-138 LOP

    M01 OSDPTENG 20482238 5 TL-76 LOP LFL

    M01 OSDPTENG 20482223 2 TL-86 PPR

    M01 OSDPTENG 20468578 2 Rahab-2 PCP repair

    M01 OSDPTENG 20475553 3 MM-475 Reduce Of Production/tubing leak

    M01 OSDPTENG 20484273 6 Rahab-19ROP

    M01 OSDPTENG 20478968 7 Rahab-11 ROP

    M01 OSDPTENG 20488092 3 MM-011 Lose of Production

    M01 OSDPTENG 20487165 1 TL-63 LOP

    M01 OSDPTENG 20488437 7 Rahab-36 P/R repair

    M01 OSDPTENG 20489239 7 Bean Pump Replacement (LOP)

    M01 OSDPTENG 20489914 7 Rahab-10 install 3.75 PLNG

    M01 OSDPTENG 20490420 7 TL-102 LOP LFL

    M01 OSDPTENG 20490427 7 TL-99 LOP LFL

    M01 OSDPTENG 20490711 7 TL-17 LOP LFL

    M01 OSDPTENG 20490724 3 MM-311 to repleace broken polished rod

    M01 OSDPTENG 20484277 5 TL-56 LOP LFL

    M01 OSDPTENG 20495898 7 TL-133 LOP LFL

    M01 OSDPTENG 20489874 3 MM-376 Lose of Production

    M01 OSDPTENG 20493591 7 TL-123 Beam Pump Upsize

    M01 OSDPTENG 20397847 4 TL-51-CONVERSION -INJ TO PRODUCER

    M01 OSDPTENG 20487003 3 MM-471 PPR-low efficiency pump

    M01 OSDPTENG 20495814 7 TL-18 pump upsize

    M01 OSDPTENG 20502675 7 TL041 LOP Parted rod

    M01 OSDPTENG 20422634 3 MM-240 Re-Open

    M01 OSDPTENG 20438078 3 TL-44 Pump upsize

    M01 OSDPTENG 20482855 7 TL-119 cleanout

    M01 OSDPTENG 20503575 6 QT-22 LOP

    M01 OSDPTENG 20502677 7 TL023 ROP

    M01 OSDPTENG 20496441 2 MM-515 Step Rate Test

    M01 OSDPTENG 20487366 1 ZMD-4 Intergrity repair and LOPM01 OSDPTENG 20503320 3 MM-120 PPR-low pump efficiency

    M01 OSDPTENG 20503734 7 RA-10 LOP

    M01 OSDPTENG 20475674 7 MM-476 Stimulation

    M01 OSDPTENG 20490015 3 MM-511 injection well cleanout with acid

    M01 OSDPTENG 20503984 2 MM-059-LOP-P/R-BROKEN

    M01 OSDPTENG 20504137 1 MM-53-LOP-FIX

    M01 OSDPTENG 20478111 3 TL-96 injector cleanout

    M01 OSDPTENG 20505845 3 MM-517 PCP repair program

    M01 OSDPTENG 20506437 3 MM-364 PPR-to replace pump like for like

    M01 OSDPTENG 20504571 3 MM-161 PPR-to replace pump LFL

    M01 OSDPTENG 20478628 6 MM-34 Conversion to water injector

    M01 OSDPTENG 20506445 7 RA-10 CCT cleanout

    M01 OSDPTENG 20513965 6 Q-22 LOP

    M01 OSDPTENG 20489881 7 TL-111 ROP LFLMES OSDPTENG 20513669 7 Trenching on wellsite MAurid NE-1

    M01 OSDPTENG 20505286 7 QT-8 BP repair

    M01 OSDPTENG 20437691 1 MM-115 Integrity test

    M01 OSDPTENG 20493471 1 MM-138 set the plug

    M01 OSDPTENG 20434499 3 Zumurrud-10 Integrity repair

    M01 OSDPTENG 20506093 3 MM-029-PPR-PUMP REPLACEMENT

    M01 OSDPTENG 20514173 6 MM-305 replace PCP

    M01 OSDPTENG 20514172 7 MM-446 rplace PCP

    M01 OSDPTENG 20478249 5 MM-220 Workover

    M01 OSDPTENG 20472058 3 MM-65 Injectivity & integrity test

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    36/296

    M01 OSDPTENG 20514503 4 MM-150 BP repair program

    M01 OSDPTENG 20514793 2 MM-191-LOP-FIX BROKEN P/R

    M01 OSDPTENG 20515055 4 MM-121 LOP

    M01 OSDPTENG 20489452 4 MM-486 Sand Clean Out with CCT

    M01 OSDPTENG 20503750 3 MM-226 integri ty test + static survey

    M01 OSDPTENG 20515648 7 TL-134 LOP and pump upsize

    M01 OSDPTENG 20437694 3 MM-130 Integrity test

    M01 OSDPTENG 20514265 7 TL-51 PCP backflush

    M01 OSDPTENG 20498640 7 QT-45 P/R Failure

    M01 OSDPTENG 20437702 3 MM-38 Integrity test + Open Up

    M01 OSDPTENG 20516939 2 MM-350-LOP-PUMP FAILURE

    M01 OSDPTENG 20465191 3 MM-023 to upsize BP from 3.5" to 4.5

    M01 OSDPTENG 20514237 7 RA-33 CCT cleanout

    M01 OSDPTENG 20528394 2 MM-472-DRIVEHEAD REPAIR

    M01 OSDPTENG 20476679 7 MM-279 Major Integrity Work (Casing)

    M01 OSDPTENG 20521640 7 ZMD-4 LOP

    M01 OSDPTENG 20505830 3 MM-246 integri ty test + static survey

    M01 OSDPTENG 20518109 7 MM-367 PPR

    M01 OSDPTENG 20503131 7 TL035 ROP

    M01 OSDPTENG 20522814 7 MM-289 LOP (PUMP UPSIZE)

    M01 OSDPTENG 20522982 7 TL-48 LOP LFL

    M01 OSDPTENG 20515749 7 TL-33 ROP

    M01 OSDPTENG 20464268 3 MM-149 Integrity test

    M01 OSDPTENG 20524038 7 TL-114 , Bean Pump Replacement (LOP)

    M01 OSDPTENG 20521447 3 MM-353 PCP upsize

    M01 OSDPTENG 20523402 2 MM-409-LOP-REPAIR

    M01 OSDPTENG 20521800 3 MM-018 PCP failure

    M01 OSDPTENG 20525506 7 Q-12 PPR

    M01 OSDPTENG 20525287 7 Q-35 ESP LOP

    M01 OSDPTENG 20521802 2 MM-336 PCP failure

    M01 OSDPTENG 20528453 7 Bean Pump Replacement (LOP)

    M01 OSDPTENG 20524739 2 Dhiab-4 LOP

    M01 OSDPTENG 20528339 Beam pump faiure (LOP)

    M01 OSDPTENG 20528032 2 MM-365-LOP FIX

    M01 OSDPTENG 20524171 4 MM-91 LOPMES OSDPTENG 20397064 5 Re-open the well by install ing a PCP

    M01 OSDPTENG 20514956 7 Q-5 replace BP

    M01 OSDPTENG 20528658 7 Q-17 LOP

    M01 OSDPTENG 20503093 3 MM-118 integri ty test + static survey

    M01 OSDPTENG 20514958 7 Q-30 add perforation

    M01 OSDPTENG 20524782 7 Q- 6 PPR

    M01 OSDPTENG 20523043 7 TL-51 LOP LFL

    M01 OSDPTENG 20516048 7 Rahab-41 Reperforation

    M01 OSDPTENG 20530927 3 MM-410, PCP repair program

    M01 OSDPTENG 20528605 7 TL-53 LOP and integrity repair

    M01 OSDPTENG 20530925 4 MM-211 BP repair

    M01 OSDPTENG 20530917 3 PCP failure

    M01 OSDPTENG 20531547 3 MM-248 BP failure

    M01 OSDPTENG 20521016 3 MM-133 integri ty test + statci surveyM01 OSDPTENG 20528451 3 PCP failure

