Water Production from Shale Oil and Gas Wells

20
Water production from shale oil and gas wells Bing Bai 8/12/2013

description

 

Transcript of Water Production from Shale Oil and Gas Wells

Page 1: Water Production from Shale Oil and Gas Wells

Water production from shale oil and gas wells

Bing Bai

8/12/2013

Page 2: Water Production from Shale Oil and Gas Wells

Outline

• Wastewater characteristics• Wastewater production

• Vertical wells• Horizontal wells

• Sources of variability in water production volumes

• Water production prediction tools

Page 3: Water Production from Shale Oil and Gas Wells

Wastewater characteristics

• Frac flowback water– Fracturing fluids (15% – 40% recovery)– Water flows back after fracturing within 7 – 10

days– TDS: 30,000 – 200,000 mg/L– Chemical additives

• Produced water– Formation water + fracturing fluids– Water flows through the whole life time of well– High TDS– Oil & Grease and NORM

Page 4: Water Production from Shale Oil and Gas Wells

Wastewater production

• Vertical oil and gas wells• Arps Equation (Exponential decline) Q=Ae-kt

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

0

0.2

0.4

0.6

0.8

1

1.2

1.4

1.6

1.8

2

2σ confidence interval

Average

Year

Wa

ter

pro

du

cti

on

, b

bl/

da

y/w

ell

Page 5: Water Production from Shale Oil and Gas Wells

Wastewater production

• Horizontal oil and gas wells• Arps Equation (Hyperbolic decline)

1 18 35 52 69 86 1031201371541711882052222392562732903073243413580

200

400

600

800

1000

1200

1400

1600

Time, days

Wa

ter

Pro

du

cti

on

, bb

l

Produced water (>164 days)

Transition water (31-163 days)

Frac Flowback (<30 days)

Page 6: Water Production from Shale Oil and Gas Wells

Wastewater production

• Horizontal well water production• Frac flowback water (30 – 35%)• Transition water (17 – 20%)• Produced water (53 – 55%)

10 15 20 25 30

0

10

20

30

40

50

60

70

80

90

100

Produced water

Transition water

Frac flowback water

Year

Pe

rce

nta

ge

, %

Page 7: Water Production from Shale Oil and Gas Wells

Water recovery ratio

• Frac flowback water: 21.75%• Transition water: 12.23%• Produced water: 28.26%(10 years) to 37.93% (30 years)

• Total water recovery ratio: 62.24% (10 years) to 71.91% (30 years)

Page 8: Water Production from Shale Oil and Gas Wells

DJ basin water production prediction

• Production per horizontal well• Flowback water: 13442.3 bbls (2137.2 m3)• Transition water: 8286.1 bbls (1317.4 m3)• Produced water: 10 year — 18766 bbls (2983.6 m3)

30 year — 26356.6 bbls (4190.4 m3)

• DJ basin water production prediction• Assume 1500 new horizontal wells are drilled each

year in DJ basin

Page 9: Water Production from Shale Oil and Gas Wells

• Water production volumes (DJ basin)• 30 day flowback: 20 million bbls (3.17 million m3)• 133 day transition: 12.4 million bbls (1.97 million m3)• Produced water: 10 year — 28.1 million bbls (4.47 million m3) 30 year — 39.5 million bbls (6.3 million m3)

• Total water produced from 1500 new horizontal wells in DJ basin

60.5 million bbls (10 year) — 71.9 million bbls (30 year) (9.61 million m3) (11.44 million m3)

DJ basin water production prediction

Page 10: Water Production from Shale Oil and Gas Wells

Sources of variability in water production volumes

Page 11: Water Production from Shale Oil and Gas Wells

Sources of variability in water production

• Temporal variability (decline curves)

1 19 37 55 73 91 1091271451631811992172352532712893073253433610

200

400

600

800

1000

1200

1400

1600

Time, days

Wa

ter

Pro

du

cti

on

, bb

l

Produced water (>164 days)

Transition water (31-163 days)

Frac Flowback (<30 days)

Frac floback Transition water Produced water

Page 12: Water Production from Shale Oil and Gas Wells

• Spatial variability (well location)• Formation, temperature, pressure, porosity

164179194209224239254269284299314329344359

0

5

10

15

20

25

30

35

40Produced water

Field AField B

Time, days

Wa

ter

Pro

du

cti

on

, b

bl

31 41 51 61 71 81 91 101 111121 131141 151161

0

20

40

60

80

100

120

140

160

180Transition water

Field AField B

Time, days

Wa

ter

Pro

du

cti

on

, b

bl

1 4 7 10 13 16 19 22 25 28

0

200

400

600

800

1000

1200

1400

1600Frac flowback

Field AField B

Time, days

Wa

ter

Pro

du

cti

on

, b

bl

Sources of variability in water production

Time periodArea A(bbl)

Area B(bbl)

Two tail t-test(p value)

Frac flowback 14069.96 12279.41 0.03

Transiton water 8286.1 8290.74 0.94

Produced water 4496.6 4517.34 0.98

Total 26852.66 25087.49 0.54

Page 13: Water Production from Shale Oil and Gas Wells

• Wellbore length (frac stages)

Long: 38 stages (9500 ft/2900 m)Normal: 20 stages (5000 ft/1500 m)

0 50 100 150 200 250 3000

500

1000

1500

2000

2500

3000

Long

Normal

Time, days

Wat

er P

rod

uct

ion

, b

bl

Sources of variability in water production

Page 14: Water Production from Shale Oil and Gas Wells

Time periodWater production

(bbl)

Water production volume per stage(bbl/stage)

Two tail t-test(p value)

  Long Normal Long Normal  

Frac flowback 26130 13420 690 670 0.71

Transition water 14750 8340 390 420 0.66

Produced water 6520 3540 170 180 0.52

Total 47400 25300 1250 1260 0.51

Sources of variability in water production

Page 15: Water Production from Shale Oil and Gas Wells

• Type of frac fluid

Type I — Guar based fluid with basic pH

Type II —Non-guar based fluid with low pH

1 10 19 28 37 46 55 64 73 82 91 1001091181271361451541630

200

400

600

800

1000

1200

1400

Type I

Type II

Time, days

Wat

er P

rod

uct

ion

, b

bl

Sources of variability in water production

Time period Type I Type IITwo tail t-test

(p value)

Frac flowback 8802.49 7954.57 0.44

Transition water 5408.55 3442.38 0.046

Total 14211.04 11396.95 0.04

Page 16: Water Production from Shale Oil and Gas Wells

• Frac water source

Recycled: Recycled produced water (recycle ratio 1/7)

Non-recycled: Fresh water

Sources of variability in water production

1 6 11 16 21 26 31 36 41 46 51 56 61 66 71 76 81 860

200

400

600

800

1000

1200

1400

Recycled

Non-recycled

Time,days

Wat

er p

rod

uct

ion

, b

bl

Time periodRecycled/Fresh Blend (1/7)

(bbl)Fresh Water

(bbl)Two tail t-test

(p value)

Frac flowback 7620.32 8281.41 0.63

Transiton water 1783 1984.87 0.52

Page 17: Water Production from Shale Oil and Gas Wells

Water production prediction tools

Page 18: Water Production from Shale Oil and Gas Wells

Water production prediction tool

• Excel based tool

Page 19: Water Production from Shale Oil and Gas Wells

• ArcMap based tool

Water production prediction tool

Page 20: Water Production from Shale Oil and Gas Wells

Thank you!

Questions?