WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error...

59
May 30-31, 2002 WECC Auto Time Error Correction Workshop 1 WECC WORKSHOP AUTO TIME ERROR CORRECTION

Transcript of WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error...

Page 1: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

1

WECC WORKSHOP

AUTO TIME ERRORCORRECTION

Page 2: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

2

WELCOMERandy Beckwith

• Introductions• Arrangements

– Breaks– Vendor get togethers?

• Sign Up Sheet on Registration Form• Question Forms• Sign Up Sheet for Extra Help

Page 3: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

3

ACTION ITEMS

• CMOPS has approved three OC Handbook changes– ACE Equation– II Payback Procedure– TE Control Procedure

• OC approved February 2002• BOD approved October 2002

– This workshop sets the effective date.

Page 4: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

4

BACKGROUNDWarren McReynolds

• TOO MANY MANUAL TIME ERROR CORRECTIONS - > 50 per month

• CMOPS assigned PWG to RECOMMEND CORRECTIVE ACTION

• PWG Recommended going after the root cause of Time Error

Page 5: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

5

ROOT CAUSES of TEl Errors in Measurement

– Frequency– Net Interchange

l Errors in Schedules– Frequency– Net Interchange Schedules

l Inadequate Control System or Telecommunicationsl Energy Conversion Units Responsive to AGC

dispatch– Not available– Not assigned

Page 6: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

6

SO WHAT?

• Time Error Costs Money• 23 minutes of accumulated TE in

2000– 425,500 MWh of correction– means 425,500 MWh of poor

performance in the first place

Page 7: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

7

TE is still AccumulatingA C C U M U L A T E D T IM E E R R O R W I T H O U T T IM E C O R R E C T IO N S

W E S T E R N IN T E R C O N N E C T IO N : 01O C T 97 thru 10M A R 03

00:0002:0004:0006:0008:0010:0012:0014:0016:0018:0020:0022:0024:0026:0028:0030:0032:0034:0036:0038:0040:0042:0044:0046:0048:0050:0052:0054:0056:0058:0060:00

01Oct97

30N

ov97

29Ja

n98

30M

ar98

29M

ay98

28Ju

l98

26Se

p98

25N

ov98

24Ja

n99

25M

ar99

24M

ay99

23Ju

l99

21Se

p99

20N

ov99

19Ja

n00

19M

ar00

18M

ay00

17Ju

l00

15Se

p00

14N

ov00

13Ja

n01

14M

ar01

13M

ay01

12Ju

l01

10Se

p01

09N

ov01

08Ja

n02

09M

ar02

08M

ay02

07Ju

l02

05Se

p02

04N

ov02

03Ja

n03

04M

ar03

Da

te

/H

ou

r

Ho

url

y c

alcu

lati

on

s b

ased

on

BP

A R

OD

S d

ata;

T

ime

erro

r ac

cum

ula

tio

n b

egin

s 0

1O

CT

97

; N

o a

nn

ual

res

et

Acc

umul

ated

Tim

e E

rror

(m

inut

es:s

econ

ds)

-0

2:0

0-

04

:00

-0

6:0

0

Ra

te o

f C

ha

ng

e:

15

Ma

r0

0-

15

Ja

n0

1:

+ 5

.6 s

ec

on

ds

pe

r d

ay

Ra

te o

f C

ha

ng

e:

15

Ju

l02

-1

5D

ec

02

: -

2.7

se

co

nd

s p

er

da

y

Page 8: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

8

Terminology• Bias is a negative number

– Subscript n is your control area– Subscript s is the WECC– Subscript i are the other control areas

• ε is time error• I is interchange or inadvertent interchange• II is inadvertent interchange• B or β is frequency bias setting• L10 is the NERC CPS2 10-minute ACE limit

Page 9: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

9

Let’s Decompose Time Error• εn = - ( 6 / Bs ) * ( In – BII – βn * εs / 6 )

• It is a function of the WECC & your:Frequency Bias

&Inadvertent Interchange

• The second term is found in AIE surveys• If you can control your Inadvertent

Interchange, you can control yourTE

WECC TE

WECC Bias

Page 10: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

10

Let’s Decompose Inadvertent• The component of area (n) inadvertent

interchange caused by the regulating deficiencies of area (n) itself is called:

• PRIMARY INADVERTENT INTERCHANGE

• Inn = [ (Bs – βn) / Bs ] * (In – BII - βn*εs / 6)

– In is NIA – NIS– The second term is found in AIE surveys– BII is bilateral inadvertent interchange payback for

inadvertent accumulated prior to February 4, 2003.

