South Road Tender to Undertake Feasibility Study

GJCLPoss

Tender to Undertake Feasibility Study

South Road and Outer Harbor Rail Line

Grade Separation

13th March 2013

Page 2: Weebly - Tender to Undertake Feasibility Study South Road and … · 2019. 9. 7. · South Road Tender to Undertake Feasibility Study i | P a g e 13th March 2012 Dr Julie Mills, Ms

South Road Tender to Undertake Feasibility Study

i | P a g e

13th March 2012

Dr Julie Mills, Ms Kirsty Beecham, Mr Desmond Khoo, Mr Leigh Dalwood

School of Natural and Built Environments

Mawson Lakes Boulevard

Mawson Lakes

RE: Expression of Interest – Feasibility Study for the South Road and Outer Harbor rail line grade separation

Dear Julie, Kirsty, Desmond and Leigh,

Edge Engineering would like to present our tender for the Feasibility Study for the South Road and Outer Harbor rail line grade separation, offered by the Department of Planning, Transport and Infrastructure (DPTI).

Established in 2009, Edge Engineering have a team of 32 professional, young and enthusiastic engineers who specialise in Engineering disciplines such as project management, structural, transportation, geotechnical, water, environmental, and urban planning.

The following expression of interest contains a complete profile of Edge Engineering, and offers a proposed design for the feasibility study of the project in question.

Edge Engineering have reviewed the project, and value the feasibility stage of the South Road and Outer Harbor rail line grade separation at:

$268,752.00 (AUD) INC GST

This bid is based on information provided at the time of tender submission, and assumes that if Edge Engineering are successful, all parties will work together,

We appreciate your consideration of our application. If you have any queries or issues please don’t hesitate to contact us.

Yours sincerely,

Catherine Possingham

Project Manager

Page 3: Weebly - Tender to Undertake Feasibility Study South Road and … · 2019. 9. 7. · South Road Tender to Undertake Feasibility Study i | P a g e 13th March 2012 Dr Julie Mills, Ms

South Road Tender to Undertake Feasibility Study

ii | P a g e

Table of Contents

1. Mission Statement .......................................................................................................................... 1

2. Company Profile .............................................................................................................................. 1

2.1. Company History ..................................................................................................................... 1

2.2. Services Provided .................................................................................................................... 2

2.3. Summary of Past Projects ....................................................................................................... 3

2.4. Financial Backing ..................................................................................................................... 4

3. Management Structure ................................................................................................................... 5

3.1. Roles and Responsibilities ....................................................................................................... 6

3.1.1. Project Manager .............................................................................................................. 6

3.1.2. Quality Assurance and Quality Control Manager ........................................................... 6

3.1.3. Head of Departments ...................................................................................................... 6

3.1.4. Urban Planner ................................................................................................................. 7

3.1.5. Community Consultant ................................................................................................... 7

3.1.6. Department Engineer ...................................................................................................... 7

3.2. Key Personnel.......................................................................................................................... 8

4. Project Description ........................................................................................................................ 16

4.1. Goals ..................................................................................................................................... 17

4.2. Objectives.............................................................................................................................. 17

5. Scope of Works ............................................................................................................................. 18

6. Proposed Methodology ................................................................................................................ 19

6.1. Transportation Component .................................................................................................. 19

6.2. Urban Planning Component .................................................................................................. 21

6.3. Structural Component .......................................................................................................... 22

6.4. Geotechnical Component ..................................................................................................... 24

6.5. Water and Services Component ........................................................................................... 26

6.6. Environmental Component ................................................................................................... 27

6.7. Quality Assurance/Control .................................................................................................... 29

Page 4: Weebly - Tender to Undertake Feasibility Study South Road and … · 2019. 9. 7. · South Road Tender to Undertake Feasibility Study i | P a g e 13th March 2012 Dr Julie Mills, Ms

South Road Tender to Undertake Feasibility Study

iii | P a g e

7. Assumptions .................................................................................................................................. 30

8. Project Schedule ........................................................................................................................... 31

8.1. Major Deliverables ................................................................................................................ 31

8.2. Minor Deliverables ................................................................................................................ 31

9. Pricing ............................................................................................................................................ 32

9.1. Team member hourly rates .................................................................................................. 32

9.2. Cost proposal ........................................................................................................................ 32

10. Company Policies ...................................................................................................................... 34

10.1. Quality ............................................................................................................................... 34

10.2. Occupational Health & Safety ........................................................................................... 34

10.3. Environmental ................................................................................................................... 35

Appendix 1: Feasibility Study Detailed section schedules .................................................................... 36

Page 5: Weebly - Tender to Undertake Feasibility Study South Road and … · 2019. 9. 7. · South Road Tender to Undertake Feasibility Study i | P a g e 13th March 2012 Dr Julie Mills, Ms

South Road Tender to Undertake Feasibility Study

1 | P a g e

1. Mission Statement

Edge Engineering is a devoted company providing guidance, expertise and sustainable results for

civil engineering tasks. We are accomplished in a number of areas such as feasibility studies,

conceptual and detailed design, all of which can be specialised to the requirements of the client. The

company prides itself on the detailing and growth of infrastructure, including services to benefit the

client as well as the community.

Edge Engineering professionals have been recruited with select skills in order to form a team with a

wide variety of aptitudes. In particular, innovative individuals, who not only take pride in the

company and what it succeeds in, but also in their independent day-to-day tasks.

With our passion for engineering, Edge Engineering not only meets industry standards but excels in

them.

2. Company Profile

2.1. Company History

Edge Engineering is a young, vibrant South Australian company located in Adelaide’s CBD, who are

redefining class and precision engineering. Founded in 2009, Edge is fully South Australian owned

with a strong emphasis on supporting local and national businesses. The company’s thorough

recruiting process has resulted in attaining the highest quality engineers with experience in

numerous major engineering projects, across all specialisations.

Recruiting the best and brightest young engineers has been a big focus in attaining a good balance of

senior and graduate engineers. As new graduates are the future of the profession, Edge Engineering

offers undergraduates the chance to gain valuable work experience to help them hit the ground

running when they graduate Edge Engineering attains a good balance of engineers, whom share

knowledge and experience whilst promoting innovative thinking, which leads to a productive and

enjoyable environment.

Edge Engineering has always encouraged a multicultural working environment where our cultural

diversity is celebrated and not discriminated against. Our commitment to our clients is second to

none building a rapport with the client, striving to get the job done which benefits not only the client

and ourselves, but the general public who will be able to reap the rewards of our hard work.

