Water Resources Water Resources total engineering services

Transcript of Water Resourceschssmena.ae/wp-content/uploads/brochure/8 Water Resources.pdfState road was upgrade...

Page 1: Water Resourceschssmena.ae/wp-content/uploads/brochure/8 Water Resources.pdfState road was upgrade to a flood protection bund to protect the agricultural areas and the surrounding

Water

Resources

Water

Resources

total engineering services

Page 2: Water Resourceschssmena.ae/wp-content/uploads/brochure/8 Water Resources.pdfState road was upgrade to a flood protection bund to protect the agricultural areas and the surrounding

Mission

Statement

HSS Group’s vision is simple;

“To be recognised as Malaysia’s premier one stop one engineering service

provider, as reflected in our continuous outstanding contribution to the

development of major infrastructure; and maintain this position through

excellent services and superior technical quality,

innovation and performance”

This vision is reailsed through;

Personal involvement of the directors to provide strong leadership to ensure

timely and speedy implementation of both corporate objectives & goals

Existing effective and efficient corporate structure to provide maximum

operating efficiencies to the Group

The vast base of experience within the Group that helps to leverage its niche

in the engineering arena

The availability of capital within the Group to provide adequate funding

strength for Group operations

Continuous quality engineering services upgrading through constant re-

engineering process and training while maintaining the existing standard of

professionalism

Page 3: Water Resourceschssmena.ae/wp-content/uploads/brochure/8 Water Resources.pdfState road was upgrade to a flood protection bund to protect the agricultural areas and the surrounding

Corporate

Information

The HSS Group of companies, headquartered in Kuala Lumpur, has offices in the

UAE, Qatar, Iraq, Iran and India. Its flagship company, HSS Integrated Sdn Bhd

(HSSI), is currently one of the leading ISO Certified (ISO 9001:2008 Standard)

engineering consultancy firms in Malaysia. With a proud history since its

establishment in 1984. HSSI is a firm with shared values, an open culture,

commitment to services & quality, provision of high standards of professionalism

and business ethics, along with a leading edge approach to delivering a

sustainable future.

Our expertise includes project management, master planning, preliminary and

detailed engineering designs, construction supervision, contracts administration,

feasibility studies for major infrastructure project in South East Asia, Middle East

and North Africa (MENA), South Asia and Australia. The Group’s results are

evident from the track records of vast experiences and timely delivery of projects

in addition to the established good working relationships with clients from both the

public and private sectors.

As a total engineering solution Firm with a global total workforces of over 700 staff

of which more than 250 are engineers, HSS is able to draw on resources within

and is well equipped to handle projects of varying magnitudes. Having contributed

successfully in the Asian, Middle Eastern, North African and South East Asian

regions, HSS is confident that as a group, similar engineering consultancy

services can be provided in other parts of the world mainly in the infrastructure &

Water Resource development projects. The group is confident that with the

experience and track record, it will be able to provide a high standard of

engineering services to any client.

Page 4: Water Resourceschssmena.ae/wp-content/uploads/brochure/8 Water Resources.pdfState road was upgrade to a flood protection bund to protect the agricultural areas and the surrounding

Water Resources

HSS is experienced in urban and rural drainage encompassing Master Planning,

Detailed Design, Project Management, Pre & Post Construction, etc. Area of our

competencies (but not limited to) are Major & Minor drains and ancillary works.

HSS involved in numerous projects throughout Malaysia and are familiar with the

Authority / Local Council design procedures, prevailing design standards and code

of practise. Conversant in Manual Saliran Mesra Alam (MSMA) requirement &

compliance.

