Transcript of Watershed management experiences in Amhara Region, Ethiopia
![Page 1: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/1.jpg)
Watershed Management Experiences in Amhara Region
Watershed Management Experiences in Amhara Region
Fentahun Mengistu (Dr.)Amhara Regional Agricultural Research Institute (ARARI)
Fentahun Mengistu (Dr.)Amhara Regional Agricultural Research Institute (ARARI)
Stakeholders’ Workshop on Enhancing Communities’ Adaptive Capacity to Climate Change Induced Water Scarcity
in Kabe Watershed, South Wollo ZoneWollo University, Dessie, Ethiopia, 24-25 November 2011
![Page 2: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/2.jpg)
![Page 3: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/3.jpg)
![Page 4: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/4.jpg)
Why Watershed Approach?• Land degradation seriously
affects livelihoods and food security in Ethiopia
• Land degradation arises: soil erosion- steep slopes,
continuous encroachment and cultivation of marginal lands
deforestation overgrazing negative coping strategies
(animal dung burning , charcoal, reduced rotation, etc.)
• has political, social and economic implications
Food Insecurity and Poverty Trap: Interrelationships between key challenges
Food Insecurity and Poverty Trap: Interrelationships between key challenges
To combat the land degradation-food insecurity-poverty nexus, a holistic approach: watershed management
To combat the land degradation-food insecurity-poverty nexus, a holistic approach: watershed management
![Page 5: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/5.jpg)
Common Practices
![Page 6: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/6.jpg)
Common out comes
![Page 7: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/7.jpg)
Common out comes
![Page 8: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/8.jpg)
Common out comes
![Page 9: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/9.jpg)
Elements and characteristics of watershed
• Biophysical (water, land, vegetation)• climate (rainfall, altitude, and
winds), drainage and water,• soil, vegetation, specific
topographic features (gradient and length of slope, shape and direction and past/current erosion features (rill, gullies, land slides,etc). • Land use: homesteads,
cultivated land, grazing land, forest (natural and artificial), degraded areas
• Socio-economic• population• farming systems • social setups• economic activities • vulnerability profile • gender
![Page 10: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/10.jpg)
![Page 11: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/11.jpg)
PWDP as a foundation for sustainable agricultural development in rural Ethiopia
• CBPWD Guideline• 5 Yrs GTP: on Natural Resources
Management and Climate Change: In all areas which require physical soil
and water conservation works will be fully implemented through proactive and organized community participation
• Amhara rural development strategy: a conservation based, watershed focused development approach
• watershed focused NRM campaign as of last year with organized community participation ( Development Army, 20-30 people, 1 to 5 work team)
• Almost all BI-lateral/Multi-lateral projects/NGOs follow IWM
![Page 12: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/12.jpg)
![Page 13: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/13.jpg)
PLANNING PROCEDURES AND STEPS
![Page 14: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/14.jpg)
1. Amhara Micro-enterprise development, AgriculturalResearch, Extension, and Watershed management
(AMAREW) Project
1. Amhara Micro-enterprise development, AgriculturalResearch, Extension, and Watershed management
(AMAREW) Project
• Launched in July 2002• Focus: functional integration of on-farm
research, extension, and watershed management activities
• 3 pilot watersheds: Yeku (Sekota), Lenche Dima (Guba Lafto) and Gumet (Sekela)
• Launched in July 2002• Focus: functional integration of on-farm
research, extension, and watershed management activities
• 3 pilot watersheds: Yeku (Sekota), Lenche Dima (Guba Lafto) and Gumet (Sekela)
![Page 15: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/15.jpg)
Approach: multi-faceted and integrated rural development activities in agricultural research, extension, watershed management and micro enterprise development
Approach: multi-faceted and integrated rural development activities in agricultural research, extension, watershed management and micro enterprise development
Engaged Research in testing a wide range of technologies at the watersheds and to provide the Extension and other development organizations with land use planning tools and proven technologies for sustainable development and rehabilitation
Engaged Research in testing a wide range of technologies at the watersheds and to provide the Extension and other development organizations with land use planning tools and proven technologies for sustainable development and rehabilitation
Community watershed management organization (CWMO) 12-32 members responsible for planning, implementing and monitoring the watershed development activities
Community watershed management organization (CWMO) 12-32 members responsible for planning, implementing and monitoring the watershed development activities
![Page 16: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/16.jpg)
![Page 17: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/17.jpg)
Interventions madeI. Physical and biological soil &
water conservation measures
• Hill side and Farm land terrace
• Check dam construction
• Bund stabilization
• Gully rehabilitation
• Trench construction
• Small Scale Dam construction
• Micro basin , eye burrow basin
• Improved pits , Cut-off drains
• Hand dug well construction
