EHS-GBP-05 GBF-08 APPLICABILITY This booklet comprises the checklists for various elements of the green building regulations and is meant to be used by the stakeholders concerned for providing accurate information on the project. It comprises the following parts Part-1 Project Summary Part-2 Checklist for Green Building Submission Part-3 Green Building Compliance Statement Part-4 Envelope Commitment Sheet Part-5 AC System Compliance Sheet Disclaimer This checklist has been developed for project teams to use when compiling the submission documentation for EHS Review / Assessment. A completed version of this checklist must be included within the Main Submission. Revision: 00 July 2015 Page 1 of 23 SUBMISSIO N BOOKLET Regulation : GB 7. Green Building Regulations – Prescriptive Compliance sheet (Areas < 500 m 2 ) Procedure : EHS-GBP-8 Procedure for NOC-BCC Green Building Submission (Prescriptive compliance Areas < 500 m 2 )

Transcript of  · Web viewItem no 2, The Green Building Project Report (GBPR) is an extension of the Green...

Page 1:  · Web viewItem no 2, The Green Building Project Report (GBPR) is an extension of the Green Building Project Plan (GBPP) submitted originally during the NOC-BP and should reflect

EHS-GBP-05 GBF-08

APPLICABILITY

This booklet comprises the checklists for various elements of the green building regulations and is meant to be used by the stakeholders concerned for providing accurate information on the project. It comprises the following parts

Part-1 Project Summary

Part-2 Checklist for Green Building Submission

Part-3 Green Building Compliance Statement

Part-4 Envelope Commitment Sheet

Part-5 AC System Compliance Sheet

DisclaimerThis checklist has been developed for project teams to use when compiling the submission documentation for EHS Review / Assessment.

A completed version of this checklist must be included within the Main Submission.

The accuracy and completeness of the submission is entirely the responsibility of the project team. EHS will not be held accountable for incorrect or incomplete submissions sent for assessment.

Revision: 00 July 2015 Page 1 of 15

SUBMISSION

BOOKLET

Regulation : GB 7. Green Building Regulations – Prescriptive Compliance sheet (Areas < 500 m2)

Procedure : EHS-GBP-8 Procedure for NOC-BCC Green Building Submission (Prescriptive compliance Areas < 500 m2 )

Phase : NOC-BCC

Page 2:  · Web viewItem no 2, The Green Building Project Report (GBPR) is an extension of the Green Building Project Plan (GBPP) submitted originally during the NOC-BP and should reflect

EHS-GBP-05 GBF-08

PART-1

PROJECT SUMMARY

Project Name:Click here to enter text. GB Consultant: Click here to enter text.

Plot No: Click here to enter text. Commissioning: Click here to enter text. specialist

Project: Click here to enter text. Engineer of: Click here to enter text.description record

Project Contact Name: Click here to enter text.

Contact E-Mail: Click here to enter text.

I, the Project Contact, hereby confirm that:

a. I have reviewed the submission checklist and the contents therein and ascertained that they align with the main submission package provided to EHS

b. I understand that EHS reserve the right to not assess a submission that is inconsistent with the Regulations, submission procedures and the guidelines

c. I take complete responsibility for the accuracy and completeness of the submission.

Name: Click here to enter text.

Signature: Date: Click here to enter text.

Revision: 00 July 2015 Page 2 of 15

Page 3:  · Web viewItem no 2, The Green Building Project Report (GBPR) is an extension of the Green Building Project Plan (GBPP) submitted originally during the NOC-BP and should reflect

EHS-GBP-05 GBF-08

PART- 2

CHECKLIST FOR GREEN BUILDING SUBMISSION [NOC-BCC]

Project Name: Click here to enter text.

