WBS for for Fuel Cargo Trailer (25 m3)

download WBS for for Fuel Cargo Trailer (25 m3)

of 69

Transcript of WBS for for Fuel Cargo Trailer (25 m3)

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    1/69

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    2/69

    01.01.02.02.02 Lower Turning table guide- 1 110x35X10 8

    01.01.02.02.03 Lower Turning table guide- 2 120x55X10 4

    01.01.02.02.04 Upper Turning table guide 1 120x55X10 8

    01.01.02.02.05 Upper Turning table guide 2 110x35X10 4

    01.01.02.02.06 Draw bar cover plate at front 175X94X6 1

    . . .

    01 Cutting procedure on 10 mm thickness

    01.01.03.01.01 right gusset plate at front axle 250x220x10 1

    01.01.03.01.02 left gusset plate at front axle 250x220x10 1

    01.01.03.01.03 Cover plate (Trolley) 325*160*10 2

    01.01.03.01.04 Corner Rein. (Trolley) 140X115x10 4

    01.01.03.01.05 Bottom Reinforcement (beam) 1310x130x10 2

    01.01.03.01.06 Pin guide 20*12*10 4

    01.01.03.01.07 Plate reserve wheel carrier 100*60*10 8

    01.01.03.01.08 connecting plate 80x50x10 4

    01.01.03.01.09 Draw bar cover plate at rear 304X80X6 2

    02 Cutting procedure on 8 mm thickness

    01.01.03.02.01 Vertical reinforcement rear 406x95x8 12

    01.01.03.02.02Vertical reinforcement front 184x95x8 12

    01.01.03.02.03 gusset plate at rear of rear axle 481x158x8 4

    01.01.03.02.04 Rear Suspension Cover plate 320x220x8 6

    01.01.03.02.05 Front Suspension Cover plate 320x180x8 4

    01.01.03.02.06

    front and rear beam reinforcement

    plate 114x64x8 6

    01.01.03.02.07 side beam reinforcement plate 112x74x8 6

    01.01.03.02.08 Draw bar Side frame 1928*188*8 2

    01.01.03.02.09 Cross member (L) 809*148*8 1

    01.01.03.02.10 Cross member (M) 615*148*8 101.01.03.02.11 Cross member (SH) 421*148*8 1

    01.01.03.02.12 Spring Supporting Plate 70*60*8 8

    01.01.03.02.13 Upper fixing Bracket 181x60x8 32

    01.01.03.02.14 lower fixing bracket 254x145x8 32

    Sub -total

    (01.01.03) Big shearing cutting (New)

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    3/69

    01.01.03.02.15 supporting plate 405x105x8 8

    01.01.03.02.16

    front and rear beam reinforcement

    plate 114x64x8 6

    01.01.03.02.17 side beam reinforcement plate 112x74x8 6

    01.01.03.02.18 plate for spring holer 70x60x8 1

    01.01.03.02.19 lifting plate 300x280x8 2

    01.01.03.0 Cutting procedure on 4 mm thickness

    01.01.03.03.01 Shell 7200x6820x4 1

    01.01.03.0 Cutting procedure on 6 mm thickness

    01.01.03.04.01 fixing plate 5

    01.01.03.04.02 triangular reinforcement plate 120x75x6 1201.01.03.04.03 plate at front 200x145x6 201.01.03.04.04 cover plate at rear 304x80x6 201.01.03.04.05 cover plate at front 175x94x6 101.01.03.04.06 fixing plate 105x50x6 401.01.03.04.07 reinforcement plate 340x40x6 401.01.03.04.08 Rear brake system valve support 130x100x6 1

    01.01.03.04.09 Front Air valve supporting plate 110x70x6 1

    01.01.03.04.10 rear air valve supporting plate 80x60x6 1

    01.01.03.0 Cutting Procedure on 5 mm thickness

    01.01.03.05.01 Air Cylinder Support Plate 370.59x40x5 2

    01.01.03.05.02 Rolled Plate 2258x450x6 4

    01.01.03.05.03 support -I 105x50x5 6

    01.01.03.05.04 support -II 790x50x5 4

    01.01.03.05.05 support -III 178x50x5 2

    01.01.03.0 Cutting procedure on 4 mm thickness

    01.01.03.06.01 Side Plate (Tool Box) 226x150x4

    01.01.03.06.02 Vertical Part of Bumber 384x375x401.01.03.06.03 Air Cylinder Support Beam 1060x244x4 1

    01.01.03.06.04 Internal Cross member 1st 890x254x4 1

    01.01.03.06.05 Internal Cross member 2 st 890x374x4 4

    01.01.03.06.06 Internal Cross member 3 st 890x404x4 3

    Sub -total

    Sub -total

    (01.01.03) Big shearing cutting (Old)

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    4/69

    01.01.03.06.07 External Cross Member 795x234x4 3

    01.01.03.06.08 Front Beam 2496x189x4 1

    01.01.03.06.09 Rear Beam 2500x254x4 1

    01.01.03.06.10 side reinforcment 400x217x4 2

    01.01.03.06.11 fixing plate 228x25x4 10

    01.01.03.06.12 reinforcement 91x40x4 2

    01.01.03.06.13 shell 7500x6820x4 1

    01.01.03.06.14 item-1 116x30x4 2

    01.01.03.06.15 item-2 897x30x4 2

    01.01.03.06.16 item-3 50x30x4 1

    01.01.03.06.17 locking plate 63x50x4 1

    01.01.06.0 Cutting procedure on 3 mm thickness

    01.01.06.02.01 Side Plate (Gang way) 7480x280x3 2

    01.01.06.02.02 Front & Rear sheet (Gang way) 1200x261x3 2

    01.01.06.02.03 Pannel (Chentini) 850x318x3 8

    01.01.06.0 Cutting procedure on 2 mm thickness

    01.01.06.03.01 Supporter I (Reflector) 177x20x2 1

    01.01.06.03.02 Supporter II (Reflector) 142x20x2 2

    01.01.06.03.03

    tanker) 2000*1414*2 1

    01.01.06.03.04 Top Sheeting (Reserve fuel tanker) 2000*318*2 1

    01.01.06.03.05

    tanker) 496*436*2 2

    01.01.06.03.06 Internal Pannel (Reserve fuel tanker) 494*434*2 2

    01.01.06.03.07 Junction box 403*150*2 1

    01.01.06.03.08 sheeting of Box for discharge 1254x700x2 1

    01.01.06.03.09 side sheeting 430x429x2 2

    01.01.06.03.10 frame-I 420x30x2 2

    01.01.06.03.11 frame-II 690x30x2 2

    01.01.06.03.12 rear light holder 790x510x2 2

    01.01.06.03.13 number plate 890x471x2 1

    01.01.06.03.14 cover plate 280x104x2 2

    01.01.06.03.15 cover for horizontal part of bumper 100x50x2 201.01.06.03.16 rear, top and bottom sheeting 1342x800x2 1

    01.01.06.03.17 side sheeting

    Sub -total

    (01.01.06) Activities done on small shearing

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    5/69

    01.01.06.03.18 Chequer plate 2 2

    01.01.06.03.19 Walk way plate 2 1

    01.01.07.01 Bottom Reinforcement 1310x130x10 2

    01.01.07.02 Side frame (draw bar) 1928x188x8 2

    01.01.07.03 Cross member long 834x148x8 101.01.07.04 Cross member medum 639x148x8 1

    01.01.07.05 Cross member Short 445x148x8 1

    01.01.07.06 Saddle 2180x666x6 4

    . . . rac e we e on sa e x x 32

    . . . rac e we e on ong eam x x 32

    01.01.08.03 Support I 177x20x2 1

    01.01.08.04 Support II 142x20x2 2

    01.01.08.05 Side Plate (Gang way) 7180x220x3 201.01.08.06 Front & Rear sheet (Gang way) 1200x202x3 201.01.08.07 Pannel (Chentini) 850x318x3 801.01.08.08 Internal cross member 1 888*254*4 1

    01.01.08.09 Internal cross member 2 888*374*4 4

    01.01.08.10 Internal cross member 3 888*404*4 3

    01.01.08.11 Fender 708*400*3 2

    01.01.08.12 Bottom, Rear & top sheet (Tool box) 1760*895*3 1

    01.01.08.13

    tanker) 2000*1414*2 1

    01.01.09.01 Interna Pannel (Reserve fuel) 496x434x2 2

    01.01.10.0

    01.01.10.01.01 Central suspension support1080xEx dia.=63.5 1

    01.01.10.01.02 Vertical pipe for ladder 2446x1" 201.01.10.01.03 Step Pipe ladder 300x1" 5

    01.01.10.01.04 Pipe-01 (Front) 565x4" 1

    sub-total

    (01.01.08) Activities done on small bending

    (01.01.07)Activities done on Beg Bending (New)

