QUALITY POLICY
We at “FORCE MOTORS” are committed to manufacture and supply products of superior technology at competitive price, which will satisfy the customers in totality for performance and reliability.
We will achieve this by effective implementation of a comprehensive quality management system and by continual improvement.
R&D PROCEDURE MANUAL
(ISO9001:2015/ IATF 16949:2016)
01
RESEARCH AND DEVELOPMENT
Procedure Manual
[ ISO 9001:2015 / IATF: 16949 ]
Doc No : R&D/II/D/01
REV NO: - 00
ISSUE NO/DT: 00/27.11.2017
PG:- 1 OF 1
MANUAL IDENTIFICATION, OWNERSHIP, AND AUTHORISATION
1. COPYRIGHT
RESEARCH & DEVELOPMENT DEPT. of FORCE MOTORS LTD. has the copyright of this R&D Procedure Manual. No part of this QUALITY MANUAL will be reproduced in any form without the written permission of the RESEARCH & DEVELOPMENT DEPT of FORCE MOTORS LTD.
2. STATUS
THIS IS A CONTROLLED COPY SIGNIFIED BY A RUBBER STAMP (IN GREEN) AS INDICATED BELOW, WITHOUT WHICH THIS DOCUMENT IS VOID AND INVALID. THIS STAMP HAS TO BE PRESENT ON EACH AND EVERY PAGE OF THIS MANUAL
3. STAMP
4. APPROVED BY:
SIGNATURE: ……………………………………………………
H O D
DATE: - 27.11.2017
Place: Pune 411 035, INDIA
5. CONTROLLED COPY NO.: - 01
6. ISSUED TO: - AMR
7. ISSUE NO: - 00
8. ISSUE DT: - 27.11.2017
02
RESEARCH AND DEVELOPMENT
Procedure Manual
[ ISO 9001:2015 / IATF: 16949 ]
Doc No : R&D/II/D/02
REV NO: - 00
ISSUE NO/DT: 00/27.11.2017
PG:- 1 OF 1
CONTENTS LIST
DOC No
DESCRIPTION
ISO 9001:2015 / IATF:16949 CL No.
REV No
Page
R&D/II/D/01
Manual identification, ownership & authorization
--
0
02
R&D/II/D/02
Contents List
--
0
03
R&D/II/D/03
Issue and Revision Sheet
--
0
04
R&D/II/D/04
Introduction
--
0
06
R&D/II/D/05
Scope
--
0
07
R&D/II/D/06
Controlled copy holder’s list
--
0
08
R&D/II/D/07
Abbreviations & Terminology
--
0
10
R&D/II/D/08
Document Numbering System
0
11
R&D/II/D/09
Organization Chart of Research & Development Department
--
0
12
R&D/II/D/10
External and Internal issue List
4.1
0
13
R&D/II/D/11
List of Needs and Expectation of Interested Parties
4.2
0
14
R&D/II/D/12
Responsibility & Authority
5.3
0
15
R&D/II/D/13
Actions to address Risks and Opportunities
6
0
27
R&D/II/D/14
Organizational Knowledge
7.1.6
0
29
R&D/II/D/15
Communication
7.4
0
30
R&D/II/D/16
Guidelines for DCR
8.3.6
0
31
R&D/II/P/01
Procedure for Product Safety
4.4.1.2
0
33
R&D/II/P/02
Procedure for Product Design & Development
8.3
0
37
R&D/II/P/03
Procedure for Proto Manufacturing
8.3.4
0
46
R&D/II/P/04
Product Testing (LAB testing / Vehicle testing / Engine Testing)
8.3.4
0
50
R&D/II/P/05
Procedure for Design & Development Review
8.3.4
0
54
R&D/II/P/06
Procedure for CAE Analysis
8.3.4
0
58
R&D/II/P/07
Procedure for Design & Development Output
8.3.5
0
62
R&D/II/P/08
Procedure for Design & Development Changes
8.3.6
0
69
R&D/II/D/17
Document information on development of product with embedded software
8.3.2.3.
0
73
03
RESEARCH AND DEVELOPMENT
Procedure Manual
[ ISO 9001:2015 / IATF: 16949 ]
Doc No : R&D/II/D/03
REV NO: - 00
ISSUE NO/DT: 00/27.11.2017
PG:- 1 OF 2
ISSUE AND REVISION SHEET
Sr.No. DCN No. Date Changed Doc. Ref.
1
DCN/R&D/0217/05/2000R&D/III/D/04 Issue No. 1 released through electronic media
2
DCN/R&D/0418/11/2000R&D/III/D/04 Issue No 2 completed revised.
3
DCN/R&D/0518/03/2001R&D/III/D/04, 05 revised & R&D/00/46 form is added in F&F list.
4
DCN/R&D/0618/03/2001R&D/02/03 form revised
5
DCN/R&D/1301/10/2001R&D/III/D/04 Issue No. 3 released through electronic media.
6
DCN/R&D/2503/04/2003R&D/IlI/D/04 Issue No. 3 released through electronic media.
7
DCN/R&D/2601/10/2003R&D/IlI/D/04 Issue No. 3 released through electronic media.
8
DCN/R&D/2718/11/2003R&D/IlI/D/04 Issue No. 3 released through electronic media.
9
DCN/R&D/2812/07/2004R&D/IlI/D/04 Issue No. 3 released through electronic media.
10
DCN/R&D/2904/12/2004R&D/IlI/D/04 Issue No. 3 released through electronic media.
11
DCN/R&D/3018/04/2004R&D/IlI/D/04 Issue No. 3 released through electronic media.
12
DCN/R&D/3110/07/2005R&D/00/28 & R&D/00/29 deleted, Manual revised for ISO/TS requirements
13
DCN/R&D/3212/09/2005FORCE MOTORS LTD logo incorporated Fitment performance Report
R&D/00//01 in place of R&D/00/111 ,R&D/00/131 & R&D/00/132 forms added
14
DCN/R&D/3306/09/2006Forms controlled by lED are deleted from the List of Forms & Formats
15
DCN/R&D/3425/09/2007R&D Procedures 04 & 06, Documents 02,03, 09 are revised
16
DCN/R&D/3505/11/2007R&D Procedures 05, Documents 02,03 are revised
17
DCN/R&D/3619/01/2008General guide line for DCR Clearance is revised, (Doc No. –R&D/II/D/11)
18
DCN/R&D/3707/06/2008Cad analysis request cum report(R&D/01/24) is modified & released through
electronic media
04
RESEARCH AND DEVELOPMENT
Procedure Manual
[ ISO 9001:2015 / IATF: 16949 ]
Doc No : R&D/II/D/03
REV NO: - 00
ISSUE NO/DT: 00/27.11.2017
PG:- 2 OF 2
ISSUE AND REVISION SHEET
Sr.No. DCN No. Date Changed Doc. Ref.
