WATROPEC project 1 Vlaams Kenniscentrum Water FITA premission seminar CROATIA Brussels, 25 November...
-
Upload
darleen-tate -
Category
Documents
-
view
216 -
download
2
Transcript of WATROPEC project 1 Vlaams Kenniscentrum Water FITA premission seminar CROATIA Brussels, 25 November...
![Page 1: WATROPEC project 1 Vlaams Kenniscentrum Water FITA premission seminar CROATIA Brussels, 25 November 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649f115503460f94c23b55/html5/thumbnails/1.jpg)
WATROPEC project1
FITA premission seminarCROATIA
Brussels, 25 November 2011
![Page 2: WATROPEC project 1 Vlaams Kenniscentrum Water FITA premission seminar CROATIA Brussels, 25 November 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649f115503460f94c23b55/html5/thumbnails/2.jpg)
WATROPEC project2
WATROPEC: before the start
• 26 – 28 March 2008:
FITA (Flanders International Technical Agency) mission
![Page 3: WATROPEC project 1 Vlaams Kenniscentrum Water FITA premission seminar CROATIA Brussels, 25 November 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649f115503460f94c23b55/html5/thumbnails/3.jpg)
WATROPEC project3
WATROPEC: before the start
• 26 – 28 March 2008:
FITA (Flanders International Technical Agency) mission
![Page 4: WATROPEC project 1 Vlaams Kenniscentrum Water FITA premission seminar CROATIA Brussels, 25 November 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649f115503460f94c23b55/html5/thumbnails/4.jpg)
WATROPEC project4
WATROPEC: Project framework
• Bi-lateral agreement Croatia – Flanders
• Co-operation program Flanders and Croatia (2008-2010)
![Page 5: WATROPEC project 1 Vlaams Kenniscentrum Water FITA premission seminar CROATIA Brussels, 25 November 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649f115503460f94c23b55/html5/thumbnails/5.jpg)
WATROPEC project5
WATROPEC: before the start• May 2008:
follow-up visit Croatian Water• July – August 2008
local beneficiaries?• January 2009
Belgian Embassy proposed new potential partners … EcoTech local beneficiaries
• 5 March 2009Project proposal introduced to the
Flanders/Belgian government• 26 June 2009
Minister Environment, Nature and Energy signed
![Page 6: WATROPEC project 1 Vlaams Kenniscentrum Water FITA premission seminar CROATIA Brussels, 25 November 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649f115503460f94c23b55/html5/thumbnails/6.jpg)
WATROPEC project6
WATROPEC: Project paperwork
• Total budget: 222 k EUR• Financial support Flanders
• Flanders Government: 140 k EUR• Promotors: 47 k EUR
• Financial support Partners• Minimum 15%• In kind confirmation letters
![Page 7: WATROPEC project 1 Vlaams Kenniscentrum Water FITA premission seminar CROATIA Brussels, 25 November 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649f115503460f94c23b55/html5/thumbnails/7.jpg)
WATROPEC project7
WATROPEC: the project in general• Financed by the Flanders region,
Environment, Nature and Energy Department.
• Water Treatment Optimization with Ecological Criteria (WATROPEC).
• Started 16 July 2009, 18/24 months• total budget is 221.679,- €
140.172,- € is contributed by the Flemish Government. • In the middle of the EU pre accession
(Urban Water Directive, Water Framework Directive...).• Case studies and training …
transfer of know-how, experiencesNot what to do, not how to do ...