    (01.01.10) Activities done on band saw

    Cutting of pipes

    sub-total

    (01.01.09) Activities done on notching

    sub-total

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    6/69

    01.01.10.01.05 Pipe-02 (Front) 470.5x4" 101.01.10.01.06 Pipe-03 (Front) 2690x4" 101.01.10.01.07 Pipe-04 (Front) 750x4" 101.01.10.01.08 Pipe-01 (Rear) 160x4" 101.01.10.01.09 Pipe-02 (Rear) 700x4" 101.01.10.01.10 Pipe-03 (Rear) 500x4" 101.01.10.01.11 drainge pipe support 20x30 20

    01.01.10.01.12 Drainge pipe 60x20 2

    01.01.10.0

    01.01.10.02.01 Iter-2 (Reserve fuel carrier) 1050x60x30x6 2

    01.01.10.02.02 Iter-3 (Reserve fuel carrier) 2000x60x30x6 2

    01.01.10.02.03 Iter-4 (Reserve fuel carrier) 1022x50x25x5 2

    01.01.10.02.04 Item-5 (Reserve fuel carrier) 370x60x30x6 2

    01.01.10.02.05 Item-6 (Reserve fuel carrier) 200x60x30x6 2

    01.01.10.02.06 Item-10 (Reserve fuel carrier) 710x50x25x5 4

    01.01.10.02.07 Item-11 (Reserve fuel carrier) 950x50x25x5 2

    01.01.10.02.08 Item-12 (Reserve fuel carrier) 156x100x50x5 8

    01.01.10.02.09 Item-12 (Reserve fuel carrier) 206x100x50x5 8

    01.01.10.02.10 Item-13 (Reserve fuel carrier) 115x60x30x6 4

    01.01.10.02.11 Item-14 (Reserve fuel carrier) 85x60x30x6 4

    01.01.10.02.12 Fixing U-Profile 1 (Refuel carr ier) 156x100x50x5 8

    01.01.10.02.13 Fixing U-Profile 2 (Refuel carr ier) 206x100x50x5 8

    01.01.10.02.14Vertical supporting frame U-channel 625*60*30*6 8

    01.01.10.02.15

    Bottom reserve wheel fuel tank

    supporting frame 650*60*30*6 4

    01.01.10.02.16 hose support 212x40x20x5 8

    01.01.10.0

    01.01.10.03.01 Wheel clamp head dia. 20*275 2

    01.01.10.0

    01.01.10.04.01 Tanker un sliding support 318*40*40*4 2

    01.01.10.04.02 Angle Iron (Mounting Bracket) 70x70x7 4

    01.01.10.04.03 Angle iron (for chantini) 1558x40x40x4 4

    01.01.10.04.04 Angle iron (for chantini) 1339x40x40x4 4

    01.01.10.04.05 Locking Angle iron 40x40x40x2 2

    Cutting of u-channels

    Cutting of Rods

    Cutting of Angle Iron

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    7/69

    01.01.10.0

    01.01.10.05.01 T-Profile 6496x30x30x5 4

    01.01.10.05.02 Fuel guid 361x30x30x5 4

    01.01.11.0

    01.01.11.01.01 e rame - eam tro ey 13

    01.01.11.01.02 Cross I beam (trolley) 8*13 2

    01.01.11.01.03 I beam (platform) 8*13 2

    01.01.12.01 Lower Plate 7518x150x12 2

    01.01.12.02 External cross member 792 *234 *4 10

    01.01.12.03 Front beam 2500*304*4 1

    01.01.12.04 Rear beam 2500*250*4 1

    01.01.12.05 Rear bumper r/nt (Vertical) 384*375*4 2

    01.01.12.06 Air Cylinder Support beam 1060*244*4 1

    01.01.12.07 Reserve fuel tanker 2000*1414*2 1

    0

    01.01.12.01 Item-7 (Reseve fuel Tanker) 340x50x6 2

    01.01.12.02 Shell 7200x6820x4 1

    01.01.12.03 Rolled plate 2258x450x6 4

    01.01.12.04 T-Profile 6496x30x30x5 401.01.12.05 Fuel guid 361x30x30x5 4

    01.02.0

    1

    01.02.01.01 Gusset plate at front 250X220X10 2

    01.02.01.02 Connecting plate 100X60X10 8

    01.02.01.03

    wheel carrier 200x60X30x6 2

    01.02.01.04 Air valve support 110x70X6 1

    sub-total

    (01.01.11) Power hacksaw cutting

    Cutting of T-profile

    Cutting of I-Beams

    sub-total

    (01.01.12) Big bending bends

    Total sum of Man-Hour,(for material preparation)

    III-Work Break Down Structure for 3-Axle Fuel cargo Trailer in Machine Shop(01.02) Activities done on Machine shop

    Drilling operation

    (01.01.12) Rolling

    12

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    8/69

    01.02.01.05 Plate no support 708x400X3 2

    01.02.01.06 Rear light holder 600X490X2 2

    01.02.01.07 Junction box support 403x150x2 1

    01.02.0201.02.02.01 ow ng ye gu e x a.

    01.02.02.02 n u e us ng x a

    01.02.02.03 n u e us ng x a01.02.02.04 pacer x a

    01.02.02.05 n or raw ar x a

    2

    2

    LaborHr.

    MachineHr.

    MaterialCost

    101.03.01.01 Polish Upper & lowe plate (One side) 1

    01.03.01.02Mount on jig &Tack vertical (web) Plate withthe upper plate 2

    01.03.01.03 Tack lower Plate with the web plate 3.3401.03.01.04

    beam on turning jig for final welding 1

    01.03.01.05 Both side longitudinal beams final welding 4

    2 Plate form Tacking & Welding 11.34

    01.03.02.01

    members (check levelness for tunning tableseat) 3

    01.03.02.02 Tack internal & external cross members 2

    01.03.02.03Tack internal & external reinforcement plate (attunning table position)

    1

    Qty/unit(Pcs)

    Cost Elements

    % of Completionper station/shop

    Turning operation

    .

    16

    IV-Work Break Down Structure for 3-Axle Fuel cargo Trailer in Welding Shop

    S/N Sub-Ope.

    NameTasks Code (leve ----

    ) Task DescriptionItem dimension

    (LxWxt)Production

    Cost

    sub-total

    Total sum of Man-Hour(for Machine shop)

    Longutidinal beam Tacking & Welding

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    9/69

    01.03.02.04 Weld I-beam cross member 1

    01.03.02.05 Front beam tacking & welding 2

    01.03.02.06 Vertical reinforcement tacking & welding 1

    01.03.02.07

    plate on lower longitidunal beam (from bothside)

    0.66

    01.03.02.08Transport the frame to the next work station(using over head cran 1

    01.03.02.09 Tighten frame on turnning jig 1

    01.03.02.10 Frame final welding 5

    01.03.02.11 Drill 8 holes on lower I-beam (for turnningtable) by portable hand drill machine

    3

    01.03.02.12 Turnning table fitting with longitudinal beam 1

    01.03.02.13 Weld turnning table guide 1

    01.03.02.14 Tack & we chequered plate on plate form 16

    01.03.02.15 Tack & weld rear beam with chequer plate 401.03.02.16 Weld pumper with raer beam 2

    01.03.02.17 Weld bumper support plate (U-channel) 1

    01.03.02.18 Weld tail light support plate on raer beam 0.17

    01.03.02.19 Fit electrical junction support plate 0.17

    01.03.02.20 Flame cutting raer beam for tool box 0.5

    01.03.02.21 Tack & weld tool box with rear beam 2

    01.03.02.22 Tack & weld tool box hinges 1

    01.03.02.23 Grinding & Polishing (finishing) 2

    01.03.02.24

    chequer plate to fix brackets that ties with theshell bracket

    1

    01.03.02.25Flame cutting of 2 holes of rear beam forelectrical lines

    0.08

    01.03.02.26 Tack & weld tarffic plate number postion plate 0.34

    52.92

    3

    01.03.03.01

    beam 4

    01.03.03.02.

    external) 1

    01.03.03.03Tack & Weld connecting plate with spacer(bushing) & I-beam

    2

    Trolley Fabrication

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    10/69

    01.03.03.04.

