Waterway LanePreliminary Engineering Study
Public Input Meeting August 17, 2021
![Page 2: Waterway Lane Preliminary Engineering Study](https://reader031.fdocuments.us/reader031/viewer/2022012920/61c7579f24ac6e7cde4ea177/html5/thumbnails/2.jpg)
• Elected Officials• City of New Braunfels Staff• Garry Ford, PE, City Engineer• Charlie Blue, Assistant Capital Project Manager
• Consultant Engineer: HMT • Bill Ball, PE • Ryan Stangel, PE
Introductions
![Page 3: Waterway Lane Preliminary Engineering Study](https://reader031.fdocuments.us/reader031/viewer/2022012920/61c7579f24ac6e7cde4ea177/html5/thumbnails/3.jpg)
• Improve mobility and safety
• Reduce congestion
• Accommodate pedestrian and bicycle traffic
• Maintain reasonable access to existing properties
Project Objectives
![Page 4: Waterway Lane Preliminary Engineering Study](https://reader031.fdocuments.us/reader031/viewer/2022012920/61c7579f24ac6e7cde4ea177/html5/thumbnails/4.jpg)
Project Location
![Page 5: Waterway Lane Preliminary Engineering Study](https://reader031.fdocuments.us/reader031/viewer/2022012920/61c7579f24ac6e7cde4ea177/html5/thumbnails/5.jpg)
Project History
• Originally identified in 2008 Capital Improvements Plan
• Project intent is to connect two sections of Waterway Lane creating a connection between Gruene Road and Common Street.
![Page 6: Waterway Lane Preliminary Engineering Study](https://reader031.fdocuments.us/reader031/viewer/2022012920/61c7579f24ac6e7cde4ea177/html5/thumbnails/6.jpg)
• Data Collection (survey, utilities, geotechnical investigation)• Drainage Analysis• Identify and Evaluate Constraints • Conceptual Design • Public Input• Schematic Design (roadway and ROW details)• Cost Estimates (ROW, engineering, construction)
Preliminary Engineering Study
![Page 7: Waterway Lane Preliminary Engineering Study](https://reader031.fdocuments.us/reader031/viewer/2022012920/61c7579f24ac6e7cde4ea177/html5/thumbnails/7.jpg)
• Construct two lane roadway
• Left-turn lane at intersections with Gruene Rd. and Common St. • Left-turn lane on Gruene Rd. onto Waterway Lane• 5’ bike lane on each side of roadway
• 6’ sidewalk on each side of roadway• Traffic signal at the intersection of Waterway Lane and
Common Street
Proposed Project
![Page 8: Waterway Lane Preliminary Engineering Study](https://reader031.fdocuments.us/reader031/viewer/2022012920/61c7579f24ac6e7cde4ea177/html5/thumbnails/8.jpg)
Existing Area
![Page 9: Waterway Lane Preliminary Engineering Study](https://reader031.fdocuments.us/reader031/viewer/2022012920/61c7579f24ac6e7cde4ea177/html5/thumbnails/9.jpg)
Proposed Typical Section – at intersections
![Page 10: Waterway Lane Preliminary Engineering Study](https://reader031.fdocuments.us/reader031/viewer/2022012920/61c7579f24ac6e7cde4ea177/html5/thumbnails/10.jpg)
Proposed Typical Section – between intersections
![Page 11: Waterway Lane Preliminary Engineering Study](https://reader031.fdocuments.us/reader031/viewer/2022012920/61c7579f24ac6e7cde4ea177/html5/thumbnails/11.jpg)
Proposed Schematic
![Page 12: Waterway Lane Preliminary Engineering Study](https://reader031.fdocuments.us/reader031/viewer/2022012920/61c7579f24ac6e7cde4ea177/html5/thumbnails/12.jpg)
•Alleviate traffic in the area•Local drainage patterns•Gruene Rd. intersection•Preserving existing trees and landscaping• Improve quality of non-vehicular transportation
Project Considerations
![Page 13: Waterway Lane Preliminary Engineering Study](https://reader031.fdocuments.us/reader031/viewer/2022012920/61c7579f24ac6e7cde4ea177/html5/thumbnails/13.jpg)
• Future developments on Common St. • Future roadway geometry of Common St.
Other Considerations
![Page 14: Waterway Lane Preliminary Engineering Study](https://reader031.fdocuments.us/reader031/viewer/2022012920/61c7579f24ac6e7cde4ea177/html5/thumbnails/14.jpg)
• No funding for final design or Construction
• May be funded through 2023 Bond
• Final design/construction funded through 2023 Bond
• Construction Cost Estimate: $2.4M
Timeline• Survey and right-of-way• Drainage and utility review
• Conceptual Design• Geometry Options
• Schematic design• 30% Plans• Cost estimate• Public Input