Specific capabilities on drainage & irrigation are related to rivers, township and

land development includes the following;

• Hydrological & hydraulics Analysis

• Flood Mitigation Works & Flood Mapping and Risk Assessment Studies

• Dredging & Reclamation Works

• River & Coastal Protection Works

• Drainage & Irrigation Works

• Erosion and Sediment Control Plan (ESCP)

• Rain Water Harvesting

Water Resources

Capability

Page 5: Water Resourceschssmena.ae/wp-content/uploads/brochure/8 Water Resources.pdfState road was upgrade to a flood protection bund to protect the agricultural areas and the surrounding

Water Resources

Experience

The following generally highlights HSS’s experience, knowledge and deep

involvement on some prominent large scale Water Recourse projects both in the

Pre and Post Contract Stage. Some of the projects are as listed below.

Kota Tinggi Drainage Master Plan Study, Johor Darul Takzim.

Description : The consultancy services provided involved the undertaking of a

Drainage Master Plan Study, comprising an area of 2,000 ha

within the boundaries of the district council of Kota Tinggi

Services : Formulation of drainage study strategy for Kota Tinggi Town,

proposals for the improvement of the existing drainage system,

formulation of a plan for the beautification of waterway corridors,

proposals for the protection of river bank slips and proposals for

institutional arrangements for the operation and maintenance of

the proposed drainage system.

Project Value : RM 28 million

Project Type : Masterplan

Drainage Masterplan Study, Simpang Renggam Town

Description : HSS has been invited by Drainage and Irrigation Department of

Johor to carry out a Drainage Master Plan Study for Simpang

Renggam Town. The town is located 20 km south of Bandar

Kluang and East of North - South Expressway. The total project

study area is approximately 1000 h.a. Simpang Renggam town

is rapidly developing as key area for small and medium industrial

including housing in the District of Kluang. The topography of the

study Area is generally undulating high land and flood plain

along the water-courses. There are four main streams draining

the project study area : Sg. Benut, Sy. Parit Hj. Yasin and Sg.

Parit Chokro.

Services : The study require the preparation of a Drainage Master Plan for

Simpang Renggam Town which will :-

Identification of existing drainage problems and improvement of

existing drainage facilities. Provide planning information to

ensure that adequate provision are made for future

developments and formulate drainage strategies for the whole

development in accordance with established environmental

norms and standards

Project Value : RM 23 million

Project Type : Masterplan

Page 6: Water Resourceschssmena.ae/wp-content/uploads/brochure/8 Water Resources.pdfState road was upgrade to a flood protection bund to protect the agricultural areas and the surrounding

Water Resources

Experience

Master Plan and Detailed Design for Muar River Flood Mitigation Works

Description : A Master Plan of Flood Mitigation Works in Sg. Muar River

Basin (6300km2) was carried out, testing the effectiveness of

each component of works following calibration of mathematical

model. Priority cost-effective flood mitigation works in Segamat

and Lower Muar were identified for detailed design and

implementation.

Services : Hydrological Modeling, Hydraulic Modeling, Flood Risk Mapping,

GIS, Detailed Design of Flood Mitigation Works, Preparation of

Bill of Quantities and Specification Tender Documents

Project Value : RM350 million

Project Type : Masterplan & Flood Mitigation

Lemal & Rantau Panjang Flood Protection Scheme

Description : For the Lemal area, this project involved the construction of a

dyke measuring 1 km away in parallel to the Golok river. For the

Rantau Panjang area, the existing Lubok Stol-Rantau-Lanchang

State road was upgrade to a flood protection bund to protect the

agricultural areas and the surrounding towns. Necessary

drainage were also provided for these areas. The increase in

water levels in Golok river was reduced to pre-works level via a

construction a 500m in width by pass channel and bridge.