![Page 8: WATROPEC project 1 Vlaams Kenniscentrum Water FITA premission seminar CROATIA Brussels, 25 November 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649f115503460f94c23b55/html5/thumbnails/8.jpg)
WATROPEC project8
Croatian partners for dissimination
- CROATIAN WATER
- CROATIAN WATER POLLUTION CONTROL SOCIETY (HDZV)
- University of Split (Prof. Roko Andričević)
![Page 9: WATROPEC project 1 Vlaams Kenniscentrum Water FITA premission seminar CROATIA Brussels, 25 November 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649f115503460f94c23b55/html5/thumbnails/9.jpg)
WATROPEC project9
WATROPEC: issue descriptionWATROPEC: issue description
• Water Framework Directive• water management at the level of a river
basin• the surface waters should obtain a good
ecological quality
• Wastewater treatment installations will reduce the pollution• Efficiency - Evaluation
![Page 10: WATROPEC project 1 Vlaams Kenniscentrum Water FITA premission seminar CROATIA Brussels, 25 November 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649f115503460f94c23b55/html5/thumbnails/10.jpg)
WATROPEC project10
Schematic overview of the integral system under study
Biodiversity
Sensitivity
Biological Assessment
WATROPEC: issue descriptionWATROPEC: issue description
![Page 11: WATROPEC project 1 Vlaams Kenniscentrum Water FITA premission seminar CROATIA Brussels, 25 November 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649f115503460f94c23b55/html5/thumbnails/11.jpg)
WATROPEC project11
WATROPEC: Project planning WATROPEC: Project planning (original)(original)
= what has changed
![Page 12: WATROPEC project 1 Vlaams Kenniscentrum Water FITA premission seminar CROATIA Brussels, 25 November 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649f115503460f94c23b55/html5/thumbnails/12.jpg)
WATROPEC project12
WATROPEC: Project phases
• Phase 1: inception.• Phase 2: data collection
– Opaija (see comment)
– Varazdin
![Page 13: WATROPEC project 1 Vlaams Kenniscentrum Water FITA premission seminar CROATIA Brussels, 25 November 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649f115503460f94c23b55/html5/thumbnails/13.jpg)
WATROPEC project13
Aquatic Ecology
Monitoring Campaign
![Page 14: WATROPEC project 1 Vlaams Kenniscentrum Water FITA premission seminar CROATIA Brussels, 25 November 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649f115503460f94c23b55/html5/thumbnails/14.jpg)
WATROPEC project14
Biological measurements: Biological measurements: hand net sampleshand net samples
![Page 15: WATROPEC project 1 Vlaams Kenniscentrum Water FITA premission seminar CROATIA Brussels, 25 November 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649f115503460f94c23b55/html5/thumbnails/15.jpg)
WATROPEC project15
28 Sampling locations28 Sampling locations
Aquatic Ecology
Perimetrical channels
Drainage channel
Drava river
Dubrava LakeCakovec lake17
16
1514
2
1
3
A1 A2 A3 A4 A54 5
B1 B2 B3 B4 B5
718
6 8 10
9
11
12
13
Hydro-power Plant
Small channel
Small channel
Big channel
WWTP
Small channel
Small channel
![Page 16: WATROPEC project 1 Vlaams Kenniscentrum Water FITA premission seminar CROATIA Brussels, 25 November 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649f115503460f94c23b55/html5/thumbnails/16.jpg)
WATROPEC project16
Sorting macroinvertebratesSorting macroinvertebrates Aquatic Ecology
![Page 17: WATROPEC project 1 Vlaams Kenniscentrum Water FITA premission seminar CROATIA Brussels, 25 November 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649f115503460f94c23b55/html5/thumbnails/17.jpg)
WATROPEC project17
Biological assessmentBiological assessmentIdentification and counting of macroinvertebrates
![Page 18: WATROPEC project 1 Vlaams Kenniscentrum Water FITA premission seminar CROATIA Brussels, 25 November 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649f115503460f94c23b55/html5/thumbnails/18.jpg)
WATROPEC project18
Field Protocols Field Protocols Aquatic Ecology
![Page 19: WATROPEC project 1 Vlaams Kenniscentrum Water FITA premission seminar CROATIA Brussels, 25 November 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649f115503460f94c23b55/html5/thumbnails/19.jpg)
WATROPEC project19
Technical information sheets Technical information sheets