Page 6: Weebly - Tender to Undertake Feasibility Study South Road and … · 2019. 9. 7. · South Road Tender to Undertake Feasibility Study i | P a g e 13th March 2012 Dr Julie Mills, Ms

South Road Tender to Undertake Feasibility Study

2 | P a g e

2.2. Services Provided

Edge Engineering has acquired professionals with a variety of skills which include:

Structural Engineering

Steel, concrete and timber design

Finite element analysis modelling

Geotechnical Engineering

Footing design

Settlement analysis

Slab & Pavement design

Water Engineering

Stormwater design

Sewer design

Potable water supply design

Environmental

Environmental impact

Risk management

Pollution control

Urban Planning

Urban design & development

Page 7: Weebly - Tender to Undertake Feasibility Study South Road and … · 2019. 9. 7. · South Road Tender to Undertake Feasibility Study i | P a g e 13th March 2012 Dr Julie Mills, Ms

South Road Tender to Undertake Feasibility Study

3 | P a g e

2.3. Summary of Past Projects

Engineers Without Borders (2009)

o “Living on the Water” – Tonlé Sap, Cambodia

Britannia Roundabout redevelopment design (2011)

o Redesign of Britannia roundabout, one of Adelaide’s most notorious intersections in

an attempt to improve travel efficiency and motorist safety

Seaford Industry Park Subdivision design - Aurecon (2011)

o Design of water supply, sewer and stormwater for a new industrial subdivision in

south metropolitan Adelaide

UniSA Learning Centre partial design (2012)

o Structural design of the steel and concrete components for the top floor of the

newest building at UniSA’s City West campus

Structural Design Project – Finite element analysis of The Louvre (2011)

o Strand7 analysis of the Louvre pyramid, France, to analyse its behaviour under real

life loading conditions to ensure that the structure is capable of withstanding the

applied loads without a failure occurring.

Sellicks Beach Subdivision Water Design - Aurecon (2012)

o Design of potable water supply, sewer and stormwater for a new residential

subdivision in southern Adelaide

Geotechnical Project – Design of spread footings for an overpass (2012)

o Design and analysis of footings for the new South Road Northern connector

Geotechnical Project – Settlement Analysis (2012)

o Design and analysis of settlement of embankments for the new South Road

Northern connector

Construction of Mezzanine Floor - Ambra (2011-2012)

o Assistance in relocating warehouse racking and construction of mezzanine floor in

Ambra warehouse

North-South Interconnection System – SA Water (2011-2013)

o A project to secure Adelaide’s water supply until 2015. Student site engineer for the

Western pipeline, including site inspections, pipe tracking, and progress charts

among other work.

Page 8: Weebly - Tender to Undertake Feasibility Study South Road and … · 2019. 9. 7. · South Road Tender to Undertake Feasibility Study i | P a g e 13th March 2012 Dr Julie Mills, Ms

South Road Tender to Undertake Feasibility Study

4 | P a g e

2.4. Financial Backing

Edge Engineering has grown over a number of years since it began in 2009, and with a growing client

base grew the need for more significant and more secure financial backing. Edge Engineering has

acquired a number of financiers to offer a guarantee of stability to our clients and subcontractors.

Trust and security is the most important aspect of our work.

Page 9: Weebly - Tender to Undertake Feasibility Study South Road and … · 2019. 9. 7. · South Road Tender to Undertake Feasibility Study i | P a g e 13th March 2012 Dr Julie Mills, Ms

South Road Tender to Undertake Feasibility Study

5 | P a g e

3. Management Structure

Project Manager

Catherine Possingham

Head of Transport

Yuyang Qian (Yanis)

1 Senior Engineer

3 Transport Engineers

1 Graduate Engineers

Head of Urban Planning

Mohd Aizat

2 Urban Planners

1 Graduate Engineer

1 Community Consultants

Head of Structural

Chris Baird

1 Senior Engineer

3 Structural Engineers

1 Graduate Engineers

Head of Geotechnical

Peng Gao (Simon)

1 Senior Engineer

3 Geotechnical Engineers

1 Graduate Engineers

Head of Water & Services

Yuk Wang Tsoi (Leo)

1 Water Engineer

1 Graduate Engineer

Head of Environmental

Manoj Jogi

1 Environmental Engineer

1 Graduate Engineer

Quality Assurance/ Quality Control

Manager Shaun de Waal

1 Graduate Engineer

Page 10: Weebly - Tender to Undertake Feasibility Study South Road and … · 2019. 9. 7. · South Road Tender to Undertake Feasibility Study i | P a g e 13th March 2012 Dr Julie Mills, Ms

South Road Tender to Undertake Feasibility Study

6 | P a g e

3.1. Roles and Responsibilities

3.1.1. Project Manager

The responsibilities of the Project Manager are the overall planning of the works, liaising and

corresponding with the Client, Client’s Representative, Consultants, Authorities, Sub-Contractors and

Suppliers to ensure the work is carried out as per the projects requirements. The Project Manager is

also responsible for allocating the necessary amount of required resources at the right time to the

project to facilitate its implementation. Furthermore, the Project Manager must ensure all of the

contracts are appropriately administered.

The Project Manager is also responsible for monitoring and ensuring the project is progressing

positively on time, under budget, and with a high quality. They should also proactively value-

engineer the project to make it cost effective for the company as well as the client whenever

possible.

3.1.2. Quality Assurance and Quality Control Manager

Each Head of Department leads their respective department and reports to the Project Manager.

They assist the Project Manager in matters of finding suitable sub-contractors with the required

qualifications, whilst working closely with the QA/QC Manager to ensure that the work produced by

their department is according to the relevant standards.

Their responsibilities include but are not limited to the following:

Coordinating respective teams by making detailed plans showing the delegation of work for

each team member

Assisting the Project Manager in estimating the cost of the project

Negotiate or consult with the Client and/or client’s representative(s)

Resolving contractual issues or claims, if any

Direct, approve and review of their respective departments’ report and designs

3.1.3. Head of Departments

(Transportation, Urban Planning, Structural, Geotechnical, Water & Environmental)

Each Head of Department leads their respective department and reports to the Project Manager. He

assists the Project Manager in matters of finding suitable sub-contractors with the required

qualifications, whilst working closely with the QA/QC Manager to ensure that the work produced by

their department is according to the standard.

