Water Resources 2012 Annual Report
-
Upload
city-of-edmond -
Category
Documents
-
view
217 -
download
1
description
Transcript of Water Resources 2012 Annual Report
The Water Resources Department wishes to acknowledge the efforts of several persons in the timely production of this document. Without their expertise, effort, and unique abilities this would not have been possible and certainly the document would not have been produced as the professional and attractive package it is. These persons are: Earl Hall, Kris Neifing, Ron Birdsong, Sam Drain, Keith Stewart, Cynthia Moore, Susan Miller, Rae Reese, and Jennifer Young and Jennifer Slack.
Population Estimate
Average Number of Active Accounts
2008 2009 2010 2011 2012
*Edmond Population 79,559 81,093 81,405 83,019 83,035
2008 2009 2010 2011 2012
Water 25,221 26,260 26,756 26,957 27,702
Wastewater 27,888 27,875 28,413 28,535 29,241
Electric 34,564 34,671 35,300 35,497 36,985
*Source: Edmond Economic Development Authority
Community Focused Water and Wastewater Utilities
To Meet the Needs of Edmond’s Customers by Providing Trustworthy Water and Wastewater Services
Maintain the Water Resources Infrastructure Maintain Market Competitiveness Through the Use of Technology and Qualified Personnel Continue to Provide Safe Water to Consumers and Return Clean Water to the Environment
Quality Water and Wastewater Services Customer Satisfaction and Involvement Professional, Honest Relationships with our Customers and with One Another A Team-Created, Positive, Safe and Enjoyable Work Environment Trained, Empowered Employees Sincere, Straightforward Communication
Water Production Division Edmond Water Treatment Plant Pumping Stations, Water Towers and Storage Tanks Water Wells (Fifty-six wells located throughout Edmond)
Wastewater Treatment Division Coffee Creek Wastewater Treatment Plant Wastewater Lift Stations
Edmond’s Coffee Creek Wastewater Treatment Plant (CCWWTP) is a continuous flow activated sludge process utilizing oxidation ditches and aeration tanks for secondary treatment. It has a total design capacity of nine (9) million gallons per day. The plant is operated under an Oklahoma Pollution Discharge Elimination System (OPDES) permit, issued by the Oklahoma Department of Environmental Quality (ODEQ). In 2009 the facility received a renewed OPDES permit effective May 1. The renewed permit will be in effect for five years. During 2012 ODEQ personnel conducted five plant inspections and did not note any significant issues. The basic features of the wastewater treatment process are, screens to remove debris from raw wastewater entering the plant, aeration basins that provide for oxygenation and mixing of active microorganisms with raw sewage (the activated sludge process), a basin or clarifier to separate solids from the treated effluent, a system to return solids, also known as activated sludge, from the clarifiers back to the aeration basins and a system to waste or remove excess solids from either the basin or clarifier thus controlling the solids mass. Operational controls include, controlling the oxygen level, the rate that activated solids are returned to the aeration basins and the rate that solids are withdrawn from the process. The treatment process is designed to remove carbonaceous organic material and oxidize ammonia to nitrate.
Treated water from the plant is also filtered to remove nearly all of the remaining solids, chlorinated to kill any potentially harmful microorganisms and then dechlorinated to eliminate excess chlorine that could be harmful to natural organisms in the receiving stream. The chlorination and dechlorination system is utilized for five months each year from May through September. These are the months most likely to have receiving stream recreational use. Biosolids, or sludge, that is wasted or removed from the wastewater treatment process is treated in facultative lagoons. After the sludge has spent a required amount of time in the lagoons it is tested for compliance with regulatory requirements and then land applied to local farmland for growth of second generation food crops, such as hay for stock feed. This program is defined in the plant Sludge Management Plan (SMP). The current SMP was approved by ODEQ in October 2006. The facility also has a storm water discharge permit, issued by ODEQ. This permit was issued in May 2012 and expires on May 2016. A new permit is pending ODEQ action. The document requires Edmond to maintain best management practices for control and containment of materials that should not contaminate plant storm water run off. The CCWWTP Division is also responsible for the operation and maintenance of the City’s nine (9) lift stations. The lift stations convey wastewater from the collection system to the CCWWTP. The stations are currently undergoing a rehabilitation effort to ensure that they remain at full operational capacity at all times.
The CCWWTP processed a total of 2,733,500,000 gallons of wastewater during 2012. Total operations and maintenance expenditures for 2012 were approximately $1,663,024. The percent removal of our major permitted parameters was above 97%. In 2012, a total of 4,721,800 gallons (1,485 dry tons) of biosolids were land applied on ODEQ approved farmland. Five (5) employees, One (1) Chief Plant Operator, One (1) Maintenance Mechanic, One (1) Laboratory Technician, two (2) Operators, and one (1) Instrumentation Technician operate and maintain the CCWWTP and the collection system lift stations. Staff is provided direction by the Water Resources Superintendent, Assistant Superintendent and the CCWWTP Chief Plant Operator.
Plant InfluentChisholm Creek
Lift Station
Influent Bar Screen
Screening to Landfill
Influent Lift Station
Influent FlowEqualization
Basin
Influent Fine Screen
Screenings To Landfill
Plant Influent Spring Creek
Lift Station
First Stage Aeration
Basin
First StageAeration
Basin
First StageClarifier
First Stage Clarifier
Phase 1
Second StageAir Basin
Second StageAir Basin
Solids Second StageClarifier
Second StageClarifier
Effluent to Sand Filters
Solids
RAS/WAS WAS to Facultative Lagoons
Solids
Solids
Sand Filters (8)
Phase 2
Oxidation Ditch
Oxidation Ditch
Clarifier Clarifier
Solids Solids
Effluent To Sand Filters
RAS/WAS WAS to Facultative Lagoons
Phase 3
OxidationDitch
Oxidation Ditch
Clarifier Clarifier
Solids Solids
ChlorinationDechlor.
To OutfallDischarge No 001
City of EdmondCoffee Creek Wastewater
Treatment Plant1600 N Midwest BlvdEdmond, OKFlow Schematic March 1, 2011
0 2 4 6 8
10
Total Precipitation Inches
Average Effluent Flow MGD
Total Precipitation
Inches
Average Effluent Flow
MGD Jan-12 0.41 7.3 Feb-12 1.74 7.5 Mar-12 4.86 8.7 Apr-12 7.68 8.9
May-12 3.63 8.1 Jun-12 3.60 7.2 Jul-12 0.60 6.6
Aug-12 3.20 7.0 Sep-12 4.38 7.1 Oct-12 2.32 6.8 Nov-12 0.86 6.7 Dec-12 0.63 6.4
Total 33.91 88.30 Average 2.83 7.4
0 50
100 150 200 250
Jan
uar
y Fe
bru
ary
Mar
ch
Ap
ril
May
Ju
ne
Ju
ly
Au
gust
Se
pte
mb
er
Oct
ob
er
No
vem
ber
D
ecem
be
r
Raw BOD mg/L
Final BOD mg/L
Raw BOD mg/L
Final BOD mg/L
Jan-12 135.5 1.5 Feb-12 150.9 1.5 Mar-12 119.5 2.1 Apr-12 110.8 1.7
May-12 123.4 2.0 Jun-12 136.0 1.6 Jul-12 155.8 3.5
Aug-12 160.3 2.1 Sep-12 148.0 2.3 Oct-12 155.0 2.3 Nov-12 166.2 3.5 Dec-12 204.8 2.1
Total 1766.2 26.2 Average 147.2 2.2
0 50
100 150 200 250
Raw TSS mg/L
Effluent TSS mg/L
Raw TSS mg/L
Effluent TSS mg/L
Jan-12 167.4 1.8
Feb-12 180.4 1.9
Mar-12 152.4 2.4
Apr-12 154.9 2.0
May-12 156.9 1.4
Jun-12 159.9 1.7
Jul-12 182.8 17.3
Aug-12 210.6 2.5
Sep-12 200.4 2.7
Oct-12 180.4 2.6
Nov-12 196.3 2.8
Dec-12 154.5 2.8
Total 2096.9 41.9
Average 174.7 3.5
35
35
ArcadiaLake
Covell Rd
Danforth Rd
Edmond Rd
15th St
33rd St
Memorial Rd
Coffee Creek Rd
Sorghum Mill Rd
Waterloo Rd
Weste
rn Av
e
Santa
Fe Av
e
Kelly
Ave
Broa
dway
Brya
nt Av
e
Coltra
ne R
d
Soon
er Rd
Air D
epot
Blvd
Midw
est B
lvd
Doug
las Bl
vd
Post
Rd
Westm
inster
Rd
Oak Tree Oak Tree Reserve
Coffee Creek
Chisholm Creek
Spring Creek
Fire Station 4
33rd Street
40th Street
Memorial
Coffee Creek PlantWWTP
Lift Stations
0 1 20.5Miles
January 14, 2009
City of Edmond
The City of Edmond disclaims any warranty or merchantability or warranty for fitness of use for a particular purpose, expressed or implied, with respect to this data. Furthermore, the City of Edmond disclaims any responsibility for the accuracy or completeness of this data.
Legend
WWTP Waste Water Treatment Plant
Lift StationCity LimitsRailroadStreets
Lift Station Name Location Number
of Pumps Motor
HP Pump GPM
CHISHOLM CREEK ¾ Mile North of Covell on Western 2 150 1500
1 300 3000
COFFEE CREEK South side of Coffee Creek, ¼ mile east of Santa Fe Ave.
3 75 1500
COFFEE CREEK TREATMENT PLANT
Coffee Creek Plant grounds 2 25 1100
1 60 3000
FIRE STATION #4 I-35 Access road, ¼ miles south of 15th Street (Decommissioned 12/26/2012)
2 5 150
MEMORIAL ROAD North side of Memorial, ½ miles west of I-35
2 3 75
OAK TREE 6340 North Santa Fe Ave 3 130 1100
OAK TREE RESERVE East side of Kelly , ¾ mile past Sorghum Mill
2 20 450
SPRING CREEK ¼ mile east of I-35 on 66 Highway
1 30 1000
1 75 2000
2 125 3100
33rd Street South side of 33rd St, ½ miles west of I-35
2 10 75
40th Street 40th St between Karen and Stevens Dr.
2 30 200
Field Name Legal Description Latitude Longitude Field Name Legal Description Latitude Longitude
CR-1 SW/4 SEC 26 T14N R1W 35o 39’ 28.613” -97o 16’ 44.667” JM-1 S/2 NW/4 SEC 8 T14N R1W 35o 42’ 28.745” -97o 19’ 29.088”
CR-2 S/2 SW/4 SEC 26 T14N R1W 35o 39’ 13.342” -97o 16’ 35.11” JM-2 S/2 NW/4 SEC 8 T14N R1W 35o 42’ 18.487” -97o 19’ 29.782
GM-1 NE 1/4 NE 1/2 SE 1/4 SEC 8 T14N R1W 35o 42’ 12.803” -97o 19’ 9.387” JM-3 S/2 NW/4 SEC 8 T14N R1W 35o 42’ 7.524 -97o 19’ 31.045”
GM-2 NE 1/4 NE 1/2 SE 1/4 SEC 8 T14N R1W 35o 42’ 32.465” -97o 19’ 21.433 JM-4 S/2 NW/4 SEC 8 T14N R1W 35o 42’ 19.92 -97o 20’ 8.191”
JG-2 W/2 NE/4 SEC 30 T14N R1W 35o 39’ 56.94” -97o 20’ 34.022” LS-1 SW/4 SEC 24 T14N R2W 35o 40’ 5.795” -97o 22’ 5.878”
JG-3 NE/4 SEC 30 T14N R1W 35o 39’ 56.993” -97o 20’ 29.663” LS-2 W/2 SE/4 SEC 19 T14N R1W 35o 40’ 15.436” -97o 20’ 36.527
JG-4 S/2 NE/4 SEC 30 T14N R1W 35o 39’ 38.531” -97o 20’ 34.857” LS-3 N/2 NE/4 SEC 28 T14N R1W 35o 39’ 59.139” -97o 18’ 20.074”
JG-5 W/2 NW/4 SEC 29 T14N R1W 35o 39’ 56.098” -97o 20’ 5.815” LS-4 NE/4 SEC 28 T14N R1W 35o 39’ 41.501” -97o 18’ 13.096”
JG-6 W/2 NW/4 SEC. 29 T14N R1W 35o 39’ 40.748” -97o 20’ 3.511” LS-5 E/2 SW/4 SEC 21 T14N R1W 35o 40’ 23.184” -97o 18’ 57.692”
JG-13 NW/4 NW/4 SEC 21 T14N R1W 35o 40’ 48.561” -97o 18’ 59.003” LS-8 W/2 NE/4 SEC 25 T14N R2W 35o 39’ 52.351” -97o 21’ 39.77
JG-14 SW/4 SW/4 SEC 16 T14N R1W 35o 41’ 1.442” -97o 18’ 49.714” LS-9 E/2 NE/4 SEC 25 T14N R2W 35o 39’ 44.149” -97o 21’ 23.639”
JG-15 W/2 SW/4 SEC 16 T14N R1W 35o 41’ 7.379” -97o 19’ 3.689” LS-11 SW/4 SEC 2 T14N R2W 35o 40’ 5.795” -97o 22’ 5.878”
JG-16 NW/4 SW/4 SEC 16 T14N R1W 35o 41’ 13.657” -97o 19’ 4.669” LS-12 E/2 SE/4 SEC 19 T14N R1W 35o 40’ 2.498” -97o 20’ 28.158”
JG-17 N/2 SW/4 SEC 16 T14N R1W 35o 41’ 14.08” -97o 18’ 58.135 LS-13 W/2 SE/4 SEC 24 T14N R2W 35o 40’ 3.011” -97o 21’ 43.151”
JG-18 E/2 SW/4 SEC 21 T14N R1W 35o 40’ 11.561” -97o 18’ 44.847” LS-14 N/2 NW/4 SEC 25 T14N R2W 350 40’ 1.465” -970 21’ 46.087”
JG-19 NE/4 NW/4 SEC 35 T14N R1W 35o 39’ 2.845” -97o 16’ 36.389” LS-15 NW/4 SEC 26 T14N R2W 350 39’ 51.827” -970 22’ 16.714”
JG-20 N/2 NE/4 SEC 35 T14N R1W 35o 39’ 4.193” -97o 16’ 19.267 LS-16 SW/4 SEC 35 T14N R1W 350 38’ 18.751” -970 16’ 52.775”
Raw Water FromArcadia Lake
LT2 Sample Site
Ozone Destruct Unit
East Contact Clarifiers
West Contact Clarifiers
Sludge
To WaterDistribution
Back Wash
Waste Washwater
GACContainers
F.W.
GWWell
DecantPS
RM107 OPS
AreaOffice
ODULOX
CO2storage
Chemical
OzoneGen
High LiftPump
Station
Maintenance
Clearwell No. 2
Clearwell No. 1
1
2
3
4
5
6
7
8
9
GACPump
StationFlocculating Clarifier #2
Flocculating Clarifier #1
RecarbBasin/Post
ozoneFilter and
Operations Building
Mixers
PreOzone
RWScreen Building
Sludge Drying Beds
Sludge Drying Beds
Washwater Basins
No. 1
No. 2
No. 3
No. 4
W a t e r t r e a t m e n t P l a n tCity of Edmond, Oklahoma
PWSID# OK1020723
Water Resources, Water Division, personnel continued to perform sampling and monitoring work at well sites and water distribution sites to meet all regulatory parameters and we are happy to report a 100% compliance rate for 2012. The total gallons produced for the Water Plant and Wells was 4, 195,457,230. Total operations and maintenance expeditures for 2012 were approximately $4,706, 408. We have completed a number of projects intended to reinvest in existing infrastructure. These include painting the plant lime silos, replacing media in the plant multi-media filters, and specifying and obtaining heavy equipment to provide the capability for staff to remove processed lime sludge from drying beds. The lime sludge removal was previously outsourced. Purchasing the heavy equipment will allow Edmond to bring the lime sludge removal process in-house where costs can be better controlled. We have also completed a number of projects to enhance water production and supply for the future. These projects include: booster stations to help maintain good system pressure, improvements in water transmission and distribution lines to allow us to deliver water more effectively, the design and construction of the Breakpoint Chlorination Facility at Mitch Park (to convert Oklahoma City water to the same type of chlorine disinfectant as Edmond water), and the design and construction of the Northwest complex for water storage and distribution.
In addition to the measures noted above Edmond has negotiated with Oklahoma City and has secured an agreement that will provide for the purchase of millions of gallons (up to a maximum of 15.0 million gallons per day) of water produced at Oklahoma City’s Hefner Road Water Treatment Plant. This water will be stored at, and distributed from, the Northwest complex. The Edmond area experienced a hot dry late summer by recent standards. This resulted in a higher water supply demand than has been seen in recent years. We continued to experience an increase in consumer demand for water through the rest of 2012. Edmond’s single day, peak demand, usage was 22,097,693 gallons on July 24, 2012. Mandatory water conservation was implemented last summer, and thanks to the cooperation of our water customers the residence addressing system was effective.
Edmond’s Treatment Plant was constructed and completed in 1987. This facility treats water from Arcadia Lake, which provides flood control, water supply, and recreation for the Upper Deep Fork River Basin. Edmond’s facility is equipped with many treatment processes to ensure a high quality of water is produced. The Edmond Water Treatment Plant is designed to treat 12.0 MGD. Major water treatment plant upgrades were completed in 2004. The following is a brief description of the treatment process, after water from Arcadia Lake is pumped to the plant headworks: Screen building: Screens remove leaves, sticks, fish, and other large debris. Air stripping: Aeration is intended to remove certain dissolved gases in the water. It can also be used to increase the waters dissolved oxygen content, which is the first step in the removal of iron and manganese. Pre-ozone: Ozone is a better virucide than chlorine. Unlike chlorine, there are no disinfection byproducts produced. Ozonation removes color, odor, and taste. This process also oxidizes iron, manganese, sulfide, and organics.