S.NO DOCUMENT DETAILS ATTACHED(Yes / No) REMARKS

1 Proof of Payment of Green Building Review Fee            

2 A detailed Green Building Project Report explaining the strategies being adopted in the process of compliance to the Regulation GB 7            

3Supporting documents for “ Category A-General Requirements” as highlighted under the section “Evidence Required at Post Construction NOC-BCC stage ” of Regulation GB-7

           

4Supporting documents for “ Category B-Envelope & Energy” as highlighted under the section “Evidence Required at Post Construction NOC-BCC Stage “ of Regulation GB 7

           

5Supporting documents for “Category C-Lighting” as highlighted under the section “Evidence Required at Post Construction NOC-BCC Stage” of Regulation GB 7

           

6Supporting documents for “Category D- Control Systems” as highlighted under the section “Evidence Required at Post Construction NOC-BCC Stage” of Regulation GB 7

           

7 Supporting documents for “Category E- Water” as highlighted under the section “Evidence Required at Post Construction NOC-BCC Stage of Regulation GB 7            

Revision: 00 July 2015 Page 3 of 15

Page 4:  · Web viewItem no 2, The Green Building Project Report (GBPR) is an extension of the Green Building Project Plan (GBPP) submitted originally during the NOC-BP and should reflect

EHS-GBP-05 GBF-08

S.NO DOCUMENT DETAILS ATTACHED(Yes / No) REMARKS

8Supporting documents for “Category F- Environment & Internal Air Quality” as highlighted under the section “Evidence Required at Post Construction NOC-BCC Stage “ of Regulation GB 7

           

9Supporting documents for “Category G- Sustainable Site” as highlighted under the section “Evidence Required at Post Construction NOC-BCC Stage” of Regulation GB 7

           

10Supporting documents for “Category H- Operational Sustainability” as highlighted under the section “Evidence Required at Post Construction NOC-BCC Stage” of Regulation GB 7

           

11 Justification for Non Compliance to any specific credit (if any)            

Notes

1) The above check-list should be filled up in a professional manner devoid of inconsistencies2) Item no 2, The Green Building Project Report (GBPR) is an extension of the Green Building Project Plan (GBPP) submitted

originally during the NOC-BP and should reflect the current status of all the elements/credit categories originally sought together in addition to any other credits targeted after the original approval. While a Matrix is required at a minimum level, detailed report is recommended.

3) Letters of undertaking should directly relate to the pending activities and should commit to complete the related tasks. It may comprise all of but not limited to:a. Installation activitiesb. Commissioning activitiesc. Obtaining relevant documents such as material data sheets, Reports etc.d. As built drawings

4) It should be ensured that ONLY the latest / most recent version of the forms as reflected in the portal are used for the submissions. Forms bearing the earlier revisions or those that have been superseded will not be accepted.

Revision: 00 July 2015 Page 4 of 15

Page 5:  · Web viewItem no 2, The Green Building Project Report (GBPR) is an extension of the Green Building Project Plan (GBPP) submitted originally during the NOC-BP and should reflect

EHS-GBP-05 GBF-08

PART- 3

GREEN BUILDING COMPLIANCE STATEMENT [NOC-BCC]Project Name: Click here to enter text.

ITEM DESCRIPTION

TYPE COMPLIANCE REQUIREMENT

COMPLIED

Yes / No

LIST OF SUPPORTING DOCUMENTS ATTACHED.

A: General Requirements

1

Integrated Design Approach for achieving energy savings

M AS HIGHLIGHTED IN SECTION A1 OF THE REGULATION GB-7            

2

Post Contract Green Briefing.Sustainability Kick-off

M AS HIGHLIGHTED IN SECTION A2 OF THE REGULATION GB-7            

B: Envelope and Energy

1

Compliance with Thermal Insulation System and Best Practices Energy conservation methods

M AS HIGHLIGHTED IN SECTION B1 OF THE REGULATION GB-7            

2

LIMITING / REVERSING THERMAL BRIDGES

M AS HIGHLIGHTED IN SECTION B2 OF THE REGULATION GB-7            

Revision: 00 July 2015 Page 5 of 15

Page 6:  · Web viewItem no 2, The Green Building Project Report (GBPR) is an extension of the Green Building Project Plan (GBPP) submitted originally during the NOC-BP and should reflect

EHS-GBP-05 GBF-08

ITEM DESCRIPTION

TYPE COMPLIANCE REQUIREMENT

COMPLIED

Yes / No

LIST OF SUPPORTING DOCUMENTS ATTACHED.

