Webinar: Risk Management for Oil and Gas Projects
description
Transcript of Webinar: Risk Management for Oil and Gas Projects
![Page 1: Webinar: Risk Management for Oil and Gas Projects](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815e05550346895dcc5108/html5/thumbnails/1.jpg)
Webinar: Risk Management for Oil and Gas Projects
Intaver Institute Inc.303, 6707, Elbow Drive S.W, Calgary, AB, CanadaTel: +1(403)692-2252Fax: +1(403)459-4533www.intaver.com
![Page 2: Webinar: Risk Management for Oil and Gas Projects](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815e05550346895dcc5108/html5/thumbnails/2.jpg)
Introduction• Intaver Institute Timeline• 2002: Established • 2004: V.1 RiskyProject • 2009: v 3 Integrated Risk Register• 2012: v 5
• RiskyProject• Full Project Risk Management
Lifecycle• Integrated Risk Register• Risk Matrix, Risk Planning
+• Quantitative Monte Carlo Cost and
Schedule Risk Analysis
04/2
2/20
2320
13 I
ntav
er In
stitu
te
2
Clients
![Page 3: Webinar: Risk Management for Oil and Gas Projects](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815e05550346895dcc5108/html5/thumbnails/3.jpg)
2003 2007 March, 2009 September, 2009
September, 2011, First
Phase
05
101520253035404550
Gorgon Natural Gas Project
Project Cost Estimate in Billions A$
Date of cost estimate
A three-train liquefied natural gas (LNG) facility on Barrow Island (Australia) that will produce 15.6 million metric tons of LNG per year.
04/2
2/20
2320
13 I
ntav
er In
stitu
te
3
![Page 4: Webinar: Risk Management for Oil and Gas Projects](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815e05550346895dcc5108/html5/thumbnails/4.jpg)
Project Risk Analysis in Corporate Portfolio Management Process
Project Cost and Schedule risks and
uncertainties
Geological and other Uncertainties affecting
production
Price Uncertainties
Other Risks and Uncertainties:
- Political risks- Uncertainties in
Royalties regimes- ….
Economic Analysis of the
Projects
Corporate Portfolio
Management
Strategic Decision
04/2
2/20
2320
13 I
ntav
er In
stitu
te
4
![Page 5: Webinar: Risk Management for Oil and Gas Projects](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815e05550346895dcc5108/html5/thumbnails/5.jpg)
Risk Management Affects Project Profitability
Without risks With risks With risks and mitigations0
0.5
1
1.5
2
2.5
3
3.5
4 Other costs: OpCost, Royal-ties, Return, G&A, etc.
Other costs: OpCost, Royal-ties, Return, G&A, etc.
Gas Price
Full circle cost of gas$/Mcf 04
/22/
2023
2013
Int
aver
Insti
tute
5
![Page 6: Webinar: Risk Management for Oil and Gas Projects](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815e05550346895dcc5108/html5/thumbnails/6.jpg)
Identifying and Managing Critical Risks is Key
04/2
2/20
2320
13 I
ntav
er In
stitu
te
6
RiskOpportunity?
Threat?
![Page 7: Webinar: Risk Management for Oil and Gas Projects](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815e05550346895dcc5108/html5/thumbnails/7.jpg)
Which risks are critical?
04/2
2/20
2320
13 I
ntav
er In
stitu
te
7
Risk 3
Risk 4
Risk 1
Risk 5
Risk 2
Risk 1
Risk 2
Risk 3
Risk 4
Risk 5
Sche
dule
ris
k
Cost
Risk
Safe
ty R
isk
Lega
l Risk
Qua
lity
Risk
……
……
…..