Flocculation, Clarifiers: This process gathers together the fine, light particles to form larger particles that will not readily settle or filter out of the water. The floc settles out the larger particles. Arcadia Lake raw water quality has historically been good enough to allow Edmond to forego this systems use. Chemical Building: Pebble quick lime is mixed with the water to form calcium hydroxide for softening purposes. Polymer is added as a coagulant aid. Solids Contact Clarifiers: These units are designed to allow the lime and other solids to settle out of the water after hardness reduction. Post-ozone: Ozone is a better virucide than chlorine. Unlike chlorine, there are no disinfection byproducts produced. Ozonation removes color, odor, and taste. This process also oxidizes iron, manganese, sulfide, and organics. Carbon Dioxide-Recarbonation: This process is used to lower the pH and alkalinity. It is effective in doing this, particularly in lime-softened water.
Mixed Media Filters: Filtration removes small solids from the water being treated. Filtration is the process of passing water through material, such as sand, coal, granulated carbon and/or other substances to trap particles. Granulated Activated Carbon (GAC) Filtration: GAC filtration is effective for removal of many types of organic compounds, including those that can form potentially harmful byproducts after chlorination. This process removes synthetic organic compounds such as solvents, cleaning compounds, insecticides and herbicides. The facility is operated twenty-four (24) hours per day, seven (7) days per week. Staff includes Nineteen (19) employees: One (1) Chief Plant Operator, One (1) Maintenance Supervisor, one (1) Mechanic, one (1) Instrumentation and Controls Technician, six (6) Operators, three (3) Water Well Operators, three (3) Water Well Helpers, and three (3) Laboratory Technicians. The water plant is operated under the direction of the Water Resources Superintendent, Assistant Superintendent and Chief Water Plant Operator.
Production Ratio
Plant
Well
Volume Comparison
Raw Water In
Filter Water
I-35 Pump Station
Plant Production
Well Production
Well Production
Well Number
Well Hours
Well Gallons
Well Number
Well Hours
Well Gallons
8 3,338.8 29,327,329 41 4,320.7 48,117,773
9 4,325.2 49,430,220 42 4,241.5 34,026,768
10 2,646.7 20,378,297 43 4,368.9 39,822,190
11 3,509.8 20,813,534 44 4,494.3 80,299,692
14 3,601.9 22,713,340 45 1,773.6 20,680,856
15 4,400.6 39,756,119 46 4,511.4 39,173,862
18 2,988.2 34,067,669 47 2,494.1 24,843,739
19 3,934.5 28,997,031 48 4,651.5 45,209,729
20 3,059.3 21,770,900 49 3,765.7 33,122,472
21 4,618.2 31,845,659 50 4,806.2 49,805,559
22 3,455.1 26,574,727 51 4,794.3 46,445,617
23 3,840.0 27,270,489 52 3,683.0 20,815,855
24 3,914.3 35,928,608 53 996.2 11,453,523
25 4,721.8 44,475,947 54 4,497.0 58,825,073
26 2,785.2 21,696,083 55 344.8 3,087,860
27 4,142.0 45,115,292 56 4,537.5 39,129,964
28 4,099.8 38,137,985 57 5,338.3 92,299,612
29 4,340.8 45,314,646 58 3,377.1 24,697,301
30 0.0 0 59 3,979.9 29,622,949
31 3,476.7 30,022,062 60 3,806.4 35,063,752
32 4,910.8 70,286,481 61 4,069.3 49,122,659
33 4,177.2 51,491,333 62 2,811.6 19,878,032
34 4,398.2 49,110,360 63 2,391.6 9,271,034
35 4,526.3 39,432,214 64 3,700.5 30,777,464
36 4,731.8 43,588,995 65 3,914.6 25,839,425
37 4,498.5 46,143,162 66 3,907.8 25,882,755
38 5,038.0 56,304,928 67 3,772.1 23,296,202
39 4,270.0 52,882,604 68 3,765.9 23,035,390
40 3,604.2 31,364,052
Plant Production
Location Gallons
Raw Water In 2,301,325,949
Filter Water 2,352,009,818
Finished High Lift 2,163,483,074
High Lift Return 88,866,084
I-35 Pump Station 2,134,902,373
Combined Production
Plant Production 2,163,483,074
Well Production 2,031,974,156
Total Combined
Production 4,195,457,230
2012 Annual
Production Ratio
Plant
Well
Volume Comparison
Raw Water In
Filter Water
I-35 Pump Station
Plant Production
Well Production
Well Production
Well Number
Well Hours
Well Gallons
Well Number
Well Hours
Well Gallons
8 249.3 1,782,490 41 260.0 3,417,045
9 319.7 4,363,408 42 204.5 1,752,378
10 115.4 1,068,825 43 281.3 3,416,164
11 141.6 1,047,740 44 214.5 4,765,788
14 249.1 1,720,150 45 24.1 283,299
15 205.8 1,850,396 46 265.5 2,581,470
18 88.2 1,260,567 47 193.5 1,814,330
19 185.4 1,712,292 48 284.7 3,554,972
20 20.9 133,318 49 247.2 2,521,612
21 265.1 2,073,066 50 302.1 3,463,394
22 0.0 0 51 293.7 3,266,027
23 219.6 1,847,462 52 232.9 1,545,187
24 216.2 2,305,783 53 243.0 2,935,835
25 274.0 2,555,520 54 272.3 3,782,101
26 0.0 0 55 0.0 0
27 202.7 2,475,825 56 224.0 2,027,805
28 52.0 542,485 57 288.8 4,962,873
29 257.9 3,329,678 58 235.1 1,820,106
30 0.0 0 59 258.6 2,281,146
31 232.8 2,618,479 60 223.6 2,324,594
32 234.0 3,807,293 61 224.9 3,199,479
33 192.2 2,772,945 62 236.8 1,952,785
34 213.0 2,779,666 63 176.8 815,120
35 308.1 3,414,611 64 199.8 1,880,412
36 316.2 3,638,633 65 271.7 1,955,035
37 242.3 2,585,510 66 261.5 1,938,832
38 244.8 3,030,022 67 262.0 1,733,182
39 167.7 2,219,362 68 270.4 1,787,985
40 0.4 3,160
Plant Production
Location Gallons
Raw Water In 117,889,135
Filter Water 118,426,037
Finished High Lift 110,787,932
High Lift Return 8,433,709
I-35 Pump Station 130,193,764
Combined Production
Plant Production 110,787,932
Well Production 124,717,636
Total Combined
Production 235,505,568
2012 January
Production Ratio
Plant
Well
Volume Comparison
Raw Water In
Filter Water
I-35 Pump Station
Plant Production
Well Production
Well Production
Well Number
Well Hours
Well Gallons
Well Number
Well Hours
Well Gallons
8 40.3 290,774 41 213.3 2,825,394
9 205.6 2,839,676 42 216.2 1,887,057
10 113.0 1,068,779 43 210.3 2,705,163
11 202.0 1,567,803 44 193.8 4,262,789
14 265.0 1,840,565 45 67.2 789,921
15 141.7 1,273,421 46 222.3 2,182,355
18 95.9 1,390,288 47 23.8 223,748
19 97.6 917,051 48 220.3 2,731,765
20 0.0 0 49 232.2 2,372,209
21 226.1 1,788,742 50 205.1 2,400,242
22 0.0 0 51 226.7 2,531,431
23 211.8 1,825,903 52 226.3 1,518,009
24 210.1 2,209,219 53 201.5 2,440,441
25 278.7 2,601,259 54 230.8 3,241,712
26 0.5 12,004 55 0.0 0
27 210.4 2,597,444 56 212.1 1,917,657
28 183.2 2,150,466 57 222.5 3,787,568
29 236.8 3,098,856 58 190.7 1,570,386
30 0.0 0 59 166.0 1,473,772
31 213.3 2,410,418 60 218.5 2,273,248
32 218.7 3,551,607 61 224.5 3,245,324
33 228.5 3,370,739 62 190.1 1,658,661
34 223.6 2,968,256 63 132.2 621,384
35 224.8 2,535,265 64 146.6 1,363,077
36 187.6 2,197,435 65 220.3 1,528,951
37 105.8 1,118,398 66 238.2 1,791,414
38 207.1 2,582,083 67 209.2 1,426,048
39 207.3 2,759,970 68 222.8 1,512,299
40 136.8 1,265,606
Plant Production
Location Gallons
Raw Water In 103,105,878
Filter Water 106,651,713
Finished High Lift 98,335,680
High Lift Return 7,512,835
I-35 Pump Station 116,962,856
Combined Production
Plant Production 98,335,680
Well Production 108,514,046
Total Combined
Production 206,849,726
2012 February
Production Ratio
Plant
Well
Volume Comparison
Raw Water In
Filter Water
I-35 Pump Station
Plant Production
Well Production
Well Production
Well Number
Well Hours
Well Gallons
Well Number
Well Hours
Well Gallons
8 0.0 0 41 344.2 4,221,467
9 193.4 2,619,275 42 415.3 3,516,968
10 282.4 2,387,878 43 305.1 3,605,828
11 507.0 3,505,944 44 418.3 8,994,106
14 333.4 2,175,951 45 144.0 1,399,874
15 338.3 3,070,555 46 463.8 4,289,558
18 280.5 3,656,651 47 164.0 1,336,751
19 415.4 3,807,700 48 481.1 5,643,670
20 0.1 600 49 472.3 4,547,097
21 365.1 2,837,901 50 542.3 6,105,265
22 166.5 1,183,425 51 522.0 5,729,951
23 284.6 2,370,122 52 205.8 1,314,894
24 505.0 5,101,748 53 412.8 4,706,088
25 356.2 3,381,007 54 331.9 4,566,673
26 18.2 162,116 55 0.0 0
27 342.1 4,124,827 56 443.5 4,023,595
28 344.6 3,782,102 57 500.7 8,409,385
29 424.1 5,207,316 58 192.8 1,549,391
30 0.0 0 59 335.1 2,944,885
31 400.7 4,198,105 60 243.1 2,500,790
32 394.3 6,366,294 61 400.0 5,677,720
33 138.4 1,965,883 62 152.6 1,205,019
34 478.1 5,879,790 63 161.4 722,127
35 449.0 4,677,338 64 304.6 2,708,337
36 410.8 4,478,188 65 431.2 2,943,093
37 424.6 4,541,053 66 407.9 2,815,747
38 420.0 5,096,542 67 383.2 2,439,647
39 380.9 4,876,046 68 455.9 2,667,102
40 310.2 2,801,806
Plant Production
Location Gallons
Raw Water In 72,036,937
Filter Water 73,646,099
Finished High Lift 67,720,302
High Lift Return 5,826,142
I-35 Pump Station 74,652,545
Combined Production
Plant Production 67,720,302
Well Production 194,841,192
Total Combined
Production 262,561,494
2012 March
Production Ratio
Plant
Well
Volume Comparison
Raw Water In
Filter Water
I-35 Pump Station
Plant Production
Well Production
Well Production
Well Number
Well Hours
Well Gallons
Well Number
Well Hours
Well Gallons
8 0.0 44,482 41 341.9 4,322,391
9 255.7 3,275,528 42 322.8 2,656,529
10 150.9 1,350,634 43 362.9 4,158,461
11 306.0 2,046,767 44 303.0 6,454,802
14 0.0 0 45 86.1 1,013,006
15 446.5 4,019,498 46 320.8 3,009,754
18 159.7 2,180,453 47 0.0 0
19 391.0 3,613,620 48 283.3 3,310,698
20 150.7 1,536,817 49 334.0 3,393,480
21 377.8 2,867,111 50 285.5 3,223,932
22 267.6 1,907,828 51 138.4 1,512,533
23 385.7 3,090,495 52 255.9 1,669,555
24 263.8 2,641,161 53 2.4 18,632
25 333.2 3,109,768 54 317.4 4,326,241
26 36.6 326,960 55 0.0 0
27 328.3 3,943,687 56 383.7 3,173,038
28 205.9 2,338,640 57 328.1 5,537,170
29 342.9 4,205,748 58 197.9 1,600,585
30 0.0 0 59 210.6 1,846,199
31 400.0 4,092,129 60 269.0 2,768,153
32 384.0 6,128,185 61 317.3 4,495,536
33 391.6 5,422,413 62 45.9 411,797
34 307.5 3,719,030 63 118.1 561,783
35 397.3 4,118,012 64 235.0 2,177,213
36 399.6 4,140,604 65 203.5 1,427,847
37 434.1 5,202,121 66 252.0 1,867,703
38 357.0 4,296,684 67 203.6 1,480,760
39 272.1 3,512,946 68 252.5 1,755,178
40 10.7 107,377
Plant Production
Location Gallons
Raw Water In 142,469,742
Filter Water 151,390,866
Finished High Lift 138,149,948
High Lift Return 7,271,323
I-35 Pump Station 134,689,074
Combined Production
Plant Production 138,149,948
Well Production 151,411,672
Total Combined
Production 289,561,620
2012 April
Production Ratio
Plant
Well
Volume Comparison
Raw Water In
Filter Water
I-35 Pump Station
Plant Production
Well Production
Well Production
Well Number
Well Hours
Well Gallons
Well Number
Well Hours
Well Gallons
8 314.8 3,263,144 41 421.2 5,055,824
9 444.8 5,329,543 42 493.1 3,880,204
10 241.3 2,023,894 43 551.8 5,423,822
11 402.4 2,244,231 44 384.5 8,185,903
14 333.3 2,136,918 45 98.3 1,151,361
15 514.9 4,630,833 46 476.1 4,268,782
18 285.9 3,560,585 47 0.0 0
19 425.7 3,583,982 48 472.0 4,910,123
20 367.9 3,589,507 49 507.2 4,990,879
21 450.6 3,177,243 50 508.6 5,438,092
22 443.7 2,788,269 51 525.8 5,424,253
23 466.9 3,392,117 52 443.2 2,751,225
24 440.8 4,252,367 53 0.0 0
25 484.7 4,521,227 54 517.2 6,849,692
26 367.5 3,286,454 55 1.1 2,282
27 464.4 5,223,736 56 477.2 3,529,574
28 248.1 2,413,719 57 574.8 9,471,096
29 404.0 4,626,971 58 342.0 2,634,026
30 0.0 0 59 427.4 3,470,378
31 68.3 622,104 60 462.4 4,552,992
32 503.8 7,798,427 61 435.9 5,827,826
33 531.1 6,786,544 62 231.5 1,816,464
34 370.7 4,395,651 63 166.4 731,360
35 473.1 4,338,794 64 339.7 2,997,905
36 511.6 5,051,909 65 394.0 2,742,363
37 492.7 4,762,903 66 396.3 2,781,855
38 513.6 6,029,903 67 390.1 2,619,713
39 492.9 6,239,198 68 382.8 2,438,285
40 405.7 3,649,525
Plant Production
Location Gallons
Raw Water In 172,975,797
Filter Water 176,606,691
Finished High Lift 161,810,656
High Lift Return 7,567,623
I-35 Pump Station 154,567,596
Combined Production
Plant Production 161,810,656
Well Production 217,665,971
Total Combined
Production 379,476,627
2012 May
Production Ratio
Plant
Well
Volume Comparison
Raw Water In
Filter Water
I-35 Pump Station
Plant Production
Well Production
Well Production
Well Number
Well Hours
Well Gallons
Well Number
Well Hours
Well Gallons
8 284.9 2,899,680 41 363.8 4,275,331
9 417.3 4,983,504 42 375.9 3,016,169
10 175.5 1,465,482 43 420.5 4,281,685
11 332.0 1,883,672 44 457.3 9,382,369
14 346.8 2,259,838 45 61.5 758,887
15 324.8 2,920,401 46 400.0 3,621,090
18 228.1 2,898,039 47 41.5 499,388
19 301.5 2,019,270 48 435.7 4,584,577
20 368.4 3,544,996 49 314.7 3,548,586
21 372.6 2,581,166 50 404.4 4,365,501
22 351.6 2,514,489 51 362.2 3,643,391
23 377.9 2,756,001 52 304.9 1,889,242
24 423.9 3,943,600 53 0.0 0
25 454.4 4,235,803 54 428.1 5,659,481
26 317.0 2,834,727 55 162.6 1,860,478
27 442.7 5,001,411 56 394.2 3,485,198
28 419.6 4,044,065 57 558.8 10,654,892
29 332.8 3,825,619 58 212.9 1,635,710
30 0.0 0 59 313.3 2,529,587
31 72.5 717,186 60 264.4 2,555,553
32 452.0 7,015,987 61 291.8 3,811,575
33 414.8 5,364,481 62 183.4 1,462,375
34 420.0 4,838,307 63 189.1 793,876
35 415.5 3,924,300 64 353.2 3,011,513
36 343.2 3,277,604 65 402.0 2,761,117
37 427.4 3,992,608 66 400.4 2,741,471
38 430.6 5,009,986 67 384.3 2,498,813