Services : Flood Mitigation Studies involving Hydrology and Hydraulic

Analyses, Mathematical Modelling of Flood in the Golok river

basin, Detailed Design of Floodway, River Improvement and

Flood corridor, Detailed Design of River bunds, River Walls and

Bank Protection, Geotechnical Investigation and design,

Sociological Studies, Formulation of Land Acquisition and

Resettlement Plans, Design of Road Network and Pavements,

Environmental Impact Assessment, Formulation of Agricultural

Development Plan & Economic Evaluation of Project Options

Project Value : RM 180 million

Project Type : Flood Mitigation

Page 7: Water Resourceschssmena.ae/wp-content/uploads/brochure/8 Water Resources.pdfState road was upgrade to a flood protection bund to protect the agricultural areas and the surrounding

Water Resources

Experience

Kinta River Flood Mitigation and Catchment Area Rehabilitation

Description : This project involved a comprehensive study of the flood

problems in Sg. Kinta catchment and to formulate measures to

rehabilitate the catchment which has been extensively mined in

the past.

Services : Flood Mitigation Studies involving Hydrology and Hydraulics

Analysis, Mathematical Modelling of River Flow and Sediment

using MIKE II, Mining Land Rehabilitation including Mine

Inventory, Agricultural Options and other possible uses,

Legislative, Resource Planning and Sociological Studies,

Environmental Improvement plant for Sg. Kinta within Ipoh,

Establishment of Pilot Project for Land Rehabilitation, Economic

Evaluation of Project Options

Project Value : RM 18.6 million

Project Type : Flood Mitigation

Page 8: Water Resourceschssmena.ae/wp-content/uploads/brochure/8 Water Resources.pdfState road was upgrade to a flood protection bund to protect the agricultural areas and the surrounding

Water Resources

Experience

Kota Tinggi - River Protection and Landscaping - Detail Design

Description : The project entailed the detail designs for bank protection works,

recreational facilities and landscaping works for Sungai Johor at

Kota Tinggi for a stretch of 1.2km on both banks of the river.

Services : Investigation and analysis for the cause of river bank erosion of

the effected areas. Formulate conceptual designs of river bank

protections works deemed necessary to mitigate erosion

problem. Detailed design of river bank protection works. Detailed

design of all outlet structures and associated works &

Detailed design of landscaping works and recreational facilities

Project Value : RM 50 million

Project Type : River Works

Scour at Sungai Langat and Sungai Semenyih Substructure

Description : Sg. Langar and Sg. Semenyih bridges were constructed in mid

1970’s and extended with additional lanes in nearly 1990. These

two bridges links KL and Seremban from part of North South

Expressway. The substructure for the bridges has scoured by

4.0m and 3.0 respectively due possibly to sand mining activity

downstream sometime in 1990’s. Massive gabion retaining walls

titled towards exposed piles caused by undermining of gabion

foundation. Proposal was made to provide emergency protection

to Langat bridge using rock amour. Permanent protection works

comprise:

• R.C retaining wall to support local JKR road reserve (10m)

• Install micro-piles

• Cast base slab

• Fill up exposed piles with concrete to form integrated pile cap

• Rip rap protection on geotextile filter to river bed and river slope

Services : Hydrological and Hydraulic Modeling, Geotechnical and

foundation studies & Structural Analysis

Project Value : RM 5 million

Project Type : River Works

Page 9: Water Resourceschssmena.ae/wp-content/uploads/brochure/8 Water Resources.pdfState road was upgrade to a flood protection bund to protect the agricultural areas and the surrounding

Water Resources

Experience

Remedial Work of Substructures and River Bank Protection on Bridges 1104

and 1068

Description : This project comprised the detailed engineering design for sub-

structure rehabilitation works on rail Bridge No. 1104 across Sg.

Semenyih and No. 1068 across Sg. Langat. The substructure for

the bridges is scoured to 30m, due to sand downstream activity

sometime in the 1990’s.

Services : Hydrological and hydraulic modeling, Geotechnical and

foundation studies, Detail Design of river protection works,

Supervision and coordination of soil investigation works and detail

topographical survey. Site supervision and contract administration

during construction & Preparation of quantities, tender documents

and contract documents.

Project Value : RM 4 million

Project Type : River Works

Emergency Protection Works at Sungai Long River and Associated Works in

Hulu Langat District, Selangor

Description : This project involved the detail design for the proposed slope and

riverbank protection works.