19
DCN/R&D/3827/12/2008Design and Development Activity Plan (R&D/00/136) introduced.
20
DCN/R&D/3924/10/2009Procedure manual (R&D) revised and updated for new issue no 7
21
DCN/R&D/4006/08/2010Procedure manual revised for changes to existing procedures & introduction of
new formats.
22
DCN/R&D/4115/09/2010R&D/III/D/04 Issue No. 1 released through electronic media
23
DCN/R&D/4215/09/2010Procedure for keeping the Status of Non Conformity Reports identified
properly now as hard and soft format in MLQR of AMR
24
DCN/R&D/4315/09/2010Column containing the Issue No & Revision No updated in MLQSD of AMR
25
DCN/R&D/4415/09/2010Column containing the Issue No & Revision No updated in MLQSD of HOD
26
DCN/R&D/4521/01/2011List of Forms and Formats updated
27
DCN/R&D/4621/01/2011Issue and Revision Sheet updated
29
DCN/R&D/4821/01/2011Team Feasibility Commitment fine tuned in R&D/II/P/01, page 5 of 9.
30
DCN/R&D/4921/01/2011Various Changes in the Procedure Manual.
31
DCN/R&D/5020/09/2012Control Copy Holder List modified (Doc No. –R&D/II/D/06)
32
DCN/R&D/5125/09/2015Entire manual is reviewed and reissued.
33
DCN/R&D/5227/11/2017Entire manual is reviewed and reissued.
34 DCN/R&D/5303/04/2019 DFMEA Guideline is updated as per FMEA fourth revision AIAG standard
05
RESEARCH AND DEVELOPMENT
Procedure Manual
[ ISO 9001:2015 / IATF: 16949 ]
Doc No : R&D/II/D/04
REV NO: - 00
ISSUE NO/DT: 00/27.11.2017
PG:- 1 OF 1
INTRODUCTION
RESEARCH & DEVELOPMENT DEPARTMENT OF FORCE MOTORS LTD, Pune.
1.0 Introduction
1.1 FORCE MOTORS LTD, Research & Development (R&D) department is responsible to design new products based on the inputs given by the management.
1.2 It is also responsible to carry out design changes in the existing products to cater for product life improvement & performance, safety, environment protection, new legislative requirements, value engineering, customer satisfaction etc.
06
RESEARCH AND DEVELOPMENT
Procedure Manual
[ ISO 9001:2015 / IATF: 16949 ]
Doc No : R&D/II/D/05
REV NO: - 00
ISSUE NO/DT: 00/27.11.2017
PG:- 1 OF 1
SCOPE
This manual covers the requirements of International Standard ISO9001:2015 / IATF 16949: 2016
for Design activity as applicable to RESEARCH & DEVELOPMENT DEPARTMENT of FORCE MOTORS LTD, Pune.
The Objectives of the various sections within the Research & Development department is in the form of Critical & Conformance KPI’s which is reviewed monthly in order to cater to the Company
Level Objectives.
List of Customer Specific requirements (CSR)
Sr No
Customer
Requirements
Monitoring & Review mechanism
1
Marketing Dept
Product design as per marketing dept. with applicable regulatory and statutory requirement as notified.
Project Review meeting, FAMC, SLA
Monitoring
3
PE Dept.
Release of new design as per time plan for Tool design and tool manufacturing
Project Review meeting, FAMC,
SLA Monitoring
Timely release of Design modification note
07
RESEARCH AND DEVELOPMENT
Procedure Manual
[ ISO 9001:2015 / IATF: 16949 ]
Doc No : R&D/II/D/06
REV NO: - 00
ISSUE NO/DT: 00/27.11.2017
PG:- 1 OF 1
CONTROLLED COPY HOLDER LIST:
Copy No 1 – Hard copy of manual with the AMR (R&D)
Copy No 2 – Soft copy available on the Tempest
08
RESEARCH AND DEVELOPMENT
Procedure Manual
[ ISO 9001:2015 / IATF: 16949 ]
Doc No : R&D/II/D/07
REV NO: - 00
ISSUE NO/DT: 00/27.11.2017
PG:- 1 OF 5
09
RESEARCH AND DEVELOPMENT
Procedure Manual
[ ISO 9001:2015 / IATF: 16949 ]
Doc No : R&D/II/D/07
REV NO: - 00
ISSUE NO/DT: 00/27.11.2017
PG:- 1 OF 2
ABBREVATION
WORD
ADD
Ancillary ` Dept.
AP
Activity Plan
Appd
Approved
Asst
Assistant
BIS
Bureau of Indian Standards
BoM
Bill of Material
BOM
Board of Management
BTS
Bajaj Tempo Standards
CAD
Computer Aided Designing
CAM
Computer Aided Manufacturing
CAE
Computer Aided Engineering
MD
Managing Director
Cl.
Clause
Comm
Commercial
CMVR
Central Motor Vehicle Rule
CT
Component Testing
CRRN
Change in Regulatory Requirement Note
CV
Commercial Vehicle
Cyl
Cylinder
D&D
Design & Development
DCR
Design Change Request
DCN
Document Change Note
DDD
Design Description Document
DEPT
Department
DGM
Deputy General Manager
Div
Division
DH
Divisional Head
DMN
Design Modification Note
DOC/Doc
Document
Drgs
Drawings
DT
Date
Dy
Deputy
DVdP
Design Validation Plan
DVdSR
Design Validation Summary Report
DVP&R
Design Verification Plan and Report
DVS
Design Verification Summary Sheet
DWN
Design Withdrawal Note
EIC
Engineer / Executive In charge
ELL
Engineering Legislation and Liaison
E
Engine
EDDT
Engine Design, Development & Testing
Engg
Engineering
Elec
Electrical
FAMC
Functional Activity Management Committee
FML
FORCE MOTORS LTD
FMS
Force Motors Standards
GDN
Goods Dispatch Note
YC Potential Critical Characteristics
YS Potential Significant Characteristics
GP
General Procedure
GM
General Manager
HCV
Heavy Commercial Vehicle
HOD
Head of Department
Inst
Instrumentation
KPI
Key Performance Indicator
LCV
Light Commercial Vehicle
MR
Management Representative
MIN
Material Inward Note
Min.
Minimum
MOM
Minutes of Meeting
MRF
Material Request Form
Mfg
Manufacturing
Mgmt
Management
MRV
Material Requisition Voucher
No.
Number
PG
Page
PDED
Product Drawing and Engineering Documentation
PM
Proto Manufacturing
PPC
Prototype Planning Cell
PRL
Project Review List
PRN
Product Release Note
PRR
Product Release Request
PR
Proto Request
Pr/P
Procedure
Proto
Prototype
RCIA
Receipt cum Inspection Advice
Ref.
Reference
R&D
Research & Development
SUV
Sport Utility vehicle
REV/Rev
Revision
SCV
Small Commercial Vehicle
Sd
Signed
Sr/S.