    M01 OSDPTENG 20528417 7 TL-64 PCP flush

    M01 OSDPTENG 20537947 2 MM-181, PCP repair program

    M01 OSDPTENG 20471776 1 BP-Upsize from 3.5" to 4.5" on MM-86

    M01 OSDPTENG 20456287 4 BP-Upsize from 3.5" to 4.5" on MM-129

    M01 OSDPTENG 20537389 2 MM-457 PUMP REPLACEMENT

    M01 OSDPTENG 20521263 3 MM-146 integrity test & static survey

    M01 OSDPTENG 20475566 1 QT-44 replace PCP

    MES OSDPTENG 20506894 1 MM-390 PCP upsize

    M01 OSDPTENG 20538320 3 MM-471 LOP-parted

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    37/296

    M01 OSDPTENG 20452126 3 MM-449 MPLT logging in Water Injector

    M01 OSDPTENG 20537995 7 TL102 LOP

    M01 OSDPTENG 20537438 3 MM-138 PCP Repair

    M01 OSDPTENG 20505327 7 TL-99 Replace PCP

    M01 OSDPTENG 20537499 3 PCP failure

    M01 OSDPTENG 20539073 3 MM-79 PCP failure

    MES OSDPTENG 20503792 3 MM-475 LOP-to replace pump LFL

    M01 OSDPTENG 20540816 3 MM-437 LOP-pump failure

    M01 OSDPTENG 20539935 3 MM-454 PPR-low pump efficiency

    M01 OSDPTENG 20521009 4 MM-499 PLT and Temperature Logging

    M01 OSDPTENG 20540484 7 MM-129 BP Back Flush

    M01 OSDPTENG 20547289 3 MM-262, PCP Repair program

    M01 OSDPTENG 20541515 3 MM-236, BP Repair Program

    M01 OSDPTENG 20540795 3 MM-336 PCP repaire

    M01 OSDPTENG 20505759 7 Q-55 add perforation

    M01 OSDPTENG 20521188 3 MM-406 BP Reduce of Production

    M01 OSDPTENG 20537954 7 TL-46 LOP

    M01 OSDPTENG 20547255 7 Q-27 PCP LOP

    M01 OSDPTENG 20538526 7 TL-51 PCP backflush

    M01 OSDPTENG 20543442 3 MM-188 PPR

    M01 OSDPTENG 20547290 3 MM-58 PPR

    M01 OSDPTENG 20548987 3 MM-452 LOP_parted rod to fix

    M01 OSDPTENG 20535701 3 MM-402 Temp survey & PLT

    M01 OSDPTENG 20515756 7 TL-52 Beam Pump Upsize

    M01 OSDPTENG 20542494 7 TL-63 LOP

    M01 OSDPTENG 20507653 1 TL-138 cleanout, add perf, PCP conv

    M01 OSDPTENG 20437689 3 MM-093 Integrity test

    M01 OSDPTENG 20522643 4 Step-rate & Fall-off test

    M01 OSDPTENG 20549259 7 Q-11 replace PB

    M01 OSDPTENG 20521190 3 MM-451 PCP pump upsize

    M01 OSDPTENG 20535702 3 MM-403 Temp survey & PLT

    M01 OSDPTENG 20547258 7 MM-139 ROP

    M01 OSDPTENG 20549914 1 QT-23 LOP

    M01 OSDPTENG 20537760 3 MM-125 BP Upsize from 3-1/2" to 4-1/2"

    M01 OSDPTENG 20549926 3 MM-443, PCP Repair programM01 OSDPTENG 20530092 7 TL-34 WSO using cement and CHFR logging

    M01 OSDPTENG 20549451 3 MM-353 PCP failure

    M01 OSDPTENG 20535697 3 MM-381 Temp survey & PLT

    M01 OSDPTENG 20538441 3 MM-479 step rate test

    M01 OSDPTENG 20524670 7 Fishing job for QT14

    M01 OSDPTENG 20550033 4 MM-138 PCP failure

    M01 OSDPTENG 20549993 5 MM-61 PCP recompletion, reopen C/I well

    MES OSDPTENG 20449304 3 TL-113, conversion WI to OP

    M01 OSDPTENG 20522497 3 MM-488 PCP upsize

    M01 OSDPTENG 20540102 3 MM-379 step rate and fall off test

    M01 OSDPTENG 20546998 7 Integrity test and recompletion

    M01 OSDPTENG 20521182 7 TL-70 ROP

    M01 OSDPTENG 20555256 7 MUDNE-5 PCP Replacement (LOP)

    M01 OSDPTENG 20556188 3 MM-230 Parted RodM01 OSDPTENG 20548140 7 Rahab-32 Recompletion

    M01 OSDPTENG 20537738 4 MM-244, BP installation

    M01 OSDPTENG 20550502 2 TL-57 ROP

    M01 OSDPTENG 20553499 2 MM-257, ESP Repair Program

    M01 OSDPTENG 20555226 7 MM-558 Back Flush for a stuck rotor

    M01 OSDPTENG 20556602 2 QATA-1 PPR

    M01 OSDPTENG 20556543 2 MM-346 Stuffing box leak

    MES OSDPTENG 20503355 3 MM-263 PCP-Drive head Repair

    M01 OSDPTENG 20556312 2 TL-84 LOP LFL

    M01 OSDPTENG 20548316 2 Rahab-20 Fishing and Adding MG/LG1

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    38/296

    M01 OSDPTENG 20528532 2 Rahab-45 LG1 Perforation

    M01 OSDPTENG 20471038 7 MM-413 PCP Optimization

    M01 OSDPTENG 20549934 7 Q-10 conversion to dual

    M01 OSDPTENG 20560957 3 MM-558 Backflush

    M01 OSDPTENG 20560019 7 MDNE-15

    M01 OSDPTENG 20542590 7 TL-38 CT Cleanout stimulation

    M01 OSDPTENG 20561109 7 MDNE-14 Beam Pump Replacement (LOP)

    M01 OSDPTENG 20561734 7 Q-23 LOP

    M01 OSDPTENG 20549937 7 Q-22 conversion to dual

    M01 OSDPTENG 20547924 7 CTU -2 Q-53 stimualtion

    M01 OSDPTENG 20469030 4 Q-53 PLT/SRT

    M01 OSDPTENG 20560501 3 MM-205 BP repair

    M01 OSDPTENG 20546997 7 MUDNE-1 Water shut-off using bridge plug

    M01 OSDPTENG 20547927 7 Q-15 stimualtion

    M01 OSDPTENG 20562391 3 MM-364 Lose of production

    M01 OSDPTENG 20560215 7 RA-48 PPR

    M01 OSDPTENG 20560357 3 MM-310 ppr-worn out pump

    M01 OSDPTENG 20546305 3 MM-498 install dual well head

    M01 OSDPTENG 20554621 7 TL-134 dual conversion

    M01 OSDPTENG 20561083 4 MM-150 BP repair program

    M01 OSDPTENG 20562797 7 PCP-LOP (broken rod)

    M01 OSDPTENG 20560502 3 MM-121 BP repair

    M01 OSDPTENG 20555759 7 MM-164 FWVI Leaking off

    MES OSDPTENG 20553341 3 MM-406 Install drive head

    M01 OSDPTENG 20565249 7 MM-40 LOP

    M01 OSDPTENG 20563365 7 TL-96 Corrosion logging

    M01 OSDPTENG 20546402 7 QT-48 MPLT

    M01 OSDPTENG 20563367 7 TL-104 Corrosion logging

    M01 OSDPTENG 20530330 7 TL-54 completion

    M01 OSDPTENG 20560473 7 TL009 ROP

    MES OSDPTENG 20561852 3 MM-492 Lose of Production

    M01 OSDPTENG 20561708 7 sand cleanout trip using CCT QT-2

    M01 OSDPTENG 20522981 7 RA-48 LOP

    M01 OSDPTENG 20567782 7 TL-18 LOP

    M01 OSDPTENG 20517144 2 MM-511-SRT, PFO AND PLTM01 OSDPTENG 20568466 7 Reduced Production ( QT-48 )

    MES OSDPTENG 20561019 7 MM-151 New Tech and PCP Upsize

    M01 OSDPTENG 20521285 3 MM-495 MPLT

    M01 OSDPTENG 20548036 7 MUDNE-12 Add perforation & recompletion

    M01 OSDPTENG 20478045 4 MM-423 SRT & Fall Off Survey

    M01 OSDPTENG 20553851 7 TL-82 Water shut-off using TT plug

    M01 OSDPTENG 20548032 7 MUDNE-8 Add perfs and recompletion

    M01 OSDPTENG 20568715 7 TL-123 PPR

    MES OSDPTENG 20560042 7 MM-138 LOP and Zone Reopen

    M01 OSDPTENG 20569559 7 MM-86 LOP LFL

    M01 OSDPTENG 20521242 3 MM-431 MPLT

    M01 OSDPTENG 20570399 2 Beam Pump Replacement (LOP)

    M01 OSDPTENG 20560212 7 RA-15 PCP upsize

    MES OSDPTENG 20564905 7 MM-279 UpsizeM01 OSDPTENG 20550738 2 MM-472 to replace existing worn out PCOP