39 400.8 5,016,204 68 369.3 2,302,259
40 399.7 3,497,804
Plant Production
Location Gallons
Raw Water In 219,951,129
Filter Water 223,044,424
Finished High Lift 203,618,853
High Lift Return 7,291,852
I-35 Pump Station 199,727,603
Combined Production
Plant Production 203,618,853
Well Production 190,896,345
Total Combined
Production 394,515,198
2012 June
Production Ratio
Plant
Well
Volume Comparison
Raw Water In
Filter Water
I-35 Pump Station
Plant Production
Well Production
Well Production
Well Number
Well Hours
Well Gallons
Well Number
Well Hours
Well Gallons
8 706.4 5,647,067 41 638.2 5,857,889
9 670.7 6,465,382 42 667.0 5,054,400
10 438.6 2,877,687 43 686.6 4,324,850
11 578.4 2,492,817 44 663.0 11,494,346
14 563.5 3,188,278 45 363.4 4,273,115
15 687.3 6,210,116 46 656.2 5,157,756
18 499.7 4,704,024 47 514.7 4,522,415
19 538.5 3,299,452 48 644.8 4,875,629
20 638.2 4,766,769 49 574.0 3,086,881
21 708.4 4,524,079 50 696.1 6,516,678
22 629.0 4,754,044 51 670.8 5,622,187
23 656.5 3,994,330 52 621.8 3,095,479
24 698.3 5,523,388 53 0.0 0
25 718.3 6,829,150 54 671.3 8,248,000
26 599.9 5,005,230 55 148.3 1,061,929
27 658.0 6,519,957 56 661.3 5,790,250
28 695.4 6,057,563 57 705.3 12,727,258
29 675.3 5,870,942 58 613.1 4,178,243
30 0.0 0 59 645.0 3,902,701
31 481.3 3,449,225 60 602.6 4,788,894
32 667.5 9,904,852 61 599.0 6,066,404
33 683.4 7,397,653 62 508.1 2,835,725
34 652.1 6,412,838 63 428.7 1,444,753
35 625.5 4,418,282 64 656.6 5,017,783
36 657.8 5,059,534 65 411.0 2,441,865
37 637.9 6,038,281 66 411.7 2,132,678
38 699.4 7,265,221 67 414.4 2,036,923
39 704.6 8,432,268 68 400.0 2,066,266
40 693.6 5,260,268
Plant Production
Location Gallons
Raw Water In 329,191,460
Filter Water 333,756,210
Finished High Lift 308,230,155
High Lift Return 7,850,777
I-35 Pump Station 300,482,303
Combined Production
Plant Production 308,230,155
Well Production 280,989,993
Total Combined
Production 589,220,148
2012 July
Production Ratio
Plant
Well
Volume Comparison
Raw Water In
Filter Water
I-35 Pump Station
Plant Production
Well Production
Well Production
Well Number
Well Hours
Well Gallons
Well Number
Well Hours
Well Gallons
8 520.4 3,704,800 41 523.2 4,441,741
9 551.5 4,757,338 42 499.4 3,643,795
10 337.2 1,922,492 43 425.0 1,760,838
11 368.4 1,153,998 44 505.8 7,235,243
14 403.5 2,070,977 45 372.7 4,252,873
15 554.9 4,908,064 46 566.9 4,084,799
18 414.6 3,321,458 47 520.4 4,396,256
19 443.9 2,770,463 48 522.9 3,227,662
20 448.2 2,095,980 49 438.8 2,883,277
21 587.4 3,474,319 50 502.3 4,507,580
22 480.1 3,185,176 51 597.3 4,420,693
23 415.5 2,142,330 52 438.2 2,497,195
24 388.5 2,733,075 53 0.0 0
25 564.8 5,192,390 54 484.0 5,720,987
26 451.7 2,972,036 55 32.7 163,171
27 547.4 4,907,718 56 574.0 4,475,977
28 570.8 4,587,568 57 563.6 9,301,640
29 490.1 3,718,693 58 439.8 2,667,333
30 0.0 0 59 435.4 2,746,996
31 451.0 2,395,792 60 466.2 3,241,941
32 525.1 7,502,782 61 513.8 4,447,685
33 497.4 4,815,572 62 405.5 1,968,358
34 534.4 4,817,572 63 231.4 682,494
35 491.6 2,664,481 64 412.1 3,033,862
36 556.9 3,520,436 65 285.6 1,461,942
37 520.5 4,823,776 66 274.1 1,248,832
38 616.7 6,066,118 67 277.1 1,187,144
39 571.0 6,631,974 68 267.7 1,242,662
40 506.2 3,653,984
Plant Production
Location Gallons
Raw Water In 340,977,740
Filter Water 348,944,763
Finished High Lift 316,233,680
High Lift Return 7,822,521
I-35 Pump Station 285,930,263
Combined Production
Plant Production 316,233,680
Well Production 191,541,319
Total Combined
Production 507,774,999
2012 August
Production Ratio
Plant
Well
Volume Comparison
Raw Water In
Filter Water
I-35 Pump Station
Plant Production
Well Production
Well Production
Well Number
Well Hours
Well Gallons
Well Number
Well Hours
Well Gallons
8 441.0 3,601,407 41 390.2 3,877,033
9 337.6 3,507,720 42 265.4 2,015,061
10 167.6 1,256,068 43 333.0 2,332,802
11 290.6 1,563,122 44 471.4 6,334,222
14 264.4 1,656,299 45 110.8 1,362,891
15 395.7 3,607,731 46 380.2 3,081,801
18 217.8 2,345,822 47 208.8 2,065,566
19 290.9 1,803,828 48 461.6 3,631,925
20 216.9 1,239,730 49 242.1 1,570,766
21 431.1 2,682,835 50 498.3 4,638,601
22 316.6 2,538,579 51 537.8 4,788,500
23 288.2 1,822,163 52 252.2 1,102,147
24 411.3 3,639,302 53 0.0 0
25 387.6 3,754,213 54 343.8 4,305,670
26 237.6 1,685,005 55 0.0 0
27 265.0 2,747,012 56 409.8 3,735,066
28 451.0 3,736,962 57 470.9 7,564,768
29 292.8 2,502,661 58 294.9 2,058,341
30 0.0 0 59 396.1 2,561,798
31 511.3 3,601,440 60 303.6 2,670,797
32 519.0 7,569,326 61 240.2 2,467,210
33 392.0 4,263,430 62 133.8 934,143
34 415.8 4,077,790 63 78.9 320,631
35 422.8 2,859,943 64 362.1 2,741,006
36 462.8 3,667,178 65 244.3 1,561,370
37 493.9 4,922,039 66 241.1 1,512,504
38 487.3 4,869,859 67 205.0 1,180,837
39 249.7 2,944,346 68 219.9 1,310,774
40 331.5 2,728,675
Plant Production
Location Gallons
Raw Water In 290,635,776
Filter Water 296,928,684
Finished High Lift 272,416,264
High Lift Return 7,553,354
I-35 Pump Station 263,267,452
Combined Production
Plant Production 272,416,264
Well Production 158,920,712
Total Combined
Production 431,336,976
2012 September
Production Ratio
Plant
Well
Volume Comparison
Raw Water In
Filter Water
I-35 Pump Station
Plant Production
Well Production
Well Production
Well Number
Well Hours
Well Gallons
Well Number
Well Hours
Well Gallons
8 260.5 2,589,237 41 273.4 3,194,000
9 321.8 3,866,268 42 259.5 2,248,086
10 212.2 1,682,038 43 287.6 2,869,801
11 124.9 484,827 44 247.0 3,745,938
14 287.3 1,902,751 45 172.1 2,179,717
15 225.7 2,184,947 46 262.6 2,387,752
18 215.0 2,663,334 47 272.6 3,239,278
19 220.3 1,597,970 48 301.3 3,112,865
20 264.2 1,439,448 49 211.7 2,434,249
21 275.5 1,946,538 50 255.5 2,608,167
22 224.6 2,305,347 51 298.2 2,965,582
23 207.1 1,612,861 52 239.8 1,112,048
24 307.0 3,064,937 53 0.0 0
25 267.2 2,678,777 54 296.3 3,930,223
26 259.3 1,862,917 55 0.0 0
27 227.2 2,451,903 56 288.4 2,750,098
28 290.9 2,521,201 57 357.6 6,201,393
29 291.0 2,815,955 58 252.7 1,873,982
30 0.0 0 59 262.1 1,874,087
31 89.8 787,709 60 253.8 2,499,239
32 305.1 4,687,704 61 272.0 3,045,076
33 247.4 3,166,969 62 254.9 1,964,553
34 268.8 3,085,572 63 256.6 870,126
35 161.4 1,594,238 64 278.2 2,335,230
36 264.4 2,482,671 65 325.0 2,253,909
37 323.3 3,317,393 66 320.0 2,219,265
38 317.0 3,463,716 67 310.6 2,027,511
39 288.2 3,431,080 68 280.2 1,854,631
40 281.1 2,801,028
Plant Production
Location Gallons
Raw Water In 221,008,469
Filter Water 224,241,328
Finished High Lift 206,526,621
High Lift Return 6,579,235
I-35 Pump Station 201,669,714
Combined Production
Plant Production 206,526,621
Well Production 136,286,141
Total Combined
Production 342,812,762
2012 October
Production Ratio
Plant
Well
Volume Comparison
Raw Water In
Filter Water
I-35 Pump Station
Plant Production
Well Production
Well Production
Well Number
Well Hours
Well Gallons
Well Number
Well Hours
Well Gallons
8 308.4 3,175,010 41 327.7 3,866,147
9 377.3 4,561,711 42 311.9 2,568,783
10 270.9 2,087,224 43 291.2 2,681,651
11 10.3 9,780 44 360.2 5,310,620
14 331.2 2,220,768 45 197.0 2,316,812
15 352.3 3,168,188 46 291.9 2,628,900
18 275.3 3,362,056 47 363.3 4,352,200
19 424.4 2,631,342 48 349.1 3,408,910
20 326.5 1,874,195 49 0.0 0
21 351.8 2,386,748 50 336.4 3,585,945
22 364.3 3,348,981 51 320.6 3,318,462
23 326.2 2,416,705 52 296.5 1,469,590
24 49.4 514,027 53 0.0 0
25 354.0 3,299,824 54 357.2 4,779,966
26 326.1 2,312,179 55 0.0 0
27 282.7 3,120,261 56 264.0 2,373,146
28 364.7 3,375,275 57 413.2 7,345,684
29 333.3 3,305,881 58 192.4 1,444,633
30 0.0 0 59 264.5 1,945,843
31 321.8 2,914,779 60 310.9 2,984,413
32 275.4 4,045,803 61 282.6 3,387,838
33 303.4 3,902,917 62 244.2 1,737,265
34 268.9 3,194,175 63 234.0 834,485
35 302.8 2,617,496 64 248.0 2,059,700
36 302.1 2,822,701 65 444.6 2,943,033
37 0.3 2,784 66 424.9 2,894,216
38 337.1 3,858,579 67 429.2 2,649,407
39 318.5 4,027,671 68 378.0 2,366,816
40 250.3 2,512,640
Plant Production
Location Gallons
Raw Water In 153,999,325
Filter Water 157,926,360
Finished High Lift 146,740,200
High Lift Return 7,370,976
I-35 Pump Station 146,644,875
Combined Production
Plant Production 146,740,200
Well Production 152,324,161
Total Combined
Production 299,064,361
2012 November
Production Ratio
Plant
Well
Volume Comparison
Raw Water In
Filter Water
I-35 Pump Station
Plant Production
Well Production
Well Production
Well Number
Well Hours
Well Gallons
Well Number
Well Hours
Well Gallons
8 212.7 2,329,237 41 223.8 2,763,513
9 229.8 2,860,867 42 210.5 1,787,338
10 141.8 1,187,296 43 213.6 2,261,124
11 246.2 2,812,835 44 275.7 4,133,566
14 224.4 1,540,847 45 76.5 899,099
15 212.7 1,911,969 46 205.1 1,879,846
18 227.7 2,724,393 47 191.5 2,393,808
19 200.0 1,240,062 48 194.7 2,216,933
20 257.3 1,549,540 49 191.5 1,773,438
21 206.7 1,505,912 50 269.6 2,952,162
22 211.1 2,048,589 51 300.8 3,222,608
23 0.0 0 52 165.4 851,285
24 0.0 0 53 136.5 1,352,527
25 248.6 2,317,010 54 246.7 3,414,327
26 171.0 1,236,455 55 0.0 0
27 171.2 2,001,511 56 205.6 1,848,561
28 273.6 2,587,939 57 354.1 6,335,885
29 259.7 2,806,327 58 212.8 1,664,566
30 0.0 0 59 265.8 2,045,558
31 234.0 2,214,696 60 188.5 1,903,138
32 432.0 1,908,222 61 267.4 3,450,988
33 157.1 2,261,789 62 224.8 1,930,887
34 245.2 2,941,713 63 218.1 872,895
35 254.7 2,269,455 64 164.5 1,451,428
36 318.8 3,252,102 65 281.5 1,818,901
37 395.7 4,836,298 66 279.7 1,938,238
38 407.4 4,736,217 67 303.6 2,016,217
39 216.4 2,791,538 68 266.4 1,731,134
40 278.0 3,082,182
Plant Production
Location Gallons
Raw Water In 137,084,561
Filter Water 140,446,643
Finished High Lift 132,912,783
High Lift Return 7,785,737
I-35 Pump Station 126,114,328
Combined Production
Plant Production 132,912,783
Well Production 123,864,967
Total Combined
Production 256,777,750
2012 December
0
10
20
30
2008
2009
2010
2011
2012
(In Million Gallons) 2008 2009 2010 2011 2012
January 8.6 9.4 8.8 10.7 8.7
February 8.8 9.3 8 8.5 8.1
March 9.4 13.1 8.7 12.9 11.4
April 11.5 12.1 11.3 17 14.6
May 17.9 15.3 14.3 15.3 14.8
June 16 21.9 15.6 20.8 18.2
July 20 22.1 18.7 21.4 22.1
August 19.3 14.8 21.2 18.7 20.0
September 14.6 13.6 16.8 19 18.5
October 13.8 12.3 14.3 15.2 12.4
November 11.5 9.9 11.6 10.7 11.6
December 8.5 8.3 8.3 8.1 10.9
Maximum for Year 20 22.1 21.2 21.4 22.1
Gallons
2008
2009
2010
2011
2012
Year Gallons
2008 9,615,269
2009 10,222,949
2010 10,037,612
2011 10,640,288
2012 11,220,194
2008
2009
2010
2011
2012
2008 2009 2010 2011 2012
January 227,818,326 247,099,203 231,379,703 238,467,052 227,125,859
February 206,858,841 220,702,093 196,704,229 213,280,325 199,393,891
March 234,995,338 271,659,510 224,823,016 289,504,682 256,773,352
April 270,402,451 268,114,401 268,084,414 395,199,013 282,334,297
May 337,769,620 298,728,904 320,241,559 350,232,135 371,983,004
June 369,250,886 464,588,571 378,065,627 490,588,502 387,360,346
July 490,027,084 519,372,452 426,087,931 616,258,331 581,463,371
August 411,209,086 341,873,465 589,010,114 566,350,001 521,219,478
September 342,338,248 292,817,152 381,986,152 453,838,469 457,337,622
October 328,675,500 265,614,868 368,567,360 354,923,923 336,315,527
November 267,666,192 247,705,860 270,525,873 246,860,056 291,773,385
December 236,087,915 225,451,749 228,426,212 212,704,213 249,064,013
35
35
ArcadiaLake
Covell Rd
Danforth Rd
Edmond Rd
15th St
33rd St
Memorial Rd
Coffee Creek Rd
Sorghum Mill Rd
Ande
rson R
d
Weste
rn Av
e
Santa
Fe Av
e
Kelly
Ave
Broa
dway
Brya
nt Av
e
Coltra
ne R
d
Soon
er Rd
Air D
epot
Blvd
Midw
est B
lvd
Doug
las Bl
vd
Post
Rd
Westm
inster
Rd
PS
PS
PS
PS
PS
PS
PS
PS
NW Complex
Danforth Complex
33rd StreetComplex
BF
College Complex
I-35 Complex
Post RoadComplex
Arcadia LakeWTP
2nd StreetBooster
Arcadia
0 1 20.5 Miles
City of Edmond Water System
January 14, 2009
The City of Edmond disclaims any warranty or merchantability or warranty for fitness of use for a particular purpose, expressed or implied, with respect to this data. Furthermore, the City of Edmond disclaims any responsibility for the accuracy or completeness of this data.
Transmission Line (Edmond Water)Distribution Lines
Transmission Line (OKC Water)Transmission Line (OKC Owned)
Elevated Storage Tank
Ground Storage Tank Water Well
BF Breakpoint FacilityPS Pumping Station
DANFORTHWATER TOWER COMPLEX COLLEGE TOWER COMPLEX
CLEARWELL CAPACITY 2.0 MG CLEARWELL CAPACITY 2.0 MG
CLEARWELL DIAMETER 146'-0" CLEARWELL DIAMETER 88' 10" Inside Dia.
CLEARWELL DEPTH 17'-0" CLEARWELL DEPTH 42' 7.5" Liquid Depth
TOWER CAPACITY 0.5 MG TOWER CAPACITY 0.5 MG
OVERFLOW 1340 OVERFLOW 1340
GPM 1500 each GPM 650 each
HORSEPOWER 2 each at 75 HORSEPOWER 2 each at 60
Chlorination provided to ground storage. Chlorination provided to ground storage.
Notes: Continuous monitoring provided. Notes: Continuous monitoring provided.