    Side) 0.34

    01.03.03.05 Support beam tacking & welding 0.5

    01.03.03.06Support for cylinder (U-plate and rolledleaf) tacking & welding

    0.34

    01.03.03.07 Drilling hole for turning table( 8 holes)

    01.03.03.08Welding 12pcs of Turning table fitting &guide (on trolley)

    01.03.03.09 Weld Valve support Plate 0.17

    01.03.03.10 Weld chain ring on trolley

    01.03.03.11Spring fitting with chain (Bolt, nut, andwasher)

    10.02

    4

    01.03.04.01

    Ass. Front Axle (one set) & Rear Axle(two

    set) with Leaf spring & Tighten with "U"bolt (chek for levelness & digonals)

    16

    01.03.04.02Ass. Front & Rear suspension supportwith Axle (Temporarly tack with bars)

    4

    01.03.04.03Mount Trolley on front Axle and weld withSuspension

    8

    01.03.04.04Mount frame on Trolley and welding &bolting

    8

    01.03.04.05Tack & weld Gusset plate on suspension(6 pcs)

    2

    01.03.04.06 Weld vertical reinforcemnt (12 pcs) 6

    01.03.04.07Weld Mechanical hand break support onsuspension

    0.17

    44.17

    5 Draw Bar Fabrication

    01.03.05.01Tack Drawbar frame & front bushing fortowing eye

    1

    01.03.05.02Tack drawbar cross members(short,midium & long)

    1

    01.03.05.03 Tack & weld bushing for drawbar (rearside)

    1.5

    01.03.05.04Tack upper and lower cover plate at front(boths side)

    0.67

    Axle Assembly with trolley & Frame

    1.5

    0.17

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    11/69

    01.03.05.05 Tack & weld cover plate at front& rear 2

    01.03.05.06Tack & Weld Triangular plate (on eachcross member)

    1

    01.03.05.07 Chain supporting ring welding (Right side) 10

    01.03.05.08 Final polishing of drawbar 0.34

    17.51

    6

    01.03.06.01

    for tire) 0.75

    01.03.06.02 Grind the flame cut L.B. 1

    01.03.06.03

    ( 3x2x2=12pcs) 2

    01.03.06.04 ss. raw ar we p n gu 1.5

    01.03.06.05 mec an ca an rea s 0.75

    6

    7

    01.03.07.01 e s ape anne s pcs 2

    01.03.07.02 e cross mem ers r e p a es 0.25

    01.03.07.03

    s ruc ure 6

    8.25

    8 Fabrication of Reserve Fuel Tancker

    01.03.08.01Position,Tack & weld Partision (internal &side) with body 1

    01.03.08.02 Tack & Weld Top,side Cover Plate 6

    01.03.08.03 Weld in-let Pipe & Discharge (out-let)Pipe 6

    13

    9 Fabrication of Reserve Fuel Tanker Support

    01.03.09.01 Weld U channel with Plate 1

    01.03.09.02 Weld the support with Structuer & bolted 1.5

    2.5

    10

    01.03.10.01 Weld tool box 6

    6

    Fabrication of Tool Box

    Tyre Fitting & Assembly of draw bar

    Fabrication of reserve wheel carrier support

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    12/69

    11

    01.03.11.01Rectify Oval ring to required shape byhummer 4.67

    01.03.11.02Tack the Rein. Angle Iron & drainage Halfring with oval ring 4

    01.03.11.03Weld the connecting joint (after removingfrom the jig)

    1.3310

    12 Fabrication of Shell

    01.03.12.01Floor Sheet metal welding (L=3000,3000& 1500) 15

    01.03.12.02Internal Structure(Chentini & Support)fitting 6

    01.03.12.03 Centeral Dome fitting In shell seg. L=1500 2

    01.03.12.04 Shell segment Ass. (Three Segment) 10

    01.03.12.05

    weld (continous) 24

    01.03.12.06 Man-hole marking & Cutting (Two Hole) 0.5

    01.03.12.07oo va ve oe mar ng cu ng wo

    Hole) 0.5

    01.03.12.08 Baffle fitting & welding (Stagered welding) 12

    01.03.12.09

    Rear) 20

    01.03.12.10Upper flange (foot valve) tacking &welding (from external) 1

    01.03.12.11Rolled Plate tacking & weld on Shell (atfour Position) 4

    01.03.12.12

    Saddle positioning, tacking & welding (at

    same position) 30

    01.03.12.13Tack & weld upper fixing bracket ( 8 pcsper each (4)Saddel) 9

    01.03.12.14ec anca r v ng oe ame cu ng a

    top Position) 0.33

    01.03.12.15 Mechanical driving welding 0.41

    01.03.12.16 Welding manhole ring(Cercumferencial) 2

    01.03.12.17 Weld Hook for handling/Lifting ( 2 pcs) 0.5

    01.03.12.18Reflector support(3) cut & weld (at theback) 0.5

    137.713 Gang Way (walk way) Welding

    Chentini Preparation (4 pcs)

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    13/69

    01.03.13.01 Tacking of Side sheet & weld (Emperial) 10

    01.03.13.02Front and rear sheet tack & weld(Emperial)

    01.03.13.03 Tacking & Welding of woking way

    12

    14 01.03.14.01 Mount the vertical pipe on the jig

    01.03.14.02

    with the vertical pipe

    01.03.14.03

    vertical pipe

    01.03.14.04 Final weld

    0.5

    15

    01.03.15.01 Fixing Bracket (Bottom) welding 14

    01.03.15.02Bolting bracket with washer,bolt & nut 7

    01.03.15.03Rein. ( Stopper) welding with main chassis 1 348.1

    01.03.15.04 Ladder Fitting 6

    28

    16

    01.03.16.01 discharge box tacking

    01.03.16.02 discharge box final welding

    01.03.16.03discharge Box fitting with the aid of boltsand nuts

    01.03.16.04Welding of flange on pipe-1 & Pipe-2 onboth front & rear discharging pipes. 1

    01.03.16.05Putting the pipes on jig,tacking & weldingof pipe-01 & 03 with pipe-02 (Both front &rare discharging pipe) 0.3

    1.3

    17

    01.03.17.01 Preparation work 1.34

    Ladder Fabrication

    Shell Mounting & Ladder Fitting

    Water Test

    Discharge preparation

    2

    0.5

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    14/69

    01.03.17.02 Filling water ( in front Half) 3

    01.03.17.03 Checking for leakage (first half) 0.42

    01.03.17.04 Filling water ( in front Half) 3

    01.03.17.05 Checking for leakage (second half) 0.42

    01.03.17.06 Water Discharging ( for both section) 6

    1

    01.04.01.01 Polishing with Sand paper 24

    01.04.01.02 Washing 12

    01.04.01.03 Anti Rust Painting 1.5

    2

    01.04.02.01 Smoothing the Shell by Hummering 15

    3

    01.04.03.01 Washing 2.33

    01.04.03.02 Stucco Per Metal Painting 30

    01.04.03.03

    Polishing metal stucco with water proof

    sand paper 22.401.04.03.04 Washing with water proof sand paper 2.42

    01.04.03.05Sprusso Painting (Propersional ratio1:2:6) 0.5

    01.04.03.06 Normal Stucco Painting 10

    01.04.03.07 Washing normal Stucco 11.8

    01.04.03.08Nitro-synthetic Painting (for Identifingerror) 1.15

    01.04.03.09 First final painting(Shell) 2.5

    01.04.03.10 Second Final painting(Chassis) 17.4

    153

    Task Description

    Item

    dimension(LxWxt)

    Qty/unit

    (Pcs)

    Cost Elements Production

    Cost

    % of Completion

    per station/shop

    Rectification

    Final Painting

    Anti Rust Painting

    V-Work Break Down Structure for 3-Axle Fuel cargo Trailer in Painting Shop

    S/N

    Sub-Ope.

    Name

    Tasks Code (leve ----

    )

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    15/69

    1

    01.05.01.01

    Mounting of breaking chamber type 30 on

    1stAxle ( Contains:-break lever,coil spring& small yoke) 0.33

    01.05.01.02

    Mounting of breaking chamber type 24 on

    middleAxle ( Contains:-break lever,coil

    spring & longer yoke) 0.33

    01.05.01.03

    Mounting of breaking chamber type 24 on

    rearAxle ( Contains:-break lever,coilspring & longer yoke) 0.33

    01.05.01.04Assembly of emergency rely with loadvalve ( fitting elbow, nipple & "T"distributor) 0.5

    01.05.01.05 Mounting emergency rely on Trailer 0.1701.05.01.06 Mounting air reservoir tanker on support 0.67

    01.05.01.07

    Installation of hose with itsconnectors(#1=out let,#2(right)=fits to

    front axle break chamber, #2 (left)fits tomiddle axle then to rear axle,#3(large )fits to air reservoir tanker & #4=inlet 0.83

    01.05.01.08 Fitting of 3 way & 4 way hose 0.33

    01.05.01.09Connecting Steel cable with mechanicalhand break & break lever at rear axle

    0.5

    01.05.01.10Fitting red & yellow break coils with thesame colour of coupling head(Inlet=yellow,Outlet=red) 0.33

    4.322 ELECTRICAL INSTALLATION

    % of Completion

    per station/shopTask Description

    Item

    dimension(LxWxt)

    Qty/unit

    (Pcs)

    Cost Elements

    PNEUMATIC (AIR BREAKING)SYSTEM

    V-Work Break Down Structure for 3-Axle Fuel cargo Trailer in Finishing Shop

    S/N

    Sub-Ope.

