Water Sector Planning ApproachDWS IDP Support
6 – 7 November 2014Free State Province
IDP Manager Rep Forum
Water Sector: IDP Planning Support Challenges1. IDP’s are backlog eradication based, not socio economic development planning
a) Capex Grant funding, versus Own revenue and borrowingb) Social grants – focus on Indigents instead of infirm and frailc) Budgets not cash backed; None revenue servicesd) Repair and maintenance ratios below 7%; Staffing ratiose) Capex investment into new and existing infrastructure not 60% versus 40%
based; Asset Registers not unbundledf) Unfunded projects not indicated – thus no Infrastructure investment
frameworks; no CIP’sg) Strategic business planning strategies ? CSF’s; Mandates; KPA’s???? ; Not
integrated planning [WSDP’s not revised or adopted]2. IDP assessment take place in the absence of benchmarking – e.g. only IDP and not
SDBIP or MTREF Budgeta) Not all revenue collectedb) Revenue models exhausted – too many indigentc) Unfunded Mandatesd) Service CUC [Consumer Unit Costs] are very highe) Does not look into future [30 years ahead]; WCWDMf) High water/energy - loss which are not Accounted for
3. Overlap of IDP planning activitiesa) Multiple sessions same time framework spread over countryb) Unavailability Provincial IDP Process Plan’s
• In Integrated development planning we need to split National Backbone and Local Backbone Consumer Unit Costs [CUC]:– Fund National backbone out of National Revenue [PAYE; VAT;
etc.]; Dams; Transfer Schemes; etc.– Fund Local backbone out of Local revenue [rates and taxes;
fines; levies; etc.]; Reticulation; Works; etc.– Improve efficacy:
– Doing right things – effective– Doing things right – efficiency– More value per buck– Timely planning– Preventative
Latest Development1. Developed water sector SCOA – MFMA – July 2017 – Council accountability2. Revised WSDP’s [water services development plans - SCOA]3. Expediting Licensing Process [ water use licensing application – could take
up to 18 months / backlog outstanding licenses / illegal WSA operations] = Water security plus biodiversity
4. Participation in IDP support Activities are unfunded Mandates – e.g. it is an over and above function [benchmarking efficacy]
5. Draft NEMA Regulations: Vlei Land; estuary and coastal management6. Does not provide for:
• Climate change; Disaster; Drought; Floods; Abstraction; Inter basin transfer – none related outflow; Outflow and Abstraction interdependence; etc.
• X8 National Department / Provincial Department – Licenses and Permits
7. Total Outflow Overview Strategy Study Partnership between eThekwini Metro and DWS dovetailed with WCWDM
8. Blue Drop; Green Drop; No Drop
Six Themes / Areas have been identified:1.Regulatory Framework2.Governance & Development
Planning + Agencies3.Justice System & Certification4.RPMS5.ME&R6.Benchmarking
1
2
3
4
5
6
All are interdependent
and relate
Water Sector Regulatory Process
Piloting: Partnership between eThekwini Metro and DWS
Tongaat(2/115)
uMdlotiRegional(0/110)
PhoenixUmhlanga
(5/60)
KwaMashu(32/0)
Amanzimtoti(5/27)
Central(29/0)
Dassenhoek(3/6)
Fredville(0/0)
Hammarsdale(2/45)
Isipingo(7/0)Kingsburgh
(0.5/20)
KwaNdengezi(1/3)
Mpumalanga(5/0)
Mzinyathi(0/10)
Northern(10/27)Southern
(59/0)
Umbilo(12/0)
Umhlatuzana(5/26)
uMkhomaziRegional
(0/16)
N
Wastewater Masterplan 2012/13 - Anticipated Ultimate Wastewater Treatment Systems (Current Spare
Capacity / Additional Capacity Required for Ultimate in Ml/day)
1. Inter-basin transfer causing none related outflow
2. Cultural Council choice not to use re-cycle water directly
3. Implication CUC rising from 40 cent per unit to R1-80 per unit
4. Water loss needing to build dams causing CUC to rise from R1-80 to R2-40 per unit
5. Need to revise CAPEX financing model
B: Balance: Outflow
dovetailed with WCWDM
Y: Appropriate Treatment &
Disposal
X: Classification Framework; SCOA
Reserve
Rivers; Dams; Ground water
Marine Outfall
Estuaries
Socio- Economic Objectives
Cultural & Political
Objectives
T: Technology, Assets, Cost & Time
W: Water Use Allocation
P: Protection- RQO Reserve
Z: License /
Permit
WTW
WWTW
W{S}DP
IDPBudget / MTREF
SDBIP
CIPIIF
SDFLED
LG & WSA & WSP Governance & Development Planning
C:Compliance Requirements
Regulatory Framework
R: Regulatory Performance Management
System
No-Drop
AG Audit Report
Blue Drop
Green Drop
Context Diagram: Sustainable Compliant-Outflow- dovetailed with WCWDM Governance – use and protection (Ver. 8.0)The DWA: Sub-Directorate WS Planning [ proprietary – may not be reproduced without DWA approval]
• Redress• Justice• Corrective Action• Act's, Rules,
Regulation, by-laws, Guidelines
• Legal Framework
• Clean Audit• Blue-, Green-
No-Drop• Blue Flag
WSDP Audit
Municipal Bio Diversity Plan
yxi
yxii
yxiii
yxivyxvi
yxvii
y
x
zii
w
t
bi
bii
biiip
License: z = {c & W, etc.