Risk
Envi
rom
enta
l Risk
![Page 8: Webinar: Risk Management for Oil and Gas Projects](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815e05550346895dcc5108/html5/thumbnails/8.jpg)
Time Dependent C
osts
Cost
Risk
Time is Money: Cost and Schedule Risks
04/2
2/20
2320
13 I
ntav
er In
stitu
te
8
• Schedule risk drives Costs due to time dependent resource costs
• 40% -70% cost risk is schedule driven
Sche
dule
ris
k
![Page 9: Webinar: Risk Management for Oil and Gas Projects](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815e05550346895dcc5108/html5/thumbnails/9.jpg)
Input 1: Project Schedule
Input 2: List of Risks (Risk Register)
Assign Risks to Project Tasks and Resources
Perform Analysis
Risk Events ApproachInput 1: Project Schedule
![Page 10: Webinar: Risk Management for Oil and Gas Projects](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815e05550346895dcc5108/html5/thumbnails/10.jpg)
Schedule
04/2
2/20
2320
13 I
ntav
er In
stitu
te
10
![Page 11: Webinar: Risk Management for Oil and Gas Projects](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815e05550346895dcc5108/html5/thumbnails/11.jpg)
Costs
04/2
2/20
2320
13 I
ntav
er In
stitu
te
11
![Page 12: Webinar: Risk Management for Oil and Gas Projects](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815e05550346895dcc5108/html5/thumbnails/12.jpg)
Resources
04/2
2/20
2320
13 I
ntav
er In
stitu
te
12
![Page 13: Webinar: Risk Management for Oil and Gas Projects](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815e05550346895dcc5108/html5/thumbnails/13.jpg)
Risk Register
04/2
2/20
2320
13 I
ntav
er In
stitu
te
13
![Page 14: Webinar: Risk Management for Oil and Gas Projects](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815e05550346895dcc5108/html5/thumbnails/14.jpg)
Risk AssignmentTask R1 R2 R3 R4 R5 R6
Installing Microsoft Seismic monitoring
x x
Deliver frac fleet and install equipment
x
Deliver rig and equipment x
Well 1,2,3 (share common risks) x
Rig Mobilization x
Drilling x x x x
Installing Service Rig x
Completion (8 stages fracing) x x
04/2
2/20
2320
13 I
ntav
er In
stitu
te
14
![Page 15: Webinar: Risk Management for Oil and Gas Projects](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815e05550346895dcc5108/html5/thumbnails/15.jpg)
Risk Assignment Interface
04/2
2/20
2320
13 I
ntav
er In
stitu
te
15
30 % chance that risk causes a delay and
increase in cost of drillingRisk Assigned to task
‘Drilling’
![Page 16: Webinar: Risk Management for Oil and Gas Projects](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815e05550346895dcc5108/html5/thumbnails/16.jpg)
Run Monte Carlo Simulation
04/2
2/20
2320
13 I
ntav
er In
stitu
te
16
![Page 17: Webinar: Risk Management for Oil and Gas Projects](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815e05550346895dcc5108/html5/thumbnails/17.jpg)
Results of Analysis
04/2
2/20
2320
13 I
ntav
er In
stitu
te
17
![Page 18: Webinar: Risk Management for Oil and Gas Projects](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815e05550346895dcc5108/html5/thumbnails/18.jpg)
Risk Adjusted Project Schedule
04/2
2/20
2320
13 I
ntav
er In
stitu
te
18
Schedule with risks
Schedule without risks
Arrows show risk assignments
![Page 19: Webinar: Risk Management for Oil and Gas Projects](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815e05550346895dcc5108/html5/thumbnails/19.jpg)
Project Cost
04/2
2/20
2320
13 I
ntav
er In
stitu
te
19
Schedule with risks
Schedule without risks
![Page 20: Webinar: Risk Management for Oil and Gas Projects](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815e05550346895dcc5108/html5/thumbnails/20.jpg)
Risk Planning – Mitigation Plan
04/2
2/20
2320
13 I
ntav
er In
stitu
te
20
![Page 21: Webinar: Risk Management for Oil and Gas Projects](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815e05550346895dcc5108/html5/thumbnails/21.jpg)
Pre and Post Mitigation
04/2
2/20
2320
13 I
ntav
er In
stitu
te
21
Pre-mitigation
Post-mitigation
![Page 22: Webinar: Risk Management for Oil and Gas Projects](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815e05550346895dcc5108/html5/thumbnails/22.jpg)
Risk: Mechanical Problem with instrument
Risk Planning
04/2
2/20
2320
13 I
ntav
er In
stitu
te
22
Post Mitigation $16, 734, 906Pre-Mitigation Cost 17, 178, 397
![Page 23: Webinar: Risk Management for Oil and Gas Projects](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815e05550346895dcc5108/html5/thumbnails/23.jpg)
RiskyProject Enterprise
04/2
2/20
2320
13 I
ntav
er In
stitu
te
23
Enterprise Risk Database:Schedules,
Risks,Mitigation Plans
RiskyProject Professional
RiskyProject Lite
RiskyProject Web
![Page 24: Webinar: Risk Management for Oil and Gas Projects](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815e05550346895dcc5108/html5/thumbnails/24.jpg)
• Virine, L. and M. Trumper. 2007 Project Decisions: The Art and Science. VA: Management Concepts • P. Leach. 2005. Late and Over Budget: Why Projects Always Seem to Take Longer and Cost More
Than Planned. Projects & Profits, Vol. V Issue - XI, November 2005• http://www.project decisions.org• http://www.intaver.com/index-whitepapers.html• http://www.risk-doctor.com/• http://www.projectrisk.com
Contact Michael [email protected] Institute Inc.www.intaver.com