    Name

    Tasks Code (leve ----

    )

    Production

    Cost

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    16/69

    01.05.02.01Fixing junction box with screws on rearlongitudinal beam 0.33

    01.05.02.02Installing Seven lines electrical Cable from

    junction box to a driver 0.25

    01.05.02.03Fitting protection grid & parking light onrear beam 0.33

    01.05.02.04

    Connecting the junction box's cables to

    parking light,plate number light(squarecable) & side Light 0.5

    01.05.02.05 Fitting Lights(Plate light,side light) 0.33

    1.74

    3 OTHER MECHANICAL WORKS

    01.05.03.01oun ng o ose ous ng ase p pe

    housing support holder 1.33

    01.05.03.02 Hose fitting( Reducer & hose with clamp) 0.5

    01.05.03.03 Drilling & Riveting by 4.5mm for rivetingrectangular,circular & triangular reflector 0.83

    01.05.03.04on ng u er w g ue or suppor ng

    Reserve fuel tanker 3

    01.05.03.05 Fitting gate-valve with nipples 0.17

    01.05.03.06Fitting Chain with gate of discharge pipering 0.83

    01.05.03.07 Mounting reserve tyre 0.33

    01.05.03.08Fitting Man hole cover( Rubber seal &ring) 0.67

    01.05.03.09 Fitting Mud gurd rubber 1

    01.05.03.10Fitting "MIE-Mekelle" logo on top of thetanker 0.5

    9.16

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    17/69

    % of Completion

    per station Total

    : of

    WP-14-10

    ent No.

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    18/69

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    19/69

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    20/69

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    21/69

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    22/69

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    23/69

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    24/69

    % of Completion

    per station Total

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    25/69

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    26/69

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    27/69

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    28/69

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    29/69

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    30/69

    % of Completion

    per station Total

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    31/69

    % of Completion

    per station Total

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    32/69

    Form No:WF/

    Product Name: Fuel Cargo Trailer Station Name:Pantograph Ma

    Product Code:04

    Laborcost/Unit

    Machinecost/unit.

    MaterialCost/unit

    04.01.01.01 Cutting procedure on 12 mm thickness

    04.01.01.012.01 Connecting plate 370x325x12 4

    04.01.01.02 Cutting procedure on 10 mm thickness

    04.01.01.02.01 Lower Turning table guide- 1 110x35X10 8

    04.01.01.02.02 Lower Turning table guide- 2 120x55X10 4

    04.01.01.02.03 Upper Turning table guide 1 120x55X10 8

    04.01.01.02.04 Upper Turning table guide 2 110x35X10 4

    04.01.01.03 Cutting procedure on 8 mm thickness04.01.01.03.01 Web plate 7490X385X6 2

    04.01.01.04 Cutting procedure on 6 mm thickness

    04.01.01.04.01 Draw bar cover plate at front 175X94X6 2

    04.01.01.04.02 Saddle 2180x666x6 4

    04.01.01.05 Cutting procedure on 3 mm thickness

    04.01.01.05.01 Baffle 1538x955x3 8

    04.01.01.01 Rolled Plate 2257x450x6 4

    04.01.01.02 Baffle 1538x955x3 8

    PageTitle of document:Procedure for Process planning

    mSFN x!NSTL x!n!NNG `.yt.yG.k#N

    Mesfin Industrial Engineering PLC

    Issue no.02

    MIE-QMS

    Docum

    Shop Code:04.01 Station Code:04.01.01

    Semi-Automatic flame cutting

    sub-total

    Shop:Material Preparation

    Task Description

    % of

    Completion per

    station/shop

    (04.01.01) Pantograph cutting

    S/N

    Sub-Ope.

    Name

    Tasks Code

    (leve ----)

    Produ. Cost

    Item dimension

    (LxWxt)

    Qty/unit

    (in Pcs)

    Cost Elements

    (04.01.01) Manual Flame Cutting

    Cost Elements

    Work Break Down Structure

    Prepared By:- Atakelti G.Sign:-_______________

    checked by:- Gizaw B.Sign:-______________

    Approved By:-Nicodemos A.sign:-___________________

    http://localhost/var/www/apps/conversion/tmp/scratch_1//Administrator/abrahaa/Application%20Data/Microsoft/QA%2002%20001.dochttp://localhost/var/www/apps/conversion/tmp/scratch_1//Administrator/abrahaa/Application%20Data/Microsoft/QA%2002%20001.doc
  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    33/69

    Laborcost/Unit

    Machinecost/unit.

    MaterialCost/unit

    04.02.02.01 04.01.02.02.01 Web plate 7490X385X6 2

    04.01.02.02.02 Connecting plate 370x325x12 4

    04.01.02.02.03 Lower Turning table guide- 1 110x35X10 8

    04.01.02.02.04 Lower Turning table guide- 2 120x55X10 4

    04.01.02.02.05 Upper Turning table guide 1 120x55X10 8

    04.01.02.02.06 Upper Turning table guide 2 110x35X10 4

    04.01.02.02.07 Draw bar cover plate at front 175X94X6 1

    04.01.03.01

    04.01.03.01.01 right gusset plate at front axle 250x220x10 1

    04.01.03.01.02 left gusset plate at front axle 250x220x10 1

    04.01.03.01.03 Cover plate (Trolley) 325*160*10 2

    04.01.03.01.04 Corner Rein. (Trolley) 140X115x10 4

    04.01.03.01.05 Bottom Reinforcement (beam) 1310x130x10 2

    04.01.03.01.06 Pin guide 20*12*10 4

    04.01.03.01.07 Plate reserve wheel carrier 100*60*10 8

    04.01.03.01.08 connecting plate 80x50x10 4

    04.01.03.01.09 Draw bar cover plate at rear 304X80X6 2

    04.01.03.02

    04.01.03.02.01 Vertical reinforcement rear 406x95x8 12

    04.01.03.02.02 Vertical reinforcement front 184x95x8 12

    04.01.03.02.03 gusset plate at rear of rear axle 481x158x8 4

    04.01.03.02.04 Rear Suspension Cover plate 320x220x8 6

    04.01.03.02.05 Front Suspension Cover plate320x180x8 4

    04.01.03.02.06

    front and rear beam reinforcement

    plate 114x64x8 6

    (04.01.02) Rectification and Grinding

    S/N

    Sub-Ope.

    Name

    sub-total

    Tasks Code

    (leve ----) Task Description

    Item dimension

    (LxWxt)

    (04.01.03) Big shearing cutting (New)

    % of

    Completion per

    station/shop

    Cutting procedure on 8 mm thickness

    Qty/unit

    (in Pcs)Production

    Cost

    Cutting procedure on 10 mm thickness

    Prepared By:- Atakelti G.Si

    checked by:- Gizaw B.Si

    Approved By:-Nicodemos A.i

    04 01 03 02 07 side beam reinforcement plate 112 8 6

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    34/69

    04.01.03.02.07 side beam reinforcement plate 112x74x8 6

    04.01.03.02.08 Draw bar Side frame 1928*188*8 2

    04.01.03.02.09 Cross member (L) 809*148*8 1

    04.01.03.02.10 Cross member (M) 615*148*8 1

    04.01.03.02.11 Cross member (SH) 421*148*8 1

    04.01.03.02.12 Spring Supporting Plate 70*60*8 8

    04.01.03.02.13 Upper fixing Bracket 181x60x8 32

    04.01.03.02.14 lower fixing bracket 254x145x8 32

    04.01.03.02.15 supporting plate 405x105x8 8

    04.01.03.02.16

    front and rear beam reinforcement

    plate 114x64x8 6

    04.01.03.02.17 side beam reinforcement plate 112x74x8 6

    04.01.03.02.18 plate for spring holer 70x60x8 1

    04.01.03.02.19 lifting plate 300x280x8 2

    04.01.03.03

    04.01.03.03.01 Shell 7200x6820x4 1

    04.01.03.04

    04.01.03.04.01 fixing plate 5

    04.01.03.04.02 triangular reinforcement plate 120x75x6 1204.01.03.04.03 plate at front 200x145x6 204.01.03.04.04 cover plate at rear 304x80x6 204.01.03.04.05 cover plate at front 175x94x6 1