Page 11: Weebly - Tender to Undertake Feasibility Study South Road and … · 2019. 9. 7. · South Road Tender to Undertake Feasibility Study i | P a g e 13th March 2012 Dr Julie Mills, Ms

South Road Tender to Undertake Feasibility Study

7 | P a g e

His responsibilities include but are not limited to the following:

Coordinate respective team by making detailed plans showing the delegation of work for

each team member

Assisting the Project Manager in estimating the cost of the project

Negotiate or consult with the Client and/or client’s representative(s)

Resolving contractual issues or claims, if any

Direct, approve and review of their respective departments’ report and designs

3.1.4. Urban Planner

The Urban Planner is responsible in assisting the Head of Urban Planning Department, and works

closely with the Community Consultant. The scope of an Urban Planner includes but is not limited to:

Performing site surveys and inspection

Analyse and compile information regarding the land use in matters of physical, social,

economic, environmental and cultural

Assist the appropriate party in obtaining planning permits

Creating and preparing a department report regarding the land use

Work with the design team on the formulation of plans and design

3.1.5. Community Consultant

The Community Consultant works closely with the Urban Planner and is responsible for assisting the

head of the Urban Planning department. They shall be the mediator between the company and the

community and are responsible for assisting the development of alternatives as necessary. The

community consultant is also responsible for creating awareness in the community about the

upcoming project.

3.1.6. Department Engineer

Each of the Department Engineers is responsible but not limited to the following:

Assisting and reporting to their respective head of department

Conducting research and creating designs according to the project requirement

Ensuring that all designs are within the budget of the client

Presenting and explaining their proposals, reports and findings to the head of department,

Project Manager and Client.

Page 12: Weebly - Tender to Undertake Feasibility Study South Road and … · 2019. 9. 7. · South Road Tender to Undertake Feasibility Study i | P a g e 13th March 2012 Dr Julie Mills, Ms

South Road Tender to Undertake Feasibility Study

8 | P a g e

3.2. Key Personnel

CATHERINE POSSINGHAM Mobile: 0402 XXX XXX

Email: [email protected]

EDUCATION JULY 2010 – CURRENT UNIVERSITY OF SOUTH AUSTRALIA Bachelor of Engineering (Civil and Project Management) 2009 – JUNE 2010 FLINDERS UNIVERSITY Bachelor of Engineering (Civil) (First 1.5 years)

PROFESSIONAL CAREER DEC 2011 – CURRENT SA WATER

North-South Interconnection System Project Duties: 3 month placement

New contract - Student Site Engineer New contract - GIS Technical Support Officer

AWARDS/ SPECIAL ACHIEVEMENTS May 2011 Recipient of - SA Water Undergraduate Scholarship in Civil

Engineering and Placement for Women

QUALIFICATIONS March 2012 White Card - Obtained through Master Builders SA

May 2011 Senior First Aid certificate - Obtained through Training SA

MEMBERSHIPS Student member of Engineers Australia (Civil)

Student member of Australian Institute of Project Management (AIPM) Student member of Women in Innovation and Technology (WiT)

TECHNICAL KNOWLEDGE Proficient with Microsoft Office (particularly Word, Excel, Visio, Project, Powerpoint) Familiar with Microstation, 12D, ArcGIS, GALENA,CORD, SLOG, CIRCLY, HEC-RAS, DRAINS, EPANET,

STRAND7 Familiar with Australian Standards 1170, 4100, and 3600

PAST PROJECTS 2009 Engineers without Borders “Living on the Water” 2010 Rube Goldberg Creation 2011 Spaghetti Bridge 2011 Britannia Roundabout redevelopment design 2011 Seaford Industry Park Subdivision design 2012 UniSA Learning Centre partial design

Page 13: Weebly - Tender to Undertake Feasibility Study South Road and … · 2019. 9. 7. · South Road Tender to Undertake Feasibility Study i | P a g e 13th March 2012 Dr Julie Mills, Ms

South Road Tender to Undertake Feasibility Study

9 | P a g e

CHRIS BAIRD

Mobile: 0409 XXX XXX Email: [email protected]

EDUCATION 2010 – CURRENT UNIVERSITY OF SOUTH AUSTRALIA Bachelor of Engineering (Civil)

PROFESSIONAL CAREER OCT 2007 – MAR 2008 MCDONALDS

Team Member Duties: Required communication and team work skills Had to perform tasks quickly and effectively

AWARDS/ SPECIAL ACHIEVEMENTS 2010 Chancellor's Letter of Commendation 2010 FutureNet High Achiever Engineering Prize 2011 Chancellor's Letter of Commendation 2011 G.V. Allen Medal (formerly Local Government Engineers Prize) 2011 Civil Engineering Graduates' Society Prize

6.66 GPA

MEMBERSHIPS Student member of Engineers Australia (Civil)

TECHNICAL KNOWLEDGE Microsoft Word, Microsoft Excel, MATLAB, Strand7, Microstation, 12D Familiar with Australian Standards 4100, and 3600

PAST PROJECTS Design of spread footings for an overpass, using a variety of geotechnical data.

2010 Engineers without Borders – Bendee Downs Redevelopment Project 2012 Sellicks Beach Water design project 2012 UniSA Learning Centre partial design 2012 Geotechnical - Design of spread footings for an overpass

Page 14: Weebly - Tender to Undertake Feasibility Study South Road and … · 2019. 9. 7. · South Road Tender to Undertake Feasibility Study i | P a g e 13th March 2012 Dr Julie Mills, Ms

South Road Tender to Undertake Feasibility Study

10 | P a g e

SHAUN DE WAAL Mobile: 0433 XXX XXX

Email: [email protected]

EDUCATION

2012 – CURRENT UNIVERSITY OF SOUTH AUSTRALIA Bachelor of Engineering (Civil and Structural) 2009 – 2010 FLINDERS UNIVERSITY Bachelor of Engineering (Civil) (First 2 years)

PROFESSIONAL CAREER MAY 2011 – FEB 2012 AMBRA Picker/Stock Replenishment/Forklift

Duties: Using in-house computer system to access product information Forklift Operation Stock Picker Trainee

QUALIFICATIONS 2011 Certificate III Transport & Logistics (Warehousing and Storage) 2011 LF Forklift Licence

MEMBERSHIPS Student member of Engineers Australia

TECHNICAL KNOWLEDGE Proficient with Microsoft Office Familiar with Autocad, 12D, ArcGIS, GALENA,CORD, SLOG, CIRCLY, HEC-RAS, DRAINS, STRAND7 Familiar with Australian Standards 1170, 4100, and 3600