Serial
SIAM
Society of Indian Automobile Manufacturers
SIC
Section In charge
SIR
Sample Inspection Requisition
TRR
Test Request Requisition
TCR
Technical Change Request
UV
Utility Vehicle
Veh
Vehicle
VED
Vehicle Evaluation Division
3WH
3 wheeler
3 wh
3 wheeled vehicle
TGR
Thing gone right
TGW
Thing gone wrong
RESEARCH AND DEVELOPMENT
Procedure Manual
[ ISO 9001:2015 / IATF: 16949 ]
Doc No : R&D/II/D/07
REV NO: - 00
ISSUE NO/DT: 00/27.11.2017
PG:- 2 OF 2
10
RESEARCH AND DEVELOPMENT
Procedure Manual
[ ISO 9001:2015 / IATF: 16949 ]
Doc No : R&D/II/D/08
REV NO: - 00
ISSUE NO/DT: 00/27.11.2017
PG:- 1 OF 1
DOC NUMBERING SYSTEM
DOC Numbering System identified in GP is followed for Department manual. For The sub level manuals in R&D Department (Division manuals) the following document numbering system is followed.
Sub Level IIIDocument
Dept - Div /Level /Document/Sr. No.
(Div.)
Example
R&D - CT/III/D/01
Work InstructionDept - Div/Level/Work Inst./Sr. No.
Example
R&D - CT/III/WI/01
Sub. Level IVForm/Format
Dept/Revision No./Sr. No.
(Div.)
Example
R&D/00/01
Departmental Registers to be numbered as follows
Register
Dept/Div/Reg. Name/Sr. No.
Example
R&D/ELL/SIAM doc./001
11
RESEARCH AND DEVELOPMENT
Procedure Manual
[ ISO 9001:2015 / IATF: 16949 ]
Doc No : R&D/II/D/09
REV NO: - 00
ISSUE NO/DT: 00/27.11.2017
PG:- 1 OF 1
Organization Chart:
1. Organization Chart of each section is available with the concerned DH/SIC
2. Copy of this is sent to HOD by the DH’s & to the SIC’s by the DH’s
3. The charts are updated depending on the changes
12
RESEARCH AND DEVELOPMENT
Procedure Manual
[ ISO 9001:2015 / IATF: 16949 ]
Doc No : R&D/II/D/10
REV NO: - 00
ISSUE NO/DT: 00/27.11.2017
PG:- 1 OF 1
UNDERSTANDING THE EXTERNAL AND INTERNAL ISSUES
R&D Department has determined external and internal issues that are relevant to the purpose and its strategic direction, and which can affect its ability to achieve the intended results of its quality management system. This information is monitored and reviewed in FAMC meet.
The external and internal issues are identified and are continuously being monitored and reviewed by management.
External Issues:
Political Factors (P)
1. Government rules, regulation and policies for vehicle requirement as notified.
Technology Factors (T)
1 Unique selling product points.
2 Competitive products..
Dealer /Customer (D/C)
1. Regular new product launch
Internal Issues:
Strength: 1 Top Management Involvement.
2 Good Product development team.
3. Good infrastructure in terms of hardware & software
Opportunities: 1.Timely Product launches.
2 Product Fit & Finish in line with competitors..
Threat: 1 New product from Competitors.
13
RESEARCH AND DEVELOPMENT
Procedure Manual
[ ISO 9001:2015 / IATF: 16949 ]
Doc No : R&D/II/D/11
REV NO: - 00
ISSUE NO/DT: 00/27.11.2017
PG:- 1 OF 1
UNDERSTANDING THE NEEDS AND EXPECTATION OF INTERESTED PARTIES
R&D has determined requirements of the interested parties, that are relevant to Quality management system, and which can affect its ability to consistently provide products and services to meet customer and statutory & regulatory requirements.
The information and relevant requirements of these interested parties are monitored and reviewed in FAMC
Interested parties
Requirements
Monitoring & Review mechanism
External providers
1. Technical support
Defined in PO, Documents of terms and conditions, Procedures & Reviewed in departmental FAMC
Customer
1. Customer specific requirement
Defined in Procedures & Reviewed in departmental FAMC
Statutory &
Regulatory Body
1.Complying with the statutory and
regulatory requirements as
defined from time to time.
Defined in Procedures & Reviewed in departmental FAMC & BOM
Employees
1.Skill enhancement by arranging training program,
2. Sharing of organizational knowledge
Defined in Procedures & Reviewed in departmental FAMC
Dealers
1. New Product launch
Defined in Procedures & Reviewed in departmental FAMC
14
RESEARCH AND DEVELOPMENT
Procedure Manual
[ ISO 9001:2015 / IATF: 16949 ]
Doc No : R&D/II/D/12
REV NO: - 00
ISSUE NO/DT: 00/27.11.2017
PG:- 1 OF 12
RESPONSIBILITY AND AUTHORITY OF HOD has mentioned in Apex manual.
Responsibility and Authority of Design Team
DH – Responsibilities
Sr No.
1
Project Planning along with SIC
2
Project review in macro level & Monitoring
3
Conduct brain-storm sessions with key stakeholders to resolve critical issues
4
Mentoring
5
Priortize projects as per corporate level guidelines
6
Performance Managerment evaluation (Appraisals)
7
Resource Management .
8
Resources allocation & Management approval for additional resources
9
Establishing new test facility for testing as per project plan & time line
10
Review & upgrage internal processes/technology as per market trend
11
Strategic directions for effective utilisation of resources & Technology
DH – Authorities
Sr No.
1
ApproveTest requests
2
Resource Allocation
3
Recruitment
4
Training recommendation as part of skill enhancement to the team
5
Gate pass & Leave approvals
6
PRODUCT specifications Sign-off
7
Approval to get required existing parts from Pithampur
8
Approvals for all releases for Powertrain components
9
Priorities change based on requirement
10
Contingency solution approval to implement for field failures
SIC – Responsibilities
Sr. No.
1
Plan daily work and discuss with team
2
Review 2D/3D drawings & layouts
3
Review design calculations
4
Initiate / give prototpye request / Test request
5
Discuss & approve DCR
6
Interaction for DMN / PRN
7
Analyze Field failures and then countermeasures
8
Design review / discussions with R&D Team
15
RESEARCH AND DEVELOPMENT
Procedure Manual
[ ISO 9001:2015 / IATF: 16949 ]
Doc No : R&D/II/D/12
REV NO: - 00
ISSUE NO/DT: 00/27.11.2017
PG:- 2 OF 12
Responsibility and Authority of Design Team
SIC – Responsibilities
9
Design review / discussions with Production Team
10
Interaction with Vendor
11
ISO / TS related work
12
Interaction with Pithampur QC for production issues
13
Homologation Activities
14
Review work status with Department Head
15
Review Project status with PE/ADD/Purchase
16
Review Marketing requirement
17
Review SIR status
18
Review Proto assly / Mfg status
19
Review with PDED
20
FAMC review
21
IQA results interaction with R&D Team
22
Project planning
23
Project Execution and monitoring
24
DVVP preparation
SIC – Authorities
Sr No.