    04.01.03.04.06 fixing plate 105x50x6 404.01.03.04.07 reinforcement plate 340x40x6 404.01.03.04.08 Rear brake system valve support 130x100x6 1

    04.01.03.04.09 Front Air valve supporting plate 110x70x6 1

    04.01.03.04.10 rear air valve supporting plate 80x60x6 1

    04.01.03.05

    04.01.03.05.01 Air Cylinder Support Plate 370.59x40x5 2

    04.01.03.05.02 Rolled Plate 2258x450x6 4

    04.01.03.05.03 support -I 105x50x5 6

    04.01.03.05.04 support -II 790x50x5 4

    (01.01.03) Big shearing cutting (Old)

    sub-total

    sub-total

    Cutting procedure on 6 mm thickness

    Cutting procedure on 4 mm thickness

    Cutting Procedure on 5 mm thickness

    Prepared By:- Atakelti G.Sign:-

    checked by:- Gizaw B.Sign:-

    Approved By:-Nicodemos A.sign:-

    04 01 03 05 05 support -III 178x50x5 2

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    35/69

    04.01.03.05.05 support III 178x50x5 2

    04.01.03.06

    04.01.03.06.01 Side Plate (Tool Box) 226x150x4

    04.01.03.06.02 Vertical Part of Bumber 384x375x4 2

    04.01.03.06.03 Air Cylinder Support Beam 1060x244x4 1

    04.01.03.06.04 Internal Cross member 1st 890x254x41

    04.01.03.06.05 Internal Cross member 2 st 890x374x4 4

    04.01.03.06.06 Internal Cross member 3 st 890x404x4 3

    04.01.03.06.07 External Cross Member 795x234x4 3

    04.01.03.06.08 Front Beam 2496x189x4 1

    04.01.03.06.09 Rear Beam 2500x254x4 1

    04.01.03.06.10 side reinforcment 400x217x4 2

    04.01.03.06.11 fixing plate 228x25x4 10

    04.01.03.06.12 reinforcement 91x40x4 2

    04.01.03.06.13 shell 7500x6820x4 1

    04.01.03.06.14 item-1 116x30x4 2

    04.01.03.06.15 item-2 897x30x4 2

    04.01.03.06.16 item-3 50x30x4 1

    04.01.03.06.17 locking plate 63x50x4 1

    04.01.06.02

    04.01.06.02.01 Side Plate (Gang way) 7480x280x3 2

    04.01.06.02.02 Front & Rear sheet (Gang way) 1200x261x3 2

    04.01.06.02.03 Pannel (Chentini) 850x318x3 8

    04.01.06.02.04 Hose housing 423x40x3 8

    04.01.06.03

    04.01.06.03.01 Supporter I (Reflector) 177x20x2 1

    04.01.06.03.02 Supporter II (Reflector) 142x20x2 2

    04.01.06.03.03

    tanker) 2000*1414*2 1

    04.01.06.03.04 Top Sheeting (Reserve fuel tanker) 2000*318*2 1

    04.01.06.03.05

    tanker) 496*436*2 2

    sub-total

    (04.01.06) Activities done on small shearingCutting procedure on 3 mm thickness

    Cutting procedure on 2 mm thickness

    Cutting procedure on 4 mm thickness

    sub-total

    sub-total

    Prepared By:- Atakelti G.Sign:-_______________

    checked by:- Gizaw B.Sign:-______________

    Approved By:-Nicodemos A.sign:-___________________

    Internal Pannel (Reserve fuel

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    36/69

    04.01.06.03.06

    Internal Pannel (Reserve fuel

    tanker) 494*434*2 2

    04.01.06.03.07 Junction box 403*150*2 1

    04.01.06.03.08 sheeting of Box for discharge 1254x700x2 1

    04.01.06.03.09 side sheeting 430x429x2 2

    04.01.06.03.10 frame-I 420x30x2 2

    04.01.06.03.11frame-II 690x30x2 2

    04.01.06.03.12 rear light holder 790x510x2 2

    04.01.06.03.13 number plate 890x471x2 1

    04.01.06.03.14 cover plate 280x104x2 2

    04.01.06.03.15 cover for horizontal part of bumper 100x50x2 2

    04.01.06.03.16 rear, top and bottom sheeting 1342x800x2 1

    04.01.06.03.17 side sheeting

    04.01.06.03.18 Chequer plate 7880x892x2+2 2

    04.01.06.03.19 Walk way plate 6320x388x2+2 1

    04.01.07.01 Internal Pannel (Reserve fuel) 496x434x2 2

    04.01.08.01

    04.01.08.01.01 Central suspension support 1080xEx dia. =63.5 104.01.08.01.02 er ca p pe or a er x

    04.01.08.01.03 Step Pipe ladder 300x1" 5

    04.01.08.01.04 Pipe-01 (Front) 565x4" 104.01.08.01.05 Pipe-02 (Front) 470.5x4" 104.01.08.01.06 Pipe-03 (Front) 2690x4" 104.01.08.01.07 Pipe-04 (Front) 750x4" 104.01.08.01.08 Pipe-01 (Rear) 160x4" 104.01.08.01.09 Pipe-02 (Rear) 700x4" 104.01.08.01.10 Pipe-03 (Rear) 500x4" 104.01.08.01.11 drainge pipe support 20x30 20

    04.01.08.01.12 Drainge pipe 60x20 2

    sub-total

    Cutting of pipes

    sub-total

    (04.01.07) Activities done

    Cost Elements

    (04.01.08) Activities done

    sub-total

    Prepared By:- Atakelti G.Sign:-_______________

    checked by:- Gizaw B.Sign:-______________

    Approved By:-Nicodemos A.sign:-___________________

    Labor Machine Material% of

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    37/69

    Laborcost/Unit

    Machinecost/unit.

    MaterialCost/unit

    04.01.08.02

    04.01.08.02.01 Iter-2 (Reserve fuel carrier) 1050x60x30x6 2

    04.01.08.02.02 Iter-3 (Reserve fuel carrier) 2000x60x30x6 2

    04.01.08.02.03 Iter-4 (Reserve fuel carrier) 1022x50x25x5 2

    04.01.08.02.04 Item-5 (Reserve fuel carrier) 370x60x30x6 204.01.08.02.05 Item-6 (Reserve fuel carrier) 200x60x30x6 2

    04.01.08.02.06 Item-10 (Reserve fuel carrier) 710x50x25x5 4

    04.01.08.02.07 Item-11 (Reserve fuel carrier) 950x50x25x5 2

    04.01.08.02.08 Item-12 (Reserve fuel carrier) 156x100x50x5 8

    04.01.08.02.09 Item-12 (Reserve fuel carrier) 206x100x50x5 8

    04.01.08.02.10 Item-13 (Reserve fuel carrier) 115x60x30x6 4

    04.01.08.02.11 Item-14 (Reserve fuel carrier) 85x60x30x6 4

    04.01.08.02.12 Fixing U-Profile 1 (Refuel carrier) 156x100x50x5 8

    04.01.08.02.13 Fixing U-Profile 2 (Refuel carrier) 206x100x50x5 8

    04.01.08.02.14

    channel 625*60*30*6 8

    04.01.08.02.15Bottom reserve w ee ue tan

    supporting frame 650*60*30*6 4

    04.01.08.02.16 hose support 212x40x20x5 8

    04.01.08.03

    04.01.08.03.01 Wheel clamp head dia. 20*275 2

    04.01.08.04

    04.01.08.04.01 Tanker un sliding support 318*40*40*4 2

    04.01.08.04.02 Angle Iron (Mounting Bracket) 70x70x7 4

    04.01.08.04.03 Angle iron (for chantini) 1558x40x40x4 4

    04.01.08.04.04 Angle iron (for chantini) 1339x40x40x4 4

    04.01.08.04.05 Locking Angle iron 40x40x40x2 2

    04.01.08.05

    04.01.08.05.01 T-Profile 6496x30x30x5 404.01.08.05.02 Fuel guid 361x30x30x5 4

    Cutting of Rods

    sub-total

    Cutting of u-channels

    Cutting of Angle Iron

    sub-total

    Completion per

    station/shopS/N

    Sub-Ope.