PLANT HIGH LIFT PUMP STATION NORTHWEST COMPLEX
CLEARWELL CAPACITY 2 each at 4.0 MG CLEARWELL CAPACITY 2.0 MG
CLEARWELL DIAMETER 180' CLEARWELL DIAMETER 125' Inside Diameter
CLEARWELL DEPTH 20' CLEARWELL DEPTH 22' 6" Liquid Depth
POST RD TOWER CAPACITY 0.5 MG NUM. OF PUMP UNITS 4
OVERFLOW 1240 GPM 2 at 3,000; 2 at 5,000
NUMBER OF UNITS 4 HORSEPOWER 2 at 300; 2 at 450
GPM 2 at 2,800; 2 at 5,560 I-35 BOOSTER PUMP STATION
HORSEPOWER 2 at 250; 2 at 500 CLEARWELL CAPACITY 1.0 MG
Notes: Continuous monitoring provided and required. CLEARWELL DIAMETER 94" Inside Diameter
33RD STREET WATER TOWER COMPLEX CLEARWELL DEPTH 19' Liquid Depth
CLEARWELL CAPACITY 2.0 MG SHORT TOWER CAPACITY 0.5 MG
CLEARWELL DIAMETER 146' 0" OVERFLOW 1240
CLEARWELL DEPTH 17' 0" TALL TOWER CAPACITY 0.5 MG
TOWER CAPACITY 0.5 MG OVERFLOW 1336
OVERFLOW 1340 GPM 2 at 1,530; 2 at 2,800; 2 at 6,000
GPM 2 at 1800 each HORSEPOWER 2 at 125; 2 at 250; 2 at 400
HORSEPOWER 2 each at 100 15TH STREET BOOSTER PUMP STATION
Chlorination provided to ground storage. NUMBER OF UNITS 3
Notes: Continuous monitoring provided. GPM DESIGN CAPACITY 300 GPM
2ND STREET BOOSTER PUMP STATION HORSEPOWER 7.5 HP
NUMBER OF UNITS 3 PLANT LOW LIFT PUMP STATION
GPM DESIGN CAPACITY 2,000 GPM each GPM 1 at 2,800; 4 at 2,080
HORSEPOWER 3 each at 125 HORSEPOWER 50 each
Water Tower Heights
Location Feet PSI
College 115 50.945
Danforth 155 68.665
33rd St 155 68.665
I-35 Tall 218 96.574
I-35 Short 124 54.932
Post Rd 159 70.437
35
35
ArcadiaLake
Water Treatment Plant
Covell Rd
Danforth Rd
Edmond Rd
15th St
33rd St
Memorial Rd
Coffee Creek Rd
Sorghum Mill Rd
Waterloo Rd
Weste
rn Av
e
Santa
Fe Av
e
Kelly
Ave
Broa
dway
Brya
nt Av
e
Coltra
ne R
d
Soon
er Rd
Air D
epot
Blvd
Midw
est B
lvd
Doug
las Bl
vd
Post
Rd
Westm
inster
Rd
646362
606159
58
57
44
0904
35
3332
2356
54
47
3031
22 36
16 17
2829
1410
46
18
48
5551
42
43
19
15
371221
38
26
40
39
3450
45
41 20
52 4953
0327
25
24 11
0608
6665
6867
Water Well Locations
0 1 20.5 Miles LegendWater Treatment PlantWater WellCity LimitsRailroadStreets
January 14, 2009
City of Edmond
The City of Edmond disclaims any warranty or merchantability or warranty for fitness of use for a particular purpose, expressed or implied, with respect to this data. Furthermore, the City of Edmond disclaims any responsibility for the accuracy or completeness of this data.
35
35
ArcadiaLake
Covell Rd
Danforth Rd
Edmond Rd
15th St
33rd St
Memorial Rd
Coffee Creek Rd
Sorghum Mill Rd
Waterloo Rd
Weste
rn Av
e
Santa
Fe Av
e
Kelly
Ave
Broa
dway
Brya
nt Av
e
Coltra
ne R
d
Soon
er Rd
Air D
epot
Blvd
Midw
est B
lvd
Doug
las Bl
vd
Post
Rd
Westm
inster
Rd
A
B
C
DE
Water Well Zones
0 1 20.5 MilesLegend
City LimitsRailroadStreets
January 14, 2009
City of Edmond
The City of Edmond disclaims any warranty or merchantability or warranty for fitness of use for a particular purpose, expressed or implied, with respect to this data. Furthermore, the City of Edmond disclaims any responsibility for the accuracy or completeness of this data.
Water Well Zone AWater Well Zone BWater Well Zone CWater Well Zone DWater Well Zone E
109 E 5th St WELL STATISTICS
Date Drilled 1952
Flow (GPM) 120
Latitude/Longitude 35.65 / -97.48
Elevation 1190'
Total Depth 650'
Top Perforations 252'
Lower Perforations 442'
Pump Set 540'
Method of Drilling Cable Tool
Driller Rouner
Number of Joints
Size of Casing 10.75"
Size of Pump Columns 4"
PVC/Steel Pump 140'steel, 400'certilock
General Condition Good
EQUIPMENT
Electrical Controls ABB Variable
Pump Christiansen
Stages 6 inch 8 stage
Motor Franklin
Horsepower 50 HP
Pump Install Date 1992
Work Performed 2012: Pulled pump and motor, video, did down hole cleaning of the casing and performed 48 hour pump test. Ordered new equipment.
Recommendations for 2013: Installed new pump and motor and rehabilitated well head. Performed routine maintenance
MONTH GALLONS
January 2,124,017
February 743,446
March 1,381,545
April 2,250,779
May 1,052,876
June 2,972,845
July 4,028,457
August 2,986,247
September 2,807,298
October 1,613,018
November 1,494,880
December 1,110,866
37 W 8th St WELL STATISTICS
Date Drilled 1954
Flow (GPM) 170
Latitude/Longitude 35.65 / -97.48
Elevation 1188'
Total Depth 554'
Top Perforations 228'
Lower Perforations 425'
Pump Set 527'
Method of Drilling Cable Tool
Driller Statts
Number of Joints
Size of Casing 10.75"
Size of Pump Columns 4"
PVC/Steel Pump 126' Steel, 400' PVC
General Condition Good
EQUIPMENT
Electrical Controls ABB/VFD
Pump Christiansen
Stages 8 stage
Motor Franklin
Horsepower 50 HP
Pump Install Date 2008
Work Performed 2012: Performed routine maintenance
Recommendations for 2013: Perform routine maintenance
MONTH GALLONS
January 3,398,111
February 1,798,604
March 0
April 236,875
May 3,352,978
June 5,413,485
July 6,277,420
August 5,598,304
September 5,276,452
October 2,873,284
November 1,602,426
December 3,301,691
326 N Baumann Ave WELL STATISTICS
Date Drilled 1957
Flow (GPM) 171
Latitude/Longitude 35.66 / -97.47
Elevation 1224'
Total Depth 719'
Top Perforations 317'
Lower Perforations 713'
Pump Set 580'
Method of Drilling Cable Tool
Driller Rouner
Number of Joints 27
Size of Casing 10.75"
Size of Pump Columns 5.5"
PVC/Steel Pump
General Condition Good
EQUIPMENT
Electrical Controls ABB/VFD
Pump Christiansen
Stages 7walc/6 stage
Motor Centripro
Horsepower 40 HP
Pump Install Date 2009
Work Performed 2012: Performed routine maintenance
Recommendations for 2013: Perform routine maintenance
MONTH GALLONS
January 1,573,424
February 1,484,530
March 3,122,182
April 2,409,014
May 974,877
June 2,190,196
July 3,403,603
August 2,429,443
September 1,978,504
October 811,930
November 582,743
December 1,219,730
1335 S Broadway WELL STATISTICS
Date Drilled 1964
Flow (GPM) 190
Latitude/Longitude 35.64 / -97.48
Elevation 1183'
Total Depth 724'
Top Perforations 355'
Lower Perforations 722'
Pump Set 622.4
Method of Drilling Cable Tool
Driller Rouner
Number of Joints 36
Size of Casing 10.75"
Size of Pump Columns 5.5"
PVC/Steel Pump 29joints pvc 2joints steel
General Condition Good
EQUIPMENT
Electrical Controls ABB
Pump Christiansen
Stages 6CHC 10stage
Motor Franklin
Horsepower 40 HP
Pump Install Date 2012
Work Performed 2012: Motor failed, pulled well and replaced pump and motor, returned to service and performed routine maintenance
Recommendations for 2013: Perform routine maintenance
MONTH GALLONS
January 2,789,357
February 1,643,268
March 4,766,269
April 4,340,380
May 2,703,097
June 3,945,889
July 6,815,952
August 1,048,944
September 0
October 0
November 947,365
December 1,153,412
17 N Bryant Ave WELL STATISTICS
Date Drilled 1969
Flow (GPM) 119
Latitude/Longitude 35.65 / -97.46
Elevation 1188'
Total Depth 747'
Top Perforations 355'
Lower Perforations 694'
Pump Set 619.5
Method of Drilling Cable Tool
Driller Statts
Number of Joints
Size of Casing 10.75"
Size of Pump Columns 4"
PVC/Steel Pump 21joints pvc 10 steel
General Condition Fair
EQUIPMENT
Electrical Controls ABB/VFD
Pump Christiansen
Stages 7 stage
Motor Franklin
Horsepower 40 HP
Pump Install Date 2011
Work Performed 2012: Replaced variable Frequency drive, performed routine maintenance
Recommendations for 2013: Perform routine maintenance
MONTH GALLONS
January 216,137
February 0
March 0
April 181,000
May 1,564,283
June 2,473,801
July 3,404,604
August 2,956,999
September 1,113,539
October 1,459,580
November 1,080,972
December 1,279,653
2335 S Rankin St WELL STATISTICS
Date Drilled 1967
Flow (GPM) 170
Latitude/Longitude 35.63 / -97.47
Elevation 1187'
Total Depth 775'
Top Perforations 281'
Lower Perforations 766'
Pump Set 660'
Method of Drilling Cable Tool
Driller Statts
Number of Joints 33
Size of Casing 10.75"
Size of Pump Columns 5.5"
PVC/Steel Pump
General Condition Good
EQUIPMENT
Electrical Controls ABB/VFD
Pump Centrilift
Stages 7 stage
Motor PSM
Horsepower 60 HP
Pump Install Date
Work Performed 2012: Rehabilitated the well head, painted interior walls, painted the floor and performed routine maintenance
Recommendations for 2013: Perform routine maintenance
MONTH GALLONS
January 2,104,829
February 2,592,730
March 3,422,620
April 3,349,623
May 2,552,748
June 4,660,384
July 6,236,640
August 3,494,878
September 740,212
October 2,922,631
November 1,241,531
December 1,241,597
817 E 2nd St WELL STATISTICS
Date Drilled 1979
Flow (GPM) 173
Latitude/Longitude 35.65 / -97.47
Elevation 1180'
Total Depth 684'
Top Perforations 291'
Lower Perforations 662'
Pump Set 614'
Method of Drilling Cable Tool
Driller Statts
Number of Joints
Size of Casing 10.75"
Size of Pump Columns 4"
PVC/Steel Pump 25joints pvc 10 steel
General Condition Good
EQUIPMENT
Electrical Controls Benshaw Softstart
Pump Christiansen
Stages 8 stage
Motor Franklin
Horsepower 50/3450
Pump Install Date 2011
Work Performed 2012: Performed routine maintenance
Recommendations for 2013: Perform routine maintenance
MONTH GALLONS
January 1,980,117
February 1,792,202
March 1,188,829
April 1,522,563
May 1,909,741
June 3,610,369
July 4,903,467
August 3,856,120
September 2,649,108
October 1,352,976
November 980,298
December 1,749,890
916 E 15th St WELL STATISTICS
Date Drilled 1971
Flow (GPM) 120
Latitude/Longitude 35.64 / -97.47
Elevation 1150'
Total Depth 689'
Top Perforations 230'
Lower Perforations 669'
Pump Set 620'
Method of Drilling Cable Tool
Driller Statts
Number of Joints 30
Size of Casing 10.75"
Size of Pump Columns 5.5"
PVC/Steel Pump
General Condition Good
EQUIPMENT
Electrical Controls ABB
Pump Christensen/6CLC
Stages 16st/4.19 impellar
Motor Franklin
Horsepower 60 HP/3450
Pump Install Date 2010
Work Performed 2012: Performed routine maintenance
Recommendations for 2013: Perform routine maintenance
MONTH GALLONS
January 1,590,266
February 1,996,483
March 2,516,622
April 2,599,660
May 1,660,789
June 3,752,868
July 4,903,723
August 4,471,759
September 3,464,714
October 1,650,849
November 1,316,792
December 1,347,725
580 N Kelly Ave WELL STATISTICS
Date Drilled 1972
Flow (GPM) 135
Latitude/Longitude 35.66 / -97.49
Elevation 1170'
Total Depth 635'
Top Perforations 109'
Lower Perforations 630'
Pump Set 550'
Method of Drilling Cable Tool
Driller Statts
Number of Joints 27
Size of Casing 10.75"
Size of Pump Columns 5.5"
PVC/Steel Pump
General Condition Good
EQUIPMENT
Electrical Controls ABB VFD
Pump Centrilift
Stages 14 stage
Motor Centrilift
Horsepower 40 HP
Pump Install Date
Work Performed 2012: Performed routine maintenance
Recommendations for 2013: Perform routine maintenance
MONTH GALLONS
January 1,570,712
February 679,575
March 2,596,632
April 2,597,175
May 1,735,699
June 2,084,963
July 3,849,900
August 2,953,388
September 2,024,079
October 709,801
November 629,348
December 968,458
3308 S Kelly Ave WELL STATISTICS
Date Drilled 1972
Flow (GPM) 160
Latitude/Longitude 35.62 / -97.49
Elevation 1165'
Total Depth 705'
Top Perforations 240'
Lower Perforations
Pump Set 567'
Method of Drilling Cable Tool
Driller Statts
Number of Joints 29
Size of Casing 10.75"
Size of Pump Columns 5.5"
PVC/Steel Pump
General Condition Good
EQUIPMENT
Electrical Controls ABB/DRIVE
Pump Christenson
Stages 8 stage
Motor Centripro
Horsepower 30 HP
Pump Install Date 2008
Work Performed 2012: Performed routine maintenance
Recommendations for 2013: Perform routine maintenance
MONTH GALLONS
January 1,777,384
February 2,520,850
March 2,918,553
April 2,719,115
May 2,248,063
June 3,536,969
July 4,300,721
August 3,822,808
September 2,560,253
October 2,216,209
November 1,581,843
December 2,089,310
840 S Bryant Ave WELL STATISTICS
Date Drilled 1972
Flow (GPM) 175
Latitude/Longitude 35.64 / -97.46
Elevation 1100'
Total Depth 650'
Top Perforations 130'
Lower Perforations 585'
Pump Set 602'
Method of Drilling Cable Tool
Driller Statts
Number of Joints 28
Size of Casing 10.75"
Size of Pump Columns 5.5"
PVC/Steel Pump
General Condition Good
EQUIPMENT
Electrical Controls ABB/VFD
Pump PSM
Stages 13 stage
Motor PSM
Horsepower 45 HP
Pump Install Date
Work Performed 2012: Performed routine maintenance
Recommendations for 2013: Perform routine maintenance
MONTH GALLONS
January 2,738,553
February 1,510,418
March 3,970,290
April 3,558,568
May 1,192,510
June 1,985,941
July 2,466,949
August 1,206,568
September 69,398
October 0
November 0
December 0
2016 E 33rd St WELL STATISTICS
Date Drilled 1973
Flow (GPM) 210
Latitude/Longitude 35.62 / -97.45
Elevation 1145'
Total Depth 698'
Top Perforations 114'
Lower Perforations 690'
Pump Set 623'
Method of Drilling Cable Tool
Driller Statts
Number of Joints 27
Size of Casing 10.75"
Size of Pump Columns 5.5"
PVC/Steel Pump
General Condition Good
EQUIPMENT
Electrical Controls ABB/VFD
Pump Centrilift
Stages 13 stage
Motor Centrilift
Horsepower 46 HP
Pump Install Date
Work Performed 2012: Pulled pump and motor and replaced, painted interior walls and rehabilitated the well head
Recommendations for 2013: Perform routine maintenance
MONTH GALLONS
January 2,065,396
February 2,585,191
March 2,048,240
April 3,289,274
May 1,691,975
June 3,694,488
July 3,987,368
August 3,103,745
September 2,088,886
October 1,080,698
November 1,429,851
December 2,782,034
1309 S Kelly Ave WELL STATISTICS
Date Drilled 1973
Flow (GPM) 210
Latitude/Longitude 35.64 / -97.49
Elevation 1150'
Total Depth 604'
Top Perforations 114'
Lower Perforations 604'
Pump Set 540'
Method of Drilling Cable Tool
Driller Statts
Number of Joints
Size of Casing 10.75"
Size of Pump Columns 5.5"
PVC/Steel Pump
General Condition Good
EQUIPMENT
Electrical Controls ABB/VFD
Pump PSM
Stages 22 stage
Motor PSM
Horsepower 60 HP
Pump Install Date
Work Performed 2012: Pulled pump and motor for repair, repaired damaged surface casing, replaced well head, painted interior of well house
Recommendations for 2013: Perform routine maintenance
MONTH GALLONS
January 3,011,693
February 2,807,644
March 3,775,508
April 3,901,510
May 2,213,980
June 5,546,053
July 5,369,808
August 4,567,811
September 3,079,309
October 2,499,303
November 3,354,310
December 2,600,840
2400 S Kelly Ave WELL STATISTICS
Date Drilled 1975
Flow (GPM) 230
Latitude/Longitude 35.63 / -97.49
Elevation 1150'
Total Depth 705'
Top Perforations 356'
Lower Perforations 680'
Pump Set 483'
Method of Drilling Cable Tool
Driller Statts
Number of Joints
Size of Casing 10.75"
Size of Pump Columns 5.5"
PVC/Steel Pump
General Condition Good
EQUIPMENT
Electrical Controls ABB/VFD
Pump Centrilift
Stages 6 stage
Motor Centrilift
Horsepower 57 HP/3600
Pump Install Date
Work Performed 2012: Painted interior walls and Performed routine maintenance
Recommendations for 2013: Perform routine maintenance
MONTH GALLONS
January 3,246,226
February 3,283,219
March 4,011,070
April 4,497,968
May 2,479,328
June 5,015,240
July 6,504,242
August 6,186,987
September 5,206,716
October 3,320,602