Page 11: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

11

Secondary Inadvertent Interchange• The component of area inadvertent interchange

caused by the control area (i)– Ini is II in area n caused by area i (must

decompose Iii)– Iin is II in area i caused by area n (must

decompose Inn)– Ini is not equal to Iin

• Ini = -[Yn / (1-Yi) ] * Iii

• Iin = -[Yi / (1-Yn) ] * Inn

– where Yn = β n / Bs and Yi = β i / B s

Page 12: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

12

Primary Time Error & Primary II are Mathematically Interchangeable

•You cause your own Primary II and

•You respond with Secondary II from your Frequency Bias Obligation

Inn = -(Bs – βn) εn / 6

Iin = (β i / 6 ) εn

In = Inn + Σ Iin

•Whenever any one of the three components, εn , Inn , or Iin , is zero, the others will also be zero.

Page 13: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

13

Western System Bias Relationship on TE & II

-200

-100

0

100

200

300

400

500

600

0 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6 1.8 2

Area TE component - secs

Are

a P

rim

ary

& S

econ

dary

II

com

pone

nt -

MW

h

BPA

CISO

PSCo

50

Page 14: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

14

Sign Relationships

• εn is not necessarily of the same sign as εs

• Inn is not necessarily of the same sign as In

• εn and Inn are always the same sign• Iin in all remote areas i are always of

the opposite sign to εn and Inn

Page 15: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

15

How do you alter decomposed In and εn ?

• Area n component εn may be obscured in εs by εi components of areas i, but it can only be altered by area n.

• Area n primary component Inn may be obscured in In by Ini secondary components caused by areas i, but it can only be altered by area n.

• Area n components εn and Inn , and components Iin in all areas i are all linearly related, and all curves defining these relations pass through the zero-zero origin, so that when one is zero, all are zero.

Page 16: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

16

So What do we do with this Information?

• Since you know who did what to whom, you could develop a settlement process– Requires all II accounts fully reconciled– Requires all frequency bias settings are known– Requires N*(N-1) matrix for every hour

• Single Step Corrective Control– Already have necessary information - εs, In, Bs, β n…– Simple hourly accounting process to compute Inn

for on-peak and off-peak.– Simple hourly accounting process to track ∆TE– No need to compute secondary inadvertent

interchange

Page 17: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

17

• This is a single step correction approach– Use of existing II accounting to compute a

correction term:– ΣIIprimary / [(1 - Y) * H]

• Y = β / Bwecc

• H = correction time period in hours• Σ IIprimary = IIprimary + (1-Y) * (IIactual -BII - β *∆TE/6)• Track On/Off Peak ΣIIprimary

– Correction Term must be ≤ |L10| or |0.2* β|

Add Auto TE / II Payback to ACE

Page 18: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

18

ACE EquationBart McManus

• Review of the ACE equation modes• Start from existing equation

– Modified TE control– Tie Line Bias + TE control– Turned off TE control Oct. 1, 1997

• Transition to Auto TE Control– Auto Unilateral IIprimary payback

Page 19: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

19

• NIA - NIS

• – Tob

• + IME

ACE in Flat TL mode(constant interchange)

• Net Interchange Deviation

• Bilateral II Payback

• Compensation

Used when frequency error equipment is out of service

Page 20: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

20

• - 10β (FA - FS)

• IME

ACE in Constant Frequency mode

• Frequency Bias Obligation

• Compensation

Used during islanded operation or black out restoration

Page 21: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

21

ACE in TLB + TD modeRevised July 26, 1989

• T1 - T0

• -10*Bf *(F1 – F0)

• -s*(0.3Bt * td )

• -Tob• + C

• Net Interchange Deviation

• Frequency Bias Obligation

• Modified Time Error Obligation

• Bilateral II Payback• Compensation

Exclude from CPS

Page 22: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

22

WECC Switched to TLBOctober 1, 1997

• The TD portion did not coordinate with CPS1 or CPS2

• It did not have provisions for tracking on-peak & off-peak TE (EPRI report on CPS)

• It did not have bounds like the Eastern Interconnection uses for Unilateral II Payback to coordinate with CPS2.