1
DCR /SIR/ vendor drg approval
2
Technical discussion with candidates @ Recruitment
3
PRN release
4
DMN approval
5
Data transfer initial approval
EIC – Responsibilities
Sr No.
1
2D/ 3D drg release
2
Engine packaging feasibility study.
3
Proto part request initiation
4
Proto part follow up/ Casting tooling request
5
Data transfer intitiation.
6
DAR booking
7
DCR raising/ DMN followup
8
Data information input sharing with supplier
9
On job training
10
House keeping
EIC – Authorities
Sr No.
1
Catia Tool license allocation to end users
2
First level design & drawing review and approval to next level
16
RESEARCH AND DEVELOPMENT
Procedure Manual
[ ISO 9001:2015 / IATF: 16949 ]
Doc No : R&D/II/D/12
REV NO: - 00
ISSUE NO/DT: 00/27.11.2017
PG:- 3 OF 12
Responsibility and Authority of Proto Manufacturing Team
DH – Responsibilities
Sr No.
1
Management approvals for proto type vehicle/components manufacturing.
2
Proto type manufacturing as per project plan & time line.
3
Review of Proto Type project activities.
4
Inter action with HOD, Design DH for proto type manufacturing.
5
Attend CFT meeting.
6
Resource Management .
7
Review meetings for Safety awareness.
8
Technology & infrastructure up-gradation.
9
Resources allocation & Management approval.
10
Proto type manufacturing philosophy.
DH – Authorities
Sr No.
1
Material movement to outside factory for Processing on returnable basis .
2
Raw material procurement on cash purchase basis ( As per Management approval).
3
Raw material / Bought out Material availability for proto part manufacturing ( 901 Movement )
4
Leave / Official gatepass / Personal gatepass sanctioning.
5
Cash purchase voucher sectioning.
6
TA / DA bill sanctioning
7
Cash withdrawal voucher signing.
8
Trainee & Probationer employee monthly report evaluation.
9
Employee appraisal evaluation.
10
Inter departmental support for proto part manufacturing ( Processing).
11
Rejected & Material not in use ( Scrap note ) signing.
12
R & D entry gatepass signing for visitors.
SIC – Responsibilities
Sr No.
1
Ensuring availability of Raw material for proto part manufacturing.
2
Interdepartmental interaction for priorities.
3
Morning meeting & Work allocation.
4
Training for Safety awareness.
5
To attend Projects CFT meetings.
6
Ensuring availability of proto parts for assembly.
7
Other department interaction for process support
8
Vendor interaction & visit for proto part manufacturing.
9
Interaction with Design departments.
10
To maintain shop discipline.
11
Resource utilization.
17
RESEARCH AND DEVELOPMENT
Procedure Manual
[ ISO 9001:2015 / IATF: 16949 ]
Doc No : R&D/II/D/12
REV NO: - 00
ISSUE NO/DT: 00/27.11.2017
PG:- 4 OF 12
Responsibility and Authority of Proto Manufacturing Team
SIC – Authorities
Sr No.
1
Selection of temporary workmen.
2
To raise Raw material indent.
3
Selection of new employee.
4
Training recommendation for skill enhancement.
5
Internal goods movement ( Gatepass) signing.
LIC – Responsibilities
Sr No.
1
Shift scheduling.
2
Morning meeting & Work allocation.
3
Housekeeping ( Maintain 5's).
4
To ensure Work discipline.
5
Parts manufacturing as per drawings.
6
Record for proto parts.
7
Ensuring preventive maintenance schedule & Break down record.
8
Daily attendance ( Muster record ).
9
Calibration compliance.
10
Proto parts confirmation as per specification ( Quality check).
11
Inter departmental interaction for proto part manufacturing.
12
On job training to workmen.
LIC – Authorities
Sr No.
1
Break down intimation.
2
Fraud punching intimation to time office.
3
Workmen (Internal Gatepass) signing.
Responsibility and Authority of Engine Testing LAB
DH – Responsibilities
Sr. No.
1
Management & execution of power train projects
2
Resource Management .
3
Resources allocation & Management approval.
4
Establishing new test facility for engine testing as per project plan & time line
5
Review to upgrade existing technology & test facility
18
RESEARCH AND DEVELOPMENT
Procedure Manual
[ ISO 9001:2015 / IATF: 16949 ]
Doc No : R&D/II/D/12
REV NO: - 00
ISSUE NO/DT: 00/27.11.2017
PG:- 5 OF 12
Responsibility and Authority of Engine Testing LAB
DH – Authorities
Sr No.
1
To sign the Test requests for carrying out the tests
2
Resource utilization.
3
Selection of new employee.
4
Training recommendation for skill enhancement.
SIC – Responsibilities
Sr No.
1
To plan & execute the tests as per request.
2
To Maintain the test facility
3
Release the test results
4
Interdepartmental interaction for priorities.
5
Morning meeting & Work allocation.
6
Training for Safety awareness.
7
To attend Projects meetings.
8
Ensuring availability of spare & consumable parts for test equipments.
9
Other department interaction for maintenance support
10
Vendor interaction & visit for AMC.
SIC – Authorities
Sr No.
1
To raise indent.
LIC – Responsibilities
Sr No.
1
To conduct emission tests as per procedure
2
Maintenance of Test equipments / instruments
3
calibration of test equipments / instruments to be carried out Inhouse or with the help of external agency
4
Shift scheduling.
5
Housekeeping ( Maintain 5's).
6
On job training to workmen.
7
Inter departmental interaction for maintenance.
LIC – Authorities
Sr No.
1
Break down intimation.
19
RESEARCH AND DEVELOPMENT
Procedure Manual
[ ISO 9001:2015 / IATF: 16949 ]
Doc No : R&D/II/D/12
REV NO: - 00
ISSUE NO/DT: 00/27.11.2017
PG:- 6 OF 12
Responsibility and Authority of Homologation and Regulation
DH – Responsibilities
Sr No.
1
Management & execution of Homologation and Regulations Activities
2
Resource Management .
3
Product certification and Regulatory requirements monitoring
4
Addressing Interdepartmental and departmental meetings to create Regulatory requirements awareness
5
Periodical reviews of Homologation and certification activities
6
Interaction with external agencies SIAM /TMA/ARAI / VRDE / CFMT&TI/ TUV / CIRT and CMVR TSC / AISC / SCOE
DH – Authorities
Sr No.
1
Giving Approvals to process Homologation activities and certification documents
2
Resource utilization.
3
Selection of new employee.
4
Training recommendation for skill enhancement.
SIC – Responsibilities
Sr No.
