WCMS Report Web Advisory Committee April 2010. Joining the Teams WCMS and Redesign Team...

15
WCMS Report Web Advisory Committee April 2010

Transcript of WCMS Report Web Advisory Committee April 2010. Joining the Teams WCMS and Redesign Team...

Page 1: WCMS Report Web Advisory Committee April 2010. Joining the Teams WCMS and Redesign Team collaborating extensively; –In May to develop functional requirements.

WCMS Report

Web Advisory Committee

April 2010

Page 2: WCMS Report Web Advisory Committee April 2010. Joining the Teams WCMS and Redesign Team collaborating extensively; –In May to develop functional requirements.

Joining the Teams

• WCMS and Redesign Team collaborating extensively;– In May to develop functional requirements– In Phase 1 and Phase 2 to develop Uwaterloo

Main site;

Page 3: WCMS Report Web Advisory Committee April 2010. Joining the Teams WCMS and Redesign Team collaborating extensively; –In May to develop functional requirements.

Schedule

April• Meeting w/ other universities using Drupal • Obtaining additional Drupal knowledge via

conference • Developing rapid prototypes to learn about

Drupal

Page 4: WCMS Report Web Advisory Committee April 2010. Joining the Teams WCMS and Redesign Team collaborating extensively; –In May to develop functional requirements.

Schedule

May• Define and implement hardware (system

architecture) to run Drupal • Finalize web design functional

requirements specifications (with Redesign Team)

Page 5: WCMS Report Web Advisory Committee April 2010. Joining the Teams WCMS and Redesign Team collaborating extensively; –In May to develop functional requirements.

Schedule

May• Define the scope for

– Pilot website 1 - Phase 1 (Housing) – Pilot website 2 - Phase 1 (Web resources) – Pilot website 3 - Phase 1 (UWaterloo main)

• Perform thorough review of CMS requirements

Page 6: WCMS Report Web Advisory Committee April 2010. Joining the Teams WCMS and Redesign Team collaborating extensively; –In May to develop functional requirements.

Schedule

June – September• Define Drupal configuration • Develop Pilot website 1 (Housing) - Phase 1

Page 7: WCMS Report Web Advisory Committee April 2010. Joining the Teams WCMS and Redesign Team collaborating extensively; –In May to develop functional requirements.

Schedule

September 2010• Develop Pilot website 2 (Web resources) -

Phase 1

Page 8: WCMS Report Web Advisory Committee April 2010. Joining the Teams WCMS and Redesign Team collaborating extensively; –In May to develop functional requirements.

Schedule

October 2010• Develop Pilot website 3 (UWaterloo main) -

Phase 1

Page 9: WCMS Report Web Advisory Committee April 2010. Joining the Teams WCMS and Redesign Team collaborating extensively; –In May to develop functional requirements.

Schedule

November 2010• Develop Pilot website 3 (UWaterloo main) -

Phase 2

Page 10: WCMS Report Web Advisory Committee April 2010. Joining the Teams WCMS and Redesign Team collaborating extensively; –In May to develop functional requirements.

Schedule

December 2010• Develop Pilot website 1 (Housing) - Phase 2

Page 11: WCMS Report Web Advisory Committee April 2010. Joining the Teams WCMS and Redesign Team collaborating extensively; –In May to develop functional requirements.

Schedule

January 2010• Develop Pilot website 2 (Web resources) -

Phase 2

Page 12: WCMS Report Web Advisory Committee April 2010. Joining the Teams WCMS and Redesign Team collaborating extensively; –In May to develop functional requirements.

Notes

• Web Resources site chosen as pilot b/c site will provide CMS and Design Resources for the project

Page 13: WCMS Report Web Advisory Committee April 2010. Joining the Teams WCMS and Redesign Team collaborating extensively; –In May to develop functional requirements.

Notes

• Housing chosen as pilot b/c of staff on the team and b/c well-defined existing website with manageable scope

Page 14: WCMS Report Web Advisory Committee April 2010. Joining the Teams WCMS and Redesign Team collaborating extensively; –In May to develop functional requirements.

Notes

• Starting with Housing, then Web Resources and UW Main in Phase 1

• Reversing the order in Phase 2 Pilot because of time pressures to get site out

Page 15: WCMS Report Web Advisory Committee April 2010. Joining the Teams WCMS and Redesign Team collaborating extensively; –In May to develop functional requirements.

Notes

• Faculty rollout and other-sites rollout TBD– phased faculty rollout expected;– sometime after January 2011;