pg Interdisciplinary Project
Hazard and Materials Identification Form (Construction)
1) Draw diagrams/sketches of your planned installation showing how you think it will be constructed
2) create a simple timeline showing the order in which things will be done
3) itemise tools and materials needed
Identify all potential hazards in the construction process and identify risks, and state what you are doing to avoid them.
This will be used to complete a Health and Safety Form later.
Diagram(s)/sketches – at least two side views (90 degrees apart) needed with indicative measurements. Please also indicate any particular environmental requirements (low light level etc).
Black lines – proposed construction.
Blue lines – proposed movement through space.
Proposed layout of internal space once constructed.
Timeline of construction (include date and times)
Monday 11th 10am – Meet and assess space and work to be undertaken
11am – Begin process of laser cutting puppet shapes
2pm – Have puppet pieces cut in 3D workshop
3pm - Gather construction materials required to build temporary walls for installation
4pm – Finalise construction plans for following day
Tuesday 12th 11am – Begin construction of wall frames
1pm – Lunch
2pm – Cladding of wall frames
5pm – Projector equipment test in newly constructed space
Wednesday 13th 10am – Paint the installation space
11am – Construct plinth for projector/ puppet housing
1pm – Construct roof enclosure
4pm – Ready space for public viewing
List of resources required (if in doubt, write it down)
Projector, Plinth or MDF to construct plinth, Projector Cage if being suspended, MDF, Power drill and drill bits, Laser cutter, Power supply, Paint, Hand saw, Japanese saw, Chipboard sheeting, Lengths of 2x2 and 2x1 pine, Dark fabric, 75mm masking tape, Mac mini and related connections
#
Risk or Hazard
Management/mitigation strategy
1
Usage of power tools
Obtain required training beforehand and ensure supervision if needed
2
Public working environment
Remain aware of the movements of others within the workspace, time jobs to take place during minimal times of footfall
3
Electronic equipment (e.g. Projector)
Ensure you are aware beforehand of device workings and/or seek supervision of experienced technician
4
Trip hazards due to materials
Remain aware of the changing work environment, paying special attention to the movement of other groups and their materials alongside our own.
5
Usage of hand tools
Obtain required training beforehand and ensure supervision if needed.
6
Working at height
Use correct equipment such as ladders or footstools, not improvised equipment such as chairs or tables to work at height. Ensure the correct usage of this equipment through training and have secondary support from a fellow team member.
7
Working in enclosed spaces
Remain aware of your immediate physical environment and the placement of items. When space is to be enclosed, if construction work is still underway, ensure usage of additional light sources.