Services : Investigation and study the site condition and problems.

Formulate conceptual designs at slope and riverbank. Detailed

design at slope and riverbank protection works & Detailed design

at all outlet structure and associated works

Project Value : RM 1.7 mil

Project Type : River Works

Page 10: Water Resourceschssmena.ae/wp-content/uploads/brochure/8 Water Resources.pdfState road was upgrade to a flood protection bund to protect the agricultural areas and the surrounding

PROJECT DESCRIPTION

CL

IEN

T

ER

OS

ION

AN

D S

ED

IME

NT

CO

NT

RO

L

SU

RF

AC

E D

RA

IN/U

RB

AN

DR

AIN

AG

E

GP

T/T

RA

SH

SC

RE

EN

OS

D/D

ET

EN

TIO

N P

ON

D/

OU

TL

ET

CO

NT

RO

L

RA

INW

AT

ER

HA

RV

ES

TIN

G

DR

AIN

AG

E C

ULV

ER

T

RIV

ER

BR

IDG

E

RE

ALIG

NM

EN

T/ S

TR

EA

M

DIV

ER

SIO

N

Manjung Coal Unit 4, 1 x 1000 MegaWatt – Power Plant

Malaysia TNB √ √ √ √

Klang Valley Mass Rapid Transit (KVMRT) – Sg. Buloh to

Kajang MRT Corporation √ √ √ √ √ √ √ √

Proposed Maju Expressway Extension to KLIA Maju Holdings √ √ √ √ √ √ √

Feasibility Study for the Proposed East Coast Rail Route ECER √ √ √ √ √

Masterplan Study on Kuantan Port City, Kuantan, Pahang PAG √ √ √ √ √ √ √

Proposed Development of New Low Cost Carrier

Terminal (LCCT) and Associated Works at

Kuala Lumpur International Airport (KLIA)

Malaysia Airport

Berhad √ √ √ √ √ √ √

Development of Bandar Bukit Raja (Stage 1), Mukim

Kapar, Daerah Klang, Selangor Darul Ehsan

Sime Darby

Development √ √ √ √ √ √

Electrified Double Track Project (Northern Line:

Ipoh to Padang Besar under GAMUDA) Gamuda √ √ √ √ √ √

Electrified Double Track Project (Southern Line):

Seremban to Gemas under IRCON) IRCON √ √ √ √ √ √

Extension of Light Rail Train(LRT Ampang Lines) Prasarana √ √ √ √ √ √ √ √

Proposed Extension of Existing Penang Bridge, Penang Penang Bridge

Sdn Bhd √ √ √

Ipoh-Lumut Link Road and Diamond Interchange, Perak

Darul Ridzuan

Projek Lebuhraya

Utara Selatan (PLUS) √ √ √ √ √ √ √

Privatisation of Kajang Seremban Highway (LEKAS) LEKAS √ √ √ √ √ √ √

Proposed Masterplan Study for Madinat Al-Arab,

Dubai UAE Nakheel √ √ √ √ √

Proposed Mixed Use Development on Plot 611-122,

Bukadra, Dubai UAE Nakheel √ √ √ √ √

Proposed Development and Construction of the Nad Al

Sheba Course on Parcel 600-6888,

Nad Al Sheba, Dubai UEA

TAK √ √ √ √ √

Detailed Design of Sungai Muar Flood Mitigation Works

(FASA 1) Johor JPS √ √ √ √ √ √ √

East Coast Expressway ECE II

(Bukit Besi to Bukit Payung – Package 10D) MTD √ √ √ √ √ √

Proposed Construction of Sidel Factory at Shah Alam

Selangor

Sidel Distribution (M)