3

Envelope Tightness (Prescriptive based) THERMAL IMAGING TECHNIQUE

M AS HIGHLIGHTED IN SECTION B3 OF THE REGULATION GB-7            

4 THIS SPACE HAS BEEN INTENTIONALLY LEFT BLANK

5 Efficient SIZING of the HVAC systems M AS HIGHLIGHTED IN SECTION B5 OF THE

REGULATION GB-7            

6 THIS SPACE HAS BEEN INTENTIONALLY LEFT BLANK

7

Selection of A/C unit with HIGH Energy Efficiency Ratio (EER)

M AS HIGHLIGHTED IN SECTION B7 OF THE REGULATION GB-7            

8 THIS SPACE HAS BEEN INTENTIONALLY LEFT BLANK

9INTERIOR LIGHTING LEVELS

M AS HIGHLIGHTED IN SECTION B9 OF THE REGULATION GB-7            

10EXTERIOR LIGHTING LEVELS

M AS HIGHLIGHTED IN SECTION B10 OF THE REGULATION GB-7            

11Use of Renewable sources of energy for domestic heating

VAS HIGHLIGHTED IN SECTION B11 OF THE REGULATION GB-7            

Revision: 00 July 2015 Page 6 of 15

Page 7:  · Web viewItem no 2, The Green Building Project Report (GBPR) is an extension of the Green Building Project Plan (GBPP) submitted originally during the NOC-BP and should reflect

EHS-GBP-05 GBF-08

ITEM DESCRIPTION

TYPE COMPLIANCE REQUIREMENT

COMPLIED

Yes / No

LIST OF SUPPORTING DOCUMENTS ATTACHED.

12Use of Renewable sources of energy for power

V AS HIGHLIGHTED IN SECTION B12 OF THE REGULATION GB-7            

13 THIS SPACE HAS BEEN INTENTIONALLY LEFT BLANK

14 COMMISSIONING M AS HIGHLIGHTED IN SECTION B14 OF THE REGULATION GB-7

15

FOR AIR-CONDITIONED SPACESMORE THAN 2000 SQ.M NOT APPLICABLE            BUILDING ENERGY SIMULATIONENERGY MODELING

16

FOR AIR-CONDITIONED SPACESMORE THAN 2000 SQ.M NOT APPLICABLE            

INDEPENDENT COMMISSIONING AGENT

C: Lighting

1GENERAL

V AS HIGHLIGHTED IN SECTION C1 OF THE REGULATION GB-7            

Use of Solar Day

Revision: 00 July 2015 Page 7 of 15

Page 8:  · Web viewItem no 2, The Green Building Project Report (GBPR) is an extension of the Green Building Project Plan (GBPP) submitted originally during the NOC-BP and should reflect

EHS-GBP-05 GBF-08

ITEM DESCRIPTION

TYPE COMPLIANCE REQUIREMENT

COMPLIED

Yes / No

LIST OF SUPPORTING DOCUMENTS ATTACHED.

lighting Technologies

2

OFFICE PORTION

M AS HIGHLIGHTED IN SECTION C2 OF THE REGULATION GB-7            Usage of energy

saving high performance lamps

3 Usage of Electronic Ballast M AS HIGHLIGHTED IN SECTION C3 OF THE

REGULATION GB-7            

4

WAREHOUSE PORTION

M AS HIGHLIGHTED IN SECTION C1 OF THE REGULATION GB-7            Usage of energy

saving high performance lamps

5 Usage of Electronic Ballast M AS HIGHLIGHTED IN SECTION C1 OF THE

REGULATION GB-7            

D: Control Systems

1

Use of programmable thermostats for HVAC system

M AS HIGHLIGHTED IN SECTION D1 OF THE REGULATION GB-7            

2 Control of External lights M AS HIGHLIGHTED IN SECTION D2 OF THE

REGULATION GB-7            

3 Interlock of Toilet / Bathroom fans M AS HIGHLIGHTED IN SECTION D3 OF THE

REGULATION GB-7            

Revision: 00 July 2015 Page 8 of 15

Page 9:  · Web viewItem no 2, The Green Building Project Report (GBPR) is an extension of the Green Building Project Plan (GBPP) submitted originally during the NOC-BP and should reflect

EHS-GBP-05 GBF-08

ITEM DESCRIPTION

TYPE COMPLIANCE REQUIREMENT

COMPLIED

Yes / No

LIST OF SUPPORTING DOCUMENTS ATTACHED.

