· Web viewThe Tenderer shall show the lump sum cost of each item in the following schedule.
1
Concrete - Footpath RFT202003 Contractor………………………………….. Schedule 1 – Composition of Tender The Tenderer shall show the lump sum cost of each item in the following schedule. Item Description Amount ($AUD) 1 Preliminaries $ 2 Concrete Construction $ 3 Concrete Joins and reinforcement $ 4 Miscellaneous $ Tender Lump Sum Amount (excluding GST) $ Tender Provisional Sums (excluding GST) $ TENDER SUM (excluding GST) $ GST $ GROSS TENDER SUM (including GST) $
Transcript of · Web viewThe Tenderer shall show the lump sum cost of each item in the following schedule.
![Page 1: · Web viewThe Tenderer shall show the lump sum cost of each item in the following schedule.](https://reader034.fdocuments.us/reader034/viewer/2022042109/5e8a00be9989107a96402350/html5/thumbnails/1.jpg)
Concrete - Footpath RFT202003
Contractor…………………………………..
Schedule 1 – Composition of Tender
The Tenderer shall show the lump sum cost of each item in the following schedule.
Item Description Amount ($AUD)
1 Preliminaries $
2 Concrete Construction $
3 Concrete Joins and reinforcement $
4 Miscellaneous $
Tender Lump Sum Amount (excluding GST) $
Tender Provisional Sums (excluding GST) $
TENDER SUM (excluding GST) $
GST $
GROSS TENDER SUM (including GST) $