• Trapezoidal water tanks
• Plastic bed water harvesting ponds
• Forestry and agro forestry• Area closure
![Page 18: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/18.jpg)
Gully Rehabilitation: Yeku watershedGully Rehabilitation: Yeku watershed
![Page 19: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/19.jpg)
![Page 20: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/20.jpg)
![Page 21: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/21.jpg)
Impacts of interventions on Wsheds
• Hillside closure ,moisture harvesting - seasonal spring flow extended by 2M - ground water at a depth of 8m • income from grasses sell• Degraded gullies- feed and fuel wood• Water point -for human and livestock• Soil moisture harvesting , gully
rehabilitation on degraded hillside & farm lands maintained soil moisture for plant growth , assisted the replenishment of ground water and extended stream flow period
• vegetables and fruits thr. irrigation • Striga resistant sorghum varieties
Gobiye and Abshir
• improved seeds at household and community seed bank level
• Poor farmer hhs- asset thr. goat and sheep restocking
• Food-for-work –facilitated upper catchment's land care activities, covered watershed community food gap
• Gabion box production and fuel saving stove production- additional income, reduction of soil erosion and deforestation
• Pilot Wsheds served as learning center for DAs, woreda experts and farmers in the region
![Page 22: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/22.jpg)
Impacts?
![Page 23: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/23.jpg)
Hillside Closure Speeded up Environmental Rehabilitation
![Page 24: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/24.jpg)
Gully at GumetGully at Gumet
![Page 25: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/25.jpg)
Closed from animal interference
Closed from animal interference
• self-help user groups organized to manage degraded hillsides
Minimized soil erosion Brought significant environmental impact • allowed new shrubs and grass species• increased biodiversity
• self-help user groups organized to manage degraded hillsides
Minimized soil erosion Brought significant environmental impact • allowed new shrubs and grass species• increased biodiversity
![Page 26: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/26.jpg)
Conservation structures on farmlands, degraded hills
![Page 27: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/27.jpg)
![Page 28: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/28.jpg)
![Page 29: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/29.jpg)
Catchment Treatment replenished ground water (Yeku)Catchment Treatment replenished ground water (Yeku)
![Page 30: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/30.jpg)
Night pond at Yeku watershed used for cattle and other household serviceNight pond at Yeku watershed used for cattle and other household service
![Page 31: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/31.jpg)
![Page 32: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/32.jpg)
Brought empowerment of watershed communities towards sustainable management of land & water resources (bunds, gully rehabilitation)
![Page 33: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/33.jpg)
![Page 34: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/34.jpg)
![Page 35: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/35.jpg)
Fuel-efficient stove production at Yeku watershed
Fuel efficient stove produced and marketed by an organized group of women •make money•reduction of deforestation•reduces the drudgery•encouraged schooling of•Children•stoves reduce smoke caused eye problems
![Page 36: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/36.jpg)
Gabion Wire Box Production at Lenche
Dima Watershed
Water Point Development: Yeku
![Page 37: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/37.jpg)
2. Sida-Amhara Rural Development Programme 1997–2008
2. Sida-Amhara Rural Development Programme 1997–2008
Eight Woredas in East Gojjam and eight Woredas in South Wello
![Page 38: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/38.jpg)
Objectives:• Develop, test and
demonstrate an integrated methodology for management of small agric. Watersheds
• To create public awareness about flexibility and site specificity of IWM
Approach:
• bottom-up• Watershed
management committee
• Watershed planning• Characterization
![Page 39: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/39.jpg)
![Page 40: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/40.jpg)
Achievements
• Agricultural productivity can be sustained through appropriate IWM approach
• Improved land • Farmer’s livelihood improved
![Page 41: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/41.jpg)
3. SWHISA (Sustainable Water Harvesting and Institutional Strengthening in Amhara): Watershed
Program
• Designed to enhance sustainability of small-scale irrigation structures and dams and increase productive uses of water sources within the watersheds
• Participatory approaches – farmer to farmer extension
• Active promotion of self-help contributions from communities
![Page 42: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/42.jpg)
Area covered by different SWC measures in the pilot watersheds
![Page 43: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/43.jpg)
Interventions
Physical soil conservation measures
• Farm bunds:- stone/ soil bunds
• Hillside terraces• Gully treatment:- stone
and gabion check dams; brushwood check dams
• Cutoff drains• Artificial waterways • Percolation trenches• Micro-basin/eyebrow basin
Planting pits
Biological conservation measures
• Area closure• Planting on bunds• Gully re-vegetation• Homestead planting• Enrichment planting in
closed areas• Planting on hillsides etc.