    M01 OSDPTENG 20568841 7 MM-134 PPR

    M01 OSDPTENG 20569438 3 MM-107 Back Flush

    M01 OSDPTENG 20557203 7 RA-38 Addition perf and DWH

    M01 OSDPTENG 20565270 7 TL138 LOP

    M01 OSDPTENG 20568858 3 MM-344 Reduce of Production

    M01 OSDPTENG 20555779 7 MM-384 Upsize PCP

    M01 OSDPTENG 20571127 2 MM-81 BP repair program

    M01 OSDPTENG 20569260 7 TL-56 Recompletion

    M01 OSDPTENG 20571614 3 MM-141 Loss of production

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    39/296

    M01 OSDPTENG 20503296 3 MM-131 Integrity test + static survey

    M01 OSDPTENG 20569242 3 MM-483 PCP drivehead replacement

    M01 OSDPTENG 20575580 7 TL018 LOP

    M01 OSDPTENG 20506714 3 MM-104 integri ty test + static survey

    M01 OSDPTENG 20569775 7 TL-33 pump upsize

    M01 OSDPTENG 20571465 7 MM-289 LOP

    M01 OSDPTENG 20554622 7 TL-110 dual conversion

    M01 OSDPTENG 20570383 4 MM-173 Reopen Program

    M01 OSDPTENG 20493355 1 Y4 SIT for Well Type 6 WI

    M01 OSDPTENG 20578768 7 MDNE-8 Beam Pump Replacement (LOP)

    M01 OSDPTENG 20579648 7 MM-562 back flush

    M01 OSDPTENG 20567666 2 MM-014 PPR-like for like ESP replacement

    M01 OSDPTENG 20572343 3 MM-410 PCP repair program

    M01 OSDPTENG 20493356 1 Y4 SIT for Well Type 6 WI

    M01 OSDPTENG 20493354 1 Y4 SIT for Well Type 6 WI

    M01 OSDPTENG 20584095 3 MM-494 PCP upsize

    M01 OSDPTENG 20576621 7 MDNE-7 pump downsize

    M01 OSDPTENG 20492669 1 Y4 SIT for Well Type 5 WP Hoist

    M01 OSDPTENG 20576566 3 Q-52 stimulation

    M01 OSDPTENG 20584466 7 MAURID WSW-1 ESP Upsize

    M01 OSDPTENG 20581831 3 MM-442 PCP repair program

    M01 OSDPTENG 20437697 3 MM-009 Integrity test

    M01 OSDPTENG 20493296 1 Y4 SIT for Well Type 6 WI

    M01 OSDPTENG 20581071 3 MM-268 PCP Repair Program

    M01 OSDPTENG 20581070 3 MM-502 PCP Repair Program

    M01 OSDPTENG 20585202 3 MM-481 LOP-pump stuck

    M01 OSDPTENG 20585963 3 MM-125 Beam Pump LOP

    M01 OSDPTENG 20584479 3 MM-37 LOP-PARETD ROD

    M01 OSDPTENG 20571578 3 MM-472 Chemical cut

    M01 OSDPTENG 20579872 3 MM-346 BP repair

    M01 OSDPTENG 20571627 3 MM-265 Loss of production

    M01 OSDPTENG 20585407 3 MM-026 PCP Failure

    M01 OSDPTENG 20585922 3 MM-368 Integrity test + static survey

    M01 OSDPTENG 20584469 3 MM-370 PPR-low pump efficiency

    M01 OSDPTENG 20587380 1 MM-206 PCP failureM01 OSDPTENG 20584848 3 MM-565 PCP repair

    M01 OSDPTENG 20585950 3 MM-141 BP-LOP-PARTED ROD

    M01 OSDPTENG 20493298 1 Y4 SIT for Well Type 6 WI

    M01 OSDPTENG 20546150 7 Q-30 fishing_perforation

    NES OSDPTENG 20585409 7 Saqr-1 LOP

    M01 OSDPTENG 20586041 3 MM-120 PCP-LOP

    M01 OSDPTENG 20568891 7 QE-22MPLT Logging

    M01 OSDPTENG 20587164 MM-18 PCP failure

    MES OSDPTENG 20548975 4 MM-280 Integrity repair+BP installation

    M01 OSDPTENG 20588783 7 MDNE-1 LOP

    M01 OSDPTENG 20589274 2 MM-554 PCP failure

    M01 OSDPTENG 20589273 2 MM-206 Parted rod

    M01 OSDPTENG 20587217 3 MM-414 PPR-low pmp efficiency

    M01 OSDPTENG 20493357 1 Y4 SIT for Well Type 6 WIM01 OSDPTENG 20579426 7 TL-93 LOP LFL

    M01 OSDPTENG 20571628 3 MM-308 Loss of production

    M01 OSDPTENG 20591776 7 MDNE-01 Beam Pump Replacement (LOP)

    M01 OSDPTENG 20588057 3 MM-485 PCP upsize

    M01 OSDPTENG 20588753 7 TL-134 MPLT logging

    M01 OSDPTENG 20592659 1 MM-557 LOP (PCPUMP REPLACEMENT)

    M01 OSDPTENG 20587917 7 TL-9 LOP

    M01 OSDPTENG 20570553 7 Rahab-41 Additional perforations

    M01 OSDPTENG 20592251 3 MM-79 PCP failure

    M01 OSDPTENG 20570555 7 Rahab-42 Additional perforations

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    40/296

    M01 OSDPTENG 20577248 3 MM-295 PCP Repair program

    M01 OSDPTENG 20586475 3 MM-354 PCP upsize

    M01 OSDPTENG 20561710 4 MM-260 Integrity repair+BP installation

    M01 OSDPTENG 20584192 3 MM-107 routine pump change out+CCT clean

    M01 OSDPTENG 20548078 7 Q-32 PPR

    M01 OSDPTENG 20588877 2 MM-336 LOP- Parted rods

    M01 OSDPTENG 20588105 7 Q-11 ROP

    M01 OSDPTENG 20593313 2 MM-541 LOP

    M01 OSDPTENG 20575412 7 Rahab-53 LOP

    M01 OSDPTENG 20586080 3 MM-312 PCP repair

    M01 OSDPTENG 20594492 2 MM-112 BP Repair Program

    M01 OSDPTENG 20493328 1 Y4 SIT for Well Type 7 WD

    M01 OSDPTENG 20493288 1 Y4 SIT for Well Type 6 WI

    M01 OSDPTENG 20493304 1 Y4 SIT for Well Type 6 WI

    M01 OSDPTENG 20579844 6 Q-13 polish rod change

    M01 OSDPTENG 20493359 1 Y4 SIT for Well Type 6 WI

    M01 OSDPTENG 20592678 2 MM-066 x-mas tree problem

    M01 OSDPTENG 20560061 3 MM-486 conversion to dual wel l head

    M01 OSDPTENG 20492675 1 Y4 SIT for Well Type 5 WP Hoist

    M01 OSDPTENG 20584539 3 MM-537 Set Centralizers

    M01 OSDPTENG 20493338 1 Y4 SIT for Well Type 6 WI

    M01 OSDPTENG 20493343 1 Y4 SIT for Well Type 6 WI

    M01 OSDPTENG 20594498 7 PCP Replacement (LOP)

    M01 OSDPTENG 20592235 7 Rahab SW-03 PPR

    MES OSDPTENG 20571048 4 Re-open MM-261,by installing an ESP on t

    M01 OSDPTENG 20594715 2 MM-573 LOP

    M01 OSDPTENG 20584258 7 RA-57 MPLT

    M01 OSDPTENG 20577410 7 TL-35 PPR

    M01 OSDPTENG 20588432 3 MM-148 polished rod damage

    M01 OSDPTENG 20492593 1 Y4 SIT for Well Type 5 WP Hoist

    M01 OSDPTENG 20593076 3 TL-111 PCP LOP

    M01 OSDPTENG 20591865 7 MM-519 Downsize from 43D158 to 32D158

    M01 OSDPTENG 20537739 4 MM-244, PCP installation

    M01 OSDPTENG 20493303 1 Y4 SIT for Well Type 6 WI

    M01 OSDPTENG 20596507 7 Rahab-53 LOPM01 OSDPTENG 20493290 1 Y4 SIT for Well Type 6 WI

    M01 OSDPTENG 20493299 1 Y4 SIT for Well Type 6 WI

    M01 OSDPTENG 20531028 7 Q-46 Frack Support

    M01 OSDPTENG 20549018 7 MM-279 PCP failure

    M01 OSDPTENG 20595403 7 Injector cleanout using CT and acid

    M01 OSDPTENG 20596654 3 MM-148 polished rod damage

    M01 OSDPTENG 20493289 1 Y4 SIT for Well Type 6 WI

    M01 OSDPTENG 20596020 3 MM-373 LOP

    M01 OSDPTENG 20493341 1 Y4 SIT for Well Type 6 WI

    M01 OSDPTENG 20493295 1 Y4 SIT for Well Type 6 WI

    M01 OSDPTENG 20493294 1 Y4 SIT for Well Type 6 WI

    M01 OSDPTENG 20493301 1 Y4 SIT for Well Type 6 WI

    M01 OSDPTENG 20493297 1 Y4 SIT for Well Type 6 WI

    M01 OSDPTENG 20595894 7 Rahab-53 LOPM01 OSDPTENG 20577781 7 MDNE-13 MPLT Survey

    M01 OSDPTENG 20493332 1 Y4 SIT for Well Type 6 WI

    M01 OSDPTENG 20592981 3 MM-236 , BP + Integrity repair program

    M01 OSDPTENG 20592610 3 MM-236 , BP repair program

    M01 OSDPTENG 20567780 7 Maurid NE-9 High precision temp/MPLT

    M01 OSDPTENG 20556313 7 TL-66 LOP

    M01 OSDPTENG 20484278 6 Rahab-42 WWS flushing

    M01 OSDPTENG 20487254 4 TL-135 prepare for Frac

    M01 OSDPTENG 20584257 7 RA-55 MPLT

    M01 OSDPTENG 20445291 3 MM-387 PCP UPSIZE

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    41/296

    M01 OSDPTENG 20468590 3 MM-169 Upsize beam pump

    M01 OSDPTENG 20537448 3 MM-220 Temp. Survey & PLT

    M01 OSDPTENG 20522801 3 MM-331 PCP failure

    MES OSDPTENG 20475744 3 TL-101 zonal isolation

    M01 OSDPTENG 20517249 6 MARMUL-418 Conversion OP to WI

    M01 OSDPTENG 20586422 7 QT-17 LOP

    M01 OSDPTENG 20587896 5 MM-132 PCP failure

    M01 OSDPTENG 20594497 7 TL-93 Beam Pump Replacement (LOP)