Sdn Bhd √ √ √ √ √

Drainage Master Plan Study for Simpang Renggam Town,

Johor Darul Takzim JPS √ √ √ √ √ √ √

Water & Drainage

Experience

Page 11: Water Resourceschssmena.ae/wp-content/uploads/brochure/8 Water Resources.pdfState road was upgrade to a flood protection bund to protect the agricultural areas and the surrounding

PROJECT DESCRIPTION

CL

IEN

T

ER

OS

ION

AN

D S

ED

IME

NT

CO

NT

RO

L

SU

RF

AC

E D

RA

IN/U

RB

AN

DR

AIN

AG

E

GP

T/T

RA

SH

SC

RE

EN

OS

D/D

ET

EN

TIO

N P

ON

D/

OU

TL

ET

CO

NT

RO

L

RA

INW

AT

ER

HA

RV

ES

TIN

G

DR

AIN

AG

E C

ULV

ER

T

RIV

ER

BR

IDG

E

RE

ALIG

NM

EN

T/ S

TR

EA

M

DIV

ER

SIO

N

Proposed Design, Construction and Commissioning of

Solid Waste Thermal Treat Plant at Beroga, Mukim

Semenyih, Daerah Hulu Langat, Selangor Darul Ehsan

Kementerian

Perumahan dan

Kerajaan Tempatan

√ √ √ √ √ √

Cadangan Pembangunan bercampur di atas Lot PT21008,

Mukim Ampangan, Seremban, Negeri Sembilan

Sunrise MCL

Berhad √ √ √ √ √

Bukit Bintang City Centre Masterplan & Blue Print APUDG/UDA √ √ √ √ √ √

SOCSO Rehabilitation Centre, Melaka SOCSO √ √ √ √ √

Matriculation College, Banting Selangor Maju Holdings √ √ √ √ √

Technopark Development, Dubai Technopark

Management √ √ √ √

Expansion of West Port (CT3-CT9)

vessels water supply system, Port Klang, Malaysia. Westports √ √ √ √

Bandar Sri Permaisuri, Kuala Lumpur PPC-Glomac √ √ √ √ √ √

Putrajaya Main Infra Precint 11 PJC/PJH √ √ √ √ √

Water & Drainage

Experience

Page 12: Water Resourceschssmena.ae/wp-content/uploads/brochure/8 Water Resources.pdfState road was upgrade to a flood protection bund to protect the agricultural areas and the surrounding

PROJECT DESCRIPTION

CL

IEN

T

WA

TE

R S

UP

PLY

MA

ST

ER

PLA

N

AS

SE

T S

TU

DY

INT

ER

-RE

SE

RV

OIR

PIP

ELIN

E

TR

AN

SM

ISS

ION

PIP

ELIN

E

WA

TE

R T

RE

AT

ME

NT

PLA

NT

RE

TIC

ULA

TIO

N

PIP

ELIN

E

SU

CT

ION

TA

NK

RE

SE

RV

OIR

PU

MP

ING

SY

ST

EM

&

SU

RG

E A

NA

LY

SIS

PLU

MB

ING

Bukit Bintang City Centre Masterplan & Blue

print (2.3 Mgd) APUDG/UDA √ √ √ √ √ √

Kuantan Port City Masterplan (2008-2040), 114

Mgd PAG √ √ √ √ √ √ √ √ √

Pipes Replacement Work for Districts of Kuala

Selangor, Kuala Langat And Sepang SYABAS/KTAK √ √ √

Re-development of Lembah Beringin, Selangor Indofocus √ √ √ √ √ √ √ √ √

SOCSO Rehabilitation Centre, Melaka SOCSO √ √ √ √ √ √

Matriculation College, Banting Selangor Maju Holdings √ √ √ √ √ √

Air Kelantan Water Supply Due Diligence

Study for the State of Kelantan for AKSB.