1
To plan & execute the Certification activities based on Product certification request.
2
To Maintain the CMVR certification records
3
Interdepartmental interaction for CMVR testing
4
Morning meeting & Work allocation.
5
Training for Safety awareness.
6
To attend Projects meetings.
7
Ensuring availability of stationary for certification activities
8
Other department interaction for Certification support
9
Interaction with Domestic Marketing and International sales and Marketing for country specific Homologation requirements.
10
Study and comments on Government Notified Regulatory requirements
11
Study and comments on Indian and Automotive Standards
12
Recommendations to meet the Regulatory requirements
13
Study of National / International standards
14
Uploading, Obtaining Approvals for certified models on Vahan Portal for vehicle registration
15
R&D Recognition compliance
16
Test and Certification charges bills processing
17
Attending outside meetings for SIAM/TMA/CMVR-TSC/AISC/SCOE
18
Liasoning visit to ARAI/VRDE/ TUV/CFMT&TI/ICAT and CIRT
20
RESEARCH AND DEVELOPMENT
Procedure Manual
[ ISO 9001:2015 / IATF: 16949 ]
Doc No : R&D/II/D/12
REV NO: - 00
ISSUE NO/DT: 00/27.11.2017
PG:- 7 OF 12
Responsibility and Authority of Homologation and Regulation
SIC – Authorities
Sr No.
1
To raise indent.
2
Liasoning with Test Agency
LIC – Responsibilities
Sr No.
1
To prepare Certification Change Matrix based on Product change Matrix
2
To Identify Statutory test requirements
3
Preparation of Technical documents
4
Processing of domestic and export certification applications
5
Maintenance of Test reports and certification records
6
Liasoning with Test Agency
7
Co-ordination between Test Agency and Testing team
8
Housekeeping ( Maintain 5's).
9
MIS preparation
10
Inter departmental interaction for certification activities
11
Preparation of export homologation documents
12
Self certification activities
LIC – Authorities
Sr No.
1
Statutory testing schedule intimation.
Responsibility and Authority of PDED ( Product Drawing and Engineering Documentations)
DH – Responsibilities
Sr No.
1
Control on drawings preparation & release activity
2
Control on PRN/DMN/UDMN/UPRN/DMMN preparation & release activity
3
Control on suppliers & subcontractors drawings activity
4
Control on translation standards & documents of foreign origin.
5
Control on DCR/PRR/DPR activity
6
Control on Archives activity (record of drgs/std, printinig of drgs. against prints requisition etc)
21
RESEARCH AND DEVELOPMENT
Procedure Manual
[ ISO 9001:2015 / IATF: 16949 ]
Doc No : R&D/II/D/12
REV NO: - 00
ISSUE NO/DT: 00/27.11.2017
PG:- 8 OF 12
DH – Authorities
Sr No.
1
Approval of drawings.
2
Check the PRN/DMN/UDMN/UPRN/DMMN
3
Approval of suppliers or subcontractors drg
4
Approval of translation standards & documents of foreign origin.
5
Approval of prints requisition
SIC – Responsibilities
Sr No.
1
Checking of PRN/DMN/UDMN/UPRN/DMMN
2
Checking the BoM before release
3
Issue of the drawings / standards to user Dept.
4
Vendor drawing received & serial no allocation in R&D
5
To maintain records & documents
6
Verification of drawings w.r.t existing configuration
7
DCR/PRR/DPR serial no allocation & forward to concern.
SIC – Authorities
Sr No.
1
To check of Sub assly & assly BoM in SAP.
2
To check of DMN/PRN/UDMN/UPRN/DMMN
3
To check BOM in SAP
4
To verify suppliers or subcontractors drg
EIC – Responsibilities
Sr No.
1
Preparation of Drawings as per guideline & check list.
2
Updation in drawings based on feedback & discussion.
3
Release of Drawings as per guideline & check list.
4
Preparation of DMN/PRN/UDMN/UPRN/DMMN as per guideline & check list.
5
Updation in DMN/PRN/UDMN/UPRN/DMMN based on feedback & discussion.
6
Release of DMN/PRN/UDMN/UPRN/DMMN as per guideline & check list.
7
Record of drawings/Standards.
8
Removal/Retension of obsolete drawings.
9
Updation of drawings revision status in electronic media.
10
Preparation/Updation of BoM.
EIC – Authorities
Sr No.
1
NIL
22
RESEARCH AND DEVELOPMENT
Procedure Manual
[ ISO 9001:2015 / IATF: 16949 ]
Doc No : R&D/II/D/12
REV NO: - 00
ISSUE NO/DT: 00/27.11.2017
PG:- 9 OF 12
Responsibility and Authority : R & D Vehicle Testing / Component Testing
DH – Responsibilities
Sr No.
1
New proto type building & validation execution activities
2
Project reviews ( Existing & New ) with design team & management
3
Preparing approval notes for vehicle proto building & validation activities, new Rigs / Equipments and purchase of raw material etc.
4
Technology & infrastructure upgradation in vehicle & component testing
5
Project Review of Vehicle testing / Component testing activities.
6
Resource Management & required approvals from management
7
Execution of all critical issues in vehicle & component testing
8
Interaction with HOD, Design DH for testing related feedback & critical issues
9
Executions of vehicle display of new concept / proto as per management guidelines
10
Proto vehicles test drive for critical observations & feedbacks
11
Review meetings for Safety awareness.
12
Review of FAMC for concerned groups & Attending FAMC meeting
13
Weekly MIS report review with concerned group leader & weekly meeting with Head R&D.
14
Daily interactions & addressing project critical issues with SIC & EIC of vehicle & component testing
15
Shop floor activities related to work safety & healthy environment
DH – Authorities
Sr No.
1
Material movement to outside factory for Processing on returnable basis .
2
Raw material procurement on cash purchase basis ( As per Management approval).
3
Raw material / Bought out Material availability for proto vehicle testing / related components required for testing ( 901 Movement )
4
Leave / Official gatepass / Personal gatepass sanctioning.
5
Cash purchase voucher sanctioning.
6
TA / DA bill sanctioning
7
Cash withdrawal voucher signing.
8
Trainee & Probationer employee monthly report evaluation.
9
Employee appraisal evaluation.
10
Inter departmental support for proto part manufacturing ( Processing).
11
Rejected & Material not in use ( Scrap note ) signing.
12
R & D entry gatepass signing for visitors.
13
VRDE entry gatepass note
14
Dar booking approval for the non bargainable employees
15
Final report approval for the vehicle testing & component testing
23
RESEARCH AND DEVELOPMENT
Procedure Manual
[ ISO 9001:2015 / IATF: 16949 ]
Doc No : R&D/II/D/12
REV NO: - 00
ISSUE NO/DT: 00/27.11.2017
PG:- 10 OF 12
SIC – Responsibilities ( Vehicle & Component Testing)
Sr No.