November 3,174,849
December 2,146,941
4116 N Santa Fe Ave WELL STATISTICS
Date Drilled 1977
Flow (GPM) 150
Latitude/Longitude 35.69 / -97.51
Elevation 1055'
Total Depth 475'
Top Perforations 154'
Lower Perforations 398'
Pump Set 361'
Method of Drilling Cable Tool
Driller Statts
Number of Joints 17
Size of Casing 10.75"
Size of Pump Columns 5.5"
PVC/Steel Pump
General Condition Good
EQUIPMENT
Electrical Controls ABB
Pump Centrilift
Stages 19 stage
Motor Centrilift
Horsepower 50 HP
Pump Install Date
Work Performed 2012: Performed routine maintenance
Recommendations for 2013: Perform routine maintenance
MONTH GALLONS
January 801,450
February 438,432
March 2,363,940
April 2,252,205
May 674,932
June 764,871
July 4,392,146
August 691,901
September 0
October 0
November 0
December 0
216 S Fretz Ave WELL STATISTICS
Date Drilled 1978
Flow (GPM) 210
Latitude/Longitude 35.65 / -97.49
Elevation 1190'
Total Depth 710'
Top Perforations 200'
Lower Perforations 585'
Pump Set 550'
Method of Drilling Cable Tool
Driller Statts
Number of Joints 27
Size of Casing 10.75"
Size of Pump Columns 5.5"
PVC/Steel Pump
General Condition Good
EQUIPMENT
Electrical Controls ABB/VFD
Pump PSM
Stages 8 stage
Motor PSM
Horsepower 60 HP
Pump Install Date
Work Performed 2012: Performed routine maintenance
Recommendations for 2013: Perform routine maintenance
MONTH GALLONS
January 1,067,447
February 1,549,067
March 4,068,907
April 4,794,932
May 2,905,001
June 4,516,244
July 6,540,993
August 6,070,814
September 4,676,681
October 2,005,685
November 2,048,637
December 2,874,518
1932 N Boulevard WELL STATISTICS
Date Drilled 1977
Flow (GPM) 180
Latitude/Longitude 35.67 / -97.48
Elevation 1150'
Total Depth 478'
Top Perforations 235'
Lower Perforations 406'
Pump Set 391
Method of Drilling Cable Tool
Driller Sequoyah
Number of Joints
Size of Casing 10.75"
Size of Pump Columns 4"
PVC/Steel Pump 19joints pvc
General Condition Good
EQUIPMENT
Electrical Controls ABB
Pump Christiansen
Stages 7stage
Motor Franklin
Horsepower 40 hp
Pump Install Date 2011
Work Performed 2012: Performed routine maintenance
Recommendations for 2013: Perform routine maintenance
MONTH GALLONS
January 3,449,801
February 1,642,397
March 3,829,094
April 879,280
May 0
June 0
July 0
August 0
September 2,008,705
October 2,081,962
November 1,643,243
December 1,320,775
2301 N Bryant Ave WELL STATISTICS
Date Drilled 1978
Flow (GPM) 210
Latitude/Longitude 35.68 / -97.46
Elevation 1140'
Total Depth 532'
Top Perforations 186'
Lower Perforations 464'
Pump Set 420'
Method of Drilling Cable Tool
Driller Statts
Number of Joints 20
Size of Casing 10.75"
Size of Pump Columns 5.5"
PVC/Steel Pump
General Condition Good
EQUIPMENT
Electrical Controls ABB/VFD
Pump Christensen
Stages 9st/6CHC
Motor Franklin
Horsepower 50 HP/3450
Pump Install Date 2009
Work Performed 2012: Performed routine maintenance
Recommendations for 2013: Perform routine maintenance
MONTH GALLONS
January 4,572,601
February 2,165,956
March 6,086,573
April 5,070,024
May 2,668,149
June 5,000,332
July 6,563,898
August 4,203,973
September 3,858,659
October 2,547,388
November 1,959,435
December 3,990,322
2201 E 15th St WELL STATISTICS
Date Drilled 1978
Flow (GPM) 166
Latitude/Longitude 35.64 / -97.45
Elevation 1100'
Total Depth 715'
Top Perforations 250'
Lower Perforations 695'
Pump Set 525'
Method of Drilling Cable Tool
Driller Statts
Number of Joints
Size of Casing 10.75"
Size of Pump Columns 5.5"
PVC/Steel Pump
General Condition Good
EQUIPMENT
Electrical Controls ABB/VFD
Pump PSM
Stages 7 stage
Motor PSM
Horsepower 60 HP
Pump Install Date
Work Performed 2012: Rehabilitated the well head, painted interior walls, and performed routine maintenance
Recommendations for 2013: Perform routine maintenance
MONTH GALLONS
January 2,530,261
February 1,424,670
March 2,622,677
April 3,196,001
May 2,717,120
June 3,530,688
July 4,620,718
August 2,834,892
September 1,536,544
October 2,147,880
November 1,821,387
December 1,842,297
3740 E 40th St WELL STATISTICS
Date Drilled 1978
Flow (GPM) 285
Latitude/Longitude 35.62 / -97.43
Elevation 1120'
Total Depth 705'
Top Perforations 193'
Lower Perforations 632'
Pump Set 588'
Method of Drilling Cable Tool
Driller Statts
Number of Joints
Size of Casing 10.75"
Size of Pump Columns 5.5"
PVC/Steel Pump
General Condition Good
EQUIPMENT
Electrical Controls ABB/VFD
Pump Centrilift
Stages
Motor Centrilift
Horsepower 100 HP
Pump Install Date
Work Performed 2012: Pulled pump and motor, video, did down hole cleaning of the casing and performed 48 hour pump test. Ordered new equipment.
Recommendations for 2013: Perform routine maintenance
MONTH GALLONS
January 4,118,518
February 3,781,949
March 5,951,983
April 5,572,141
May 4,314,520
June 7,715,281
July 10,705,672
August 10,163,806
September 8,155,361
October 5,684,927
November 2,857,395
December 3,099,325
3650 S Coltrane Rd WELL STATISTICS
Date Drilled 1978
Flow (GPM) 160
Latitude/Longitude 35.62 / -97.44
Elevation 1140'
Total Depth 700'
Top Perforations 212'
Lower Perforations 560'
Pump Set 462'
Method of Drilling Cable Tool
Driller Statts
Number of Joints
Size of Casing 10.75"
Size of Pump Columns 5.5"
PVC/Steel Pump
General Condition Good
EQUIPMENT
Electrical Controls ABB/VFD
Pump Christiansen
Stages 5 stage
Motor Franklin
Horsepower 50hp
Pump Install Date 2011
Work Performed 2012: Performed routine maintenance
Recommendations for 2013: Perform routine maintenance
MONTH GALLONS
January 0
February 0
March 0
April 1,138,139
May 3,869,391
June 4,700,944
July 7,491,992
August 6,127,097
September 4,168,220
October 2,957,483
November 2,563,661
December 3,910,962
941 S Santa Fe Ave WELL STATISTICS
Date Drilled 1978
Flow (GPM) 300
Latitude/Longitude 35.64 / -97.51
Elevation 1125'
Total Depth 527'
Top Perforations 110'
Lower Perforations 472'
Pump Set 407'
Method of Drilling Cable Tool
Driller Statts
Number of Joints
Size of Casing 10.75"
Size of Pump Columns 5.5"
PVC/Steel Pump 407' 4" PVC
General Condition Good
EQUIPMENT
Electrical Controls ABB/VFD
Pump Christensen
Stages 5st/7WAHC
Motor Franklin
Horsepower 50 HP/3450
Pump Install Date 2009
Work Performed 2012: Performed routine maintenance
Recommendations for 2013: Perform routine maintenance
MONTH GALLONS
January 3,633,518
February 2,131,679
March 5,346,840
April 4,810,517
May 3,296,860
June 7,791,024
July 8,040,577
August 5,814,596
September 4,778,630
October 2,381,549
November 2,985,604
December 1,320,156
3809 E 15th St WELL STATISTICS
Date Drilled 1978
Flow (GPM) 185
Latitude/Longitude 35.64 / -97.43
Elevation 1100'
Total Depth 625'
Top Perforations 198'
Lower Perforations 518'
Pump Set 475'
Method of Drilling Cable Tool
Driller Statts
Number of Joints 19
Size of Casing 10.75"
Size of Pump Columns 5.5"
PVC/Steel Pump
General Condition Good
EQUIPMENT
Electrical Controls VFD
Pump Christensen
Stages 7 stage
Motor Centripro
Horsepower 50 HP
Pump Install Date 2008
Work Performed 2012: Rehabilitated well head, painted interior walls and performed routine maintenance
Recommendations for 2013: Perform routine maintenance
MONTH GALLONS
January 3,415,285
February 1,473,649
March 3,800,924
April 3,301,217
May 2,947,705
June 3,921,200
July 4,462,726
August 2,736,764
September 2,278,996
October 1,667,797
November 1,680,362
December 1,888,052
906 S Bryant Ave WELL STATISTICS
Date Drilled 1979
Flow (GPM) 200
Latitude/Longitude 35.64 / -97.45
Elevation 1100'
Total Depth 599'
Top Perforations 132'
Lower Perforations 595'
Pump Set 446'
Method of Drilling Cable Tool
Driller Statts
Number of Joints 24
Size of Casing 10.75"
Size of Pump Columns 5.5"
PVC/Steel Pump
General Condition Good
EQUIPMENT
Electrical Controls ABB/DRIVE
Pump 7WAHC
Stages 6 stage
Motor Franklin
Horsepower 60 HP
Pump Install Date 2007
Work Performed 2012: Performed routine maintenance
Recommendations for 2013: Perform routine maintenance
MONTH GALLONS
January 3,650,691
February 470,750
March 4,083,385
April 4,369,188
May 2,875,545
June 4,209,400
July 5,592,311
August 4,668,265
September 3,504,837
October 2,330,527
November 384,454
December 2,132,683
3840 S Broadway WELL STATISTICS
Date Drilled 1979
Flow (GPM) 200
Latitude/Longitude 35.62 / -97.49
Elevation 1160'
Total Depth 700'
Top Perforations 192'
Lower Perforations 694'
Pump Set 599'
Method of Drilling Cable Tool
Driller Statts
Number of Joints 29
Size of Casing 10.75"
Size of Pump Columns 5.5"
PVC/Steel Pump
General Condition Excellent
EQUIPMENT
Electrical Controls ABB/VFD
Pump Christensen
Stages 14st/6CLC
Motor Franklin
Horsepower 50 HP/3450
Pump Install Date 2010
Work Performed 2012: Rehabilitated well head, painted interior walls and performed routine maintenance
Recommendations for 2013: Perform routine maintenance
MONTH GALLONS
January 3,327,061
February 4,339,502
March 3,956,886
April 4,818,797
May 2,879,325
June 6,098,456
July 7,641,820
August 7,044,597
September 6,738,347
October 4,999,879
November 3,961,308
December 4,125,386
4016 S Kelly Ave WELL STATISTICS
Date Drilled 1980
Flow (GPM) 175
Latitude/Longitude 35.62 / -97.49
Elevation 1160'
Total Depth 797'
Top Perforations 116'
Lower Perforations 772'
Pump Set 636'
Method of Drilling Cable Tool
Driller Statts
Number of Joints 30
Size of Casing 10.75"
Size of Pump Columns 5.5"
PVC/Steel Pump
General Condition Good
EQUIPMENT
Electrical Controls ABB/VFD
Pump 7WAHC
Stages 6 stage
Motor Franklin
Horsepower 60 HP
Pump Install Date 2009
Work Performed 2012: Painted interior walls and Performed routine maintenance
Recommendations for 2013: Perform routine maintenance
MONTH GALLONS
January 4,405,127
February 5,310,473
March 5,427,010
April 5,572,441
May 3,313,111
June 7,490,397
July 7,625,716
August 6,904,520
September 6,222,072
October 4,950,667
November 4,835,795
December 4,289,197
2337 W 15th St WELL STATISTICS
Date Drilled 1980
Flow (GPM) 200
Latitude/Longitude 35.64 / -97.51
Elevation 1125'
Total Depth 515'
Top Perforations 182'
Lower Perforations 460'
Pump Set 404'
Method of Drilling Cable Tool
Driller Statts
Number of Joints 18
Size of Casing 10.75"
Size of Pump Columns 5.5"
PVC/Steel Pump 420' PVC
General Condition Good
EQUIPMENT
Electrical Controls Square D
Pump Christensen
Stages 6 stage
Motor Centripro
Horsepower 40 HP
Pump Install Date 2010
Work Performed 2012: Rehabilitated well head, painted interior walls and painted floor. performed routine maintenance
Recommendations for 2013: Perform routine maintenance
MONTH GALLONS
January 2,087,912
February 1,281,058
March 4,425,189
April 4,738,699
May 2,971,764
June 4,360,991
July 8,779,210
August 7,992,884
September 3,693,602
October 2,346,239
November 1,133,983
December 1,455,246
1045 W Waterloo Rd WELL STATISTICS
Date Drilled 1980
Flow (GPM) 185
Latitude/Longitude 34.72 / -97.5
Elevation 1080'
Total Depth 465'
Top Perforations 160'
Lower Perforations 437'
Pump Set 340'
Method of Drilling Cable Tool
Driller Statts
Number of Joints 16
Size of Casing 10.75"
Size of Pump Columns 5.5"
PVC/Steel Pump
General Condition Good
EQUIPMENT
Electrical Controls ABB/VFD
Pump PSM
Stages 5 stage
Motor PSM
Horsepower 40 HP
Pump Install Date
Work Performed 2012: Rehabilitated well head, painted interior walls and performed routine maintenance
Recommendations for 2013: Perform routine maintenance
MONTH GALLONS
January 2,462,356
February 1,494,007
March 2,421,565
April 3,067,864
May 1,760,725
June 4,019,253
July 5,062,530
August 2,566,689
September 20,164
October 17,445
November 1,433,849
December 341,865
1516 W Danforth Rd WELL STATISTICS
Date Drilled 1981
Flow (GPM) 225
Latitude/Longitude 35.66 / -97.5
Elevation 1150'
Total Depth 583'
Top Perforations 200'
Lower Perforations 490'
Pump Set 508'
Method of Drilling Cable Tool
Driller Statts
Number of Joints
Size of Casing 10.75"
Size of Pump Columns 5.5"
PVC/Steel Pump Certiloc
General Condition Good
EQUIPMENT
Electrical Controls ABB/DRIVE
Pump Christensen
Stages 8 stage
Motor Franklin
Horsepower 50 HP
Pump Install Date 2009
Work Performed 2012: Painted interior walls and Performed routine maintenance
Recommendations for 2013: Perform routine maintenance
MONTH GALLONS
January 2,682,787
February 1,653,831
March 945,548
April 987,447
May 3,254,136
June 5,717,549
July 7,167,682
August 5,478,489
September 4,687,512
October 3,523,720
November 1,941,615
December 1,667,737
3721 S Bryant Ave WELL STATISTICS
Date Drilled 1981
Flow (GPM) 175
Latitude/Longitude 35.62 / -97.46
Elevation 1160'
Total Depth 690'
Top Perforations 294'
Lower Perforations 676'
Pump Set 600'
Method of Drilling Cable Tool
Driller Statts
Number of Joints 29
Size of Casing 10.75"
Size of Pump Columns 5.5"
PVC/Steel Pump
General Condition Good
EQUIPMENT
Electrical Controls ABB/VFD
Pump Centrilift
Stages 13 stage
Motor Centrilift
Horsepower 46 HP
Pump Install Date
Work Performed 2012: painted interior walls and Performed routine maintenance
Recommendations for 2013: Perform routine maintenance
MONTH GALLONS
January 1,680,734
February 2,232,356
March 3,338,910
April 4,184,153
May 1,701,744
June 3,385,096
July 5,448,402
August 4,525,269
September 3,968,661
October 2,716,125
November 2,173,087
December 2,207,026
2524 Hidden Valley Rd WELL STATISTICS
Date Drilled 1981
Flow (GPM) 225
Latitude/Longitude 35.63 / -97.47
Elevation 1130'
Total Depth 700'
Top Perforations 210'
Lower Perforations 632'
Pump Set 560'
Method of Drilling Cable Tool
Driller Statts
Number of Joints 29
Size of Casing 10.75"
Size of Pump Columns 5.5"
PVC/Steel Pump
General Condition Good
EQUIPMENT
Electrical Controls Toshiba
Pump Christensen
Stages 6 stage
Motor Centripro
Horsepower 40 HP
Pump Install Date 2008
Work Performed 2012: Performed routine maintenance
Recommendations for 2013: Perform routine maintenance
MONTH GALLONS
January 3,187,072
February 4,073,789
March 4,782,429
April 5,002,427
May 2,960,347
June 4,787,723
July 2,097,991
August 2,748,887
September 3,003,489
October 2,068,990
November 2,332,930
December 3,658,222
2008 W Edmond Rd WELL STATISTICS
Date Drilled 1981
Flow (GPM) 270
Latitude/Longitude 35.65 / -97.51
Elevation 1105'
Total Depth 510'
Top Perforations 202'
Lower Perforations 466'
Pump Set 438
Method of Drilling Cable Tool
Driller Statts
Number of Joints 20
Size of Casing 10.75"
Size of Pump Columns 5.5"
PVC/Steel Pump
General Condition Good
EQUIPMENT
Electrical Controls ABB/VFD
Pump Christiansen
Stages 6 stage
Motor Franklin
Horsepower 75 hp
Pump Install Date 2011
Work Performed 2012: Painted interior walls and Performed routine maintenance
Recommendations for 2013: Perform routine maintenance
MONTH GALLONS
January 4,555,836
February 3,300,034
March 7,059,734
April 6,325,964
May 0
June 819
July 5,432,651
August 6,662,127
September 0
October 0
November 57,819
December 3,827,305
1508 W Danforth Rd WELL STATISTICS