PAST PROJECTS 2009 Engineers without Borders “Living on the Water” 2011-2012 Mezzanine Floor Construction in Ambra warehouse 2012 Britannia Roundabout redevelopment design 2012 Sellicks Beach Water design project 2012 UniSA Learning Centre partial design

Page 15: Weebly - Tender to Undertake Feasibility Study South Road and … · 2019. 9. 7. · South Road Tender to Undertake Feasibility Study i | P a g e 13th March 2012 Dr Julie Mills, Ms

South Road Tender to Undertake Feasibility Study

11 | P a g e

YUK WANG TSOI (Leo) Mobile: 0413 XXX XXX

Email: [email protected]

EDUCATION 2010 – CURRENT UNIVERSITY OF SOUTH AUSTRALIA Bachelor of Engineering (Civil) 2010 SAIBT Diploma of Technology (Engineering and the Environment), SAIBT

PROFESSIONAL CAREER NOV 2012 – FEB 2012 ZHUHAI JIAN’AN CHANGSHENG ENGINERRING CO., LTD Work Placement

Duties: Civil Engineer

TECHNICAL KNOWLEDGE Proficient with Microsoft Office. Familiar with EPA Net, Drains, Strand 7, CORD, SLOG, 12D MicroStation and Solidworks. Familiar with Australian Standards 1170, 1720, 3600, 3700, 4100, and 4600

PAST PROJECTS 2012 Britannia Roundabout redevelopment design 2011 Seaford Industry Park Subdivision design 2011 UniSA M2 Building partial design 2012 UniSA Learning Centre partial design

Page 16: Weebly - Tender to Undertake Feasibility Study South Road and … · 2019. 9. 7. · South Road Tender to Undertake Feasibility Study i | P a g e 13th March 2012 Dr Julie Mills, Ms

South Road Tender to Undertake Feasibility Study

12 | P a g e

YUYANG QIAN (Yanis) Mobile: 0451 XXX XXX

Email: [email protected]

EDUCATION 2010 – CURRENT UNIVERSITY OF SOUTH AUSTRALIA Bachelor of Engineering (Civil and Transport)

PROFESSIONAL CAREER 2012 YONGZHENG CERTIFIED ENGINEERING BUDGETEER’S CO. LTD CHINA

Work Placement Duties: Civil Engineer

2011 GUOYU PROJECT MANAGEMENT CO. LTD CHINA Work Placement

Duties: Civil Engineer

MEMBERSHIPS Student Member of Engineers Australia

TECHNICAL KNOWLEDGE Familiar with Microsoft Office, Auto CAD, 12D, DRAINS, EPANET, CORD, SLOG, Galena and strand7 Familiar with Australian Standards 1720, 3600 and 4100

PAST PROJECTS 2012 Britannia Roundabout redevelopment design 2012 UniSA Learning Centre partial design

Page 17: Weebly - Tender to Undertake Feasibility Study South Road and … · 2019. 9. 7. · South Road Tender to Undertake Feasibility Study i | P a g e 13th March 2012 Dr Julie Mills, Ms

South Road Tender to Undertake Feasibility Study

13 | P a g e

MOHD AIZAT BIN MOHD YUSOFF Mobile: 0433 XXX XXX

Email: [email protected]

EDUCATION 2010 – CURRENT UNIVERSITY OF SOUTH AUSTRALIA Bachelor of Engineering (Civil and Structural) 2007 – 2010 UNITED ENGINEERS MALAYSIA FOUNDATION COLLEGE (KYUEM) A levels

PROFESSIONAL CAREER 2012 SPAZ SDN BHD (Malaysia) Work Placement

Duties: Civil and Structural Engineering Trainee 2012 UNIVERSITY OF SOUTH AUSTRALIA Translator

Duties: Translating documents from English to Malay for UNISA

AWARDS/ SPECIAL ACHIEVEMENTS 2012 University Merit Award 2011 2012 Civil Engineering Graduates’ Society Prize 2012 2011 Civil Engineering Graduates’ Society Prize 2011 2011 National Conference Games Melbourne Rugby Champions

MEMBERSHIPS Golden Key International Honour Society Member

Engineers Australia

TECHNICAL KNOWLEDGE Proficient with Microsoft Office and other windows applications Familiar with Microstation, 12D, HEC-RAS, GALENA, CORD, SLOG, DRAINS, Auto CAD

PAST PROJECTS 2011 Britannia Roundabout redevelopment design 2012 Sellicks Beach Water design project 2012 UniSA Learning Centre partial design 2012 Structural Design Project – Finite element analysis of a car porch

Page 18: Weebly - Tender to Undertake Feasibility Study South Road and … · 2019. 9. 7. · South Road Tender to Undertake Feasibility Study i | P a g e 13th March 2012 Dr Julie Mills, Ms

South Road Tender to Undertake Feasibility Study

14 | P a g e

GAO PENG (Simon) Mobile: 0426 XXX XXX

Email: [email protected]

EDUCATION 2010 – CURRENT UNIVERSITY OF SOUTH AUSTRALIA Bachelor of Engineering (Civil and Structural)

PROFESSIONAL CAREER 2012 SA WATER North – South Interconnection System Project

Duties: Civil Engineer Trainee - Work Placement 2012 SHUNSHUI PROJECT AND CONSTRUCTION MANAGEMENT Work Placement

Duties: Civil and Structural Engineering Trainee

MEMBERSHIPS Student Member of Engineers Australia

TECHNICAL KNOWLEDGE Familiar with Microsoft Office, Solid works, Strand7, CORD, SLOG, Auto CAD Familiar with Australian Standards 1720, 3600 and 4100

PAST PROJECTS 2011 UniSA M2 Building partial design 2012 Sellicks Beach Water design project

Page 19: Weebly - Tender to Undertake Feasibility Study South Road and … · 2019. 9. 7. · South Road Tender to Undertake Feasibility Study i | P a g e 13th March 2012 Dr Julie Mills, Ms

South Road Tender to Undertake Feasibility Study

15 | P a g e

MANOJ JOGI Mobile: 0402 XXX XXX

Email: jogmy001 @mymail.unisa.edu.au

EDUCATION 2010 – CURRENT UNIVERSITY OF SOUTH AUSTRALIA Bachelor of Engineering (Civil and Transport)