![Page 20: WATROPEC project 1 Vlaams Kenniscentrum Water FITA premission seminar CROATIA Brussels, 25 November 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649f115503460f94c23b55/html5/thumbnails/20.jpg)
WATROPEC project20
Biological assessmentBiological water quality map for the monitoring
1614
17
15
1154
12137
21
3
6
119 10
867
18
Donja Dubrava lakeCakovec lake
Cakovec lakeA1
4
B2B4
B3B1
A25
A3A5
A4
B53
7
18
Site Description Site Description
S.L. 1. Drava river before junction with channel S.L. 15. End of Donja Dubrava lakeS.L. 2. Channel before junction with Drava river S.L. 16. Channel after Donja Dubrava lake S.L. 3. Beginning of the Cakovec lake S.L. 17. Drava river after Donja Dubrava lake S.L. 4. Small parallel channel to the Cakovec lake (righ side), just before MWWTP discharge S.L. 18. End of small parallel channel to the Cakovec lake (left side) S.L. 5. Small parallel channel to the Cakovec lake (righ side), just after MWWTP discharge S.L. A-1. Beginning of small parallel channel to the Cakovec lake (righ side)S.L. 6. Drava river after Cakovec lake S.L. A-2. Small parallel channel to the Cakovec lake (righ side) before 1st overflow of MWWTP S.L. 7. End of Cakovec lake S.L. A-3. Small parallel channel to the Cakovec lake (righ side) after 1st overflow of MWWTP S.L. 8. Drava river before junction with channel that transports the discharge of MWWTP S.L. A-4. Small parallel channel to the Cakovec lake (righ side) 0.65 Km before MWWTP dischargeS.L. 9. End of small parallel channel to the Cakovec lake that transports the discharge of MWWTP S.L. A-5. Small parallel channel to the Cakovec lake (righ side), 1.5 Km after MWWTP dischargeS.L. 10. Drava river just after the junction with channel that transports the discharge of MWWTP S.L. B-1. Beginning of small parallel channel to the Cakovec lake (left side)S.L. 11. Drava river dowstream the junction with channel that transports the discharge of MWWTP S.L. B-2. Small parallel channel to the Cakovec lake (left side) 0.8 Km after Sampling point B-1S.L. 12. Channel located between Cakovec and Donja Dubrava lakes S.L. B-3. Small parallel channel to the Cakovec lake (left side) 1.8 Km after Sampling point B-1S.L. 13. Drava river before junction with the channel located between 2 lakes S.L. B-4. Small parallel channel to the Cakovec lake (left side) 4.05 Km after Sampling point B-1S.L. 14. Beginning of the Donja Dubrava lake S.L. B-5. Small parallel channel to the Cakovec lake (left side) 4.11 Km after Sampling point B-1
Description of Sampling Locations at the Drava river, Croatia
ClassMMIF Score
Evaluation of quality
Colour code
I 0.9-1.0 High Blue
II 0.7-0.9 Good Green
III 0.5-0.7 Moderate Yellow
IV 0.3-0.5 Poor Orange
V 0.0-0.3 Bad Red
![Page 21: WATROPEC project 1 Vlaams Kenniscentrum Water FITA premission seminar CROATIA Brussels, 25 November 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649f115503460f94c23b55/html5/thumbnails/21.jpg)
WATROPEC project21
• Very good cooperation• Model prediction improves the quality of
the decisions.• Studies without the integrated modelling
approach can not give this information (results).
• This results can be directly used to achieve the goals of the European Water Framework Directive.
• … the basis for further cooperation and projects was laid down
WATROPEC: project conclusions
![Page 22: WATROPEC project 1 Vlaams Kenniscentrum Water FITA premission seminar CROATIA Brussels, 25 November 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649f115503460f94c23b55/html5/thumbnails/22.jpg)
WATROPEC project22
• … the basis for further cooperation and projects was laid down for … new projects• Meeting needs of Tourism Industry
(Istria, Kvarner Bay/Opatija ... And many other sites)
• Optimize costs of WWTP• Energy use / electricity• sludge production and quality (stabilization) related
to better means of sludge management like biogas plants, production
Futher cooperation
Not what to do, not how to do ...
![Page 23: WATROPEC project 1 Vlaams Kenniscentrum Water FITA premission seminar CROATIA Brussels, 25 November 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062518/56649f115503460f94c23b55/html5/thumbnails/23.jpg)
WATROPEC project23