![Page 44: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/44.jpg)
Interventions
Water harvesting • Shallow hand dug well • Run off water harvesting • Sand dams Natural Pasture Management• Grazing land improvement• Introduction of high value
crops including feed crops• Over-sowing of closed areas
with improved feed varieties
• Change crops and cropping pattern (Diversification)
• Introduction of improved crop varieties
• Compost preparation and application etc
• Supplementary irrigation ( risk reduction)
• Dry season vegetable production
• Subsistence oriented to Market oriented farming
![Page 45: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/45.jpg)
Area Closure: Karita (west Belessa)
2011
Hay harvest 20092008
Achivements
![Page 46: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/46.jpg)
Pasture Land Management
Free grazing Rotational grazing/hay
Maywoha watershed, Goncha, E. Gojam
![Page 47: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/47.jpg)
Pasture Land Management
Participatory evaluation of natural pasture: under free grazing (left) and hay production (right)
Maywoha watershed, Goncha, E. Gojam
2009 2009
Debre Mawi watershed, Adet, W. Gojam
![Page 48: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/48.jpg)
Pasture Land Management
Change communal pasture land management: from free grazing to hay production
Debre Mawi watershed, Adet, W. Gojam
20102011
![Page 49: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/49.jpg)
Pasture Land Management
Free grazing 2010
Change in natural pasture management increased herbage productivity and help to stabilize gully system
Debre Mawi watershed, Adet, W. Gojam
Hay production 2011
![Page 50: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/50.jpg)
Gully Rehabilitation
20082009
Debre Mawi watershed, Adet, W. Gojam
![Page 51: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/51.jpg)
Gully Rehabilitation
2011
Debre Mawi watershed, Adet, W. Gojam
2008
![Page 52: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/52.jpg)
Gully Rehabilitation
Gully head retreat: when promoting gully erosion control measures, conservation of the entire hillside and watershed must be considered
![Page 53: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/53.jpg)
Gully Rehabilitation
Debre Mawi watershed, Adet, E. Gojam
2008 2011
![Page 54: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/54.jpg)
Degraded Land ManagementDegraded Land Management October 2009June 2007
![Page 55: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/55.jpg)
Shallow ground water development
![Page 56: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/56.jpg)
Run off water harvesting
20092011
Tomato
Onion
Pepper
![Page 57: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/57.jpg)
The gully formation in the Debremawi watershed is more importantly caused by subsurface erosion generated from soil pore water pressure.
Potholes and smaller pipe A, and concentrated water outflow zones, B. Potholes and smaller pipe A, and concentrated water outflow zones, B.