1
Ensuring availability of components, Man power availability for proto vehicle building & Component testing
2
Interdepartmental interaction for priorities.
3
Morning meeting & Work allocation.
4
Training for Safety awareness.
5
To attend Projects CFT meetings.
6
Ensuring availability of vehicle components for assembly.
7
Other department interaction for process support
8
Vendor interaction & visit for vendor test witness etc
9
Interaction with Design departments.
10
To maintain shop discipline.
11
Resource utilisation.
12
Preparing & attending FAMC for management review meeting.
13
CFR closing report discussion with concerned for design group & EIC for closing the same.
SIC – Authorities
Sr No.
1
Selection of temporary workmen.
2
To raise Raw material / component requirement indent for Vehicle & component testing
3
conducting interview for selection of new employee.( Technician,engineer grade)
4
Training recommendation for skill enhancement.
5
Internal goods movement ( Gatepass) signing.
6
Approval of personal & official gatepass for Engineers and Workmen
7
Signing Test reports of Vehicle & Component Testing
8
Vehicle Gatepass / Diesel Slips Approval
EIC – Responsibilities ( Vehicle testing )
Sr No.
1
Shift scheduling.
2
Morning meeting & Work allocation.
3
Housekeeping ( Maintain 5's) & improving the score
4
To ensure Work discipline.
5
Assy of vehicles as per design lay out provided by design group
6
Keeping Records for std ,development, exclusive part list .
7
preparing build data of proto vehicles & highlighting deviations against specifications to concerned design group.
8
Ensuring preventive maintenance schedule & Break down record of all vehicles
9
Daily attendance ( Muster record ).
10
Calibration compliance.
11
Proto parts confirmation as per specification ( Quality check).
12
Inter departmental interaction for proto part manufacturing.
24
RESEARCH AND DEVELOPMENT
Procedure Manual
[ ISO 9001:2015 / IATF: 16949 ]
Doc No : R&D/II/D/12
REV NO: - 00
ISSUE NO/DT: 00/27.11.2017
PG:- 11 OF 12
13
On job training to workmen.
14
Preparing CFR report for the failed components on vehicle
15
Review meeting with the design groups for the closing CFR
16
Maintaining the record for the closed CFR report after getting the closing report
17
Preparation of the daily running record for the endurance test vehicles
18
Preparation of the MIS for the review meeting with DH
19
Data collection for preparing FAMC for the management review meeting
20
preparation for the test reports for the test vehicles ( assembly report , performance report , endurance test report , pave test report )
21
Maintaining the tools & gadgets for the vehicle assembly & keeping in proper condition .
22
keeping the minimum inventory stock of components & vehicles
23
keeping the record for the consumable parts on vehicle.
EIC – Authorities ( Vehicle testing)
Sr No.
1
Attending vehicle Break down & rectifying the same
2
Fraud punching intimation to time office.
3
Workmen (Internal Gatepass) signing.
4
Preparation document for removed oil from test vehicle for analysis
5
Xerox requisition
6
Test report sign before proceeding to SIC & EIC
EIC – Responsibilities ( Component testing )
Sr No.
1
Shift scheduling.
2
Morning meeting & Work allocation.
3
Housekeeping ( Maintain 5's) & improving the score
4
To ensure Work discipline.
5
Preparing test plan, test setup, conducting tests & monitoring test during shift duty and preparing test reports.
6
Making new test fixtures and set up as and when required
7
Ensuring preventive maintenance schedule & Break down record of test rigs & fixtures.
8
Daily attendance ( Muster record ).
9
Calibration compliance.
10
Inter departmental interaction for testing
11
On job training to workmen.
12
Updating daily test status & obsrvation sheet.
13
Preparation of MIS for the review meeting with DH
14
Data collection for preparing FAMC for the management review meeting
15
Communication to concerned group regarding audit component failure status.
25
RESEARCH AND DEVELOPMENT
Procedure Manual
[ ISO 9001:2015 / IATF: 16949 ]
Doc No : R&D/II/D/12
REV NO: - 00
ISSUE NO/DT: 00/27.11.2017
PG:- 12 OF 12
EIC – Authorities ( Component testing)
Sr No.
1
Interviewing and selection of temporary workmen
2
Fraud punching intimation to time office.
3
Workmen (Internal Gatepass) signing.
4
Xerox requisition
26
RESEARCH AND DEVELOPMENT
Procedure Manual
[ ISO 9001:2015 / IATF: 16949 ]
Doc No : R&D/II/D/13
REV NO: - 00
ISSUE NO/DT: 00/27.11.2017
PG:- 1 OF 2
Actions to address Risks and Opportunities
External Issues:
Requirements
Risks
Actions to mitigate risk
Opportunities
Political Factors (P)
1. Government rules, regulation and policies for vehicle requirement as notified.
1.Ensure implementation of rules , regulations and policies.
1. Can stop business.
1. Timely implementation of regulation
1. Continous business
Technology Factors (T)
1 Unique selling product points.
2 Competitive products.
1. Customer attraction
2. Benchmarking.
1. Can reduce business. 2. Can reduce market share.
1. Build USP's like comforts, better mileage , Higher goods carrying capacity, Long service intervals, long life of aggregates etc. compared to benchmarking data
1. Increase in market share .
Employee
1Training, Competency & Skill Development.
2 Working Conditions
1.Skill enhancement
2.Empowerment 3.Involvement in new development
Inadequate competency.
Low morale.
Training, Multi skilling.
Delegation of authorities and responsibilities.
1) Increased employee morale.
2) Reduce cost to company
Customer (D/C)
1. Regular new product launch
1. Reduction in business.
1.0 To design and develop new product on market research
1) Increase in market share, Brand value
27
RESEARCH AND DEVELOPMENT
Procedure Manual
[ ISO 9001:2015 / IATF: 16949 ]
Doc No : R&D/II/D/13
REV NO: - 00
ISSUE NO/DT: 00/27.11.2017
PG:- 2 OF 2
Interested parties
Requirements
Risks
Actions to mitigate risk
Opportunities
External providers
1. Technical support to supplier
1. Component / system not conforming to specification
2. Delay in development.
1, Clarifying technical requirement to the supplier
2. Extending support in components /systems development
3. Defining design validation plan and ensuring compliance
1. Timely development of component/systems as per schedule.
Customer
1. Customer specific requirements
1) Affect market reputation and will delay supply of product
2) Unsatisfied customer may lose business and damage organization reputation.
3. Customer dis-satisfaction
1. Ensure Fit to use product of good Quality with proper and clear communication ensuring customer specific requirements are met and spares available
2. Upgrade product based on customer feedback.
1) Increase in market share, Brand value.
Statutory &
Regulatory Body
1.Complying with the statutory and regulatory requirements as
Notified
Business may stop.
Comply to statutory and regulatory requirements well in advance is ensured by R&D as per procedures.
1) Uninterrupted sale.