PROFESSIONAL CAREER 2012 Uncle Rob Pizza Bar Casual Staff Member

Duties: Delivery Driver

MEMBERSHIPS Student Member of Engineers Australia

TECHNICAL KNOWLEDGE Advanced knowledge of Microsoft Office, Solidworks, MATLAB, Microstation, DRAINS, Strand7, CIRCLY, CORD, SLOG, GALENA Familiar with Australian Standards 1720, 3600 and 4100

PAST PROJECTS 2010 Engineers without Borders – Bendee Downs Redevelopment Project 2012 Britannia Roundabout redevelopment design 2012 Sellicks Beach Water design project 2012 UniSA Learning Centre partial design

Page 20: Weebly - Tender to Undertake Feasibility Study South Road and … · 2019. 9. 7. · South Road Tender to Undertake Feasibility Study i | P a g e 13th March 2012 Dr Julie Mills, Ms

South Road Tender to Undertake Feasibility Study

16 | P a g e

4. Project Description

A feasibility study is to be undertaken to investigate the possibility of a grade separation of South

Road and the Outer Harbor rail line, located at Croydon. The study will investigate a number of

possible options and evaluate their feasibility, as well as providing an estimated cost and time frame

for the final design.

Several Strategic problems have been identified by DPTI for this section of South Road:

The increasing demand from the diverse users of South Road is increasing congestion and

travel time whilst reducing reliability of the road, hence causing high costs for business’ and

reducing Adelaide’s liveability

Poor accessibility between east and west of Adelaide (including public transport)

The current high incident rate (including road crashes) along South Road causing direct and

indirect costs to the community.

A grade separation of the road and rail line would contribute a great deal towards resolving these

issues and Edge Engineering is committed to providing DPTI with the ideal design solution.

After the completion of the feasibility study, assuming a suitable solution is found; Edge Engineering

will commence work on the preliminary design.

Page 21: Weebly - Tender to Undertake Feasibility Study South Road and … · 2019. 9. 7. · South Road Tender to Undertake Feasibility Study i | P a g e 13th March 2012 Dr Julie Mills, Ms

South Road Tender to Undertake Feasibility Study

17 | P a g e

The following goals and objectives have been identified in order to address the problems identified

by DPTI:

4.1. Goals

Ensure the National Network Transport Link (South Road) fulfils its role in accordance with

both State and National plans, and as a freight link as outlined in the 30-Year Plan for

Greater Adelaide

Support Adelaide’s future economic prosperity and liveability by ensuring efficient and

effective connectivity for people accessing employment, leisure and service opportunities

(both regional and local) and optimise the opportunity for integrated land use outcomes

Provide an integrated solution that directly and indirectly enhances transport system safety

for all road users (including motorists, public transport, pedestrians and cyclists)

Develop a corridor wide solution that makes the best use of both new and existing transport

network infrastructure, and is integrated with the broader multi-modal transport network of

Greater Adelaide

Develop a sustainable solution that provides the optimal balance between economic, social

and environmental outcomes.

4.2. Objectives

To protect and provide freight priority consistent with a National Network Transport Link

between Wingfield and Darlington to the Port of Adelaide, Adelaide Airport and other

industrial and commercial centres consistent with Adelaide’s 30-Year Plan

To improve travel time, reliability and vehicle operating costs in Adelaide’s north-south

transport corridor

To improve accessibility to employment, leisure and service opportunities of Adelaide’s east-

west traffic (including by motorists, public transport, pedestrians and cyclists)

To contribute to the achievement of the SA Government’s public transport mode share

target as outlined in the SA Strategic Plan

To minimise greenhouse gas emissions and improve air quality within the South Road

corridor

To reduce the incidence and severity of South Road crashes

To deliver a solution with positive net benefits (monetised plus non-monetised) for South

Australia.

Page 22: Weebly - Tender to Undertake Feasibility Study South Road and … · 2019. 9. 7. · South Road Tender to Undertake Feasibility Study i | P a g e 13th March 2012 Dr Julie Mills, Ms

South Road Tender to Undertake Feasibility Study

18 | P a g e

5. Scope of Works

The scope of works this tender considers is the feasibility study for the South Road and Outer Harbor

rail line grade separation, the location of which is shown in Figure 1. As traditional overpass options

have been ruled out by DPTI due to the close proximity of the Outer Harbor rail line to Port Road,

alternative solutions will have to be investigated.

Three possibilities have currently been identified which would allow for a grade separation; South

Road could run beneath the rail line, the Outer Harbor rail line could cross above South Road, or the

rail line could run beneath the road. Edge Engineering understand that it is also conceivable that

further solutions will be discovered which will be thoroughly investigated, allowing us to decide

which would best satisfy the goals and objectives outlined by DPTI while remaining cost effective.

Figure 1: Study Area

This tender includes the scope of works which make up the areas identified in the management

structure; Transportation, Urban Planning, Structural, Geotechnical, Water, Environmental and

Quality Assurance. It is presented as a bid to undertake the feasibility study report, and stands as an

offer to continue conceptual detailed design for the proposed project.

Page 23: Weebly - Tender to Undertake Feasibility Study South Road and … · 2019. 9. 7. · South Road Tender to Undertake Feasibility Study i | P a g e 13th March 2012 Dr Julie Mills, Ms

South Road Tender to Undertake Feasibility Study

19 | P a g e

6. Proposed Methodology

6.1. Transportation Component

Feasibility Study Outputs

Potential transport Design

Proposed Methodology

The transport team of Edge Engineering consists of 6 members: the head of transport department, a

senior engineer, 3 transport engineers and 1 graduate engineer. This team is full of passion, with

experience spanning several highly successful projects.

It is obvious that the transport facilities are currently not catering for the present demand. The

project area has a number of serious transport problems. The demand from the road users is

increasing congestion, travel time and reducing reliability of the road, resulting in high costs for

businesses and reducing Adelaide’s liveability. Traffic accidents occur frequently in this area. Those

accidents put a threat to the safety of both pedestrians and drivers.

The transport team of Edge Engineering will source data from the Department of Planning, Transport

and Infrastructure on the following:

Existing turn count data for South Road / Torrens Road.

Existing turn count data for South Road / Hawker Street.

Existing turn count data for South Road / Port Road.

Existing turn count data for South Road / Grange Road / Manton Street.

With the experience from the previous projects, our transport team can play a vital role in:

Reviewing the given data and past designs

The survey of other important transport data.

The analysis of the data

Finding those black spots where traffic jams and accidents occur frequently.

The design of other approaches for road users in those busy intersections.

Adjusting traffic signal phases to control traffic volumes on each road.