4

Use of Occupancy Sensor / Motion Sensor for internal lighting devices

M AS HIGHLIGHTED IN SECTION D4 OF THE REGULATION GB-7            

5

AUTOMATIC DAYLIGHT DIMMING CONTROLS(Warehouse areas > than 2000 m2)

M NOT APPLICABLE            

E: Water

1

Usage of Sewage Treatment Plant (STP) for treating Grey Water and reuse of treated water in flushing toilets and other usage not involving human direct contact.

V NOT APPLICABLE            

2

Performance Requirements for Sanitary fittings (Low Flow / Low Flush Fittings)

M AS HIGHLIGHTED IN SECTION E2 OF THE REGULATION GB-7            

3

Water efficient landscaping and irrigation systemsDrip

M AS HIGHLIGHTED IN SECTION E3 OF THE REGULATION GB-7            

Revision: 00 July 2015 Page 9 of 15

Page 10:  · Web viewItem no 2, The Green Building Project Report (GBPR) is an extension of the Green Building Project Plan (GBPP) submitted originally during the NOC-BP and should reflect

EHS-GBP-05 GBF-08

ITEM DESCRIPTION

TYPE COMPLIANCE REQUIREMENT

COMPLIED

Yes / No

LIST OF SUPPORTING DOCUMENTS ATTACHED.

irrigation methods for vegetation according to climate and seasonal conditions.

4

Water efficient landscaping and irrigation systemsEliminate potable water use or irrigation

VAS HIGHLIGHTED IN SECTION E4 OF THE REGULATION GB-7

           

F: Environment and Internal Air Quality

1

Building internal ventilation and Minimum Indoor Air Quality (IAQ)

M AS HIGHLIGHTED IN SECTION F1 OF THE REGULATION GB-7            

2Control of Environmental Tobacco Smoke

M AS HIGHLIGHTED IN SECTION F2 OF THE REGULATION GB-7            

3Low Emitting Paints, Coatings, Adhesives and Sealants

M AS HIGHLIGHTED IN SECTION F3 OF THE REGULATION GB-7            

4 Usage of Ozone friendly materials in Air Conditioning equipment, thermal insulation, foam & firefighting

M

AS HIGHLIGHTED IN SECTION F4 OF THE REGULATION GB-7

           

Revision: 00 July 2015 Page 10 of 15

Page 11:  · Web viewItem no 2, The Green Building Project Report (GBPR) is an extension of the Green Building Project Plan (GBPP) submitted originally during the NOC-BP and should reflect

EHS-GBP-05 GBF-08

ITEM DESCRIPTION

TYPE COMPLIANCE REQUIREMENT

COMPLIED

Yes / No

LIST OF SUPPORTING DOCUMENTS ATTACHED.

equipment.

G: Sustainable Site & Management

1 Sustainable Site and Management M AS HIGHLIGHTED IN SECTION G1 OF THE

REGULATION GB-7            

2 Heat Island Effect Non-Roof M AS HIGHLIGHTED IN SECTION G2 OF THE

REGULATION GB-7.            

3

Heat Island Effect Roof (Use of light and heat reflective colours on roofs)

M AS HIGHLIGHTED IN SECTION G3 OF THE REGULATION GB-7            

H: Operational Sustainability

1

Recycling facility -Storage and collection of Recyclables

M AS HIGHLIGHTED IN SECTION H1 OF THE REGULATION GB-7            

2 Energy Efficient Eqt. (White Goods) V AS HIGHLIGHTED IN SECTION GH2 OF THE

REGULATION GB-7            

3 Building user Guide M AS HIGHLIGHTED IN SECTION H3 OF THE REGULATION GB-7            

4 Facility / Building Services Tuning V AS HIGHLIGHTED IN SECTION H4 OF THE

REGULATION GB-7            

List the Supporting documents attached. *

[This should be in line with "Evidence Required at Design Stage NOC-BCC" of the Regulation GB-7.0]

Revision: 00 July 2015 Page 11 of 15

Page 12:  · Web viewItem no 2, The Green Building Project Report (GBPR) is an extension of the Green Building Project Plan (GBPP) submitted originally during the NOC-BP and should reflect

EHS-GBP-05 GBF-08

PART- 4

ENVELOPE COMMITMENT SHEET [NOC-BCC]Project Name: Click here to enter text.