Employees
1.Skill enhancement
2.Empowerment 3.Involvement in new development
Inadequate competency.
Low morale.
Training, Multi skilling.
Delegation of authorities and responsibilities.
1) Increased employee morale.
2) Reduce cost to company
Dealers /Stockists
1. New product launch
1. Reduction in business , Customer satisfaction , reduction in sales
1. Ensure on time supply of products, spares,
1. Increase in market value of investors
28
RESEARCH AND DEVELOPMENT
Procedure Manual
[ ISO 9001:2015 / IATF: 16949 ]
Doc No : R&D/II/D/14
REV NO: - 00
ISSUE NO/DT: 00/27.11.2017
PG:- 1 OF 1
ORGANISATIONAL KNOWLEDGE
R&D Department have set mechanism to share technical knowledge among all employee working in department.
· Technical presentations received from vendors, Suppliers and CD/DVDs of conference stored at below server location -
\\rndstorage\user F\ others.
Provided access to new technologies to concern design engineers.
· Aggregate-wise technical information of Projects is available at below sever location.
\\rndstorage\Non_Cad_Data
· All standards are available for design and testing engineers at below server location
\\rndstorage\ARD\Standards
· To enhance designer skill / knowledge, training of CATIA V5 Software, Analysis softwares is organized as and when required.
· Organized demonstrations / Presentations on new software update at R&D. Sometimes skypee is used for the same.
· Internet facility has been provided in R&D CAD Centre on e-mail desktops to refer latest information.
· Data related to CAE Knowledge base (Crash, CFD, NVH, e-Books, Load data of all vehicle, Seminars, SAE Presentations ) is made available at below server location -
\\rndstorage \ User F\ Others \ CAE Knowledge Base
· Test reports ( Vehicle Testing / Engine Testing / Components Testing ) are saved at below path
\\rndstorage\ARD\RELEASE\Scanned Test Report's.
These reports can be referred while designing new similar parts / Modification in existing part etc.
· Provided access to lesson learnt documents to existing as well as new comers.
· Dedicated location has been provided to all sections on R&D Server to save organizational knowledge which is specific to the organization. It is generally gained by experience.
\\rndstorage\UserF\OTHERS\Organizational knowledge
Separate documents is maintained at section level to demonstrate organizational knowledge clause.
29
RESEARCH AND DEVELOPMENT
Procedure Manual
[ ISO 9001:2015 / IATF: 16949 ]
Doc No : R&D/II/D/15
REV NO: - 00
ISSUE NO/DT: 00/27.11.2017
PG:- 1 OF 1
COMMUNICATION
The internal and external communications relevant to the QMS is determined including what, when, with whom, how and who will communicate.
What
When
With whom
How
Who
Internal Communication
Quality Policy
Always
All R&D employees
Display
AMR
Importance of effective QMS
During Induction
New Joining
Presentation
AMR
Quality objectives
Yearly
Divisional Head
Division KPI
HOD
Customer complaints / feedback
After receipt of complaint
Dept Head / Divisional Head
Monthly Warranty review
Service Dept.
What
When
With whom
How
Who
External Communication
Technical support to supplier
During Development
Supplier
Through ADD
Development Engineer
Supplier issue
Receiving information
Through ADD
Telephone/Email
Development Engineer
Customer feedback
New product launch
Customer
Through Sales and Marketing
Development Engineer
Action taken on customer complaints
After completion of action
Service Dept.
Email / letter / Warranty meeting
Development Engineer
Each section in R&D department have maintained Internal and external communications matrix in line with their activity.
30
RESEARCH AND DEVELOPMENT
Procedure Manual
[ ISO 9001:2015 / IATF: 16949 ]
Doc No : R&D/II/D/16
REV NO: - 00
ISSUE NO/DT: 00/27.11.2017
PG:- 1 OF 2
GUIDELINES FOR DCR:
1) DCR’s from R&D to be filled after completing Sketches / Analysis / Proto / Proving by concern DH.
2) Procedure for DCR’s received other than R&D dept
a) Received by PDED and recorded in the DCR Register.
b) Copy of the DCR is forwarded to the concerned DH.
c) Categorization of DCR’s by DH as followsA – Process / Design Improvements
B – Cost Reduction
C – Error Correction
D – CMVR / Govt. Regulator Act
E – Field Complaints / Warranty Claims
F – Safety
d) For category of A,B,D,E and F, DFMEA is must.
e) Pl refer FMEA Ranking which is available on Tempest ( FML Intranet).
f) All DFMEA's should be approved by Homologation person for Product Safety requirements.
3) Ensure that DFMEA is reviewed with DCR.
4) Error correction DMN’s
a) Classify the error as one among the above from A to F.
b) Study the case for error on case to case basis & prepare a report on the cause of error.
c) Identify the more frequent cause of error.
d) Study & propose corrective measures to minimize the same.
5) For DCR implementing, guideline by management (TCR) wide note M/33/5/3998 dated 07.09.2007 is to be followed.
31
RESEARCH AND DEVELOPMENT
Procedure Manual
[ ISO 9001:2015 / IATF: 16949 ]
Doc No : R&D/II/D/16
REV NO: - 00
ISSUE NO/DT: 00/27.11.2017
PG:- 2 OF 2
DCR PROCESSING TABLE:
S.No
ACTIVITY
MAN DAYS
1
DCR Copy Receipt
3
2
DCR Approval
10
3
2D drawing preparation
2 to 15 (depending upon the complexity)
4
Proto Manufacturing
6 to 30 (depending upon the complexity)
5
3D Models
10 to 15 (whenever applicable)
6
Advance DMN preparation
6
7
Advance DMN discussion (ADD/PE/PUR) indicating:
8 to 10
7a
Make and Buy
7 days are given to PE/ADD/PURCHASE/QC for their comments and 1 days for discussion.
7b
Target date of implementation
7c
Tooling involved
7d
Tooling / Equipment cost involved
7e
Cost Impact on Vehicle
7f
Old Stock assumption
8
Updation of DMN after advance DMN discussion
4 (based on availability of concerned)
9
Firm DMN approval
6 to 20 (Based on management availability)
10
Firm DMN release
6
11
Validation of proto of proposed change
2 to 10 (depending on complexity)
32
RESEARCH AND DEVELOPMENT
Procedure Manual
[ ISO 9001:2015 / IATF: 16949 ]
Doc No : R&D/II/P/01
REV NO: - 00
ISSUE NO/DT: 00/27.11.2017
PG:- 1 OF 4
TITLE: PROCEDURE FOR Product safety.
PURPOSE: The purpose of this procedure is to define Product safety in design and development process.
SCOPE: It covers safety in products, designed and developed at R&D Dept.
RESPONSIBILITY: The responsibility of implementation of this procedure lies with HOD & operational responsibility lies with DH, Design and Homologation.