Balance: b = {y & x, etc.
Compliance: c = {w & t & p & du & eia & swd & cm etc.
zi
c
NDP
Biodiversity
Compliance & Efficacy: Cuc; Reserve; RQO; Biodiversity; Backlog; Fiscal health; None revenue [all services];
Strategic Plan
Administrative /Criminal /Civil Justice System & Certification
RPMS
RPMS: r = {f & bd & g & s , etc.
f
g
bd
s
DWA: WS NIS
Benchmarking
ME&R
Six Themes / Areas:1. Governance & Development
Planning2. Justice System & Certification3. RPMS4. ME&R5. Benchmarking6. Regulatory Framework 7. Governance Agencies
Infrastructure Assets
yxv
Discharge Uses / requirements
Nema: EIA Requirement
NEMWA: Solid / Waste Disposal
Coastal & Marine Management Requirement
du
cm
swd
eia
bvii
bvii
bvbiv
Blue Flag
SDC + RDM
bviisrdm
Agencies
SDC + RDM
yxix
NWRS
WAR
WAR
yxx
1a
1b
2
34
5
6
bfInstead of WSDP WDP???
Zi: Discharge
std’s
Housing
Terms and AcronymsAG Auditor General NEMWA National Environmental Waste Act
bBalance: Sustainable Complian- Outflow Governance dovetailed with WCWDM Governance NRW Non-Revenue Water [IWA model as adapted DWA: No-Drop]
bd Blue Drop Status PPE Property Plant and Equipment [Assets]bf Blue Flag PES Present ecological stateCAPEX Capital Expenditure R&M Repairs and Maintenance
RDM Resource Directed MeasuresCIP Comprehensive Infrastructure Plan RPMS Regulatory Performance Management Plan
REC Recommended ecological controlcuc Consumer Unit Costs RQO Resource Quality Objectives
Efficacy Effective and Efficient [doing right things right] s
Service Delivery: Backlogs; Service Interruptions; Vacancies; Unfunded Mandates; Non-Revenue Water [Services]; Non-Compliance; Supply Chain
f
Financial Health: MFMA Circular 71; Unqualified Audit; Balanced CAPEX investment new + existing infrastructure; R&M =>8% of Budget [PPE]; Cash backed;
Fiscal Health
Affordable sustainable compliant services within SCOA framework and Regulatory Performance requirements and socio-economic growth based financial performance
NRWS National Water Resource Strategy SCOA Standard Chart of Accounts (DWA water sector inputs for MFMA]g Green Drop status SDBIP Service Delivery Budget Improvement PlanIDP Integrated Development Plan SDF Spatial Development Framework
SDC Source Directed ControlsIIF Infrastructure Investment Framework t Technology & Assets & Cost & Time
WAR Water allocation reformLED Local Economic Development WCWDM Water Conservation and Water Demand ManagementME&R Monitoring, Evaluation and Reporting WSA Water Services AuthorityMFMA Municipal Finance Management Act WSP Water Services Provider
MTREF Medium Term Reporting Expenditure FrameworkWSDP / WDP
Water Services Development Plan / WATER DEVELOPMENT PLAN
NDP National Development Plan WTW Water Treatment WorksNEMA National Environmental Act WWTW Waste Water Treatment WorksNIS National Information System WS Water Services