Date Drilled 1982
Flow (GPM) 133
Latitude/Longitude 35.67 / -97.5
Elevation 1160'
Total Depth 570'
Top Perforations 265'
Lower Perforations 542'
Pump Set 509'
Method of Drilling Cable Tool
Driller Statts
Number of Joints 24
Size of Casing 10.75"
Size of Pump Columns 5.5"
PVC/Steel Pump
General Condition Good
EQUIPMENT
Electrical Controls ABB/VFD
Pump Christensen
Stages 8 stage
Motor Centripro
Horsepower 30 HP
Pump Install Date 2010
Work Performed 2012: Painted interior walls and Performed routine maintenance
Recommendations for 2013: Perform routine maintenance
MONTH GALLONS
January 597,107
February 1,071,084
March 2,874,339
April 3,525,482
May 1,318,596
June 2,616,916
July 6,137,557
August 3,527,413
September 2,060,705
October 533,551
November 57,036
December 676,552
709 N University Dr WELL STATISTICS
Date Drilled 1982
Flow (GPM) 150
Latitude/Longitude 35.66 / -97.47
Elevation 1180'
Total Depth 590'
Top Perforations 200'
Lower Perforations 585'
Pump Set 525'
Method of Drilling Cable Tool
Driller Statts
Number of Joints 36
Size of Casing 10.75"
Size of Pump Columns 5.5"
PVC/Steel Pump
General Condition Good
EQUIPMENT
Electrical Controls ABB/VFD
Pump Christensen
Stages 11st/6CLC
Motor Centrapro
Horsepower 40 HP
Pump Install Date 2008
Work Performed 2012: Performed routine maintenance
Recommendations for 2013: Perform routine maintenance
MONTH GALLONS
January 3,066,684
February 2,152,794
March 2,566
April 3,082,864
May 2,828,003
June 3,515,839
July 5,597,587
August 4,909,693
September 3,465,926
October 2,784,910
November 2,051,255
December 2,630,948
1601 Ridgecrest Rd WELL STATISTICS
Date Drilled 1984
Flow (GPM) 150
Latitude/Longitude 35.63 / -97.6
Elevation 1125'
Total Depth 720'
Top Perforations 180'
Lower Perforations 620'
Pump Set 540
Method of Drilling Rotary
Driller Hemphill
Number of Joints 27
Size of Casing 10.75"
Size of Pump Columns 5.5"
PVC/Steel Pump
General Condition Good
EQUIPMENT
Electrical Controls ABB/VFD
Pump Christensen
Stages 6CHC9stage
Motor Franklin
Horsepower 50H/3450
Pump Install Date 2012
Work Performed 2012: Pulled pump and motor and did a downhole video cleaned the casing, 48 hour pump test installed new equipment and rehabilitated the well head and painted the interior walls, performed routine maintenance
Recommendations for 2013: Perform routine maintenance
MONTH GALLONS
January 2,766,861
February 3,159,402
March 4,286,602
April 4,877,611
May 2,047,577
June 4,696,825
July 5,337,289
August 4,676,125
September 4,005,270
October 2,640,161
November 2,329,692
December 2,336,107
520 E 9th St WELL STATISTICS
Date Drilled 1984
Flow (GPM) 175
Latitude/Longitude 35.64 / -97.47
Elevation 1130'
Total Depth 720'
Top Perforations 180'
Lower Perforations 620'
Pump Set 605.2'
Method of Drilling Rotary
Driller Hemphill
Number of Joints 28
Size of Casing 12.75"
Size of Pump Columns 5.5"
PVC/Steel Pump
General Condition Good
EQUIPMENT
Electrical Controls ABB/DRIVE
Pump Christensen
Stages 6st/7WAHC
Motor Franklin
Horsepower 60 HP/3450
Pump Install Date 2010
Work Performed 2012: Performed routine maintenance
Recommendations for 2013: Perform routine maintenance
MONTH GALLONS
January 0
February 236,052
March 5,588,099
April 5,010,123
May 4,051,043
June 7,575,527
July 7,637,513
August 5,990,955
September 5,976,910
October 5,496,993
November 1,500,837
December 0
1122 N Boulevard WELL STATISTICS
Date Drilled 1985
Flow (GPM) 185
Latitude/Longitude 35.67 / -97.48
Elevation 1205'
Total Depth 600'
Top Perforations 210'
Lower Perforations 534'
Pump Set 529'
Method of Drilling Air Rotary
Driller Henkle
Number of Joints 22
Size of Casing 12.75"
Size of Pump Columns 5.5"
PVC/Steel Pump
General Condition Good
EQUIPMENT
Electrical Controls ABB/VFD
Pump Christiansen
Stages 10stage
Motor Franklin
Horsepower 40 HP/3600
Pump Install Date
Work Performed 2012: Painted interior walls and Performed routine maintenance
Recommendations for 2013: Perform routine maintenance
MONTH GALLONS
January 0
February 0
March 0
April 3,378,399
May 3,119,033
June 615,382
July 0
August 0
September 0
October 1,680,850
November 1,486,894
December 2,511,597
720 W Edmond Rd WELL STATISTICS
Date Drilled 1985
Flow (GPM) 150
Latitude/Longitude 35.65 / -97.49
Elevation 1160'
Total Depth 600'
Top Perforations 200'
Lower Perforations 500'
Pump Set 515'
Method of Drilling Air Rotary
Driller Henkle
Number of Joints 25
Size of Casing 12.75"
Size of Pump Columns 5.5"
PVC/Steel Pump
General Condition Good
EQUIPMENT
Electrical Controls ABB/VFD
Pump Christensen
Stages 10st/6CLC
Motor Centripro
Horsepower 40 HP/3450
Pump Install Date 2008
Work Performed 2012: Painted interior walls and Performed routine maintenance
Recommendations for 2013: Perform routine maintenance
MONTH GALLONS
January 2,230,552
February 2,292,775
March 47,551
April 3,843,432
May 2,597,200
June 6,449,248
July 7,558,511
August 6,171,729
September 5,652,708
October 1,377,188
November 2,138,754
December 2,336,437
3308 S Boulevard WELL STATISTICS
Date Drilled 1985
Flow (GPM) 225
Latitude/Longitude 35.62 / -97.48
Elevation 1170'
Total Depth 670'
Top Perforations 200'
Lower Perforations 670'
Pump Set 610'
Method of Drilling Air Rotary
Driller Henkle
Number of Joints 29
Size of Casing 12.75"
Size of Pump Columns 5.5"
PVC/Steel Pump
General Condition Good
EQUIPMENT
Electrical Controls ABB/VFD
Pump PSM
Stages 22 stage
Motor PSM
Horsepower 60 HP
Pump Install Date
Work Performed 2012: Performed routine maintenance
Recommendations for 2013: Perform routine maintenance
MONTH GALLONS
January 3,251,754
February 3,644,648
March 4,187,468
April 4,114,024
May 3,191,701
June 6,802,916
July 5,711,443
August 5,065,857
September 5,195,743
October 4,547,364
November 3,290,678
December 3,240,214
850 W Danforth Rd WELL STATISTICS
Date Drilled 1986
Flow (GPM) 140
Latitude/Longitude 35.67 / -97.49
Elevation 1180'
Total Depth 590'
Top Perforations 210'
Lower Perforations 486'
Pump Set 491'
Method of Drilling Air Rotary
Driller Henkle
Number of Joints 24
Size of Casing 12.75"
Size of Pump Columns 5.5"
PVC/Steel Pump
General Condition Good
EQUIPMENT
Electrical Controls ABB/VFD
Pump Christensen
Stages 9 stage
Motor Centripro
Horsepower 30 HP/3450
Pump Install Date 2008
Work Performed 2012: Painted interior walls and Performed routine maintenance, installed a variable frequency drive
Recommendations for 2013: Perform routine maintenance
MONTH GALLONS
January 945,391
February 374,454
March 1,994,973
April 1,775,266
May 1,375,979
June 1,958,863
July 3,071,384
August 1,906,794
September 821,985
October 455,494
November 690,995
December 1,098,237
326 W Danforth Rd WELL STATISTICS
Date Drilled 1986
Flow (GPM) 250
Latitude/Longitude 35.67 / -97.49
Elevation 1190'
Total Depth 535'
Top Perforations 210'
Lower Perforations 520'
Pump Set 490'
Method of Drilling Air Rotary
Driller Henkle
Number of Joints 20
Size of Casing 12.75"
Size of Pump Columns 5.5"
PVC/Steel Pump
General Condition Good
EQUIPMENT
Electrical Controls ABB/VFD
Pump Christensen
Stages 6CHC 7 stage
Motor Franklin
Horsepower 40 HP/3450
Pump Install Date 2012
Work Performed 2012: Removed old equipment, down hole video, 48 hour pump test, Installed new equipment, rehabilitated well head and painted interior walls. Performed routine maintenance
Recommendations for 2013: Perform routine maintenance
MONTH GALLONS
January 2,069,755
February 2,292,466
March 3,410,221
April 4,281,627
May 2,285,799
June 5,524,547
July 5,706,258
August 4,829,170
September 4,551,618
October 2,283,622
November 1,772,392
December 2,651,917
1640 E 33rd St WELL STATISTICS
Date Drilled 1986
Flow (GPM) 215
Latitude/Longitude 35.62 / -97.46
Elevation 1160'
Total Depth 652'
Top Perforations 210'
Lower Perforations 638'
Pump Set 557'
Method of Drilling Air Rotary
Driller Henkle
Number of Joints 24
Size of Casing 12.75"
Size of Pump Columns 5.5"
PVC/Steel Pump
General Condition Good
EQUIPMENT
Electrical Controls ABB/VFD
Pump Christensen
Stages 14 stage
Motor Centripro
Horsepower 50 HP
Pump Install Date 2008
Work Performed 2012: Rehabilitated well head, painted interior walls, performed routine maintenance
Recommendations for 2013: Perform routine maintenance
MONTH GALLONS
January 4,213,614
February 4,435,224
March 6,288,640
April 6,084,261
May 3,448,159
June 6,869,155
July 8,776,742
August 8,257,444
September 6,987,210
October 5,380,295
November 2,863,113
December 3,133,879
501 Pepperdine Ave WELL STATISTICS
Date Drilled 1992
Flow (GPM) 225
Latitude/Longitude 35.62 / -97.47
Elevation 1162'
Total Depth 675'
Top Perforations 248'
Lower Perforations 590'
Pump Set 650'
Method of Drilling Rotary
Driller Henkle
Number of Joints 65
Size of Casing 12.75"
Size of Pump Columns 4"
PVC/Steel Pump
General Condition Good
EQUIPMENT
Electrical Controls ABB
Pump Christiansen
Stages 10 stage
Motor Franklin
Horsepower 60 HP
Pump Install Date
Work Performed 2012: Pulled pump and motor, video, did down hole cleaning of the casing and performed 48 hour pump test. Ordered new equipment.
Recommendations for 2013: Perform routine maintenance
MONTH GALLONS
January 3,790,568
February 5,630,512
March 5,827,209
April 5,978,650
May 3,705,835
June 5,885,994
July 8,067,930
August 2,034,086
September 0
October 0
November 0
December 0
3831 Marked Tree Dr WELL STATISTICS
Date Drilled 1992
Flow (GPM) 175
Latitude/Longitude 35.62 / -97.45
Elevation 1130'
Total Depth 640'
Top Perforations 226'
Lower Perforations 620'
Pump Set 567.7'
Method of Drilling Rotary
Driller Henkle
Number of Joints 63
Size of Casing 12.75"
Size of Pump Columns 5.5"
PVC/Steel Pump
General Condition Good
EQUIPMENT
Electrical Controls ABB/DRIVE
Pump Christensen
Stages 9 stage
Motor Franklin
Horsepower 60 HP
Pump Install Date 2008
Work Performed 2012: Performed routine maintenance
Recommendations for 2013: Perform routine maintenance
MONTH GALLONS
January 2,230,886
February 2,077,430
March 3,532,778
April 4,301,364
May 2,228,032
June 3,152,237
July 5,436,433
August 6,154,604
September 3,494,426
October 193,508
November 864,313
December 1,896,084
2204 Aurora Rd WELL STATISTICS
Date Drilled 2001
Flow (GPM) 350
Latitude/Longitude 35.63 / -97.51
Elevation 1120'
Total Depth 525'
Top Perforations 220'
Lower Perforations 490'
Pump Set 475'
Method of Drilling Rotary
Driller Henkle
Number of Joints
Size of Casing 10.75"
Size of Pump Columns 4"
PVC/Steel Pump
General Condition Good
EQUIPMENT
Electrical Controls ABB/VFD
Pump Chirstensen
Stages 6st/7WAHC
Motor Franklin
Horsepower 60 HP/3450
Pump Install Date 2010
Work Performed 2012: Performed routine maintenance
Recommendations for 2013: Perform routine maintenance
MONTH GALLONS
January 1,630,239
February 6,454,393
March 7,232,548
April 8,582,669
May 5,339,902
June 9,947,074
July 10,987,228
August 10,181,077
September 8,084,537
October 7,641,261
November 6,148,792
December 5,238,910
2175 W Covell Rd WELL STATISTICS
Date Drilled 2001
Flow (GPM) 140
Latitude/Longitude 35.68 / -97.51
Elevation 1100'
Total Depth 425'
Top Perforations 256'
Lower Perforations 405'
Pump Set 340'
Method of Drilling Rotary
Driller Henkle
Number of Joints
Size of Casing 10.75"
Size of Pump Columns 4"
PVC/Steel Pump
General Condition Good
EQUIPMENT
Electrical Controls ABB/VFD
Pump Christensen
Stages 9 stage
Motor Centripro
Horsepower 30 HP
Pump Install Date 2008
Work Performed 2012: Performed routine maintenance
Recommendations for 2013: Perform routine maintenance
MONTH GALLONS
January 1,144,778
February 926,268
March 2,366,380
April 2,596,318
May 1,911,329
June 3,557,131
July 4,299,364
August 3,828,193
September 2,394,537
October 1,782,188
November 265,399
December 983,927
3336 N Santa Fe Ave WELL STATISTICS
Date Drilled 2001
Flow (GPM) 120
Latitude/Longitude 35.69 / -97.51
Elevation 1140'
Total Depth 425'
Top Perforations 254'
Lower Perforations 396'
Pump Set 387'
Method of Drilling Rotary
Driller Henkle
Number of Joints
Size of Casing 10.75"
Size of Pump Columns 4"
PVC/Steel Pump
General Condition Good
EQUIPMENT
Electrical Controls ABB/VFD
Pump Christensen
Stages 10 stage
Motor Franklin
Horsepower 50 HP
Pump Install Date 2005
Work Performed 2012: Performed routine maintenance
Recommendations for 2013: Perform routine maintenance
MONTH GALLONS
January 1,613,276
February 1,515,712
March 2,720,045
April 2,655,660
May 1,907,912
June 3,570,471
July 3,256,164
August 3,327,616
September 2,181,528
October 1,703,712
November 142,197
December 1,517,662
2932 Shortgrass Rd WELL STATISTICS
Date Drilled 2002
Flow (GPM) 171
Latitude/Longitude 35.68 / -97.48
Elevation 1167'
Total Depth 385'
Top Perforations 216'
Lower Perforations 360'
Pump Set 320'
Method of Drilling Rotary
Driller Henkle
Number of Joints
Size of Casing 10.75"
Size of Pump Columns 4"
PVC/Steel Pump
General Condition Good
EQUIPMENT
Electrical Controls ABB/VFD
Pump PSM
Stages
Motor PSM
Horsepower
Pump Install Date 2006
Work Performed 2012: Installed new ABB/VFD in its own room painted interior walls and floor performed routine maintenance
Recommendations for 2013: Perform routine maintenance
MONTH GALLONS
January 1,675,872
February 1,398,845
March 2,702,801
April 3,394,682
May 2,236,839
June 3,267,524
July 5,022,863
August 4,922,049
September 3,328,175
October 973,943
November 1,284,895
December 1,502,321
828 Ascot WELL STATISTICS
Date Drilled 2002
Flow (GPM) 200
Latitude/Longitude 35.69 / -97.47
Elevation 1193'
Total Depth 475'
Top Perforations 232'
Lower Perforations 460'
Pump Set 366'
Method of Drilling Rotary
Driller Henkle
Number of Joints
Size of Casing 10.75"
Size of Pump Columns 4"
PVC/Steel Pump
General Condition Good
EQUIPMENT
Electrical Controls ABB/VFD
Pump Christensen
Stages 5 stage
Motor Centripro
Horsepower 40 HP/3450
Pump Install Date 2008
Work Performed 2012: Pulled old equipment, video casing, clean casing, 48 hour pump test, installed new equipment and VFD
Recommendations for 2013: Perform routine maintenance
MONTH GALLONS
January 3,374,379
February 2,714,392
March 5,215,413
April 5,213,212
May 3,156,587
June 4,345,041
July 6,639,593
August 5,562,741
September 4,202,950
October 1,958,083
November 1,836,694
December 4,440,396
5001 E 15th St WELL STATISTICS
Date Drilled 2005
Flow (GPM) 100
Latitude/Longitude 35.64 / -97.42
Elevation 1083'
Total Depth 442'
Top Perforations 300'
Lower Perforations 412'
Pump Set 340.8'
Method of Drilling Air Rotary
Driller Layne
Number of Joints 16
Size of Casing 10.75"
Size of Pump Columns 4"
PVC/Steel Pump
General Condition Good
EQUIPMENT
Electrical Controls ABB/VFD
Pump Christensen
Stages 6st/7WALC
Motor Franklin
Horsepower 40 HP/3450
Pump Install Date 2010
Work Performed 2012: Performed routine maintenance
Recommendations for 2013: Perform routine maintenance
MONTH GALLONS
January 1,335,587
February 489,366
March 1,362,109
April 2,255,529