Page 23: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

23

• NIA - NIS

• - 10β (FA - FS)

• +IIprimary/[(1-Y)*H]

• – Tob

• + IME

ACE in TLB + TD modeRevised 2002

• Net Interchange Deviation

• Frequency Bias Obligation

• Auto TE Obligation (Unilateral II Payback)

• Bilateral II Payback

• Compensation

Exclude from CPS

Page 24: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

24

Coordination with CPS

ACETLBACETLB

CPS Calculator

ACETLB+ATE

Inn/[(1-Y)*H]

Functional Model Alternative Model

CPS Calculator

ACETLB+ATE

+

Inn/[(1-Y)*H]+

-

Page 25: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

25

Where do the terms come from?Bias from NERCBs (WECC) & β (CA)Y = β / Bs

Correction TimePeriod set by PWGH = 2-5 hours

Compute on/off peakIIprimary from end ofhour II accounting

Compute on/off peakIIprimary Adjustmentsfrom ATF accounting

Add to totalAccumulated IIprimary(either on/off peak)

IIprimary/[(1-Y)*H]

Page 26: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

26

Setting Control LimitsNERC Policy 1.F (Unilateral Paybacks)

Will this limit my CPS control room?– Assume 1000 MW generator trip and recovery ramps

back within DCS period.– 1000 MW in 15-minutes is 125 MWh– Poisson probability says happens 1 in 3 years in the WECC

for control areas & reserve sharing groups.– You may have a few hours of maximum payback obligation

that causes CPS2 violations– If this happens, change the ATE limit to 0.2*Bias

IIprimary/[(1-Y)*H] is limited to L10

Page 27: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

27

Setting Rate of Payback – HSet by Performance WG

• To avoid hunting– Set rate to be slow enough to allow

completion of hourly accounting – ~3 hours

• To keep TE & II bounded– Set rate to reduce IIprimary balances in a

timely manner ( ~ 5 hours)

Page 28: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

28

Computing Primary II HourlyDon Badley

• During Hourly Control Area Checkout– Complete your hourly Inadvertent

Interchange determination.– It is possible that some errors will creep

in when checkout is incomplete. Continue your standard practice to complete hourly verification as best you can.

• Use II result to compute Primary II

Page 29: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

29

Components of Primary II• Last hour’s total II (same as always)• Last hour’s accumulated Primary IInn• Change in TE from previous hour (use your

local TE from your local frequency error source). Time Monitor does not provide hourly TE.

• TE adjustments to match WECC Time Monitor (to synch with 1400 notice)

• Manual TE offset (-0.02, 0.0, +0.02)• Number of minutes of manual TE

correction you did last hour (0, 30, 60)

Page 30: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

30

Compute Last Hour’s TE Change

∆TE = TEend hour – TEbegin hour – TDadj – (t)*(TE offset)

Should be saving time error to the nearest 0.001 second

An EMS alternative is to integratethe hourly frequency error

May want to track exact timeit is active in case start or stoptimes are not synchronized tothe official times

Save this value in EMS, you will use it for After-the-Fact Primary II adjustments

From Time Monitor @ 1400 Or, integrate the

TE offset * 60

Page 31: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

31

Alternative ∆TE Computation

∆TE = 1/60 ∫ ∆Ffor clock-hour time error change

TE = TE adjust + 1/60 ∫ ∆Ffor continuous time error (useful to compare calibrationof frequency source to WECC Time Monitor)

Page 32: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

32

Compute Last Hour’s Primary II

IIprimary = (1-Y) * (IIactual – BII - β * ∆TE / 6)

60 hertz systems

From last slide

Your control area average bias last hour (BCH & BPA take note)

Your hourly verified inadvertent

β / BsBilateral inadvertent

interchange payback for inadvertent accumulated

prior to February 4, 2003.