    Name

    Tasks Code

    (leve ----) Task Description

    Item dimension

    (LxWxt)

    Qty/unit

    (in Pcs)Production

    Cost

    sub-total

    Cutting of T-profile

    Prepared By:- Atakelti G.Sign:-_______________

    checked by:- Gizaw B.Sign:-______________

    Approved By:-Nicodemos A.sign:-___________________

    sub-total

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    38/69

    04.01.09.01

    04.01.09.01.01 S e rame I- eam tro ey 1500*160*160*8*13 2

    04.01.09.01.02 Cross I beam (trolley) 13 2

    04.01.09.01.03 I beam (platform) 13 2

    400 684.93 56901 57986.3

    04.01.10.01 Lower Plate 7940x200x15 2

    04.01.10.02 Vertical Part of Bumber 384x375x4 2

    04.01.10.03 Air Cylinder Support Beam 1060x244x4 1

    04.01.10.04 Internal Cross member 1st 890x254x4 1

    04.01.10.05 Internal Cross member 2 st 890x374x4 4

    04.01.10.06 Internal Cross member 3 st 890x404x4 3

    04.01.10.07 External Cross Member 795x234x4 3

    04.01.10.08 Front Beam 2496x189x4 1

    04.01.10.09 Rear Beam 2500x254x4 1

    04.01.10.10 Reserve fuel tanker 2000*1414*2 1

    04.01.11.01 Bottom Reinforcement 1310x130x10 2

    04.01.11.02 Side frame (draw bar) 1928x188x8 2

    04.01.11.03 Cross member long 834x148x8 1

    04.01.11.04 Cross member medum 639x148x8 1

    04.01.11.05 Cross member Short 445x148x8 1

    04.01.11.06 Upper fixing Bracket 181x60x8 3204.01.11.07 lower fixing bracket 254x145x8 32

    04.01.11.08 Saddle 2180x666x6 4

    04.01.11.09 cover plate at rear 304x80x6 2

    04.01.12.03 Support I 177x20x2 1

    04.01.12.04 Support II 142x20x2 2

    04.01.12.05 Side Plate (Gang way) 7180x220x3 2

    (04.01.12) Activities done on small bending

    Cutting of I-Beams

    Total Production Cost of Cutting Process (Birr)

    sub-total

    (04.01.11)Activities done on Big Bending (New)

    (04.01.10) Big bending

    (04.01.09) Power hacksaw

    Prepared By:- Atakelti G.Sign:-_______________

    checked by:- Gizaw B.Sign:-______________

    Approved By:-Nicodemos A.sign:-___________________

    04.01.12.06 Front & Rear sheet (Gang way) 1200x202x3 204 01 12 07 P l (Ch ti i)

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    39/69

    04.01.12.07 Pannel (Chentini) 850x318x3 804.01.12.08 Internal cross member 1 888*254*4 1

    04.01.12.09 Internal cross member 2 888*374*4 4

    04.01.12.10 Internal cross member 3 888*404*4 3

    04.01.12.11 Fender 708*400*3 2

    04.01.12.12

    Bottom, Rear & top sheet (Tool

    box) 1760*895*3 104.01.12.13

    fuel tanker) 2000*1414*2 1

    475 936.3 59117 60528.3

    04.01.13.01 Item-7 (Reseve fuel Tanker) 340x50x6 2

    04.01.13.02 Shell 7200x6820x4 1

    04.01.13.03 Rolled plate 2258x450x6 4

    04.01.13.04 T-Profile 6496x30x30x5 4

    04.01.13.05 Fuel guid 361x30x30x5 4

    04.01.13.06 Hose housing 423x40x3 8775 1163.8 61232 63171

    04.02.01

    04.02.01.01 Gusset plate at front 250X220X10 2

    04.02.01.02 Connecting plate 100X60X10 8

    04.02.01.03

    (Reserve wheel carrier 200x60X30x6 2

    04.02.01.04 Air valve support 110x70X6 1

    04.02.01.05 Plate no support 708x400X3 2

    04.02.01.06 Rear light holder 600X490X2 2

    04.02.01.07 Junction box support 403x150x2 1

    04.02.01.08 ow ng ye gu e x a.

    04.02.0204.02.02.01 ow ng ye gu e x a.

    04.02.02.02 n u e us ng x a

    Drilling operation

    (04.02) Activities done on Machine shop

    (04.01.13) Rolling

    Total Production Cost of Rolling Process (Birr)

    Turning operation

    III-Work Break Down Structure for 3-Axle Fuel cargo Trailer in Machine Shop

    Total Production Cost of Bending Process (Birr)

    Prepared By:- Atakelti G.Sign:-_______________

    checked by:- Gizaw B.Sign:-______________

    Approved By:-Nicodemos A.sign:-___________________

    04.02.02.03 n u e us ng x a

    04 02 02 04 pacer x a

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    40/69

    04.02.02.04 pacer x a

    04.02.02.05 n or raw ar x a

    775 1164 63347 65286

    Laborcost/Unit

    Machinecost/unit.

    MaterialCost/unit

    1

    04.03.01.01 Polish Upper & lowe plate (One side)

    04.03.01.02Mount on jig &Tack vertical (web) Platewith the upper plate

    04.03.01.03 Weld vertical reinforcemnt (12 pcs)04.03.01.04 Tack lower Plate with the web plate04.03.01.05

    beam on turning jig for final welding

    04.03.01.06 Both side longitudinal beams final welding

    975 1229 65462 67666

    2

    04.03.02.01Tack longitudinal beam & I-beam crossmembers (check levelness for tunningtable seat)

    04.03.02.02 Tack internal & external cross members

    04.03.02.03Tack internal & external reinforcementplate (at tunning table position)

    04.03.02.04 Weld I-beam cross member

    04.03.02.05 Front beam tacking & welding

    04.03.02.06 Vertical reinforcement tacking & welding

    04.03.02.07Tack & weld bottom (lower) reinforcementplate on lower longitidunal beam (from bothside)

    04.03.02.08

    Transport the frame to the next work

    station (using over head cran

    Longutidinal beam Tacking & Welding

    Task Description

    Total Production Cost for Material Preparation (Birr)

    IV-Work Break Down Structure for 3-Axle Fuel Cargo Trailer in Welding Shop

    Sub-Ope.

    Name

    Tasks Code (leve ----

    )S/N

    Productio

    n Cost

    Cost Elements

    % of

    Completion per

    station/shop

    Qty/unit

    (Pcs)

    Total Production cost of Longutidinal beam Tacking & Welding

    Item dimension

    (LxWxt)

    Frame Tacking & Welding

    Prepared By:- Atakelti G.Sign:-_______________

    checked by:- Gizaw B.Sign:-______________

    Approved By:-Nicodemos A.sign:-___________________

    04.03.02.09 Tighten frame on turnning jig

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    41/69

    04.03.02.10 Frame final welding

    04.03.02.11 Drill 8 holes on lower I-beam (for turnningtable) by portable hand drill machine

    04.03.02.12 Turnning table fitting with longitudinalbeam

    04.03.02.13 Weld turnning table guide

    04.03.02.14Tack & we chequered plate on plate form

    04.03.02.15 Tack & weld rear beam with chequer plate

    04.03.02.16 Weld pumper with raer beam

    04.03.02.17 Weld bumper support plate (U-channel)

    04.03.02.18Weld tail light support plate on raer beam

    04.03.02.19 Fit electrical junction support plate

    04.03.02.20 Flame cutting rear beam for tool box

    04.03.02.21Slotting (using flame cutting) the framechequer plate to fix brackets that ties withthe shell bracket

    04.03.02.22Flame cutting of 2 holes of rear beam forelectrical lines

    04.03.02.23Tack & weld tarffic plate number postionplate

    1095 1294.2 66727 69116

    3

    04.03.03.01Tack & Weld Side I-beam and cross I-beam

    04.03.03.02Tack & Weld Vertical rein.plate (fromexternal)

    04.03.03.03Tack & Weld connecting plate withspacer (bushing) & I-beam

    04.03.03.04Tack & Weld corner rein. (from internal

    Side)04.03.03.05 Support beam tacking & welding

    Trolley Fabrication

    Total Production cost of Longutidinal beam Tacking & Welding

    Prepared By:- Atakelti G.Sign:

    checked by:- Gizaw B.Sign:

    Approved By:-Nicodemos A.sign:

    04.03.03.06Support for cylinder (U-plate and rolledleaf) tacking & welding

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    42/69

    leaf) tacking & welding

    04.03.03.07 Drilling hole for turning table( 8 holes)

    04.03.03.08Welding 12pcs of Turning table fitting &guide (on trolley)

    04.03.03.09 Weld Valve support Plate

    04.03.03.10 Weld chain ring on trolley

    04.03.03.11Spring fitting with chain (Bolt,nut, and washer)

    1195 1326.8 68842 71364.1 71364.05

    4

    04.03.04.01

    Ass. Front Axle (one set) & RearAxle(two set) with Leaf spring &Tighten with "U" bolt (chek forlevelness & digonals)