    M01 OSDPTENG 20547291 7 TL-41 add perf

    M01 OSDPTENG 20568894 7 QT-40 MPLT Logging

    M01 OSDPTENG 20594922 3 MM-143 LOP

    M01 OSDPTENG 20585531 3 MM-411 PCP repair program

    M01 OSDPTENG 20599435 7 RA-54 CCT sand cleanout

    M01 OSDPTENG 20599498 7 Rahab-39 PPR

    M01 OSDPTENG 20599246 3 MM-346 To fix LOP

    MES OSDPTENG 20561087 7 MM-518 Install a New PCP and a DHG

    M01 OSDPTENG 20599428 3 Q-1 LOP

    M01 OSDPTENG 20569544 7 QT-13 MPLT logging

    M01 OSDPTENG 20594914 3 Q-17 LOP

    M01 OSDPTENG 20599434 3 MM-354 tubing leak

    M01 OSDPTENG 20585229 7 LOP QT-33

    M01 OSDPTENG 20593133 7 MM-368 Static Temperature Survey

    M01 OSDPTENG 20560124 7 TL-133 PCP Replacement (LOP)

    M01 OSDPTENG 20576731 7 Q-23 pump down size

    M01 OSDPTENG 20577911 5 MM-165 clean out & reperforation

    M01 OSDPTENG 20602451 7 Q-9 LOP

    M01 OSDPTENG 20585243 5 MM-487 fracpac & recompletion

    M01 OSDPTENG 20588806 4 MM-353 Fracpac & Recompletion

    M01 OSDPTENG 20601166 3 MM-307 BP-PPR Program

    M01 OSDPTENG 20586562 4 MM-15 PCP upsize

    M01 OSDPTENG 20601212 7 MM-459 PPR

    M01 OSDPTENG 20596606 7 BUDNE-1 mPLT

    M01 OSDPTENG 20606289 1 Y4 SIT for Well Type 5 WP Hoist

    M01 OSDPTENG 20554620 7 TL-68 dual conversion

    M01 OSDPTENG 20561841 7 QATA-44 Frac jobM01 OSDPTENG 20608229 2 MM-487 CCT cleanout

    M01 OSDPTENG 20602727 3 MM-551 to replace existing worn out PCOP

    M01 OSDPTENG 20569823 4 MM-416 reduced production, PCP

    MES OSDPTENG 20600289 7 MM-456 PPR

    M01 OSDPTENG 20608211 2 MM-505 PPR program

    M01 OSDPTENG 20602257 7 Q-1 LOP

    M01 OSDPTENG 20570918 7 Q-48 Acid bullheading

    M01 OSDPTENG 20608679 3 MM-353 CCT cleanout

    M01 OSDPTENG 20604063 7 LOP

    M01 OSDPTENG 20608293 2 MM-573 CCT cleanout

    M01 OSDPTENG 20588895 3 Q-53 poslisil trail

    M01 OSDPTENG 20602728 3 MM-484 to replace existing worn out PCOP

    M01 OSDPTENG 20604088 3 MM-556 PCP upsize

    M01 OSDPTENG 20588746 7 MM-80 PPR and UpsizeM01 OSDPTENG 20609609 3 MM-473 LOP_to replace pump LFL

    M01 OSDPTENG 20602211 7 MM-181 PPR & Downsize

    M01 OSDPTENG 20592670 7 TL-78 Beam Pump Replacement (PPR)

    M01 OSDPTENG 20602209 3 MM-445 to reopen closed in well

    M01 OSDPTENG 20604089 3 MM-560 PCP upsize

    M01 OSDPTENG 20609471 7 MM-81 BP Parted rods

    M01 OSDPTENG 20609470 7 MM-129 ROP

    MES SKTSM 20588582 4 Treching 300M from G station to Hidab To

    MAG STIPPLN 20593319 4 FL Current leak survey at MRL RD X'ings

    MAG STIPPLN 20600785 3 M1 MAR M1 ROUTINE CP STATION MAINTENANCE

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    42/296

    MAG STIPPLN 20600772 3 W1 MAR W1 ROUTINE PIGGING

    MAG STIPPLN 20604013 7 HWL-BIR excavations at BVS 1&2 for X-RAY

    MAG STIPPLN 20586031 4 6" Birba BBS1-Sur Gas Degassing & Drying

    MAG STIPPLN 20587428 6 Ultrsonic 6" Birba to BBS1 Gas Flow Line

    MAG STIPPLN 20602020 3 W1 MAR W1 ROUTINE PIGGING

    MAG STIPPLN 20565869 3 M3 MAR M3 ROUTINE PIGGING

    MAG STIPPLN 20556298 7 Assist Ultrasonic Insp. of 6"BIR - BBS01

    MAG STIPPLN 20603094 3 W1 MAR W1 ROUTINE PIGGING

    MAG STIPPLN 20589563 2 M1 HARWEEL PIPLINES ROUTINE PIGGING

    MAG STIPPLN 20604102 0 M6 MAR M6 ROUTINE TELL-TALE VENTING

    M01 STMCONS 20586315 2 CONDITION MONITORING CHECKING-POLYMER

    M01 STMCONS 20566536 3 M1 MARMUL B STN - COND. MON.

    M01 STMCONS 20572745 3 M3 MARMUL DEEP WATER DISPOSAL - COND. MO

    M01 STMCONS 20573131 3 M3 BIRBA STATION - COND. MON.

    MES STMCONS 20572577 3 M1 WELL HEAD GENERATOR MAINTENANCE

    MES STMCONS 20572578 3 M1 WELL HEAD GENERATOR MAINTENANCE

    M01 STMCONS 20573130 3 M3 MARMUL MAIN PROD. STN - COND. MON.

    MES STMCONS 20572579 3 M1 WELL HEAD GENERATOR MAINTENANCE

    M01 STMCONS 20573129 3 M3 QAHARIR STN - COND. MON.

    M01 STMCONS 20582474 3 M1 THULEILAT STATION - COND. MON.

    M01 STMCONS 20590056 3 M1 MARMUL B STN - COND. MON.

    MOS SWEWS 20535889 6 Electrification Master Pit Thuleilat

    M01 SWSNCPXX 20580642 1 Y1 WIT For Well Type-6 WI

    M01 SWSNCPXX 20580163 1 Y1 WIT For Well Type-6 WI

    M01 SWSNCPXX 20580427 1 Y1 WIT For Well Type-6 WI

    M01 SWSNCPXX 20580428 1 Y1 WIT For Well Type-6 WI

    M01 SWSNCPXX 20580437 1 Y1 WIT For Well Type-6 WI

    M01 SWSNCPXX 20580438 1 Y1 WIT For Well Type-6 WI

    M01 SWSNCPXX 20580440 1 Y1 WIT For Well Type-6 WI

    M01 SWSNCPXX 20580167 1 Y1 WIT For Well Type-6 WI

    M01 SWSNCPXX 20580166 1 Y1 WIT For Well Type-6 WI

    M01 SWSNCPXX 20580165 1 Y1 WIT For Well Type-6 WI

    M01 SWSNCPXX 20580625 1 Y1 WIT For Well Type-6 WI

    M01 SWSNCPXX 20580544 1 Y1 WIT For Well Type-6 WI

    M01 SWSNCPXX 20580634 1 Y1 WIT For Well Type-6 WIM01 SWSNCPXX 20535184 1 Y1 WIT for Well Type 1 HP