Land management processes that effectively drain subsurface water and reduce the potential pore-water pressure in shallow soils are necessaryLand management processes that effectively drain subsurface water and reduce the potential pore-water pressure in shallow soils are necessary
![Page 58: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/58.jpg)
4. Unlocking the potential of rainfed agriculture in Ethiopia
for improved rural livelihoods
4. Unlocking the potential of rainfed agriculture in Ethiopia
for improved rural livelihoods
![Page 59: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/59.jpg)
Gumara-Maksegnit WSGumara-Maksegnit WS
![Page 60: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/60.jpg)
Goal/Objectives
To sustainably improve agricultural productivity and conserve the ecosystem resources by integrating affordable and appropriate technologies in a favourable socioeconomic environment
• identify, evaluate and apply appropriate interventions that may overcome the deficiencies and achieve higher productivity.
• test and fine tune a package of water harvesting technologies that provides sufficient water for supplemental irrigation during dry spells to alleviate stress
![Page 61: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/61.jpg)
![Page 62: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/62.jpg)
Socioeconomic characterization of the watershed using PRA approach by interdisciplinary team of researchers
Socioeconomic characterization of the watershed using PRA approach by interdisciplinary team of researchers
Biophysical characterization of the watershed Biophysical characterization of the watershed
Community & District policy makers consultation and establishment of watershed community leaders
Community & District policy makers consultation and establishment of watershed community leaders
Steps in WS selection-implementation
![Page 63: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/63.jpg)
Consultation & WS community Establishment
• Consultation made with Woreda policy makers.
• Watershed community organized
![Page 64: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/64.jpg)
Biophysical characterization
![Page 65: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/65.jpg)
"Rainfed Ethiopia"project
Theme I:Land conservation
Theme II:Water harvesting &
SupplementalIrrigation
Theme III:Agronomic/
land productivity
Subtheme 1: Land conservation
Subthem 2: watershedmodeling
Subtheme 3:Reforestation
Subtheme 1:Implementation ofsmall ponds & dripirrigation systems
Subtheme 2:SupplementalIrrigation field
experiment
Subtheme 3:Communal,
medium-size pond
Subtheme 1:Crop improvement
Subtheme 2:Crop management(double cropping)
Subtheme 3:Improved/
reduced tillage
Cross-cuttingtheme:
Agronomic waterbalance
Inte
rven
tion
s U
nder
way
![Page 66: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/66.jpg)
Challenges
• Negotiation and convincing farmers
• Sustainability, ownership
• completing the already started watershed
• Focus on physical structures
• physical structures are not constructed to their technical standards
• System productivity
• Social planning unit of the government vs watershed planning
• Duplication of management (Wshed Devt Committee Vs Govt’ committee)
![Page 67: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/67.jpg)
Lessons Learnt• Communities have high
interest in development initiatives including rehabilitating natural resources
• But, farmers will accept a change in agricultural practices if only if both ecological and economic objectives are met
• Community participation is vital that local farmers, users and beneficiaries play an active role
• Needs farm and non-farm activities
• Interdisciplinary team• IWM require a process
approach• Supported with new
knowledge and practices• Site specificity nature
![Page 68: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/68.jpg)
Lessons Learnt• Government/ donors should
refrain from directly engaging in watershed management activities
• create an enabling environment; delivery of technical and advisory support
• Experience sharing tours for farmers
• Nothing should be given for free
• Building local level institution: CWMOs
• More emphasis has to be given to effective organization of communities rather than only focusing on introduction of technologies
e.g. At Lenche Dema • the watershed committee
was operational 2yrs after • others near formed
CWMOs(Tesfaye 2008)
![Page 69: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/69.jpg)
…Lessons• Capacity building interventions
are necessary to manage their resources and to guarantee sustainability
• Molding democratic pragmatism (bottom up) within the existing administrative rationalism (top down) governmental structure
• E.g. A top-down approach by GTZ: no community involvement during planning (Tesfaye Habtamu, 2008)
community did not take over the payments for the guard
No attitude change
• Withdrawal strategy, continued follow up needed:
eg. At Dijl:• the spring had insufficient
flow and providing water• Its construction was poor• no management committee
was established• the spring is not functioning• the water harvesting
structures cracked
![Page 70: Watershed management experiences in Amhara Region, Ethiopia](https://reader033.fdocuments.us/reader033/viewer/2022061408/557d9d38d8b42a34288b4795/html5/thumbnails/70.jpg)