Page 24: Weebly - Tender to Undertake Feasibility Study South Road and … · 2019. 9. 7. · South Road Tender to Undertake Feasibility Study i | P a g e 13th March 2012 Dr Julie Mills, Ms

South Road Tender to Undertake Feasibility Study

20 | P a g e

Potential Issues

Firstly, our transport plans will be designed with normal traffic loading in mind. If overloaded trucks

travel on the road, the road surface may be damaged. Secondly, the pipe work may be affected

when modification works are conducted, which may have an impact on the water and electricity

supply of residents around the project area. Lastly, during the construction period, the environment

around those areas may be negatively influenced, but every effort will be made to minimise the

impact on the surrounding environment.

Page 25: Weebly - Tender to Undertake Feasibility Study South Road and … · 2019. 9. 7. · South Road Tender to Undertake Feasibility Study i | P a g e 13th March 2012 Dr Julie Mills, Ms

South Road Tender to Undertake Feasibility Study

21 | P a g e

6.2. Urban Planning Component

Feasibility Study Outputs

Environmental issues

Social and economic concerns

Land use and its availability

Public and community feedback

Proposed Methodology

Urban planning refers to the practical and political process that is concerned with the planning of

urban environment and the land use. The Urban Planning team of Edge Engineering is made up of 2

urban planners, 1 graduate engineer, and 1 community consultant, led by a Senior Urban Planner

Edge Engineering has a specialised urban planning team who have experience solving problems in a

professional way. Relocation of any affected residential and business sites will be the major focus of

the Urban Planning team, who will work with the local councils to make sure the construction plan,

obeys council regulations.

Potential Issues

Some major problems come with the development process; land relocation, environmental issues

and community dissatisfaction. It is inevitable that the construction phase of the project will cause

disruption to the community and the general public, but our best efforts will be put in to minimise

the disruption to all involved before and during construction. Community members who oppose the

design of the project are a key area of focus for the urban planning team, posing a hurdle which can

only be overcome through excellent communication skills and feedback from the public. Cultural

heritage and the environment are yet more areas of concern for the urban planning team.

Page 26: Weebly - Tender to Undertake Feasibility Study South Road and … · 2019. 9. 7. · South Road Tender to Undertake Feasibility Study i | P a g e 13th March 2012 Dr Julie Mills, Ms

South Road Tender to Undertake Feasibility Study

22 | P a g e

6.3. Structural Component

Feasibility Study Outputs

Potential Structural Design

Identification of defects in surrounding infrastructure

Proposed Methodology

The structural component of the feasibility study will be undertaken by a team of engineers with

varying degrees of experience. The team will be led by a senior engineer with many years of

experience in the structural engineering field and with excellent leadership skills. Under the team

leader is a team which will consist of 1 senior engineer, 3 structural engineers, and 1 junior engineer.

An investigation of the surrounding infrastructure by our structural engineers will be undertaken to

identify any structural defects prior to the commencement of the project.

The structural team will also investigate the potential designs in order to determine the most cost

effective and efficient design. As the Outer Harbor rail line is in close proximity to Port Road,

traditional overpass options have been ruled out by DPTI. Three options are therefore available:

South Road could pass under the rail line, the rail line could pass under South Road or the rail line

could pass over South Road. Each of these three options could be implemented in various ways.

Close collaboration with each of the other teams, especially the geotechnical and transportation

teams will be required to ensure that the optimal design is reached and all goals are met. In order to

determine the optimal potential design during the feasibility study, the following information will be

required:

Geotechnical data, i.e. borehole logs, geological reports etc.

Estimated loads based on traffic data.

Using this data, it will be possible to develop a number of potential designs and evaluate them based

on their estimated cost. On delivery of the feasibility study, the structural team will be able to

commence working on the preliminary structural design.

Page 27: Weebly - Tender to Undertake Feasibility Study South Road and … · 2019. 9. 7. · South Road Tender to Undertake Feasibility Study i | P a g e 13th March 2012 Dr Julie Mills, Ms

South Road Tender to Undertake Feasibility Study

23 | P a g e

Potential Issues

Available space may be a potential issue, as the project will occur in a built up residential and

industrial area. Certain designs may be impossible due to insufficient space and would have to be

eliminated during the feasibility study.

The close proximity of the Outer Harbor rail line to port road also means that traditional overpass

options have been ruled out by DPTI and alternative options will therefore have to be considered.

Page 28: Weebly - Tender to Undertake Feasibility Study South Road and … · 2019. 9. 7. · South Road Tender to Undertake Feasibility Study i | P a g e 13th March 2012 Dr Julie Mills, Ms

South Road Tender to Undertake Feasibility Study

24 | P a g e

6.4. Geotechnical Component

Feasibility Study Outputs

Laboratory soil testing on site

Construction site inspection

Production of geological reports

Potential pavement design

Proposed Methodology

The geotechnical component of the Outer Harbor rail line project will be conducted by a team of 6

engineers. A senior geotechnical engineer with outstanding leadership skills will lead a team

consisting of 1 senior engineer, 3 geotechnical engineers and 1 graduate engineer.

The first task the geotechnical team will complete during the feasibility study is several on-site soil

tests. The soil tests will encompass the entire site, including the road, the rail line and the

surrounding soil.

The soil tests will be followed by a site inspection, the aim of which is to construct a visual model of

the site, detailing local soil types, elevations and the existing road and rail line. The inspection results

will highlight areas where soil quality could impact construction and provide geological data for the

structural design.

The geotechnical team will also consider the potential pavement design in order to find the most

efficient and effective pavement design. The potential pavement design consists of two parts. The

first part is to determine the cross section and the second is to determine the suitable thickness of

pavement layers. As the typical cross section for the upgraded South Road has been provided by

DPTI, The geotechnical team will be able to be focus on the second part.

Cooperation with the other teams will also be essential. Traffic data from the transportation team

will be required in order to achieve the optimal pavement design and geological data will need to be

provided to the structural division.

Potential Issues

The complex variety of soil types and properties could be a potential issue. Poor quality soil in the

project area could result in a large delay and would take a great deal of time and money to improve.

It is therefore important to thoroughly investigate the site in order to identify any problem areas

Page 29: Weebly - Tender to Undertake Feasibility Study South Road and … · 2019. 9. 7. · South Road Tender to Undertake Feasibility Study i | P a g e 13th March 2012 Dr Julie Mills, Ms

South Road Tender to Undertake Feasibility Study

25 | P a g e

prior to the structural design, so that they can either be avoided or plans can be made to improve

the soil quality.