    M01 SWSNCPXX 20519747 1 Y1 WIT For Well Type-6 WI

    M01 SWSNCPXX 20551598 1 Y3 SIT for Well Type 1 HP

    M01 SWSNCPXX 20537134 1 Y1 WIT for Well Type 1 HP

    M01 SWSNCPXX 20537145 1 Y1 WIT for Well Type 1 HP

    MES SWSS 20521144 7 Marmul Pumpshop Maintenance

    M01 SWSWHM4 20535325 1 Y1 WIT for Well Type 1 HP

    M01 SWSWHM4 20580429 1 Y1 WIT For Well Type-6 WI

    M01 SWSWHM4 20580430 1 Y1 WIT For Well Type-6 WI

    M01 SWSWHM4 20580432 1 Y1 WIT For Well Type-6 WI

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    43/296

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    44/296

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    45/296

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    46/296

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    47/296

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    48/296

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    49/296

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    50/296

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    51/296

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    52/296

    M1 HARWEEL PIPLINES ROUTINE PIGGING

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    53/296

    Functional location Location System statusOriginal Due

    Date

    Scheduled

    start

    OM.BIR.G0741-TX HWLBIR REL CNF PRC SETC 11/10/2008 12/5/2008OM.THU.BC8303-BC MARTHU REL CNF GMPS PRC SETC 11/10/2008 2/18/2009

    OM.MPS.24-LICA-423-LT MARMPS REL CNF NMAT PRC SETC 2/18/2009 2/22/2009

    OM.MPS.F2405-FU MARMPS REL CNF ESTC NMAT PRC SETC 4/2/2009 2/23/2009

    OM.BIR.K3612-KR HWLBIR REL CNF GMPS PRC SETC 7/22/2007 7/15/2007

    OM.HWL.WELLS.WL.MAM-1 HWLDAF REL CNF PRT NMAT PRC SETC 10/1/2008 10/2/2008

    OM.BIR.P36101-PF HWLBIR REL CNF NMAT PRC SETC 11/5/2008 11/5/2008

    OM.HWL.00706.GS.K3614-COMP HWLBIR REL CNF ESTC NMAT PRC SETC 12/5/2008 12/5/2008

    OM.MAU.A8817-CI1 MARMAU REL CNF PRC SETC 6/1/2008 12/6/2008

    OM.HWL.00706.CG.V36107 HWLBIR REL CNF GMPS NMAT PRC SETC 12/23/2008 12/23/2008

    OM.BIR.36922P-RV01 HWLBIR REL CNF GMPS NMAT PRC SETC 7/21/2008 12/28/2008

    OM.BIR.E3671C-BF HWLBIR REL CNF ESTC NMAT PRC SETC 1/7/2009 1/7/2009

    OM.BIR.S3681B-FL HWLBIR REL CNF GMPS PRC SETC 1/6/2009 1/8/2009

    OM.BIR.P3605-PF MARBIR REL CNF ESTC GMPS PPRT PRC SETC 1/9/2009 1/15/2009

    OM.BIR.K3612-KR HWLBIR REL CNF PRT NMAT PRC SETC 1/23/2009 1/19/2009OM.BIR.V36108-RV01 HWLBIR REL CNF NMAT PRC SETC 1/6/2009 2/18/2009

    OM.BIR.S3690B-RV01 HWLBIR REL CNF NMAT PRC SETC 6/22/2009 2/20/2009

    OM.THU.TL122-PB MAR REL CNF NMAT PRC SETC 10/24/2008 2/23/2009

    OM.THU.P8306-PF MARTHU REL CNF NMAT PRC SETC 2/17/2009 2/23/2009

    OM.MAR.WELLS.WL.ADB-4 MARMAU REL CNF NMAT PRC SETC 8/1/2008 2/23/2009

    OM.MMA.K2529B-KS MARMMA REL CNF ESTC NMAT PRC SETC 2/25/2009 2/24/2009

    OM.HWL.00706.GS.P36133 HWLBIR REL CNF ESTC NMAT PRC SETC 2/25/2009 2/24/2009

    OM.MMG.MM346-PB MARMMG REL CNF NMAT PRC SETC 2/12/2009 2/7/2009

    OM.HCF.A0705-LS HWLHCF REL CNF GMPS NMAT PRC SETC 6/12/2008 7/28/2008

    OM.MRD.MTHUA-RAHA-R3 MARMRD REL CNF NMAT PRC SETC 5/13/2008 9/24/2008

    OM.HWL.00703.AR HWLHRD REL CNF GMPS NMAT PRC SETC 10/6/2008 10/5/2008

    OM.SAK.SAK-2 WELLHEAD HWLSAK REL CNF NMAT PRC SETC 8/11/2008 11/13/2008

    OM.HWL.WELLS.WL.ZAZ-17 HWLZAZ REL CNF GMPS NMAT PRC SETC 11/14/2008 11/14/2008

    OM.HWL.00707 HWLHCF REL CNF CSER GMPS PRC SETC 10/15/2008 12/26/2008OM.MAR.00299.CI MARMPS REL CNF NMAT PRC SETC 11/11/2008 2/15/2009