(1999)

AKSB √

Masterplan for Madinat Al Arab, Jebel Ali,

Dubai. Demand 250 Mgd (2006) Nakheel √ √ √ √ √ √

Masterplan for Nad Al Sheba, Dubai. Demand 5

Mgd. (2006) TAK √ √ √ √ √ √

Al-Abdally Irrigation Farm, Kuwait Ministry of Irrigation,

Kuwait √ √ √ √ √ √

Technopark Development, Dubai Technopark

Management √ √ √ √ √ √ √

Selangor Masterplan Study (Water Supply) for

the State of Selangor. (2001) MAG/JPBD √ √ √ √ √

Port Dickson Local Plan Study, N.Sembilan

JPBD Selatan √ √ √

Lumut Port Industrial Park, Setiawan, Perak

(1,000Ac) LMT Sdn.Bhd √ √ √ √

Temerluh,Maran,Bera and Jerantut Structure

Plan Study

Rekarancang

Sdn.Bhd/ JPBD √ √ √ √ √ √

Kang keng International Airport,Cambodia Ariston √ √ √ √ √ √ √

Expansion of West Port (CT3-CT9) vessels

water supply system, Port Klang, Malaysia.

(2004-2006)

Westports √ √ √ √ √ √

Bandar Bukit Rajah water supply system, Klang,

demand 12 Mg. (3,000Ac) SIME UEP √ √ √ √ √ √

Bandar Sri Permaisuri, Kuala Lumpur water

supply system, demand 4 Mg. PPC-Glomac √ √ √ √

Universiti Teknologi Petronas water supply

system, demand 2 Mg. ITP √ √ √ √ √

Water & Drainage

Experience

Page 13: Water Resourceschssmena.ae/wp-content/uploads/brochure/8 Water Resources.pdfState road was upgrade to a flood protection bund to protect the agricultural areas and the surrounding

PROJECT DESCRIPTION

CL

IEN

T

WA

TE

R S

UP

PLY

MA

ST

ER

PLA

N

AS

SE

T S

TU

DY

INT

ER

-RE

SE

RV

OIR

PIP

ELIN

E

TR

AN

SM

ISS

ION

PIP

ELIN

E

WA

TE

R T

RE

AT

ME

NT

PLA

NT

RE

TIC

ULA

TIO

N

PIP

ELIN

E

SU

CT

ION

TA

NK

RE

SE

RV

OIR

PU

MP

ING

SY

ST

EM

&

SU

RG

E A

NA

LY

SIS

PLU

MB

ING

Forest Height Development water supply system,

Seremban, demand 2 Mg. SUNRISE √ √ √ √ √ √ √

Langkawi Airport water supply system, demand 2 Mg. AJM √ √ √ √ √ √

Bandar Baru Kertih, Terengganu water supply system PEREMBA √ √ √ √ √ √

Overview of Water Supply Demand Sudy for

Westport, Klang, Selangor D.E. for Klang Multi

Terminal Sdn. Bhd. (1998)

Westports √ √ √

Iron Foundry for Permodalan Negeri Selangor Berhad

(PNSB), Dengkil, Selangor D.E. (200 Ac). 1994-2000,

RM51.0 Mil

PNSB √ √ √ √

Master Plan for Gebeng Industrial Park, Kuantan for

UPEN State of Pahang UPEN Pahang √ √ √ √ √ √ √

Water & Drainage

Experience

Page 14: Water Resourceschssmena.ae/wp-content/uploads/brochure/8 Water Resources.pdfState road was upgrade to a flood protection bund to protect the agricultural areas and the surrounding
Page 15: Water Resourceschssmena.ae/wp-content/uploads/brochure/8 Water Resources.pdfState road was upgrade to a flood protection bund to protect the agricultural areas and the surrounding

Wisma HSS Integrated B1 (1-4) Block B Plaza Dwitasik

No 21, Jalan 5/106, Bandar Sri Permaisuri, 56100 Kuala Lumpur. Malaysia

Tel: 603-91730355 Fax: 603-91730939 E-mai: [email protected]

Website: www.hssgroup.com.my