PROCEDURE:
Refer flow chart for process – Product safety
33
RESEARCH AND DEVELOPMENT
Procedure Manual
[ ISO 9001:2015 / IATF: 16949 ]
Doc No : R&D/II/P/02
REV NO: - 00
ISSUE NO/DT: 00/27.11.2017
PG:- 1 OF 9
TITLE: PROCEDURE FOR PRODUCT DESIGN & DEVELOPMENT
PURPOSE: The purpose of this procedure is to define a method for the Design & Development activity.
SCOPE: This covers the requirement of Design & Development Planning in R&D Department of FML,
Pune.
RESPONSIBILITY: The responsibility of implementation of this procedure lies with HOD & operational responsibility lies with concerned DH.
PROCEDURE:
Refer flow chart for process – Product Design & Development.
37
RESEARCH AND DEVELOPMENT
Procedure Manual
[ ISO 9001:2015 / IATF: 16949 ]
Doc No : FORCE/1/P/03
REV NO: - 00
ISSUE NO/DT: 00/27.11.2017
PG:- 1 OF 4
TITLE: PROCEDURE FOR PROTO MANUFACTURING
PURPOSE: The purpose of this procedure is to define a method for the manufacture prototype
components for Design & Development Verification.
SCOPE: The procedure covers the manufacturing of prototype components for the Design Verification of the new products under development & also for the existing products undergoing design changes in R&D of FML, Pune.
RESPONSIBILITY: The responsibility of implementation of this procedure lies with DH (Proto Mfg.) & operational responsibility lies with concerned SIC (Proto Mfg.)
PROCEDURE:
Refer flow chart for process – Proto manufacturing.
46
RESEARCH AND DEVELOPMENT
Procedure Manual
[ ISO 9001:2015 / IATF: 16949 ]
Doc No : R&D/II/P/04
REV NO: - 00
ISSUE NO/DT: 00/27.11.2017
PG:- 1 OF 4
TITLE: PROCEDURE FOR LAB TESTING / VEHICLE TESTING/ ENGINE TESTING
PURPOSE: The purpose of this procedure is to define the method for validation of sample(s) / vehicle(s)
by conducting required tests on the components at Component testing / on Vehicle / on Engine at test cells.
SCOPE: This procedure covers the
1) Proto samples developed for first time /second source development /Proto samples made in house/ Proto samples removed from vehicle / SIR / Modified samples / Field Failure / Data generation / Data collection.
2) Random selected samples received from Receipt Inspection (in CT).
3) Proto Vehicle/Engine developed first time.
Of R&D Department, FML, Pune
RESPONSIBILITY: The responsibility of implementation of this procedure lies with DH (Testing Group) & operational responsibility lies with SIC (Testing Group).
PROCEDURE:
Refer flow chart for process – Component testing/Vehicle Testing/Engine Testing.
50
RESEARCH AND DEVELOPMENT
Procedure Manual
[ ISO 9001:2015 / IATF: 16949 ]
Doc No : R&D/II/P/05
REV NO: - 00
ISSUE NO/DT: 00/27.11.2017
PG:- 1 OF 4
TITLE: PROCEDURE FOR DESIGN & DEVELOPMENT REVIEW.
PURPOSE: The purpose of this procedure is to define a method for the Design & Development Review.
SCOPE: The procedure covers the Design & Development Reviews for the new products under
development & the existing products undergoing the Design change in R&D of FML, Pune.
RESPONSIBILITY: The responsibility of implementation of this procedure lies with HOD & operational responsibility lies with concerned DH.
PROCEDURE:
Refer flow chart for process – Design & Development Review.
54
RESEARCH AND DEVELOPMENT
Procedure Manual
[ ISO 9001:2015 / IATF: 16949 ]
Doc No : R&D/II/P/06
REV NO: - 00
ISSUE NO/DT: 00/27.11.2017
PG:- 1 OF 4
TITLE: PROCEDURE FOR CAE ANALYSIS.
PURPOSE: The purpose of this procedure is to define the method for conducting CAE Analysis.
SCOPE: The CAE Analysis covers the verification of concept design, detailed design and after validation design changes in the new products released for production and the products, which are in series production and also covers field failure, Simulation and modifications to avoid field failure for existing Products.
RESPONSIBILITY: The responsibility of implementation of this procedure lies with HOD & operational responsibility lies with DH (CAE).
PROCEDURE:
Refer flow chart for process – CAE Analysis
58
TITLE: PROCEDURE FOR DESIGN & DEVELOPMENT OUTPUT.
PURPOSE: The purpose of this procedure is to define the method for Design & Development output documents.
SCOPE: This covers the Design & Development outputs documented by R&D Department of FML, Pune.
RESPONSIBILITY: The responsibility of implementation of this procedure lies with HOD & operational
responsibility lies with DH Product Drawing & Engineering Documentation (PDED).
PROCEDURE:
Refer flow chart for process – Design & Development output
RESEARCH AND DEVELOPMENT
Procedure Manual
[ ISO 9001:2015 / IATF: 16949 ]
Doc No : R&D/II/P/07
REV NO: - 00
ISSUE NO/DT: 00/27.11.2017
PG:- 1 OF 7
62
RESEARCH AND DEVELOPMENT
Procedure Manual
[ ISO 9001:2015 / IATF: 16949 ]
Doc No : R&D/II/P/08
REV NO: - 00
ISSUE NO/DT: 00/27.11.2017
PG:- 1 OF 4
TITLE: PROCEDURE FOR DESIGN CHANGES.
PURPOSE: The purpose of this procedure is to define the method for design changes.
SCOPE: It covers the design changes in the new products released for production and the products, which are in series production.
RESPONSIBILITY: The responsibility of implementation of this procedure lies with HOD & operational responsibility lies with DH(PDED).
PROCEDURE:
Refer flow chart for process – Design & Development changes.
69
RESEARCH AND DEVELOPMENT
Procedure Manual
[ ISO 9001:2015 / IATF: 16949 ]
Doc No : R&D/II/D/17
REV NO: - 00
ISSUE NO/DT: 00/27.11.2017
PG:- 1 OF 1
Document information on development of product with embedded software.
A. Calibration ID requested by Engine design to PDED.
B. PDED provides information like Vehicle type, Engine Number , Force number , Calibration ID Number and supplier Number / type by providing drawing number which is released.
C. Engine design will forward Calibration ID to suppliers.
D. Supplier provides different data sets for conductive emission , fuel consumption tests.
E. Based on tests conducted and test reports released by engine testing and vehicle testing , data set is finalised and it is informed to supplier for containerisation.
F. Finalized ECU's ( Electronically Controlled Unit) with containerised data set is introduced in series production.
G. Randomly selected vehicles and Engines from series production for emission test to ensure conformity of production ( COP).
H. Information on embedded software used on various product is available with concern design group in Format named "List of Systems with Embedded software" ( R&D/00/179 ).
73