    OM.MAR.00299.CG.K2412-COMP MARMPS REL CNF NMAT PRC SETC 11/11/2008 2/15/2009

    OM.MAR.00305.BP MARQAH TECO CNF NMAT PRC SETC 2/14/2009 2/19/2009

    OM.MMC.MM304-PB MARMMC REL CNF NMAT PRC SETC 7/1/2008 2/20/2009

    OM.QAH.Q039OP MARQAH REL CNF NMAT PRC SETC 8/20/2008 2/22/2009

    OM.QAH.QT024OP MARQAH REL CNF NMAT PRC SETC 9/2/2008 2/23/2009

    OM.MAR.00300.CO MARMRD REL CNF PRT GMPS NMAT PRC SETC 12/16/2003 12/16/2003

    OM.MAR.00300.CO MARMRD REL CNF NMAT PRC SETC 1/18/2006 4/1/2006

    OM.MAR.00300.CO MARMRD REL CNF GMPS NMAT PRC SETC 1/18/2006 5/15/2006

    OM.MAR.00300.CO MARMRD REL CNF NMAT PRC SETC 1/18/2006 5/27/2006

    OM.MAR.00300.CO MARMRD REL CNF GMPS NMAT PRC SETC 1/18/2006 5/27/2006

    OM.MRD.M-MINJIBEACH-R3 MARMRD REL CNF NMAT PRC SETC 8/15/2006 8/15/2006

    OM.MAR.00300.CO MARMRD REL CNF GMPS NMAT PRC SETC 1/18/2006 10/21/2007

    OM.MAR.00300.CO MARMRD REL CNF CSER GMPS NMAT PRC SETC 1/18/2006 1/6/2008

    OM.QAH.QE003OP MARQAH REL CNF GMPS NMAT PRC SETC 11/13/2003 11/17/2003

    OM.THU.TLWSW007WP MARTHU REL CNF GMPS PRC SETC 38023 5/25/2004

    OM.THU.TLWSW006WP MARTHU REL CNF GMPS PRC SETC 2/6/2004 5/25/2004

    OM.MIP.OMZI01 MARMIP REL CNF GMPS PRC SETC 2/23/2004 7/29/2004

    OM.MIP.OMQI03 MARMIP REL CNF GMPS PRC SETC 12/6/2003 9/17/2004

    OM.MAR.00305.WI.Q-26 MARQAH REL CNF ESTC GMPS NMAT PRC SETC 5/7/2005 5/6/2005

    OM.QAH.Q051-RT MARMMG REL CNF ESTC GMPS NMAT PRC SETC 9/19/2005 11/19/2005

    OM.QAH.Q048-VOT MARQAH REL CNF ESTC GMPS NMAT PRC SETC 9/12/2005 11/19/2005

    OM.QAH.Q045-VOT MARQAH REL CNF ESTC GMPS NMAT PRC SETC 9/12/2005 11/19/2005

    s to be TECO

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    54/296

    OM.MAU.TM009OP MARMAU REL CNF GMPS NMAT PRC SETC 2/14/2006 2/14/2006

    OM.MAR.00296.WI.MM-392 MARMMG REL CNF GMPS NMAT PRC SETC 12/31/2005 2/27/2006

    OM.MAR.00296.WI.MM-393 MARMMG REL CNF GMPS NMAT PRC SETC 12/31/2005 3/6/2006

    OM.MAR.00296.WI.MM-395 MARMMG REL CNF GMPS NMAT PRC SETC 12/31/2005 3/10/2006

    OM.MAR.00308.OW.TL-83 MARTHU REL CNF GMPS NMAT PRC SETC 3/8/2006 3/19/2006

    OM.MAR.00307.WI MARRAH REL CNF ESTC GMPS NMAT PRC SETC 3/25/2006 6/19/2006

    OM.MIP.OMQI01 MARMIP REL CNF GMPS PRC SETC 12/6/2003 3/20/2007

    OM.MIP.OMZI01 MARMIP REL CNF GMPS PRC SETC 12/6/2003 4/22/2007

    OM.MAR.00307.WI.RA-28 MARRAH REL CNF ESTC GMPS NMAT PRC SETC 3/11/2006 1/1/2008

    OM.GNR.MM-295 WELLHEAD MARMGN REL CNF ESTC GMPS PRC SETC 8/9/2006 9/20/2006

    OM.MAR.00296.OW.MM-212 MARMMG REL CNF ESTC GMPS PRC SETC 6/26/2006 12/25/2006

    OM.MAR.00289.OW.MM-227 MARMMB REL CNF ESTC GMPS PRC SETC 6/26/2006 1/30/2007

    OM.MAR.00296.OW.MM-105 MARMMG REL CNF ESTC GMPS PRC SETC 6/26/2006 2/2/2007

    OM.MAR.00295.OW.MM-217 MARMME REL CNF ESTC GMPS PRC SETC 6/26/2006 2/11/2007

    OM.MAR.00299.OW.MM-13 MARMPS REL CNF ESTC GMPS PRC SETC 4/27/2007 5/5/2007

    OM.MAR.WELLS.WL.MM-72 MAR REL CNF ESTC GMPS PRC SETC 4/27/2007 5/13/2007

    OM.MMG.MM054-PB MARMMG REL CNF GMPS PRC SETC 4/30/2007 7/3/2007

    OM.MAR.WELLS.WL MAR REL CNF ESTC GMPS NMAT PRC SETC 5/17/2007 11/27/2007

    OM.MAR.00295.OW.MM-224 MARMME REL CNF ESTC GMPS NMAT PRC SETC 7/29/2007 12/27/2007

    OM.MAR.00288.OW MARMMA REL CNF ESTC GMPS NMAT PRC SETC 12/15/2006 12/27/2007

    OM.MAR.WELLS.WL.MM-331 MARMMA REL CNF ESTC GMPS PRC SETC 12/27/2007 12/29/2007

    OM.MAR.00289.OW MARMMB REL CNF ESTC GMPS NMAT PRC SETC 12/15/2006 12/29/2007

    OM.MAR.00290.OW MARMMC REL CNF ESTC GMPS NMAT PRC SETC 12/15/2006 12/30/2007

    OM.MAR.00293.OW MARMMD REL CNF ESTC GMPS NMAT PRC SETC 12/15/2006 12/31/2007

    OM.MAR.WELLS.WL.MM-443 MARMGN REL CNF ESTC GMPS NMAT PRC SETC 1/7/2008 1/2/2008

    OM.MAR.00295.OW MARMME REL CNF ESTC GMPS NMAT PRC SETC 12/15/2006 1/6/2008

    OM.MAR.00296.OW MARMMG REL CNF ESTC GMPS NMAT PRC SETC 12/15/2006 1/8/2008

    OM.MAR.00284.OW MARMGN REL CNF ESTC GMPS NMAT PRC SETC 12/13/2006 1/9/2008

    OM.MAR.00285.OW MARMGW REL CNF ESTC GMPS NMAT PRC SETC 12/15/2006 1/10/2008

    OM.MAR.00305.OW MARQAH REL CNF ESTC GMPS NMAT PRC SETC 12/15/2006 1/11/2008

    OM.MAR.00284.OW MARMGN REL CNF ESTC NMAT PRC SETC 12/15/2006 1/12/2008

    OM.MAR.00305.OW MARQAH REL CNF ESTC GMPS NMAT PRC SETC 12/15/2006 1/13/2008

    OM.MAR.00304.OW MARMAU REL CNF ESTC GMPS NMAT PRC SETC 12/13/2006 1/14/2008

    OM.MAR.00307.OW MARRAH REL CNF ESTC GMPS NMAT PRC SETC 12/15/2006 1/16/2008

    OM.MAR.00307.OW MARRAH REL CNF ESTC GMPS NMAT PRC SETC 12/15/2006 1/16/2008OM.MAR.00304.OW MARMAU REL CNF ESTC GMPS NMAT PRC SETC 12/15/2006 1/17/2008

    OM.MAR.00308.OW MARTHU REL CNF ESTC GMPS NMAT PRC SETC 12/15/2006 1/18/2008

    OM.MMG.MM-408 WELLHEAD MARMMG REL CNF ESTC GMPS PRC SETC 1/22/2008 1/25/2008

    OM.MMG.MM-301 WELLHEAD MARMMG REL CNF ESTC NMAT PRC SETC 1/20/2008 1/26/2008

    OM.MAR.WELLS.WL.MM-351 MARMMA REL CNF ESTC GMPS PRC SETC 2/10/2008 2/8/2008

    OM.MAR.WELLS.WL.Q-23 MARQAH REL CNF ESTC GMPS NMAT PRC SETC 2/28/2008 2/22/2008

    OM.MAR.WELLS.WL.MM-487 MAR REL CNF ESTC GMPS PRC SETC 11/23/2007 2/22/2008

    OM.MAR.WELLS.WL.MM-340 MARMMA REL CNF ESTC GMPS NMAT PRC SETC 12/4/2007 2/22/2008

    OM.MAR.WELLS.WL.MM-179 MARMMA REL CNF ESTC GMPS PRC SETC 12/11/2007 2/27/2008

    OM.MAR.00284.OW.MM-411 MARMGN REL CNF ESTC GMPS PRC SETC 9/16/2007 2/28/2008

    OM.MAR.00284.OW.MM-441 MARMGN REL CNF ESTC GMPS NMAT PRC SETC 9/9/2007 3/6/2008

    OM.MAR.WELLS.WL.MM-66 MARMMC REL CNF ESTC GMPS PRC SETC 3/13/2008 3/16/2008

    OM.QAH.QT-37 WELLHEAD MARQAH REL CNF ESTC GMPS PRC SETC 4/1/2008 3/28/2008

    OM.MAR.WELLS.WL.MM-253 MARMGW REL CNF ESTC GMPS NMAT PRC SETC 4/14/2008 4/12/2008OM.MAR.00307.OW.RA-36 MARRAH REL CNF ESTC GMPS NMAT PRC SETC 5/8/2007 4/17/2008