Page 33: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

33

Accumulate Primary II(separated into on-peak or off-peak totals)

IIprimary

accumulatedon-peak IIprimary

accumulatedoff-peak IIprimary

If on-peak, then add to:

If off-peak, then add to:

ENERGY ACCOUNTING WORLD(last hour)

AGC WORLD(current hour)

IIprimary/[(1-Y)*H]

Page 34: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

34

• If last hour was on-peak, then add last hour’s Primary II to the accumulated on-peak Primary II.

• If last hour was off-peak, then add last hour’s Primary II to the accumulated off-peak Primary II.

• Send appropriate accumulated on/off peak Primary II to AGC.

Accumulate Primary II(words in case the picture is confusing)

Page 35: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

35

Go to the Spreadsheet Example• Shows one 24 hour period referenced to

Pacific Time Zone• Input your CA bias• Input your CA hourly II• Input the clock-hour TE• Input any TE adjustments to match CISO• Input any manual TE adjustments• Result is hourly Primary II• Add any after-the-fact adjustments• Add to accumulated on/off peak Primary II• Send to AGC

Page 36: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

36

After-the-Fact Primary II Adjustments

• For each hour requiring adjustment:– Retrieve that hour’s ∆TE saved previously– Retrieve that hour’s β / Bs saved previously– Use the same spreadsheet equation from

hourly II accounting, – Compute the equivalent Primary II adj.

• All meter adjustments are 100% Primary II

• Accumulate the hourly on/off-peak Primary II adjustments and forward to AGC

Page 37: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

37

Compute Adjusted Primary II(skip hours that have no adjustments)

adjIIprimary = (1-Y) * (adjIIactual - β * ∆TE/6)

60 hertz systems

For the hour of adjustment

Your control area average bias for the hour of adjustment

Your inadvertent adjustment

β / Bs for the hour of adjustment

Page 38: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

38

Compute Meter Error Adjusted Primary II

adjIIprimary = adjIIactual

Page 39: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

39

Bring Forward AdjustedPrimary II for all hours

(separated into on-peak or off-peak totals)

adjIIprimary

accumulatedon-peak IIprimary

accumulatedoff-peak IIprimary

If on-peak, then add to:

If off-peak, then add to:

AFTER-THE-FACT ACCOUNTING WORLD(when ever you send II adjustments to AGC)

AGC WORLD(current hour)

IIprimary/[(1-Y)*H]

Page 40: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

40

Spreadsheet Example

• Use the same spreadsheet (Adjustments tab)

• Substitute your adjustments into the hourly inadvertent interchange column for the year & month & hour of adjustment

• Since the Adjusted Time Error and bias are already saved, the Primary II adjustment is computed directly.

Page 41: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

41

Miscellaneous Itemsall

• Loop Flow• Legacy Systems• Interfaces between AGC and Accounting

– Helpful tool to determine IME

• Temporary Short Cuts until I can make changes– Does size of control area bias matter?– Does variable bias mess up the accounting?

• Do we turn off Auto TE during manual TE?

Page 42: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

42

Does Unilateral II affect Loop Flow?

BPA

20

26

15

75 primary

69

48

45

39

59

-36.6secondary

-38.3secondary

Page 43: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

43

• Try these approaches:– From your spreadsheet:

• Compute Hourly Primary II• Add it to your Accumulated Primary II• Factor in the L10 & H limits

• Then add the correction to:– Eastern Interconnection Unilateral

payback

My AGC is too Old to Change

Page 44: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

44

Meter Error Correction Term• NIA - NIS

• - 10β (FA - FS)

• +IIprimary/[(1-Y)*H]

• – Tob

• + IME

Stay on TLB control mode to omit this term

Can use this term if not part of CPS

Page 45: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

45

• Dispatchers have an hourly ACE tool to determine “Regulator Error”

• Helpful for figuring how much “compensation” to add to meter error term in ACE

• Spreadsheet tool.

