Water Treatment Process Unit # 3

2
RAW WATER POND CAP. 37191 M 3 (3. 5 M)  HRSCC CAP. 675 M 3 /Hr. FILTER WATER TANK CAP. 5000 M 3 MAHANADI 24” KELO RIVER 12” MANSAROVAR 14” WATER TREATMENT PROCESS FLOW DIAGRAM P.P.UNIT # 3 ACF CAP. 2x 50 M 3 /Hr LBC CAP. 2x 50 M 3 /Hr DEGASSER TANK CAP. 150 M 3 WBA CAP. 2x 50 M 3 /Hr SBA CAP. 2x 50 M 3 /Hr MB CAP. 2X 50 M 3 /Hr. TOWER D.M.WATER STORAGE TANK - A CAP.600 M 3 BOILER FILL PUMP, 02 NOS,CAP. 100 M 3 /HR. DM.WATER TRANSFER TO PHASE #3, 02 NOS. CAP. 50 M 3 /HR. HOT WELL MAKEUP PUMP, 03 NOS. CAP. 30M 3 /HR. DM.PLANT REGENERATION PUMP, 02 NOS. CAP. 15M 3 /HR. CAP-675M 3 /Hr PUMP-1 CAP. 800 M 3 /HR PUMP-2 CAP. 800 M 3 /HR MANSAROVAR PUMP-02 NOS. CAP. 850 M 3 /HR PUMP-1 CAP. 55 M 3 /HR PUMP-2 CAP. 55 M 3 /HR CO2 PUMP-1 PUMP-2 PUMP-3 CAP. 55 M 3 /HR AIR BLOWER-1 AIR BLOWER-2 D.M.WATER STORAGE TANK - B CAP.600 M 3

Transcript of Water Treatment Process Unit # 3

7/30/2019 Water Treatment Process Unit # 3

http://slidepdf.com/reader/full/water-treatment-process-unit-3 1/1

RAW

WATER 

POND

CAP.

37191 M3

(3. 5 M)

 HRSCC

CAP. 675

M3/Hr.

FILTER WATER TANK 

CAP. 5000 M3MAHANADI 24”

KELO RIVER 12”

MANSAROVAR 14”

WATER TREATMENT PROCESS FLOW DIAGRAM P.P.UNIT # 3

ACF

CAP.2x 50 M3/Hr

LBC

CAP.2x 50 M3/Hr

DEGASSER 

TANK 

CAP. 150 M3

WBA

CAP.2x 50

M3/Hr

SBA

CAP.2x 50

M3/Hr

MB

CAP.

2X 50

M3/Hr.

TOWER 

D.M.WATER 

STORAGE

TANK - A

CAP.600 M3

BOILER FILL PUMP, 02 NOS,CAP. 100 M 3/HR.

DM.WATER TRANSFER TO PHASE #3, 02 NOS. CAP. 50 M 3/HR.

HOT WELL MAKEUP PUMP, 03 NOS. CAP. 30M 3/HR.

DM.PLANT REGENERATION PUMP, 02 NOS. CAP. 15M 3/HR.

CAP-675M3/Hr

PUMP-1

CAP. 800 M3/HR 

PUMP-2

CAP. 800 M

3

/HR 

MANSAROVAR 

PUMP-02 NOS.

CAP. 850 M3/HR 

PUMP-1

CAP. 55 M3/HR PUMP-2CAP. 55 M3/HR 

CO2

PUMP-1

PUMP-2

PUMP-3

CAP. 55 M3/HR 

AIR BLOWER-1

AIR BLOWER-2

D.M.WATER 

STORAGE

TANK - B

CAP.600 M3