BUILDING ELEMENT PARAMETER REQUIREMENTS ENVELOPE DATA (DESIGN) *

ENVELOPE DATA (AS-BUILT) **

Non Conditioned Spaces

External Walls

U – value (Max)

0.08 Btu/hr-ft2-⁰f

0.45 W/m2-⁰c            

Non Conditioned Spaces

Roof

U – value (Max)

0.074 Btu/hr-ft2-⁰f

0.42 W/m2-⁰c           

Air Conditioned Spaces

External Walls

U – value (Max)

0.055 Btu/hr-ft2-⁰f

0.3123 W/m2-⁰c           

Air Conditioned Spaces

Roof

U – value (Max)

0.045 Btu/hr-ft2-⁰f

0.2555W/m2-⁰c           

FloorsU – value

(Max)

0.1 Btu/hr-ft2-⁰f

0.57 W/m2-⁰c           

FenestrationU – value

(Max)0.30 Btu/hr-ft2-⁰f

1.7 W/m2-⁰c            

Shading 0.29            

Revision: 00 July 2015 Page 12 of 15

Page 13:  · Web viewItem no 2, The Green Building Project Report (GBPR) is an extension of the Green Building Project Plan (GBPP) submitted originally during the NOC-BP and should reflect

EHS-GBP-05 GBF-08

BUILDING ELEMENT PARAMETER REQUIREMENTS ENVELOPE DATA (DESIGN) *

ENVELOPE DATA (AS-BUILT) **

Coefficient (Max)

SHGC (Max)

0.252

VLT (Min) 25 %            

Glass

(for skylights architecture)

U – value (Max)

0.335 Btu/hr-ft2-⁰f

1.9 W/m2-⁰c           

Shading Coefficient

(Max)

SHGC (Max)

0.20

0.174           

VLT (Min) 40 %            

Note

1. Columns under * indicates the values as committed by the client during “NOC-BP” submissions. It is imperative that these are followed in the construction.

2. Columns under ** indicates the values as achieved at site in the process of construction. 3. The values provided in the table should be supported with calculations / catalogues and test reports where relevant to

demonstrate compliance

Revision: 00 July 2015 Page 13 of 15

Page 14:  · Web viewItem no 2, The Green Building Project Report (GBPR) is an extension of the Green Building Project Plan (GBPP) submitted originally during the NOC-BP and should reflect

EHS-GBP-05 GBF-08

PART- 5

AC SYSTEM COMPLIANCE SHEET [NOC-BCC]

Project Name: Click here to enter text.

S.NoSpace / Area being Air-conditioned

Proposed SystemEER

as per EHS Regulation

EERCOMMITTEDDuring Design

EERINSTALLED

As Built

Cooling load (TR)

AirQuantity

1                              

2                              

3                              

4                              

5                              

6                              

7                              

Notes1. The table should be followed for demonstrating compliance to

a. B5 – Efficient Sizing of HVAC systemsb. B7 - Selection of A/C unit with Energy Efficiency Ratio (EER)

2. This table is applicable to all conditioned areas including cases where a single AC unit is catering to multiple spaces and cases

where a single space is being catered by multiple units

Revision: 00 July 2015 Page 14 of 15

Page 15:  · Web viewItem no 2, The Green Building Project Report (GBPR) is an extension of the Green Building Project Plan (GBPP) submitted originally during the NOC-BP and should reflect

EHS-GBP-05 GBF-08

3. It should be ensured that ONLY the latest / most recent version of the forms as reflected in the portal are used for the submissions. Forms bearing the earlier revisions or those that have been superseded will not be accepted

Revision: 00 July 2015 Page 15 of 15