    04.03.04.02Ass. Front & Rear suspension support

    with Axle (Temporarly tack with bars)

    04.03.04.03Mount Trolley on front Axle and weldwith Suspension

    04.03.04.04Mount frame on Trolley and welding &bolting

    04.03.04.05Tack & weld Gusset plate onsuspension (6 pcs)

    04.03.04.06 Weld vertical reinforcemnt (12 pcs)

    04.03.04.07Weld Mechanical hand break supporton suspension

    1445 1408.3 143702 146555

    5

    04.03.05.01 Weld "L" shape U-Channels( 4 pcs)

    04.03.05.02 Weld cross members(Drilled plates)

    04.03.05.03Weld Reserve Wheel carrier supportwith structure

    04.03.05.04 Weld U channel with Plate

    Axle Assembly with trolley & Frame

    Total Production Cost of Trolley Fabrication

    Total Production Cost of Axle Assembling

    Fabrication of reserve wheel carrier support

    Prepared By:- Atakelti G.Sign:-_______________

    checked by:- Gizaw B.Sign:-______________

    Approved By:-Nicodemos A.sign:-___________________

    04.03.05.05Weld the support with Structuer &bolted

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    43/69

    bolted

    6

    04.03.06.01Position,Tack & weld Partision (internal& side) with body

    04.03.06.02 Tack & Weld Top,side Cover Plate

    04.03.06.03 Weld in-let Pipe & Discharge (out-let)Pipe

    7

    04.03.07.01 Weld tool box

    04.03.07.02

    weld Top,Rear and bottom sheeing withside sheeting by maintaing its alignmentwith each other

    04.03.07.03 Weld the tool box door to the bottomsheeting with an aid of Hinges.

    04.03.07.04 weld angle iron -1 with Angle iron-2 .ensure perpendicularity (2pcs)

    04.03.07.05 weld the reinforcement plate to both angleirons .

    04.03.07.06

    beam maintaing the 220mm from rearbeam and808mm from each other.

    04.03.07.07weld the already welded angle irons to thesupporting plates

    04.03.07.08 Assemble the the tool box with the toolbox frame with an aid of bolts and nuts

    8

    04.03.08.01Tack Drawbar frame & front bushingfor towing eye

    04.03.08.02Tack drawbar cross members(short,midium & long)

    04.03.08.03

    Tack & weld bushing for drawbar (rear

    side)

    Fabrication & Assembly of Tool Box

    sub-total

    sub-total

    Fabrication of Reserve Fuel Tanker

    Draw Bar Fabrication

    Prepared By:- Atakelti G.Sign:-_______________

    checked by:- Gizaw B.Sign:-______________

    Approved By:-Nicodemos A.sign:-___________________

    04.03.08.04Tack upper and lower cover plate atfront (boths side)

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    44/69

    04.03.08.05 Tack & weld cover plate at front& rear

    04.03.08.06Tack & Weld Triangular plate (on eachcross member)

    04.03.08.07Chain supporting ring welding (Rightside)

    04.03.08.08 Final polishing of drawbar9

    04.03.09.01Tire fitting on rear and front axles( 3x2x2=12pcs)

    04.03.09.02 Ass. draw bar & weld pin guid

    04.03.09.03 Fit mechanical hand breaks

    10

    04.03.10.01

    with the lower plate of the logutidinalbeam

    04.03.10.02mount the Horizontal bumper and weldwith the vertical part of the bumper(item-02)

    04.03.10.03mount and weld the rear beam to theframe (item-14)

    04.03.10.04mount the both left and right rear lightholder and weld with the rear beam(item -03)

    04.03.10.05 Assemble and weld the number plate(item-4)

    04.03.10.06Assemble and weld the mechanicalhand brake lever (item-11)with the

    04.03.10.07

    Assemble the mechanical hand leverwith the its accessories to the alreadyassembled axle

    04.03.10.08weld a strip of metal to the chequre ofthe plate form on the bottom side

    04.03.10.09weld the fender to the external cross

    member

    Tyre Fitting & Assembly of draw bar

    sub-total

    Rear bumper, numer plate,rear light holder a

    Prepared By:- Atakelti G.Sign:-_______________

    checked by:- Gizaw B.Sign:-______________

    Approved By:-Nicodemos A.sign:-___________________

    04.03.10.10weld the reinforcement plate to boththe strip of metal welded on the plate

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    45/69

    1635 1470.2 180314 183419

    11

    04.03.11.01Rectify Oval ring to required shape byhummer

    04.03.11.02 Tack the Rein. Angle Iron & drainageHalf ring with oval ring

    04.03.11.03Weld the connecting joint (afterremoving from the jig)

    12

    04.03.12.01Floor Sheet metal welding(L=3000,3000 & 1500)

    04.03.12.02Internal Structure(Chentini & Support)fitting

    04.03.12.03 Centeral Dome fitting In shell seg.L=1500

    04.03.12.04 Shell segment Ass. (Three Segment)

    04.03.12.05

    weld (continous)

    04.03.12.06 Man-hole marking & Cutting (TwoHole)

    04.03.12.07Foot valve hole marking & cutting (TwoHole)

    04.03.12.08Baffle fitting & welding (Stageredwelding)

    04.03.12.09 Dome end tacking & welding (Front &Rear)

    04.03.12.10Upper flange (foot valve) tacking &welding (from external)

    04.03.12.11o e a e ac ng we on e a

    four Position)

    04.03.12.12Saddle positioning, tacking & welding(at same position)

    04.03.12.13Tack & weld upper fixing bracket ( 8pcs per each (4)Saddel)

    Fabrication of Shell

    sub-total

    sub-total

    Chentini Preparation (4 pcs)

    Total Production Cost of Plat form Assembling

    Prepared By:- Atakelti G.Sign:-_______________

    checked by:- Gizaw B.Sign:-______________

    Approved By:-Nicodemos A.sign:-___________________

    04.03.12.14ec an ca r v ng o e ame

    cutting(at top Position)

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    46/69

    04.03.12.15 Mechanical driving welding

    04.03.12.16

    ring(Cercumferencial)

    04.03.12.17

    pcs)

    04.03.12.18Reflector support(3) cut & weld (at theback)

    13

    04.03.13.01

    (Emperial)

    04.03.13.02ron an rear s ee ac we

    (Emperial)

    04.03.13.03 Tacking & Welding of walking way

    14

    04.03.14.01 Mount the vertical pipe on the j ig

    04.03.14.02 Mount the steel pipes on the jig & tackwith the vertical pipe

    04.03.14.03Mount & tack the fixing plate with thevertical pipe

    04.03.14.04 Final weld

    15

    04.03.15.01 Fixing Bracket (Bottom) welding

    04.03.15.02Bolting bracket with washer,bolt & nut

    04.03.15.03Rein. ( Stopper) welding with mainchassis

    04.03.15.04 Ladder Fitting

    16

    01.03.16.01weld the top, Bottom and rear sheetingwith the side sheeting.make sure thatthe items are correctly alligned

    Shell Mounting & Ladder Fitting

    sub-total

    Discharge pipe and box welding

    Ladder Fabrication

    sub-total

    sub-total

    Gang Way (walk way) Welding

    Prepared By:- Atakelti G.Sign:-_______________

    checked by:- Gizaw B.Sign:-______________

    Approved By:-Nicodemos A.sign:-___________________

    01.03.16.02weld the discharge Box door andbottom part of the sheeting withthe

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    47/69

    helpo hinges

    01.03.16.03weld the lock plates on both uppershheting and door by maintaining thehole allignment

    01.03.16.04 weld the handle to the tool box door

    01.03.16.05weld the reinforcement plate to thelongutidnal beam (welding dischargebox frame)

    01.03.16.06weld reinfrcement plate (91x40x4) withthe reinforcement (400x217x4)(weldingdischarge box frame)

    01.03.16.07Assemble the Box for discharge andthe reinfocement plate with the aid ofbolts and nuts.

    01.03.16.08 Welding of flange on pipe-1 & Pipe-2on both front & rear discharging pipes.

    01.03.16.09Putting the pipes on jig,tacking &welding of pipe-01 & 03 with pipe-02(Both front & rare discharging pipe)

    17

    01.03.17.01Preparation work such fitting hose tothe pump and tanker

    01.03.17.02 Filling water ( in front Half)

    01.03.17.03 Checking for leakage (first half)

    01.03.17.04 Filling water ( in front Half)

    01.03.17.05 Checking for leakage (second half)

    01.03.17.06 Water Discharging ( for both section)

    4895 1427.8 211858 218181

    5670 1427.8 211858 218181

    Water Test

    Total Production Cost of Shell Assembling & Mounting

    Total production of fabrication shop (Birr)

    Cost Elements

    V-Work Break Down Structure for 3-Axle Fuel cargo Trailer in Painting Shop

    Prepared By:- Atakelti G.Sign:-_______________

    checked by:- Gizaw B.Sign:-______________

    Approved By:-Nicodemos A.sign:-___________________

    Laborcost/Unit

    Machinecost/unit.