May 1,360,875
June 2,345,786
July 3,389,506
August 2,187,278
September 1,911,743
October 381,041
November 633,783
December 1,190,435
5655 E 15th St WELL STATISTICS
Date Drilled 2005
Flow (GPM) 90
Latitude/Longitude 35.64 / -97.41
Elevation 1075'
Total Depth 420'
Top Perforations 214'
Lower Perforations 392'
Pump Set 340.8'
Method of Drilling Air Rotary
Driller Layne
Number of Joints 16
Size of Casing 10.75"
Size of Pump Columns 4"
PVC/Steel Pump
General Condition Good
EQUIPMENT
Electrical Controls ABB/VFD
Pump Christensen
Stages 6st/7RAHC
Motor Franklin
Horsepower 25 HP/3450
Pump Install Date 2010
Work Performed 2012: Performed routine maintenance
Recommendations for 2013: Perform routine maintenance
MONTH GALLONS
January 628,343
February 176,873
March 623,746
April 790,795
May 631,834
June 613,190
July 1,075,606
August 920,565
September 56,042
October 215,509
November 270,712
December 637,796
6401 E 15th St WELL STATISTICS
Date Drilled 2005
Flow (GPM) 200
Latitude/Longitude 35.64 / -97.4
Elevation 1085'
Total Depth 420'
Top Perforations 214'
Lower Perforations 416'
Pump Set 362.1'
Method of Drilling Air Rotary
Driller Layne
Number of Joints 17
Size of Casing 10.75"
Size of Pump Columns 4"
PVC/Steel Pump
General Condition Good
EQUIPMENT
Electrical Controls ABB/VFD
Pump Christensen
Stages 6st/WALC
Motor Franklin
Horsepower 40 HP/3450
Pump Install Date 2010
Work Performed 2012: Performed routine maintenance
Recommendations for 2013: Perform routine maintenance
MONTH GALLONS
January 1,329,274
February 323,604
March 1,416,302
April 2,132,973
May 1,146,860
June 3,193,015
July 5,225,526
August 4,513,064
September 1,772,414
October 1,710,238
November 893,243
December 1,377,151
10570 E 15th St WELL STATISTICS
Date Drilled 2007
Flow (GPM) 130
Latitude/Longitude 35.64 / -97.34
Elevation 500'
Total Depth
Top Perforations 192'
Lower Perforations 470'
Pump Set 451'
Method of Drilling Air Rotary
Driller Layne
Number of Joints
Size of Casing 10.75"
Size of Pump Columns 4"
PVC/Steel Pump
General Condition Good
EQUIPMENT
Electrical Controls ABB
Pump Layne
Stages 9 stage
Motor Centripro
Horsepower 25 HP
Pump Install Date
Work Performed 2012: Performed routine maintenance
Recommendations for 2013: Perform routine maintenance
MONTH GALLONS
January 2,640,507
February 1,081,145
March 2,289,897
April 2,544,314
May 886,934
June 1,722,545
July 3,679,505
August 3,180,405
September 2,796,278
October 1,553,826
November 1,710,853
December 3,069,865
2200 S Post Rd WELL STATISTICS
Date Drilled 2007
Flow (GPM) 130
Latitude/Longitude 35.63 / -97.34
Elevation 500'
Total Depth
Top Perforations 200'
Lower Perforations 466'
Pump Set 451'
Method of Drilling Air Rotary
Driller Layne
Number of Joints
Size of Casing 10.75"
Size of Pump Columns 4"
PVC/Steel Pump
General Condition Good
EQUIPMENT
Electrical Controls ABB
Pump Layne
Stages 9 stage
Motor Centripro
Horsepower 25 HP
Pump Install Date
Work Performed 2012: Performed routine maintenance
Recommendations for 2013: Perform routine maintenance
MONTH GALLONS
January 2,309,869
February 1,026,372
March 2,310,378
April 2,527,500
May 972,645
June 1,621,435
July 3,109,035
August 2,775,925
September 1,819,355
October 1,525,589
November 1,269,138
December 2,708,251
2900 S Post Rd WELL STATISTICS
Date Drilled 2007
Flow (GPM) 130
Latitude/Longitude 35.63 / -97.35
Elevation 540'
Total Depth
Top Perforations 220'
Lower Perforations 510'
Pump Set 493'
Method of Drilling Air Rotary
Driller Layne
Number of Joints
Size of Casing 10.75"
Size of Pump Columns 4"
PVC/Steel Pump
General Condition Good
EQUIPMENT
Electrical Controls ABB
Pump Layne
Stages 9 stage
Motor Centripro
Horsepower 25 HP
Pump Install Date
Work Performed 2012: Performed routine maintenance
Recommendations for 2013: Perform routine maintenance
MONTH GALLONS
January 2,502,192
February 1,186,947
March 2,264,447
April 2,462,528
May 977,606
June 1,615,827
July 2,904,041
August 2,506,242
September 2,118,787
October 1,127,514
November 1,127,724
December 1,896,951
10539 E 33rd St WELL STATISTICS
Date Drilled 2007
Flow (GPM) 130
Latitude/Longitude 35.62 / -97.34
Elevation 540'
Total Depth
Top Perforations 222'
Lower Perforations 494'
Pump Set 493'
Method of Drilling Air Rotary
Driller Layne
Number of Joints
Size of Casing 10.75"
Size of Pump Columns 4"
PVC/Steel Pump
General Condition Good
EQUIPMENT
Electrical Controls ABB
Pump Layne
Stages 9 stage
Motor Centripro
Horsepower 25 HP
Pump Install Date
Work Performed 2012: Performed routine maintenance
Recommendations for 2013: Perform routine maintenance
MONTH GALLONS
January 2,416,493
February 1,005,441
March 2,137,410
April 2,208,580
May 969,402
June 1,864,105
July 3,043,503
August 2,673,834
September 1,845,674
October 1,586,626
November 1,590,597
December 2,503,953
0
1000
2000
3000
4000
5000
6000
Well 8
Well 37
Well 64
0
200
400
600
800
1000
1200
2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012
Zone A (North of Danforth Road)
Static
Pumping
0
200
400
600
800
1000
1200
2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012
Zone B (Danforth Road to Edmond Road)
Static
Pumping
0
200
400
600
800
1000
1200
2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012
Zone C (Edmond Road to Fifteenth Street)
Static
Pumping
0
200
400
600
800
1000
2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012
Zone D (Fifteenth Street to Thirty-Third Street)
Static
Pumping
0
200
400
600
800
1000
2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012
Zone E (Thirty-Third Street to Memorial Road)
Static
Pumping
Permit Statistics
OWRB Permit Number
Wells Under This Permit Acres Under
Permit Acre Feet per Year
Million Gallons per Year
19551287 8, 9 0* 638 208
19551288 2, 3, 4, 5, 6, 7 (All removed from service) 0* 1915 624
19740466 10, 11, 14, 15 (12, 16, 17 removed from service) 0* 2234 728
19740205 18, 19, 20, 21, 22, 23, 24, 39 0* 2553 832
19770789 26, 27, 28, 29, 32, 33, 42, 46, 47, 48, 49, 50, 51, 52, 53, 54, 55, 56
8290 5745 1872
19780508 40 144 319 104
19830664 25, 30, 31, 34, 35, 36, 37, 38, 41, 43, 44, 45 3850 3830 1248
20000514 57, 58 367 734 239
20010575 59 278 555 181
20010576 60, 61 131 261 85
20040566 62, 63, 64 447 894 291
20050573 65, 66, 67, 68 320 640 209
TOTALS: 13827 20318 6621
*Per OWRB Records These Permits Do Not Specify Acreage
Field Services is made up of four divisions; Water Line Maintenance, Wastewater Line Maintenance, Street Maintenance and Traffic. The department as a whole employs 66 individuals, with the Field Services Superintendent’s responsibilities being split between the divisions. The water, wastewater and street groups have been cross trained in the various job functions of each group. This has allowed the department to staff for normal demand, but be able to respond, in force, to peak demand. The Administrative staff, which has also been consolidated, functions much the same way as operations. Field Services is still responsible for the health and well-being of City of Edmond customers by providing quality water and removing wastewater in a safe, efficient manner. Field Services prides itself on its excellent customer service. It is never a pleasant experience to have a water leak in your front yard or have a blockage in the wastewater line, but through excellent customer service and positive attitude we strive to make these experiences as painless as possible.
WATER LINE MAINTENANCE History of the Water Line Maintenance Division goes back to 1889 when the first water well was hand dug in Edmond. The first tower was constructed in 1909 at 27 W. Third Street. Beginning with only a couple of people, the Water Line Maintenance Division grew to 28 employees in 1984. Since then the area of responsibility has continued to expand but manpower has been downsized through better management practices and technological advances. Water Line Maintenance Division is comprised of twenty (19) positions, which includes eighteen (18) public health professionals and one (1) supervisor. The Water Line Maintenance Division’s function is maintaining Edmond’s 498 miles of water distribution system, 4362 hydrants in the fire protection system and 27,702 residential and commercial meters. In the last year there were 3.28 miles of new water line added to the distribution system. The Division is responsible for the following main areas:
Emergency repair of water main breaks and service line leaks - Every call Water Line Maintenance receives is treated as an emergency, until crews are on site and make an informed decision of the severity of the leak. If the leak is an immediate threat to health or property, emergency locates will be called in and the repair will be made as quickly and safely as possible. If the leak is not an immediate threat to health or property, forty-eight (48) hour locates will be called in, and the leak scheduled as time permits. Water Line Maintenance repaired 55 main breaks in the last year. Installation of new residential meters - There are currently two options for new services to be installed in the City of Edmond. Contractors can choose to have Water Line Maintenance install the service line; setter and meter can or have a contractor install the service. All parts installed for new services must be purchased from and approved by Utility Line Maintenance. If the resident chooses to have a contractor install the service, Utility Line Maintenance inspects the quality of work and physically installs the meter after the inspection. Last year Water Line Maintenance installed 234 new meters and contractors installed 176 new residential and commercial meters.
Preventative maintenance of system valves and fire hydrants – Preventative maintenance is the backbone of any good water distribution system. Currently Water Line Maintenance has two employees performing preventative maintenance on valves and one employee performing preventative maintenance of fire hydrants. In the last year numerous valves have been found buried, missing or non-functional. Water Line Maintenance is working diligently to rectify the valve situation throughout the system. Throughout the previous year Water Line Maintenance has inspected and operated 9,551 valves and 2,386 fire hydrants. Perform utility line locates to minimize the damage to City of Edmond’s water and wastewater utilities due to excavation around the utilities. In the last year, Water Line Maintenance actually located 4,223 requests for utility line locates. Maintain fifteen (15) year meter change out program. In the last year 585 meters were changed out. Water Line Maintenance is currently conducting testing on the meters that are removed to ascertain what time frame would provide the lost/benefit ratio.
Street Maintenance continues to replace sod and concrete that is removed by the Water Line Maintenance crews. It was determined the department could perform the work more efficiently, productively and maintain a better-finished product than an outside contractor. Continue updating of all utility maps. Accurate mapping is one of the most useful tools at our disposal. When working with maps on a daily basis, the employees are constantly finding discrepancies between the maps and what is actually in the system. When these problems are found it requires a joint effort with Management Information System (MIS) to make the corrections to ensure that we have the best possible data that we can get. Leak detection is a large part of the preventative maintenance program conducted throughout Water Line Maintenance. Numerous leaks have been located while they are still small and repaired that would normally not have been found until they were large enough to be noticed. This also aids in tracking unaccounted water.
WASTEWATER LINE MAINTENANCE Wastewater Line Maintenance history started when the division was created in 1972. Before then, the Sanitation Department was responsible for taking care of problems in the collection system. The line maintenance division worked out of the old City Garage barn at 27 W. Third Street, which is now demolished. Over the years three buildings were constructed at 100 N. Kelly, which became the site for the Wastewater Line Maintenance Division. In 1994 the division was moved back to 27 W. Third. Wastewater Line Maintenance is comprised of (14) positions, which include thirteen (13) public health professionals and one (1) supervisor. The function of the Wastewater Line Maintenance Division is maintaining Edmond’s 424 miles of gravity mainline, 22 miles of force main, 3 siphon sewers, and 10,757 manholes. The surface area of the collection system is 36,591 acres. In the last year there were 1.98 miles of new wastewater lines added to the collection system. The division is responsible for the following main areas:
Wastewater Line Maintenance performs preventative maintenance of the collection system daily by four (4) basic methods, hydraulic cleaning, video inspection, mechanical root removal and chemical root control. Wastewater Line Maintenance strives to be proactive in its preventative maintenance program. In the last year Wastewater Line Maintenance hydraulically cleaned 427,444 feet of collection system, performed video inspection of 193,180 feet of collection system and performed mechanical root removal on 139,312 feet of wastewater lines. In addition, 121,087 feet of the collection system was chemically treated for roots. The chemical treatment was performed by an outside contractor. Collection system blockage removal is treated as an emergency on every call that is received. Wastewater Line Maintenance treats blockages as emergencies because crews need to be on site to determine what the problem is and what needs to be done to rectify the situation. There are a number of ways to remove blockages in the collection system, but the two most common are hydraulic cleaning and mechanical sawing. In the last year Wastewater Line Maintenance removed 105 blockages from the collection system, and had a total of 73 Sanitary Sewer Overflows or 16.37 per 100 miles of collection system.
Emergency and point repairs are also made throughout the collection system. Point repairs are sometimes as simple as a cracked joint of pipe to slight offsets in the bells of the pipes where they go together to emergency repairs which usually constitute a total failure in the system (collapsed line). In the last year Wastewater Line Maintenance made 42-point repairs. Manhole inspections are conducted to ensure the integrity, stability and cleanliness. Manholes should be free of any waste and grit that may accumulate in the opening. There were 2,689 manholes inspected during the year, and 25 manholes were either raised or repaired.