A major concern to the project will be the possibility of coming across any indigenous sites,

particularly during construction. The team will need to be aware of what needs to happen if

anything is found, and procedures will be put in place for if something happens to be found.

Before the construction phase, the soil quality will be tested to confirm there are no sources of

contamination, where a soil sample will be taken as a benchmark to be tested against in the future

to ensure there is no significant increase to soil pollution during the construction phase. Soil erosion

in surrounding areas will be examined, and planting vegetation or other solutions may be

implemented to prevent soil erosion. Soil erosion is a large cause of the pollution in waterways and

can have negative effects on the safety of structural design.

Page 30: Weebly - Tender to Undertake Feasibility Study South Road and … · 2019. 9. 7. · South Road Tender to Undertake Feasibility Study i | P a g e 13th March 2012 Dr Julie Mills, Ms

South Road Tender to Undertake Feasibility Study

26 | P a g e

6.5. Water and Services Component

Feasibility Study Outputs

Potential drainage system design

Investigate surrounding catchment

Services Plan

Proposed Methodology

The water and services component of the feasibility study will be undertaken by a team of engineers

with varying degrees of experience. This will be led by a senior engineer who has many years of

experience and excellent leadership skills. The team will also consist of 1 water engineer and 1

graduate engineer.

An investigation of the surrounding area by our water engineers will be undertaken to collect any

required data for the calculation of the Average Recurrence Interval (ARI) and peak flow rate. The

water team will ensure the system effectively captures stormwater flows from the railway to

prevent stormwater damage occurring to the track. Catchment areas will have to be determined as

the project will affect surrounding area. The drainage system design will have to align with existing

infrastructure by the City of Charles Sturt Stormwater Management Plan for the surrounding

catchments.

The locations of existing services will be investigated as services such as electricity, water, gas and

telephone lines may have to be altered within the project area, and new connections for lighting will

be required. These alterations will depend heavily on the structural design chosen.

Potential Issues

Existing Services

The location of existing services and stormwater drainage systems will have to be considered during

the design. Care will have to be taken to ensure the new drainage system will not interrupt any

services running below ground in the project site. It will also be important that the new drainage

system integrates easily with the existing stormwater drainage network.

Page 31: Weebly - Tender to Undertake Feasibility Study South Road and … · 2019. 9. 7. · South Road Tender to Undertake Feasibility Study i | P a g e 13th March 2012 Dr Julie Mills, Ms

South Road Tender to Undertake Feasibility Study

27 | P a g e

6.6. Environmental Component

Feasibility Study Outputs

Potential of multiple environment pollution and issues

Primary solution for issues raised

Proposed Methodology

A feasibility study of the environmental issues related to the project will be undertaken by a team of

engineers with varying degrees of experience. The team is led by a senior engineer who has many

years of experience and excellent leadership skills, and includes 1 environmental engineer, and 1

graduate engineer.

Our environmental engineers will undertake a risk assessment study to identify any potential issue

during this project. The team will work closely with the other teams as each area overlaps and

requires communication to make sure the project comes together seamlessly, and using this data,

the team may evaluate the potential issues and provide suitable solutions to minimise

environmental impact.

Potential Issues

Flora and fauna issue

The site may have existing flora and fauna in the area. If removal is required, it will be handled with

extreme care so it can be relocated to a suitable place.

Noise/air pollution

The site is located near a residential area. The environmental team will provide a solution to

minimise the impact to the surrounding areas. Dust may arise from various construction activities.

This may include concrete and demolition works as well as construction traffic movements on

unpaved roads during the construction stage. Air pollution is a potential issue during the

construction phase. The site may have equipment such as a water sprayer in order to keep the site

moist to reduce dust particles in the air. The environmental team may test the air quality regularly to

confirm the air quality achieves a predetermined air quality target. The use of high powered

mechanical equipment may cause considerable noise pollution. For noise pollution during the

construction phase, the site may use temporary acoustic barriers and silenced equipment to

minimize the noise level.

Page 32: Weebly - Tender to Undertake Feasibility Study South Road and … · 2019. 9. 7. · South Road Tender to Undertake Feasibility Study i | P a g e 13th March 2012 Dr Julie Mills, Ms

South Road Tender to Undertake Feasibility Study

28 | P a g e

Solid waste issue

Solid waste may be generated from construction and demolition. These materials should be

removed from site and sent to a specialised disposal facility.

Water quality

The site will have waste water during the construction phase. Stormwater runoff and sewerage are

the major concerns in this area, and will need to be monitored throughout.

Page 33: Weebly - Tender to Undertake Feasibility Study South Road and … · 2019. 9. 7. · South Road Tender to Undertake Feasibility Study i | P a g e 13th March 2012 Dr Julie Mills, Ms

South Road Tender to Undertake Feasibility Study

29 | P a g e

6.7. Quality Assurance/Control

Edge Engineering strive to provide clients with quality solutions and to help implement them, a team

is formed to focus on quality control headed up by the quality assurance manager to make sure

deadlines are met whilst maintaining a level of quality which is acceptable. The team will have access

to all areas of the project making sure the major and minor components of the project are all

addressed with full attention to detail. The key aim of the team is to make sure corners aren’t cut

whilst remaining on schedule to guarantee the work is of the highest quality. The team has been

carefully put together making sure its members have a high level of experience to ensure the

optimal solution is achieved in all projects.

Page 34: Weebly - Tender to Undertake Feasibility Study South Road and … · 2019. 9. 7. · South Road Tender to Undertake Feasibility Study i | P a g e 13th March 2012 Dr Julie Mills, Ms

South Road Tender to Undertake Feasibility Study

30 | P a g e

7. Assumptions

Before undertaking the feasibility study, some assumptions and data will need to be provided.

Details of the surrounding areas which include, places of interest, heritage listed

buildings/trees

Contour map, topographic survey including flood estimation figures for the area

Previous geotechnical data such as bore hole logs, settlement data

Plans for services in the area from SA Water, ETSA, Telstra and any other related services.

Traffic data from DPTI

Environmental impact surveys

Page 35: Weebly - Tender to Undertake Feasibility Study South Road and … · 2019. 9. 7. · South Road Tender to Undertake Feasibility Study i | P a g e 13th March 2012 Dr Julie Mills, Ms

South Road Tender to Undertake Feasibility Study

31 | P a g e

8. Project Schedule

For details on the project schedule, please see Appendix 1.

