Transcript of Web based matching of transports- Internal presentation for discussions Leif Olsson.
Web based matching of transports- Internal Web based matching of transports- Internal presentation for discussionspresentation for discussions
Leif OlssonLeif Olsson
60% left!
Shipping agent: Fill the load carrier that is already scheduledSupplier: Get better price on
transport with low emissions and delivered in time
Load carrier, 20% left!
Main idea with the portal
DHLDelegoEtc.
Existing systems, commercial examples, Sweden
Systems under development, an example
LogIt D2D – Interbaltic/Transbaltichttp://www.logit-systems.com
Cost and time considered in these systems
No emissions considered in these systems
List of transport alternatives minimizing the overall transport cost (in prototype)
The prototype as a starting point, only in Swedish
The problem description
HighHigh Low, Low, MediumMedium Low Low Low, Low, MediumMedium
FastFast MediumMedium SlowSlow SlowSlow
HighHigh HighHigh MediumMedium LowLow
MediumMedium LowLow MediumMedium HighHigh
CostTimeEmissionsUncertainty
1. Intermodality2. Conflict between criterias3. Uncertainty
NOT SUPPORTED BY ANY OTHER SYSTEM!
Note: This is only an example to illustrate the problem, for instance, cost for different transport modes depends on the length of the actual transport etc.
Supplier (l)
Customer (l,k)
Route(l,k)
Leg (i,j,id), Shipping agent
In Time?
In time?
•Network model•Degree of detail: Everything is possible!
Activity 5.2: Optimization model illustration
The routes in the current example (extension of prototype model)
• 7 Routes• 55 Distinct legs• Intermodal• Train, Ferry, Truck
•Minimizing total transport cost•Emissions and delivery time as constraints
Activity 5.2
Total Cost (SEK)
Total Time (HOURS)
Total
Emissions (CO2)
Shortage Cost (SEK)
Solution Time example
Actual shortage
10917 181 520 0 00:00:01 None
11067 178 500 0 00:00:04 None11147 170,5 400 0 00:00:07 None11378 166,5 380 0 00:00:03 None
12778 160,5 360 0 00:00:23 None10397 151,5 280 570962 00:00:40 Åbo-
Trondheim route not possible
11877 128,5 260 570962 00:00:30 Åbo- Trondheim route not possible
9005 117 240 1712886 00:02:14 Åbo- Trondheim and Stockholm. Sundsvall routes not possible
The results from the example (activity 5.2) Solution procedure (activity 5.2)
Run optimization model
Solution 1
Decrease: Allowed total time, Allowed total amount of emissions.
2 3
5+9+7
6 6
4
5+7
4
9+7
4
8
2
8
2
Visualization of the example (activity 5.2)
Red arrows is the routes choosed by the system in real time
Three transports on the same ferry filling the trucks with additional 5, 9, 7 tons respectively
Current model status (example)Current model status (example)• No uncertainty considered• Only minimizing the transport cost• But emissions and time is included as constraints• Will be integrated with the portal summer of 2011 (activity 5.1)
Activities: Current and futureActivities: Current and future• How to handle
– Uncertain transportation time – Multiple Criterias (Cost, Time, Emissions)– Considered in activity 5.3 starting in august 2011
• GUI developed so that multiple transports can be considered (not possible today, activity 5.4)
•Different transport modes!•Different routes!
Choose between routes that Choose between routes that are suffiencely different are suffiencely different (activity 5.3)(activity 5.3)
Portfolio of transport alternatives!
• Considering uncertainty in model : Less disturbances!• Yes, but disturbances can never be completly avoided !• Disturbances management therefore important – portfolio of transport portfolio of transport
alternativesalternatives!
Uncertainty included in model
Portfolio of transport alternatives
Before After
Activity 5.3
Test case development, start date (Activity 5.5)1. August 2011
Suppliers will be selected from these companies customers (case 1)
Test case nr 1
Other test cases (next slide): Discussions initiated with Finnish and norweigan partners in august 2011Reference groups will
consists of financers and the involved companies
The other possible test cases
Case 2: Special transports in Osterbotnia with Finnish partners
Case 3: A case study in Norway toghether with Norweigan partners
Case 4: Food transports in the corridor with partners from all countries
Interested actors outside the project
Rauma- Gävle ports, Route 61
Mittskandia (Umeå area)
Cooperation regarding portal devlopment
Contact have been etablished with the Transbaltic Wp 5.3 (Deployment of ICT toolbox)-Poznan, Poland
Model development in cooperation with researchers at Stockholm Univeristy (joint research group)
Required data to test the portal: Small example included in red
Exempel på vad som behövs för beräkning, programmet kan samtidigt minimera transporttid, emissioner eller transportkostnad/Example on what is required for calculations, programme can jointly optimize transporttime, emissions and transportcost
Speditörer/Shipping agents
ID_nr Start leg Destination leg Carrier Commodity Transportcapacity in mt Transportcost/mt leg distance in km Transporttime for a leg in hours1 Sundsvall Gävle Truck Bulk 15 100 200 32 Sundsvall Stockholm Train Bulk 45 200 400 53 Gävle Stockholm Truck Bulk 10 80 200 345
osv
Leverantörer/SupplierStart Route Destination Route Freightvolume in mt Commodity Earliest start of route latest delivery on route
1 Sundsvall Stockholm 10 Bulk 2011-08-22 10:00 2011-08-23 07:002 Sundsvall Stockholm 20 Bulk 2011-08-22 07:00 2011-08-22 16:00
Information
As indicated above route=leg is possible but not required in modelModel today can handle multiple transports In current model cost is minimzed given that a certain amount of CO2 and time restrictions is metMore information in the slidesThe model is general and can handle a lot of transports simultanousely as indicated in the example explained in powrpoint presentation
This is the data needed to test the current portal. Additional data can be added as needed. The model to match the transports are very general and can be extended in many directions
• First demonstration with real data planned for january 2012
• First article is under review in the scientific journal Transactions on Intelligent Transportation Systems.
• This presentation is an extension for internal use in the project of the presentation at the MCDM 2011 conference in Jyväskylä, Finland, 13-17 june 2011
Thanks for listening!Thanks for listening!