ADDRESS AND MANHOLE ID NUMBER DATE ESTIMATED GALLONS
REASONS DURATION (HOURS)
WET/DRY WEATHER
EVENT
REACHED "WATERS OF THE STATE"
1100 N. Broadway - Manhole # 22163 1/9/2012 10 Debris 1 No Ground 1010 E. Main St. - Junction box 1/12/2012 25 Debris 1 No Ground
3801 S. Broadway - Manhole # 20398 1/14/2012 3,000 Grease 5.5 No Drainage channel 210 E. Edwards - Manhole # 25423 1/17/2012 1,500 Grease and debris 1.75 No Ground 911 Crown Dr. - Cleanout 1/19/2012 75 Roots 1 No Ground 1909 Edgewood Dr. - Manhole # 26001 1/20/2012 750 Debris 1 No Drainage channel 217 E. Edwards - Manhole # 21592 1/27/2012 200 Grease 1.25 No Drainage channel 421 Clermont Dr. - Cleanout 1/29/2012 400 Roots 2.5 No Ground 30 E. 33rd St. - Manholes # 26448, 26449 & 26450 1/30/2012 500 Grease and debris 1.25 No Drainage channel 633 W. 7th St. - Manhole # 22054 2/7/2012 400 Roots 1 No Ground 912 Norma Lane - Manhole # 25306 & 25307 2/15/2012 300 Debris 0.5 No Ground W. Coffee Creek Rd & Little Timber 2/21/2012 30,200 Broken force main 0.75 No Drainage channel 225 Southern Place - Cleanout 2/21/2012 100 Roots and grease 0.5 No Ground 1801 Edgewood Dr. - Manhole # 79049 2/26/2012 2,000 Roots 2 No Drainage channel 805 Heatherstone Rd. - Manhole # 24898 2/26/2012 6,000 Roots and debris 2 No Drainage channel 2208 Lytal Lane - Cleanout 3/5/2012 10,000 Roots 3.5 No Ground and creek 2400 Santa Fe Ter. - Manhole # 18940 3/10/2012 1,500 Roots and debris 4 No Creek
501 Crestview - Manhole # 19199 3/12/2012 2,000 Debris 2.5 No Drainage channel &
street 2307 Ripple Creek Lane - Cleanout 3/15/2012 20 Roots and debris 1 No Ground
1521 Apollo Rd. - Cleanout 3/16/2012 3,000 Roots and grease 3.25 No Ground and
drainage channel 1100 Richmond Rd. - Cleanout 3/16/2012 30 Roots 1.25 No Floors
153 Brad St. - Manhole # 21888 4/3/2012 1,500 Grease and debris 1.5 No Drainage channel
613 Smiling Hills Blvd. Manhole # 27374 4/6/2012 2,500 Debris 4 No Ground
813 Elmwood Dr. - Cleanout 4/11/2012 300 Roots 1 No Ground
1713 Seminole Dr. - Cleanout 4/14/2012 200 Debris 2.75 No Ground
1703 Canary Dr. - Cleanout 4/23/2012 20 Debris 2.5 No Creek bed
532 East Oak Place - Manhole # 20981 4/23/2012 100 Debris 2.5 No Ground and
drainage channel
33rd & Richard Dr. 4/25/2012 50 Broken pressure main 0.75 No Ground
2801 Downing Ct. - Cleanout 5/6/2002 200 Roots and baby wipes 1.5 No Ground
1821 S. Rankin St. - Cleanout 5/7/2012 20 Roots 1.5 No Ground
810 Pine Oak Dr. - Manhole # 25664 5/16/2012 50 Roots 1.5 No Street
313 W. 10th St. - Manhole # 21963 6/2/2012 100 Roots and debris 2.5 No Drainage channel
2133 E. 2nd St. - Manhole # 24045 6/11/2012 2,000 Roots 1.5 No Drainage channel
145 Brad St. - Manhole # 21915 6/11/2012 2,000 Roots 1 No Drainage channel
1010 Locust Lane - Cleanout 6/11/2012 250 Roots and grease 2.5 No Ground
116 Ann Arbor - Cleanout 6/13/2012 100 Dirt in main 7.5 No Street
1419 Leo Dr. - Manhole # 18559 6/27/2012 50 Roots 1 No Ground
820 W. 15th St. - Cleanout 7/5/2012 960 Grease and debris 2 No Ground and
drainage channel
2620 Lost Trail Rd. - Manhole # 19019 7/8/2012 2,500 Roots and grease 2.5 No Drainage channel
1014 E. Main St. - Cleanout 7/15/2012 600 Roots, grease & baby
wipes 3 No Ground
10th St. & Fretz Ave. - Manhole # 21887 7/21/2012 5,000 Roots and grease 2 No Drainage channel
703 Sunset Dr - Cleanout 8/7/2012 50 Roots 1.25 No Ground
918 Crown Dr. - Cleanout 8/9/2012 50 Roots 0.5 No Ground
815 Sunset Dr. - Cleanout 8/27/2012 150 Roots 1.5 No Ground/yard
3905 143rd St. OKC 8/31/2012 5,000 Broken pipe 6.75 No Ground and drainage channel
600 Lilac Dr. - Damage main 9/5/2012 403,000 Damage main 8.25 No Drainage channel
166 Dennis St. - Manhole # 21922 9/16/2012 50 Grease 2 No Ground
1701 Pine Oak Dr. - Manhole # 78683 9/18/2012 200 Debris 1.25 No Ground
625 N. Broadway - lamp hole 9/18/2012 50 Grease 3.5 No Drainage channel
517 Candlewood Dr. 9/18/2012 1,000 Roots 2.5 No Drainage channel
and pond 517 Candlewood Dr. 4" drain tapped into main 9/26/2012 200 Roots 1.25 No Drainage channel
2413 Bent Trail Rd. - Manhole #19043 10/4/2012 1,200 Roots and grease 1.5 No Drainage channel
3805 Spring Hill Dr. Cleanout 10/6/2012 200 Roots 1 No Drainage channel
1301 E. 2nd St. - Manhole # 25451 10/7/2012 5,000 Grease line collapsed 25.5 No Ground
2nd & Coltrane - Manhole # 23926 10/11/2012 300 Roots and grease 3 No Ground
188 E. 33rd St. Cleanout 10/17/2012 200 Grease 0.5 No Drainage channel
1109 North Creek Dr. Cleanout 10/21/2012 50 Roots 2 No Ground
610 Timber Lane - Lamphole 10/30/2012 25 Grease and roots 0.75 No Ground
2200 Mark Rd. - Manhole 19829 11/3/2012 400 Roots 1.75 No Ground
1104 East Dr. - Inside of house 11/15/2012 150 Roots and debris 2 No Floor
801 Signal Ridge Dr. - Siphon 11/16/2012 500 Debris 1.25 No Drainage channel
2201 Marshall Dr. - Lamphole 11/21/2012 50 Grease 2.25 No Ground 232 & 233 Stonebrook Way - Manholes # 22336 & 22337 11/29/2012 500 Debris 0.75 No Drainage channel
3500 Smoky Hollow Rd. - Manhole # 24512 12/2/2012 6,000 Debris 2 No Drainage channel
1221 N. Kelly Ave. - Cleanout 12/4/2012 500 Grease and debris 1 No Parking lot
28 E. 6th St. - Manhole # 27098 12/11/2012 20 Roots 1 No Ground 2413 Bent Trail Rd. - Manholes # 19068 & 19043
12/12/2012 2,500 Debris 2 No Drainage channel
4009 Sheffield Ave. - Manhole # 22735 12/13/2012 800 Debris 1.5 No Pond
2513 Bent Trail Rd. - Manhole is not on GIS 12/13/2012 300 Debris 1 No Drainage channel
325 Meadow Lake Dr. - Manhole # 21659 12/14/2012 1,000 Grease 0.75 No Drainage channel
529 N. Blackwelder Ave. - Manhole # 22879 12/17/2012 150 Debris 1 No Street
1609 Mistletoe Ln. - Cleanout 12/28/2012 100 Grease 2 No Drainage channel
1704 Canary Cir. - Cleanout 12/30/2012 2,000 Debris 2 No Drainage channel
Date Stop Up Address Manholes Inspected 1/4/2012 59 Shirley Lane 59 Shirley Lane - Manholes # 21719 & 21718 1/9/2012 1100 N. Broadway 1100 N. Broadway - Manhole # 22163 1/12/2012 1010 E. Main St. 1010 E. Main St. - Manhole # 27106 1/12/2012 220 W. 4th St. 220 W. 4th St. - Manhole # 21595 1/14/2012 3801 S. Broadway 3801 S. Broadway - Manholes # 20397 & 20398 1/17/2012 210 E. Edwards 210 E. Edwards - Manhole # 25423 1/18/2012 1404 S. Gemini Rd 1404 S. Gemini Rd. - Manhole # 20664 1/19/2012 911 Crown Dr. 911 Crown Dr. - Manholes # 25143 & 25149 1/19/2012 2120 Marshall Dr. 2120 Marshall Dr. - Manhole # 20664 1/20/2012 1909 Edgewood Dr. 1909 Edgewood Dr. - Manhole - 26001 1/27/2012 217 E. Edwards 217 E. Edwards - Manhole # 21592 1/27/2012 28 E. Main St. 28 E Main St. - Manhole # 21791 1/29/2012 120 Barrett Place 120 Barrett Place Manhole #21770 1/29/2012 421 Clermont Dr. 421 Clermont Dr. - Manhole # 21177 1/30/2012 30 E. 33rd St. 30 E. 33rd St.- Manholes # 26448, 26449 & 26450 2/7/2012 920 E. 10th St. 920 E. 10th St. - Manholes # 25681 & 25682 2/7/2012 633 W. 7th St. 633 W. 7th St.- Manhole # 22054 2/9/2012 1004 E. 15th St. 1004 E. 15th St. - Manholes # 25704 & 25708 2/15/2012 713 S. Santa Fe Dr. 713 S. Santa Fe Dr. - Manholes #22042 & 22041 2/15/2012 912 Norma Lane 912 Norma Lane - Manholes # 25306 & 25307 2/21/2012 617 N. Broadway 617 N. Broadway - Manhole # 21561 2/22/2012 622 Timber Lane 622 Timber Lane - Manholes # 25790 & 25791 2/23/2012 2416 Windover 2416 Windover - Manhole - 24698 2/24/2012 2813 Lost Rock Trail 2813 Lost Rock Trail - Manhole # 18983 2/26/2012 1801 Edgewood Dr. 1801 Edgewood Dr. - Manhole # 79049 2/26/2012 805 Heatherstone Rd. 805 Heatherstone Rd. - Manhole # 24898 3/5/2012 2208 Lytal Lane 2208 Lytal Lane - Manholes # 24668 & 24671 3/6/2012 3412 Prairie Ave. 3412 Prairie Ave - Manhole # 26355 3/10/2012 2400 Santa Fe Ter. 2400 Santa Fe Ter. - Manhole # 18940 3/10/2012 1000 E. 13th St. 1000 E 13th St. - Manhole # 25704 3/12/2012 501 Crestview 501 Crestview - Manhole # 19199 3/13/2012 1201 Smiling Hill Blvd. 1201 Smiling Hill Blvd. - Manhole # 26219 3/14/2012 512 Lanes Turn 512 Lanes Turn - Manhole # 22384 3/15/2012 2307 Ripple Creek Lane 2307 Ripple Creek Lane # 19262 3/16/2012 1521 Apollo Rd. 1521 Apollo Rd. Manholes # 18612 & 18613 3/16/2012 1100 Richmond Rd. 1100 Richmond Rd. - Manhole # 25400 3/18/2012 621 Smiling Hill Blvd. 621 Smiling Hill Blvd. Manholes # 26316 & 26315 3/20/2012 921 E. 10th St. 921 E. 10th St. Manhole # 25692
Date Stop Up Address Manholes Inspected
4/3/2012 153 Brad St. 153 Brad St. Manhole # 2188
4/6/2012 2830 E. 2nd St. 2830 E. 2nd St. Manholes # 26686 & 24052
4/6/2012 613 Smiling Hills Blvd. 613 Smiling Hills Blvd. Manhole # 27374
4/6/2012 900 S. Bryant Ave. 900 S. Bryant Ave. Manhole # 27061
4/7/2012 2513 Julies Trail 2513 Julies Trail Manhole # 18951
4/11/2012 813 Elmwood Dr. 813 Elmwood Dr. Manholes # 26158 & 25157
4/14/2012 1713 Seminole Dr. 1713 Seminole Dr. Manhole # 24529
4/17/2012 120 Ann Arbor 120 Ann Arbor Manholes # 20532 & 20538
4/23/2012 1703 Canary Dr. 1703 Canary Dr. Manholes # 23481 & 23506
4/23/2012 532 East Oak Place 532 East Oak Place Manhole # 20981
4/24/2012 1609 Eagle Dr. 1609 Eagle Dr. Manhole # 23560
5/4/2012 234 Dennis St. 234 Dennis St. Manholes # 22114 & 21916
5/6/2012 2801 Downing Ct. 2801 Downing Ct. Manhole # 24097
5/7/2012 1812 S. Rankin St. 1812 S. Rankin St. Manhole # 26938
5/13/2012 809 Robin Hill Rd. 809 Robin Hill Rd. Manhole # 21678
5/16/2012 3312 Baird Dr. 3312 Baird Dr. Manholes # 26245 & 26246
5/16/2012 810 Pine Oak Dr. 810 Pine Oak Dr. Manhole # 25664
5/18/2012 624 Howard Ct. 624 Howard Ct. Manhole # 22068
5/21/2012 1016 Countrywood Lane 1016 Countrywood Lane Manhole # 19250
5/24/2012 1713 Seminole Dr. 1713 Seminole Dr. Manhole # 24529
5/31/2012 4617 Rhode Island Ave. 4617 Rhode Island Ave. Manhole # 20406 & 20401
6/2/2012 313 W. 10th St. 313 W. 10th St. Manhole # 21963
6/5/2012 226 E. 4th St. 226 E. 4th St. Manholes # 25805 & 21582
6/11/2012 2133 E. 2nd St. 2133 E. 2nd St. Manhole # 24045
6/11/2012 145 Brad St. 145 Brad St. Manhole # 21915
6/11/2012 1010 Locust Lane 1010 Locust Lane Manhole # 26202
6/12/2012 1302 W. Aries 1302 W. Aries Manhole # 18581
6/14/2012 612 W. Edmond Rd. 612 W. Edmond Rd. Manhole # 26794
6/18/2012 1017 Val Genes 1017 Val Genes Manhole # 18593
Date Stop Up Address Manholes Inspected 7/5/2012 108 E. 13th St. 108 E. 13th St. Manhole # 22094
7/5/2012 820 W. 15th St. 820 W. 15th St. - Siphon
7/8/2012 2620 Lost Trail Rd. 2620 Lost Trail Rd. Manhole # 19019
7/15/2012 1014 E. Main St. 1014 E. Main St. Manhole # 27106
7/21/2012 10th St. & Fretz Ave. 10th St. & Fretz Ave. Manhole # 21887
7/26/2012 301 E. 33rd St. 301 E. 3rd St. Manhole # 25813
7/27/2012 38 E. 14th St. 38 E. 14th St. Manhole # 22093
8/5/2012 101 Burton Place 101 Burton Place Manhole # 20533
8/7/2012 703 Sunset Dr. 703 Sunset Dr. Manhole # 22048
8/9/2012 918 Crown Dr. 918 Crown Dr. Manhole # 25156
8/27/2012 815 Sunset Dr. 815 Sunset Dr. Manhole # 21291
8/28/2012 1200 Pine Valley 1200 Pine Valley Manhole # 18894
8/30/2012 1505 Apollo Rd. 1505 Apollo Rd. Manholes # 18613 & 18611
8/31/2012 3701 Oak Hollow Dr. 3701 Oak Hollow Dr. Manholes 24684 & 24685
9/5/2012 600 Lilac Dr. 600 Lilac Dr. Creek Crossing
9/10/2012 504 Cinnamon Dr. 504 Cinnamon Dr. Manhole # 21746
9/13/2012 1628 Laurie Dr. 1628 Laurie Dr. Manhole # 20350
9/14/2012 1601 Pine Oak Dr. 1601 Pine Oak Dr. Manholes # 26164 & 77682
9/16/2012 166 Dennis St. 166 Dennis St. Manhole # 21922
9/18/2012 1701 Pine Oak Dr. 1701 Pine Oak Dr. Manhole # 78683
9/18/2012 625 N. Broadway 625 N. Broadway Manhole # 21554
9/18/2012 517 Candlewood Dr. 517 Candlewood Dr. Manhole # 24981
9/21/2012 1604 Pine Oak Dr. 1604 Pine Oak Dr. - Manhole # 26164
9/21/2012 2416 Windover Dr. 2416 Windover Dr. - Manhole # 24698
9/27/2012 1206 W. Gemini 1206 W. Gemini - Manholes # 18577 & 18576
Date Stop Up Address Manholes Inspected 10/4/2012 2413 Bent Trail Rd. 2413 Bent Trail Rd. - Manhole # 19043 10/6/2012 3805 Spring Hill Dr. 3805 Spring Hill Dr. - Manhole# 24693 10/7/2012 1301 E. 2nd St. 1301 E. 2nd St. - Manhole # 25451 10/11/2012 2200 Mark Rd. 2200 Mark Rd. - Manhole # 19829 10/11/2012 2nd & Coltrane 2nd & Coltrane - Manhole # 23926 10/13/2012 1301 N. Broadway 1301 N. Broadway - Manholes # 21563 & 21568 10/16/2012 708 Rockhollow Rd. 708 Rockhollow - Manholes 24987 10/17/2012 188 E. 33rd St. 188 E 33rd St. - Manhole # 20423 10/21/2012 608 Old English Rd. 608 Old English Rd. - Manhole # 21457 10/23/2012 1109 North Creek Dr. 1109 North Creek Dr. - Manhole # 23791 10/30/2012 610 Timber Lane 610 Timber Lane - Lamphole 11/3/2012 2200 Mark Rd. 2200 Mark Rd. - Manhole # 19829 11/13/2012 120 Barrett Place 120 Barrett Place - Manholes # 21770 & 21526 11/15/2012 1104 East Dr. 1104 East Dr. - Manhole # 25555 11/16/2012 801 Signal Ridge Dr. 801 Signal Ridge Dr. - Siphons 11/20/2012 9 N Smythe Ave. 9 N Smythe Ave. Manhole # 393 11/20/2012 2008 Hardy Dr. 2008 Hardy Dr. Manhole # 25926 11/21/2012 2201 Marshall Dr. 2201 Marshall Dr - Lamphole 11/27/2012 42 E. 2nd St. 42 E. 2nd St - Manholes # 20670 & 20671 11/29/2012 232 Stonebrook Way 232 Stonebrook Way - Manholes # 22336 & 22337 12/1/2012 512 Lanes Turn 512 Lanes Turn - Manhole # 21701 12/2/2012 3500 Smoky Hollow Rd. 3500 Smoky Hollow Rd. -Manhole # 224512 12/11/2012 28 E. 6th St. 28 E. 6th St. - Manhole # 27098 12/12/2012 2413 Bent Trail Rd. 2413 Bent Trail Rd. - Manholes # 19068 & 19043 12/13/2012 4009 Sheffield Ave. 4009 Sheffield Ave. - Manholes # 22735 12/13/2012 2513 Bent Trail Rd. 2513 Bent Trail Rd. - Manhole not on the map notify GIS/cam 12/14/2012 325 Meadow Lake Dr. 325 Meadow Lake Dr. - Manhole # 21659 12/15/2012 809 Robin Hill Rd. 809 Robin Hill Rd. - Manhole # 21678 12/17/2012 529 N. Blackwelder 529 N. Blackwelder - Manhole # 22879 12/18/2012 1229 S. Gemini Rd. 1229 S. Gemini Rd. - Manhole # 18551 12/20/2012 1604 Magnolia Ln. 1604 Magnolia Ln. - Manhole # 20296 12/20/2012 1002 Locust Ln. 1002 Locust Ln. - Manholes # 26202 & 25734 12/23/2012 1400 Cedar Ridge 1400 Cedar Ridge - Manhole # 26180
17,338 Total Linear Feet of Water Line, 10,438 Total Linear Feet of Sanitary Sewer
Water Line Sanitary Sewer
Name of Project Project Number 24” 12” 10” 8” 6” 24” 18” 15” 12” 10” 8” 6”
Arbor Creek 4 PR12-00008 1904 2378
Arbor Creek Retail West PR110003 10
Belmont Park 3 PR12-00003 3725 3288
Birnam Woods PR1100017 1063 3373 4255
EPS - Adminstration Building EP100023 338
EPS - Cross Timbers Elementary EP100006 390
Enterprise Warehouse - 2325 S Fretz Ave SP110013 197
Henderson Hills Baptist Church SP080023 3319 2138 142 670 1310 905
Hutton Place PR1100016 1600 928
Legend V Apartments SP100022 706 2410 125 406
Luke Corbett Residence EP12-00004 53
Mitch Park - WL for Aqua Center WC100004 2700 595 40
Original Townsite WL Impr, Phase 2 WC11-00001 40 50 110
Porches at Arbor Creek PR11-00015 1845 6 1607
RCB Bank SP110017 277 15
Redmond Trace 4 PR040038 550 30
Spring Creek SS Interceptor, Phase 2 CD030004 2337 1318 287 11 321
Subtotals 6765 10105 468 2337 1318 957 11 4910 905