web.cimne.upc.edu · h@ascamm [email protected] ent of the be T and ave been pro ments whic uch its cont...

8

Transcript of web.cimne.upc.edu · h@ascamm [email protected] ent of the be T and ave been pro ments whic uch its cont...

Page 1: web.cimne.upc.edu · h@ascamm le@cimne.u ent of the be T and ave been pro ments whic uch its cont ECNALIA ique” to SER 20121119_ er 2012 du upc.edu uet.com .com ter.cnr.it, @pec.cnr.it
Page 2: web.cimne.upc.edu · h@ascamm le@cimne.u ent of the be T and ave been pro ments whic uch its cont ECNALIA ique” to SER 20121119_ er 2012 du upc.edu uet.com .com ter.cnr.it, @pec.cnr.it
Page 3: web.cimne.upc.edu · h@ascamm le@cimne.u ent of the be T and ave been pro ments whic uch its cont ECNALIA ique” to SER 20121119_ er 2012 du upc.edu uet.com .com ter.cnr.it, @pec.cnr.it
Page 4: web.cimne.upc.edu · h@ascamm le@cimne.u ent of the be T and ave been pro ments whic uch its cont ECNALIA ique” to SER 20121119_ er 2012 du upc.edu uet.com .com ter.cnr.it, @pec.cnr.it
Page 5: web.cimne.upc.edu · h@ascamm le@cimne.u ent of the be T and ave been pro ments whic uch its cont ECNALIA ique” to SER 20121119_ er 2012 du upc.edu uet.com .com ter.cnr.it, @pec.cnr.it
Page 6: web.cimne.upc.edu · h@ascamm le@cimne.u ent of the be T and ave been pro ments whic uch its cont ECNALIA ique” to SER 20121119_ er 2012 du upc.edu uet.com .com ter.cnr.it, @pec.cnr.it

 

 

MEE MinuPlaceStart Meet Parti# 1

2 4 8

7 10

Agen

19th N

Time

19:00

ETING MIN

ute Numbere: UPC-LABting Time: 1

ting Objectiv

icipants OrganizatiUPC

F. de RODAONDARLACNR/IMAM

ASCAMM CIMNE

nda

November 2

e Title

0 Welcomemeeting:

Main 1*Consor2*Busine3*Pre-fin4*Next M

1*CONS

Almost acoordinat

Poznan Utaken into

2*BUSINMETAL

TECNAL

  

NUTE

: 20121119_BSON, ETSE

9:30h

ve: PEC and

ion CEM

A PAN MMOTER R

JoMC

2012

e to all the PEC and PS

subjertium ess relationnancing Meetings

SORTIUM A

all the signatutor.

University hao considerati

NESS RELA

LIA sold its p

_UPC-LABSEIAT, Terras

d PSC constit

Contact steban Codin

Marissa Anglaere Roquet

Manuel CastroRoberto Paolu

oan GuaschMichele Chiumenti

attendants. SC constitutio

ects

nship betw

AGREEMEN

ures from th

as pointed ouion, but will n

ATIONSHIP

patent on “p

SON_PEC&Psa (Spain), 1

tution

Emailna ecodinarill mariss

pedro2o mcastuzzi r.paolu

PEC: direttojguascmiche

Announcemon.

to

ween SER

NT

he partners h

ut some comnot change m

P between T

ouring techn

PAC 19th Novembe

l [email protected]@2@pedro-roqtro@ondarlanuzzi@imamo

ore.imamoterch@[email protected]

ment of the

be

RT and

ave been pro

mments whicmuch its cont

TECNALIA

nique” to SER

20121119_

er 2012

edu @upc.edu

quet.com n.com oter.cnr.it,

[email protected] .com

upc.edu

aim of the

treatedAgreemen

TECNALIA

ovided to the

ch have beentent.

A and SERT

RT METAL

_UPC-LABS

t

Responsperson

e Prof. EsCodina (U

d: nt A

Prof. EsCodina (U

e

n

Prof. EsCodina (U

T

L,

 

1/3 

SON

ible

steban UPC)

steban UPC)

steban UPC)

Page 7: web.cimne.upc.edu · h@ascamm le@cimne.u ent of the be T and ave been pro ments whic uch its cont ECNALIA ique” to SER 20121119_ er 2012 du upc.edu uet.com .com ter.cnr.it, @pec.cnr.it

 

 

and they problemsanymore,consequebeneficia

When SEthat theyconsortiu

TECNALmight noThis is sti

In case Slook for were orig

3* PRE-F

The memdistributio

- Tafi

- Sth

- TthM

- Cp

Pre-finanon the 26

4* NEXT

Since Mrattend thmonths tproject ocheck listto be achi

Apart frothe consothe devel

  

provided ths between the, but they aence, TECNAry in the con

ERT METALy would coum agreemen

LIA has to cot be able toill to be conf

SERT METAan external

ginally assign

FINANCIN

mbers attenon of the pre

The coordinaamount as afinancing pro

SERT-METAhey will prob

TECNALIA hey confirm

METAL.

COMAU haproblem with

ncing will be 6th November

T MEETING

r. Andrea Ghe kick-off mtime, in ordeofficer; workt of the projeieved in the

om this meetiortium meetinopment of F

he engineerinem, TECNAare still struALIA does

nsortium.

L agreed to taonfirm their

nt.

confirm its po carry out firmed.

AL leaves tpartner to suned to them.

G

nding the e-financing, a

ator will kea consortiumoblems along

AL will not gbably leave t

will not gettheir positio

s asked to h that.

transferred tr 2012.

GS

Gentili (FLEmeeting, a teer to cover thk on the statect to realiseshort run.

ing, both the ngs to discusLEXICAST

ng process. DALIA decideduggling to not agree th

ake part in thr participati

position on the engineer

the consortiuubstitute and

meeting agalready recei

eep a 10% m guarantee g the project l

get any amouthe consortiu

t any amounon on their b

receive the

to the partne

EXICAST prechnical mehe following ate-of-the-art e both the ste

e PEC and PSss about the rproject ever

Due to somed not to lendsort this mahat SERT M

he process, thion before

this matter bring process

um, the cood carry out t

gree on thived from the

the total pfund to fa

life.

unt of pre-finum.

nt of pre-finbusiness deal

ir amount i

ers along we

roject officeeting is to bsubjects: weof the proj

eps covered

SC will take relevant mattry 6 months.

e commerciad their patenatter out. InMETAL is a

hey informedsigning the

because they themselves

rdinator wilthe tasks tha

e followinge EU.

pre-financingace potentia

nancing since

nancing unti with SERT-

in 2013. No

ek beginning

r) could nobe held in 3elcome to theject; edit theand the ones

advantage oters to assure.

al nt n a

d e

y s.

ll at

g

g al

e

il -

o

g

ot 3 e e s

f e

 

2/3 

Page 8: web.cimne.upc.edu · h@ascamm le@cimne.u ent of the be T and ave been pro ments whic uch its cont ECNALIA ique” to SER 20121119_ er 2012 du upc.edu uet.com .com ter.cnr.it, @pec.cnr.it

 

 

The mmeeting finis

  

shes at 20:000h

 

3/3