Collect Requirements is the process of determining, documenting, and managing stakeholder needs and requirements to meet project objectives.
PMBOK® Guide Fifth Edition
© 2015 iZenBridge | Public
No, its about elicitation and analysis of requirement
Is it about gathering or collecting requirements ?
© 2015 iZenBridge | Public
Elicitation and Analysis
Information / Data
Elicitation Activities
Analysis
Solution Requirement
© 2015 iZenBridge | Public
Challenges
© 2015 iZenBridge | Public
Technique
Brainstorming
Interviews
Questionnaires and surveys
Observations
Focus groups
Facilitated workshops
Prototypes
© 2015 iZenBridge | Public
Brainstorming
© 2015 iZenBridge | Public
Brainstorming
A technique used to generate and collect multiple ideas related to project and product requirements. – PMBOK® Guide Fifth Edition
© 2015 iZenBridge | Public
Brainstorming
• It’s a Data Gathering Technique
• Identify list of ideas in short period of time
• It’s conducted in a group environment
• Led by facilitators
• Done in two parts , Idea generation and Analysis
© 2015 iZenBridge | Public
Challenges
• Individual monopolize the session
• People shy sharing their views
• Distraction from agenda / goal
© 2015 iZenBridge | Public
Usage
• Generating Initial List of Stakeholders
• Identifying Risks
• Generating ideas on Business analysis approach
• Generating ideas on defined area
• Works well when people are comfortable with each other
© 2015 iZenBridge | Public
Interview
© 2015 iZenBridge | Public
What is Interview?
• Usually, one-to-one discussions with stakeholders
• One of the main fact-finding, investigation or elicitation techniques
• Occasionally more than one person
© 2015 iZenBridge | Public
How to conduct an Interview?
Planning and Preparation
Interview Follow – up
© 2015 iZenBridge | Public
Challenges in an Interview
• The BA is trying to do several things at once
• Dealing with SMEs
• Interviewees are usually busy
© 2015 iZenBridge | Public
Usages
• Provides opportunity to build relationships with key stakeholders
• Provides Interviewees a safe environment
• Helps in extracting a lot of information in short time
© 2015 iZenBridge | Public
Questionnaires and Surveys
© 2015 iZenBridge | Public
What is a Questionnaire and survey?
• It’s about designing a good survey form and collecting response on it
• Work as second-line investigation technique
© 2015 iZenBridge | Public
Questionnaire
Title
Classification
Data
Heading
© 2015 iZenBridge | Public
Challenges
• Results may not represent the view of population
• Low Response rate
• Defined boundaries
© 2015 iZenBridge | Public
Usages
• Be clear on Purpose
• Be realistic
• Plan for low response rate
© 2015 iZenBridge | Public
Observations
© 2015 iZenBridge | Public
What is Observation?
Observation consists of BAs going and looking at work – business processes
© 2015 iZenBridge | Public
How does it help?
• Business users often have trouble describing clearly or concisely what they actually want
• Captures tacit knowledge
• BAs come to know what is followed rather than what is defined to be followed
© 2015 iZenBridge | Public
Variations
• Structured Observation
• Shadowing
• Protocol Analysis
• Ethnographic Study
© 2015 iZenBridge | Public
Challenges
• You are being watched
• May disturb the doer
• Structure Observation may result in narrow focus
• Takes time
© 2015 iZenBridge | Public
Usages
• Used as preliminary investigation followed by Interview or workshop
• May be used as secondary investigation to validate findings
© 2015 iZenBridge | Public
Focus Group
© 2015 iZenBridge | Public
What is focus Group?
A focus group is an elicitation technique that brings together pre-qualified stakeholders and subject matter experts to learn about their expectations and attitudes about a proposed product, service or result.
© 2015 iZenBridge | Public
Challenges
• Participants may get influenced by group pressure
• People may not be open in group
• Facilitator should be skilled enough to encourage group thinking
• Business Analyst should also observe non verbal communication
© 2015 iZenBridge | Public
Usages
• To take feedback on completed work or prototype
• Since the participants are pre-qualified , BA gets high quality results / analysis
• Allow participants to share ideas and build on feedbacks
© 2015 iZenBridge | Public
Facilitated workshops
© 2015 iZenBridge | Public
What is workshop?
• Gathering of a group of stakeholders for
• Agreeing to the direction and scope of the project
• Examining possible solutions to the requirements
• Reviewing and approving the products of analysis
© 2015 iZenBridge | Public
How does it help?
• Workshop is less time consuming than a series of one-on-one discussions
• More democratic and transparent than decision-making by individuals
• Many people regard them as being just like any other meeting, and thus generally a waste of their time
© 2015 iZenBridge | Public
Challenges
• Securing participation
• Keeping workshop on track / managing conflicts
• Achieving results at the end.
© 2015 iZenBridge | Public
Usages
• Quick way of developing solutions
• Brings Stakeholder engagement
• Reduce documentation work
© 2015 iZenBridge | Public
Prototypes
© 2015 iZenBridge | Public
Prototype
• Provides working model of the expected product before building it , helps in obtaining early feedbacks
• Prototype can be a mock of the real result or it can be an early version of the product itself
© 2015 iZenBridge | Public
Types of Prototype
• Low-Fidelity prototype, completed with pen and paper or whiteboard or modeling tool
• High-Fidelity prototype, creates a representation of the final product and useable by the stakeholder
• Throw-away prototype
• Evolutionary Prototype
© 2015 iZenBridge | Public
Challenges
• Time Consuming
• Raises Expectations for completion
© 2015 iZenBridge | Public
Usages
• Developing new solutions
© 2015 iZenBridge | Public
Announcements
© 2015 iZenBridge | Public
PMP® Live Virtual Classroom
Program
© 2015 iZenBridge | Public
It’s an Accelerated Program
• 30 Hours of Live Virtual Classes in 45 Days
• Program designed to get your PMP® Done in 45 Days
• Fellowship of Qualified Trainer in Certification
• Conveniently timed for NA, GMT, CET and GST zones
• Online Product (PMP Videos, Questions and Facilitation Sessions)
© 2015 iZenBridge | Public
PMI-PBA® Classroom Sessions
Bangalore & Delhi
© 2015 iZenBridge | Public
Our Training Offerings
PMI-ACP® • Online PMI-ACP® preparation program • Classroom sessions at Delhi , Bangalore and Pune
PMI-PBA(SM) • Online PMI-PBA(SM) preparation program • Classroom sessions at Delhi and Bangalore
PMP® • Online PMP Preparation Program • Classroom Sessions at Gurgaon
SAFe® Agilist Classroom sessions at Delhi, Bangalore, Pune and Hyderabad
For more details www.iZenBridge.com
© 2015 iZenBridge | Public
PMI-PBA® Overview
© 2015 iZenBridge | Public
The PMI-PBA® credential recognizes an individual's expertise in business analysis, using BA tools and techniques to improve the overall
success of projects. PMI-PBA® Handbook
© 2015 iZenBridge | Public
PMI–PBA® Eligibility Requirements
Secondary Degree
Bachelor's Degree
7500 Hours of BA
Experience
4500 Hours of BA
Experience
2000 Hours Project Team
35 PDUs in BA
© 2015 iZenBridge | Public
Cost $ 405 PMI Members $ 555 Non PMI Members
Exam 200 Questions 4 Hours Prometric Center
© 2015 iZenBridge | Public
Stay Connected
YouTube
www.youtube.com/izenbridge
www.iZenBridge.com
forum.iZenBridge.com