    OM.MAR.WELLS.WL.MM-51 MARMMC REL CNF ESTC GMPS PRC SETC 3/5/2008 5/1/2008

    OM.MAR.WELLS.WL.MM-73 MARMMC REL CNF ESTC GMPS PRC SETC 3/5/2008 5/3/2008

    OM.MAR.00284.OW.MM-173 MARMGN REL CNF ESTC GMPS NMAT PRC SETC 7/29/2007 5/16/2008

    OM.MAR.WELLS.WL.MM-405 MARMMG REL CNF ESTC GMPS PRC SETC 2/24/2008 5/18/2008

    OM.MAR.WELLS.WL.MM-407 MARMMG REL CNF ESTC GMPS PRC SETC 2/24/2008 5/23/2008

    OM.MAR.WELLS.WL.MM-137 MARMMA REL CNF ESTC GMPS PRC SETC 5/19/2008 6/4/2008

    OM.MAR.WELLS.WL.MM-450 MARMGN REL CNF ESTC GMPS PRC SETC 6/1/2008 6/9/2008

    OM.MAR.WELLS.WL.MM-141 MARMMC REL CNF ESTC GMPS NMAT PRC SETC 6/3/2008 6/9/2008

    OM.MMB.MM-53 WELLHEAD MARMMB REL CNF ESTC GMPS PRC SETC 6/6/2008 6/10/2008

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    55/296

    OM.MAR.WELLS.WL.MM-141 MARMMC REL CNF ESTC GMPS PRC SETC 7/8/2008 7/3/2008

    OM.MAR.WELLS.WL.MM-65 MARMGN REL CNF GMPS NMAT PRC SETC 5/19/2008 7/5/2008

    OM.MAR.WELLS.WL.MM-300 MARMMG REL CNF ESTC GMPS PRC SETC 6/15/2008 7/7/2008

    OM.MAR.WELLS.WL.MM-54 MARMMG REL CNF ESTC GMPS PRC SETC 7/18/2008 7/20/2008

    OM.MAR.WELLS.WL.MM-525 MARMMA REL CNF ESTC GMPS NMAT PRC SETC 8/3/2008 8/8/2008

    OM.MAR.WELLS.WL.MM-525 MARMMA REL CNF ESTC NMAT PRC SETC 8/21/2008 8/26/2008

    OM.MAR.WELLS.WL.MM-37 MARMMC REL CNF ESTC GMPS NMAT PRC SETC 7/21/2008 8/30/2008

    OM.MAR.WELLS.WL.MM-433 MARMMG REL CNF ESTC GMPS PRC SETC 6/8/2008 9/1/2008

    OM.MAR.WELLS.WL.MM-391 MARMMC REL CNF ESTC GMPS PRC SETC 9/15/2008 9/12/2008

    OM.MAR.WELLS.WL.MM-440 MARMMG REL CNF ESTC GMPS PRC SETC 9/15/2008 9/16/2008

    OM.MAR.WELLS.WL.MM-522 MARMMA REL CNF ESTC GMPS PRC SETC 8/31/2008 9/25/2008

    OM.MAR.WELLS.WL.MM-541 MARMMA REL CNF ESTC GMPS PRC SETC 9/30/2008 9/29/2008

    OM.MAR.WELLS.WL.MM-525 MARMMA REL CNF ESTC GMPS NMAT PRC SETC 9/7/2008 10/3/2008

    OM.MAR.WELLS.WL.MM-73 MARMMC REL CNF ESTC GMPS PRC SETC 9/14/2008 10/4/2008

    OM.MAR.WELLS.WL.MM-455 MARMGN REL CNF ESTC GMPS PRC SETC 9/15/2008 10/5/2008

    OM.MAR.WELLS.WL.MM-440 MARMMG REL CNF ESTC GMPS PRC SETC 10/13/2008 10/10/2008

    OM.MAR.WELLS.WL.MM-343 MARMMG REL CNF ESTC GMPS PRC SETC 9/15/2008 10/10/2008

    OM.MAR.WELLS.WL.MM-552 MARMMA REL CNF ESTC GMPS PRC SETC 9/25/2008 10/11/2008

    OM.MAR.WELLS.WL.MM-537 MARMMA REL CNF ESTC GMPS PRC SETC 10/1/2008 10/18/2008

    OM.MAR.WELLS.WL.MM-473 MARMMG REL CNF ESTC GMPS PRC SETC 10/21/2008 10/25/2008

    OM.MAR.WELLS.WL.MM-37 MARMMC REL CNF ESTC GMPS PRC SETC 8/12/2008 11/2/2008

    OM.MAR.WELLS.WL.MM-376 MARMMC REL CNF ESTC GMPS PRC SETC 10/7/2008 11/2/2008

    OM.MAR.WELLS.WL.BB-9 MARBIR REL CNF NMAT PRC SETC 11/21/2008 11/21/2008

    OM.MAR.WELLS.WL.TL-96 MARTHU REL CNF GMPS PRC SETC 10/19/2009 11/26/2008

    OM.MAR.WELLS.WL.TL-101 MARTHU REL CNF NMAT PRC SETC 10/19/2009 11/28/2008

    OM.MAR.WELLS.WL.TL-81 MARTHU REL CNF NMAT PRC SETC 10/19/2009 11/29/2008

    OM.MAR.WELLS.WL.MM-565 MAR REL CNF ESTC NMAT PRC SETC 12/7/2008 12/14/2008

    OM.MAR.WELLS.WL.BBS-1 MARBIR REL CNF NMAT PRC SETC 5/1/2008 12/15/2008

    OM.MAR.WELLS.WL.BBS-1 MARBIR REL CNF NMAT PRC SETC 3/23/2009 12/15/2008

    OM.MAR.WELLS.WL.MM-450 MARMGN REL CNF ESTC NMAT PRC SETC 8/19/2008 12/22/2008

    OM.MAR.WELLS.WL.MM-487 MAR REL CNF ESTC GMPS NMAT PRC SETC 9/4/2007 12/31/2008

    OM.MAR.WELLS.WL.MM-197 MARMMA REL CNF ESTC GMPS PRC SETC 1/18/2009 1/29/2009

    OM.HWL.WELLS.WL.SAK-8 HWLSAK REL CNF NMAT PRC SETC 11/17/2009 2/4/2009

    OM.HWL.WELLS.WL.ZAZ-7 HWLZAZ REL CNF NMAT PRC SETC 2/28/2009 2/4/2009

    OM.HWL.WELLS.WL.ZAZ-6 HWLZAZ REL CNF NMAT PRC SETC 12/31/2008 2/12/2009OM.HWL.WELLS.WL.ZAZ-5 HWLZAZ REL CNF NMAT PRC SETC 2/8/2009 2/16/2009

    OM.MAR.00290.OW.MM-148 MARMMC REL CNF ESTC GMPS MSPT PRC SETC 9/20/2006 10/22/2006

    OM.MAR.00296.OW.MM-170 MARMMG REL CNF ESTC GMPS PRC SETC 7/16/2006 12/18/2006

    OM.MAR.00307.OW.RA-9 MARRAH REL CNF ESTC GMPS PRC SETC 1/15/2007 1/29/2007

    OM.MAR.WELLS.WL.TL-123 MARTHU REL CNF ESTC GMPS PRC SETC 6/16/2008 2/6/2007

    OM.MAR.00307.WI.RA-32 MARRAH REL CNF ESTC GMPS NMAT PRC SETC 11/14/2006 3/14/2007

    OM.MAR.00307.WI.RA-28 MARRAH REL CNF ESTC GMPS NMAT PRC SETC 2/28/2007 3/17/2007

    OM.MAR.00307.OW.RA-29 MARRAH REL CNF ESTC GMPS PRC SETC 3/20/2007 4/20/2007

    OM.MAR.00307.OW.RA-8 MARRAH REL CNF ESTC GMPS PRC SETC 3/21/2007 5/2/2007

    OM.MAR.WELLS.WL.RA-42 MAR REL CNF ESTC GMPS PRC SETC 5/16/2007 5/18/2007

    OM.MAR.00308.OW.TL-78 MARTHU REL CNF ESTC GMPS PRC SETC 3/28/2007 6/5/2007

    OM.MAR.WELLS.WL.MM-159 MARMMG REL CNF ESTC GMPS NMAT PRC SETC 7/4/2007 6/25/2007

    OM.MAR.WELLS.WL.RA-43 MAR REL CNF ESTC GMPS NMAT PRC SETC 6/13/2007 7/1/2007

    OM.MAR.WELLS.WL.RA-44 MAR REL CNF ESTC GMPS NMAT PRC SETC 6/13/2007 7/3/2007OM.MAR.WELLS.WL.QRM-1 MARMAU REL CNF ESTC GMPS PRC SETC 7/6/2007 7/4/2007