    MaterialCost/unit

    Productio

    n Cost

    Completion per

    station/shopTask Description

    Item dimension

    (LxWxt)

    Qty/unit

    (Pcs)S/N

    Sub-Ope.

    Name

    Tasks Code (leve ----

    )

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    48/69

    1

    04.04.01.01 Polishing with Sand paper

    04.04.01.02 Washing

    04.04.01.03 Anti Rust Painting

    04.04.01.04 Smoothing the Shell by Hummering

    2

    04.04.03.01 Washing

    04.04.03.02 Stucco Per Metal Painting

    04.04.03.03Polishing metal stucco with water proofsand paper

    04.04.03.04 Washing with water proof sand paper

    04.04.03.05 Sprusso Painting (Propersionalratio1:2:6 )

    04.04.03.06 Normal Stucco Painting

    04.04.03.07 Washing normal Stucco

    04.04.03.08Nitro-synthetic Painting (for Identifingerror)

    04.04.03.09 First final painting(Shell)

    04.04.03.10 Second Final painting(Chassis)

    8850 1528.1 214666 225044

    Laborcost/Unit

    Machinecost/unit.

    MaterialCost/unit

    1

    04.05.01.01

    Mounting of breaking chamber type 30

    on 1stAxle ( Contains:-break lever,coil

    spring & small yoke)

    Tasks Code (leve ----

    )

    Productio

    n Cost

    % of

    Completion per

    station/shopTask Description

    Item

    dimension(LxWxt)

    Qty/unit

    (Pcs)

    Cost Elements

    sub-total

    Anti Rust Painting

    Total Production Cost of Painting (Birr)

    Final Painting

    PNEUMATIC (AIR BREAKING)SYSTEM

    V-Work Break Down Structure for 3-Axle Fuel cargo Trailer in Finishing

    S/N

    Sub-Ope.

    Name

    Prepared By:- Atakelti G.Sign:-_______________

    checked by:- Gizaw B.Sign:-______________

    Approved By:-Nicodemos A.sign:-___________________

    04.05.01.02

    Mounting of breaking chamber type 24

    on middleAxle ( Contains:-breaklever coil spring & longer yoke)

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    49/69

    lever,coil spring & longer yoke)

    04.05.01.03

    Mounting of breaking chamber type 24

    on rearAxle ( Contains:-break lever,coilspring & longer yoke)

    04.05.01.04Assembly of emergency rely with loadvalve ( fitting elbow, nipple & "T"

    distributor)04.05.01.05 Mounting emergency rely on Trailer

    04.05.01.06Mounting air reservoir tanker onsupport

    04.05.01.07

    Installation of hose with itsconnectors(#1=out let,#2(right)=fits tofront axle break chamber, #2 (left)fits tomiddle axle then to rear axle,#3(large) fits to air reservoir tanker & #4=inlet

    04.05.01.08 Fitting of 3 way & 4 way hose

    04.05.01.09Connecting Steel cable withmechanical hand break & break leverat rear axle

    04.05.01.10Fitting red & yellow break coils with thesame colour of coupling head(Inlet=yellow,Outlet=red)

    2 ELECTRICAL INSTALLATION

    04.05.02.01Fixing junction box with screws on rear

    longitudinal beam04.05.02.02

    Installing Seven lines electrical Cablefrom junction box to a driver

    04.05.02.03Fitting protection grid & parking light onrear beam

    04.05.02.04Connecting the junction box's cables toparking light,plate number light(squarecable) & side Light

    04.05.02.05 Fitting Lights(Plate light,side light)

    3 OTHER MECHANICAL WORKS

    sub-total

    Prepared By:- Atakelti G.Sign:-_______________

    checked by:- Gizaw B.Sign:-______________

    Approved By:-Nicodemos A.sign:-___________________

    04.05.03.01Mounting of Hose housing (Case pipe)& housing support holder

    Hose fitting( Reducer & hose with

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    50/69

    04.05.03.02Hose fitting( Reducer & hose withclamp)

    04.05.03.03Drilling & Riveting by 4.5mm forriveting rectangular,circular & triangularreflector

    04.05.03.04on ng u er w g ue or

    supporting Reserve fuel tanker04.05.03.05 Fitting outlet tap with nipples

    04.05.03.06Fitting Chain with gate of dischargepipe ring

    04.05.03.07 Mounting reserve tyre

    04.05.03.08Fitting Man hole cover( Rubber seal &ring)

    04.05.03.09 Fitting Mud gurd rubber

    04.05.03.10Fitting "MIE-Mekelle" logo on top of thetanker

    8850 1528 240418 250796Total Production Cost of Finishing (Birr)

    Prepared By:- Atakelti G.Sign:-_______________

    checked by:- Gizaw B.Sign:-______________

    Approved By:-Nicodemos A.sign:-___________________

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    51/69

    % of

    Completion per

    station Total

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    52/69

    Prepared By:- Atakelti G.Sign:-

    checked by:- Gizaw B.Sign:-

    Approved By:-Nicodemos A.sign:-

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    53/69

    Prepared By:- Atakelti G.Sign:-_______________

    checked by:- Gizaw B.Sign:-______________

    Approved By:-Nicodemos A.sign:-___________________

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    54/69

    Prepared By:- Atakelti G.Sign:-_______________

    checked by:- Gizaw B.Sign:-______________

    Approved By:-Nicodemos A.sign:-___________________

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    55/69

    Prepared By:- Atakelti G.Sign:-

    checked by:- Gizaw B.Sign:-

    Approved By:-Nicodemos A.sign:-

    % of

    Completion per

    station Total

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    56/69

    Prepared By:- Atakelti G.Sign:-

    checked by:- Gizaw B.Sign:-

    Approved By:-Nicodemos A.sign:-

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    57/69

    23.1%

    Prepared By:- Atakelti G.Sign:-_______________

    checked by:- Gizaw B.Sign:-______________

    Approved By:-Nicodemos A.sign:-___________________

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    58/69

    24.1%

    25%

    Prepared By:- Atakelti G.Sign:-_______________

    checked by:- Gizaw B.Sign:-______________

    Approved By:-Nicodemos A.sign:-___________________

    26%

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    59/69

    26%

    26.98%

    % of

    Completion per

    station Total

    Prepared By:- Atakelti G.Sign:-_______________

    checked by:- Gizaw B.Sign:-______________

    Approved By:-Nicodemos A.sign:-___________________

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    60/69

    27.6%

    Prepared By:- Atakelti G.Sign:-_______________

    checked by:- Gizaw B.Sign:-______________

    Approved By:-Nicodemos A.sign:-___________________

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    61/69

    28.5%

    55.9%

    Prepared By:- Atakelti G.Sign:-_______________

    checked by:- Gizaw B.Sign:-______________

    Approved By:-Nicodemos A.sign:-___________________

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    62/69

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    63/69

    Prepared By:- Atakelti G.Sign:-_______________

    checked by:- Gizaw B.Sign:-______________

    Approved By:-Nicodemos A.sign:-___________________

    73.1%

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    64/69

    Prepared By:- Atakelti G.Sign:-_______________

    checked by:- Gizaw B.Sign:-______________

    Approved By:-Nicodemos A.sign:-___________________

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    65/69

    Prepared By:- Atakelti G.Sign:-_______________

    checked by:- Gizaw B.Sign:-______________

    Approved By:-Nicodemos A.sign:-___________________

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    66/69

    87.0%

    87%

    Prepared By:- Atakelti G.Sign:

    checked by:- Gizaw B.Sign:

    Approved By:-Nicodemos A.sign:

    Completion per

    station Total

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    67/69

    90%

    % of

    Completion per

    station Total

    Prepared By: Atakelti G checked by: Gizaw B Approved By: Nicodemos A

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    68/69

    Prepared By:- Atakelti G.Sign:-_______________

    checked by:- Gizaw B.Sign:-______________

    Approved By:-Nicodemos A.sign:-___________________

  • 7/28/2019 WBS for for Fuel Cargo Trailer (25 m3)

    69/69

    100.0%

    Prepared By:- Atakelti G.Sign:-_______________

    checked by:- Gizaw B.Sign:-______________

    Approved By:-Nicodemos A.sign:-___________________