How Can Meter Error Correction Determined?

Review of Hourly ACE

Page 46: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

46

Most Vendor AGC has the Eastern Interconnection Unilateral Payback term

• NIA - NIS

• - 10β (FA - FS)

• + II * 0.20 * β• limited to L10

• – Tob

• + IME

The rate of correction is 20% of bias.The Primary II has to be substituted as the accumulated (limited) II. Will require investigation into your AGC’s specific features

Page 47: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

47

My Accounting System is very customized

• Although the spreadsheet lays out the method– You can integrate the follow-on

computation manually or automatically– Remember to “Paste Special” values only

after each hour.– If you do not archive hourly ∆TE, there

may be some help using daily on/off peak average TE.

Page 48: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

48

Can I cut some Corners?

• If After-the-Fact adjustments are small– Adjusting AGC with the non-converted

inadvertent interchange will result in a two step correction

– That means new Primary II is created and will be corrected in the next accounting

Page 49: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

49

What about Variable Bias?

• Using the NERC reported average bias– Makes for easier computation – Less information to save– Differences that do occur will result in

two step correction– Similar to the after-the-fact impact

Page 50: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

50

When Bias is Very Small

• The Y term is very small, that makes my Primary II almost the same as hourly II– Yes, in the short run.– As long as you correct continuously, the

two will be very nearly equal– Control Areas having difficulty

controlling properly will see Primary II build up regardless of bias size.

Page 51: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

51

Manual TE Corrections

• Keep computing your Primary II• Keep correcting for your Accumulate

Primary II

Page 52: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

52

ClosureRandy Beckwith

• Probably more detail than you wanted• Avenues presented to change your

AGC and accounting systemsOR

• Transitional approaches to continue to use what you have

Page 53: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

53

Setting the Effective Date

• Feedback from you today• Who wants more help today?• Who wants more help at their control

center?• Last change to ACE equation was

implemented in 6 months.

Page 54: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

54

Action Items• Remove old TE correction from ACE• Add IIprimary correction to ACE• Modify Hourly Accounting to compute IIprimary,

on-peak IIprimary,, off-peak IIprimary• Modify ATF Accounting, if necessary, to

compute adjIIprimary • Continue BII paybacks prior to effective date.• Freeze In totals once Auto TE becomes

effective and use BII paybacks only for remaining balances

• Set Effective Date – February 4, 2003 0900 PST

Page 55: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

55

• Time Error (x.xxx seconds) from your frequency source

• Time Error adjustment when the 1400 Pacific time notice results in dispatcher changing your local time error setting

• Total seconds of WECC manual time error correction (0.00, ±0.60, ±1.20)

• Control Area frequency bias setting• WECC frequency bias setting• Integrated Primary II correction last hour• Bilateral II payback in MWh

AGC sends clock-hour data to Hourly Accounting

Page 56: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

56

Hourly Accounting sends last hour’s results to AGC

• Hourly Primary Inadvertent Interchange (xxx.xx MWh)

• Accumulated Primary InadvertentIntechange (on-peak, off-peak)

• Remaining MWh balance of Pre-February 4th Inadvertent Interchange

Page 57: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

57

Continue Bilateral II Payback

1000 MWh AGC Bilateral Paybackof 25 MW per hourfor 6 hours

Pre-ATE II balance Post-ATE AGC BII Payback

850 MWh...

.

.Continue until balance = 0

Pre-ATE monthend adjustmentof +300 MWh. Donot add to PrimaryII adjustment1150 MWh

Page 58: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

58

WAVIERS

• Every Control Area must begin Primary II computation at the same time to avoid trapped Pre-ATE Inadvertent Interchange.

• Use workaround in AGC to begin Auto Time Error corrections.

• Always call your Performance WG representative for assistance

Page 59: WECC WORKSHOP - North American Energy … • Frequency Bias Obligation • Modified Time Error Obligation • Bilateral II Payback • Compensation Exclude from CPS May 30 -31, 2002

May 30-31, 2002 WECC Auto Time Error Correction Workshop

59

On-Site Help

[email protected]• 360 418 8705

[email protected]• 360 418 2309