    OM.MAR.WELLS.WL.TL-80 MARTHU REL CNF ESTC GMPS NMAT PRC SETC 2/20/2008 7/6/2007

    OM.MAR.WELLS.WL.RA-42 MAR REL CNF ESTC GMPS PRC SETC 6/6/2007 7/13/2007

    OM.MAR.00307.OW.RA-10 MARRAH REL CNF ESTC GMPS PRC SETC 2/28/2007 7/14/2007

    OM.MAR.00307.OW.RA-29 MARRAH REL CNF ESTC GMPS PRC SETC 8/13/2007 8/9/2007

    OM.MAR.00308.OW.TL-121 MARTHU REL CNF ESTC GMPS PRC SETC 8/14/2007 9/1/2007

    OM.MAR.00290.OW.MM-304 MARMMC REL CNF ESTC GMPS NMAT PRC SETC 9/12/2007 9/19/2007

    OM.MAR.00290.OW.MM-112 MARMMC REL CNF ESTC GMPS PRC SETC 8/16/2007 9/22/2007

    OM.MAR.00307.OW.ZMD-4 MARRAH REL CNF ESTC NMAT PRC SETC 4/16/2007 9/26/2007

    OM.MAR.00307.OW.RA-29 MARRAH REL CNF ESTC GMPS PRC SETC 8/28/2007 9/28/2007

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    56/296

    OM.MAR.00307.OW.RA-37 MARRAH REL CNF ESTC GMPS PRC SETC 8/27/2007 10/1/2007

    OM.MAR.00296.OW.MM-107 MARMMG REL CNF ESTC GMPS PRC SETC 9/17/2007 10/1/2007

    OM.MAR.00290.OW.MM-304 MARMMC REL CNF ESTC GMPS PRC SETC 4/22/2007 10/7/2007

    OM.MAR.00296.WI.MM-421 MARMMG REL CNF ESTC GMPS NMAT PRC SETC 9/26/2007 10/12/2007

    OM.MAR.WELLS.WL.TL-138 MARTHU REL CNF ESTC GMPS PRC SETC 10/10/2007 10/16/2007

    OM.MAR.00308.OW.TL-76 MARTHU REL CNF ESTC GMPS PRC SETC 10/16/2007 10/20/2007

    OM.MAR.00308.OW.TL-86 MARTHU REL CNF ESTC GMPS PRC SETC 10/15/2007 10/22/2007

    OM.MAR.00307.OW.RA-2 MARRAH REL CNF ESTC GMPS PRC SETC 8/1/2007 10/25/2007

    OM.MAR.00296.OW.MM-475 MARMMG REL CNF ESTC GMPS PRC SETC 9/9/2007 11/1/2007

    OM.MAR.00307.OW.RA-19 MARRAH REL CNF ESTC GMPS PRC SETC 10/31/2007 11/13/2007

    OM.MAR.00307.OW.RA-11 MARRAH REL CNF ESTC GMPS PRC SETC 10/3/2007 11/13/2007

    OM.MAR.00296.OW.MM-11 MARMMG REL CNF ESTC GMPS PRC SETC 11/13/2007 11/13/2007

    OM.MAR.00308.OW.TL-63 MARTHU REL CNF ESTC GMPS PRC SETC 11/7/2007 11/17/2007

    OM.MAR.00307.OW.RA-36 MARRAH REL CNF ESTC GMPS PRC SETC 11/19/2007 11/20/2007

    OM.MAR.WELLS.WL.MDNE-10 MARMAU REL CNF ESTC GMPS PRC SETC 11/22/2007 11/22/2007

    OM.MAR.WELLS.WL.RA-10 MARRAH REL CNF ESTC GMPS PRC SETC 11/27/2007 11/24/2007

    OM.MAR.WELLS.WL.TL-102 MARTHU REL CNF ESTC GMPS PRC SETC 11/29/2007 11/26/2007

    OM.MAR.WELLS.WL.TL-99 MARTHU REL CNF ESTC GMPS PRC SETC 11/29/2007 11/28/2007

    OM.MAR.WELLS.WL.TL-17 MARTHU REL CNF ESTC GMPS PRC SETC 12/3/2007 11/29/2007

    OM.MAR.WELLS.WL.MM-311 MARMMG REL CNF ESTC GMPS PRC SETC 12/2/2007 11/30/2007

    OM.MAR.00308.OW.TL-56 MARTHU REL CNF ESTC GMPS PRC SETC 10/31/2007 12/4/2007

    OM.MAR.WELLS.WL.TL-133 MARTHU REL CNF ESTC GMPS PRC SETC 12/14/2007 12/9/2007

    OM.MAR.WELLS.WL.MM-376 MARMMC REL CNF ESTC GMPS PRC SETC 11/25/2007 12/13/2007

    OM.MAR.WELLS.WL.TL-123 MARTHU REL CNF ESTC GMPS PRC SETC 12/4/2007 12/16/2007

    OM.MAR.00308.WI.TL-51 MARTHU REL CNF ESTC GMPS PRC SETC 10/18/2006 12/21/2007

    OM.MAR.00290.OW.MM-471 MARMMC REL CNF ESTC GMPS PRC SETC 11/5/2007 12/23/2007

    OM.MAR.WELLS.WL.TL-18 MARTHU REL CNF ESTC GMPS PRC SETC 12/13/2007 12/28/2007

    OM.MAR.WELLS.WL.TL-41 MARTHU REL CNF ESTC GMPS PRC SETC 1/3/2008 12/31/2007

    OM.MAR.00289.OW.MM-240 MARMMB REL CNF ESTC GMPS PRC SETC 2/1/2007 12/31/2007

    OM.MAR.00308.OW.TL-44 MARTHU REL CNF ESTC GMPS PRC SETC 3/28/2007 12/31/2007

    OM.MAR.00308.OW.TL-119 MARTHU REL CNF ESTC GMPS NMAT PRC SETC 10/17/2007 12/31/2007

    OM.MAR.WELLS.WL.QT-22 MARQAH REL CNF ESTC GMPS PRC SETC 1/9/2008 1/4/2008

    OM.MAR.WELLS.WL.TL-23 MARTHU REL CNF ESTC GMPS NMAT PRC SETC 1/3/2008 1/5/2008

    OM.MAR.WELLS.WL.MM-515 MARMMG REL CNF ESTC GMPS NMAT PRC SETC 12/10/2007 1/6/2008

    OM.MAR.00307.OW.ZMD-4 MARRAH REL CNF ESTC GMPS PRC SETC 11/9/2007 1/6/2008OM.MAR.WELLS.WL.MM-120 MARMMD REL CNF ESTC GMPS NMAT PRC SETC 1/7/2008 1/6/2008

    OM.MAR.WELLS.WL.RA-10 MARRAH REL CNF ESTC GMPS PRC SETC 1/11/2008 1/7/2008

    OM.MAR.WELLS.WL.MM-476 MAR REL CNF ESTC GMPS PRC SETC 9/10/2007 1/8/2008

    OM.MMA.MM-511 WELLHEAD MARMMA REL CNF ESTC GMPS NMAT PRC SETC 11/27/2007 1/11/2008

    OM.MMG.MM059-PB MARMMG REL CNF ESTC GMPS PRC SETC 1/5/2008 1/11/2008

    OM.MMB.MM053-PB MARMMB REL CNF ESTC GMPS PRC SETC 1/5/2008 1/14/2008

    OM.MAR.00308.WI.TL-96 MARTHU REL CNF ESTC GMPS NMAT PRC SETC 9/25/2007 1/18/2008

    OM.MAR.WELLS.WL.MM-517 MARMME REL CNF ESTC GMPS PRC SETC 1/23/2008 1/21/2008

    OM.MAR.WELLS.WL.MM-364 MARMMG REL CNF ESTC GMPS NMAT PRC SETC 1/27/2008 1/25/2008

    OM.MMG.MM-161 WELLHEAD MARMMG REL CNF ESTC GMPS PRC SETC 1/15/2008 1/27/2008

    OM.MAR.WELLS.WL.MM-34 MARMMB REL CNF ESTC GMPS PRC SETC 10/1/2007 1/29/2008

    OM.MAR.WELLS.WL.RA-10 MARRAH REL CNF ESTC GMPS PRC SETC 1/28/2008 2/1/2008

    OM.MAR.WELLS.WL.Q-22 MARQAH REL CNF ESTC GMPS PRC SETC 2/8/2008 2/2/2008

    OM.MAR.WELLS.WL.TL-111 MARTHU REL CNF ESTC GMPS PRC SETC 11/26/2007 2/3/2008OM.MAR.WELLS.WL.MDNE-1 MARMAU REL CNF ESTC GMPS NMAT PRC SETC 2/6/2008 2/3/2008

    OM.MAR.WELLS.WL.QT-8 MARQAH REL CNF ESTC GMPS PRC SETC 1/21/2008 2/4/2008

    OM.MAR.00293.OW.MM-115 MARMMD REL CNF ESTC GMPS PRC SETC 3/27/2007 2/5/2008

    OM.MAR.WELLS.WL.MM-138 MARMMA REL CNF ESTC GMPS PRC SETC 12/4/2007 2/5/2008

    OM.MAR.00307.OW.ZMD-10 MARRAH REL CNF ESTC GMPS PRC SETC 3/11/2007 2/6/2008

    OM.MMC.MM029-PB MARMMC REL CNF ESTC GMPS PRC SETC 1/24/2008 2/7/2008

    OM.MAR.WELLS.WL.MM-305 MARMMG REL CNF ESTC GMPS NMAT PRC SETC 2/10/2008 2/10/2008

    OM.MAR.WELLS.WL.MM-446 MARMGN REL CNF ESTC GMPS NMAT PRC SETC 2/10/2008 2/11/2008

    OM.MAR.00296.WI.MM-220 MARMMG REL CNF ESTC GMPS PRC SETC 9/27/2007 2/11/2008

    OM.MAR.00284.OW.MM-65 MARMGN REL CNF ESTC GMPS PRC SETC 8/29/2007 2/13/2008

  • 8/2/2019 Week-06-2008 Marmul IAP Weekly KPIs Ful (Version 1)

    57/296

    OM.MAR.WELLS.WL.MM-150 MARMME REL CNF ESTC GMPS PRC SETC 2/12/2008 2/13/2008

    OM.MMG.MM191-PB MARMMG REL CNF ESTC GMPS PRC SETC 2/5/2008 2/15/2008

    OM.MAR.WELLS.WL.MM-121 MARMMA REL CNF ESTC GMPS PRC SETC 2/15/2008 2/15/2008

    OM.MAR.WELLS.WL.MM-486 MARMMA REL CNF ESTC GMPS PRC SETC 11/23/2007 2/16/2008

    OM.MAR.00295.OW.MM-226 MARMME REL CNF ESTC GMPS NMAT PRC SETC 1/10/2008 2/18/2008

    OM.MAR.WELLS.WL.TL-134 MARTHU REL CNF ESTC GMPS PRC SETC 2/19/2008 2/19/2008

    OM.MAR.00293.OW.MM-130 MARMMD REL CNF ESTC GMPS PRC SETC 3/27/2007 2/19/2008

    OM.MAR.WELLS.WL.TL-51 MARTHU REL CNF ESTC GMPS NMAT PRC SETC 2/11/2008 2/20/2008

    OM.MAR.WELLS.WL.QT-45 MARQAH REL CNF ESTC GMPS PRC SETC 1/2/2008 2/21/2008

    OM.MAR.00293.OW.MM-38 MARMMD REL CNF ESTC GMPS PRC SETC 3/27/2007 2/21/2008

    OM.MMG.MM-350 WELLHEAD MARMMG REL CNF ESTC GMPS PRC SETC 2/19/2008 2/22/2008

    OM.MAR.00290.OW.MM-23 MARMMC REL CNF ESTC GMPS PRC SETC 7/30/2007 2/23/2008

    OM.MAR.WELLS.WL.RA-33 MARRAH REL CNF ESTC GMPS NMAT PRC SETC 2/11/2008 2/25/2008

    OM.MMC.MM-472 WELLHEAD MARMMC REL CNF ESTC GMPS NMAT PRC SETC 3/30/2008 3/6/2008