8.1. Major Deliverables

Feasibility Study report

Feasibility Study presentation

8.2. Minor Deliverables

Preliminary findings report

Documentation of chosen solution

Meeting minutes

Page 36: Weebly - Tender to Undertake Feasibility Study South Road and … · 2019. 9. 7. · South Road Tender to Undertake Feasibility Study i | P a g e 13th March 2012 Dr Julie Mills, Ms

South Road Tender to Undertake Feasibility Study

32 | P a g e

9. Pricing

9.1. Team member hourly rates

Edge Engineering’s cost proposal is split into teams and resources, with a total of 32 employees in

consideration. The hourly rates for each employee depend on their experience and the level of

responsibility for the project. Senior engineers will lead the department teams due to their high level

of experience in their various fields. The following table summarises the hourly rate for each

employee.

Table 1: Team member hourly rates

Position Rate/hour Rate/hour + GST

Project Manager $240 $264

Quality Assurance Manager $200 $220

Head of Department (Team Leader) $200 $220

Senior Engineer $180 $198

Engineer $150 $165

Graduate Engineer $120 $132

Urban Planner $150 $165

Graduate Urban Planner $120 $132

Community Consultant $120 $132

9.2. Cost proposal

Edge Engineering have calculated the total cost of their services to undertake the feasibility study to

be $244,320, or $268,752 including 10% GST. This is based on each team member working 12 hours

a week, over 4 weeks. The detailed costs for each department are shown in Table 2.

Page 37: Weebly - Tender to Undertake Feasibility Study South Road and … · 2019. 9. 7. · South Road Tender to Undertake Feasibility Study i | P a g e 13th March 2012 Dr Julie Mills, Ms

South Road Tender to Undertake Feasibility Study

33 | P a g e

Table 2: Cost proposal

Department Position No. of people Hours/ week Weeks Cost (AUD) inc GST

Project Management

Project Manager 1 12 4 $12,672

Total $12,672

Quality Assurance

Quality Assurance Manager 1 12 4 $10,560

Graduate Engineer 1 12 4 $6,336

Total $16,896

Transport

Head of Department 1 12 4 $10,560

Senior Engineer 1 12 4 $9,504

Transportation Engineer 3 12 4 $23,760

Graduate Engineer 1 12 4 $6,336

Total $50,160

Urban Planner

Head of Department 1 12 4 $10,560

Urban Planner 2 12 4 $15,840

Graduate Urban Planner 1 12 4 $6,336

Community Consultant 1 12 4 $6,336

Total $39,072

Structural

Head of Department 1 12 4 $10,560

Senior Engineer 1 12 4 $9,504

Structural Engineer 3 12 4 $23,760

Graduate Engineer 1 12 4 $6,336

Total $50,160

Water and Services

Head of Department 1 12 4 $10,560

Water Engineer 1 12 4 $7,920

Graduate Engineer 1 12 4 $6,336

Total $24,816

Environmental

Head of Department 1 12 4 $10,560

Environmental Engineer 1 12 4 $7,920

Graduate Engineer 1 12 4 $6,336

Total $24,816

Geotechnical

Head of Department 1 12 4 $10,560

Senior Engineer 1 12 4 $9,504

Geotechnical Engineer 3 12 4 $23,760

Graduate Engineer 1 12 4 $6,336

Total $50,160

Total 32 $268,752

Page 38: Weebly - Tender to Undertake Feasibility Study South Road and … · 2019. 9. 7. · South Road Tender to Undertake Feasibility Study i | P a g e 13th March 2012 Dr Julie Mills, Ms

South Road Tender to Undertake Feasibility Study

34 | P a g e

10. Company Policies

10.1. Quality

Edge Engineering endeavours to meet the upper echelon of customer satisfaction through quality, in

work and achieving that quality in a safe and respectable manner. This company meets and exceeds

expectations specified in AS/NZS ISO 9001:2008 ‘Quality management systems – Requirements’

Edge is forever striving to improve its standards through past experiences and client feedback, with

strong communication between customer and client of utmost importance.

Ethical decisions are made and with the employment of a quality assurance manager to help

maintain a high level of quality which is continually maintained in all areas of the company. The

quality assurance manager will work with group leaders and project managers to maintain a high

level of quality and ethical solutions.

Regular training is provided to all staff to make sure a clear understanding of the quality which is

expected in the company.

10.2. Occupational Health & Safety

Occupational health & safety standards and policies are strictly adhered to by Edge Engineering.

Emphasis on undertaking tasks safely is enforced throughout the workplace to ensure the safety of

all parties involved in the day to day running of the company.

It is highly recommended that staff complete an OH&S and first aid course, and a select few are

nominated as OH&S officers and fire wardens. Steps are taken to identify potential hazards in the

work place and on-site to ensure the correct procedures are followed to prevent harm to

employees, and the community. Regular drills are undertaken and practised. Further undertakings

regarding the matter are:

Ensuring a healthy and safe working environment for all employee

Promoting a healthy and safe workplace culture to discourage accidents in the workplace

Continuously improving our OH&S performance

Page 39: Weebly - Tender to Undertake Feasibility Study South Road and … · 2019. 9. 7. · South Road Tender to Undertake Feasibility Study i | P a g e 13th March 2012 Dr Julie Mills, Ms

South Road Tender to Undertake Feasibility Study

35 | P a g e

10.3. Environmental

Edge Engineering is very conscious of its environmental footprint within society and takes measures

to reduce this impact. In working with our global and local partners, clients and subcontractors, a

mutual agreement has been achieved to supply sustainable solutions to projects without a decrease

in quality on the project.

Some company guidelines have been developed to reduce the pollution and damage to surrounding

flora and fauna to the lowest levels possible, as follows:

Complying with all relevant environmental laws, regulations and best practices

Undertake positive mitigation measures for soil erosion and sedimentation in all our project

to prevent detrimental effects to the environmental

Ensure all parties involved are committed in the implementation of our environmental policy

Set realistic goals and measure progress to ensure continuous improvement in our

environmental performance

High targets for efficiency in the consumption of energy and natural resources

Recycling products where applicable

Applying up to date environmental protection techniques

Page 40: Weebly - Tender to Undertake Feasibility Study South Road and … · 2019. 9. 7. · South Road Tender to Undertake Feasibility Study i | P a g e 13th March 2012 Dr Julie Mills, Ms

South Road Tender to Undertake Feasibility Study

36 | P a g e

Appendix 1: Feasibility Study Detailed section schedules