Water Preservation

download Water Preservation

of 21

Transcript of Water Preservation

  • 8/14/2019 Water Preservation

    1/21

    Water Preservation

    A Business Plansubmitted in partial fulfillment of

    the requirements for theDegree of Bachelor of Technology

    Under XXX

    By

    XXXXXXXXXX

    March - 2008

    Under the guidance

    ABSTRACT

    Information hiding is a new technology which integrates with theories and

    technologies of many academic and technical subjects. For information hiding, digital

    media are used as the carrier of the information to be hidden. The carrier conceals

    secret messages by covering the form of their existence. In this project, the definition,

    basic models and basic characters of information hiding have been discussed . Theapplication and research trends for information hiding system are concerned. The

    i

  • 8/14/2019 Water Preservation

    2/21

    information hiding technology based on digital audio processing is closely related to

    human hearing system. When the messages are having been concealed, the human

    ears are due to verify the existence of hiding messages. That is, the status of

    information coverage depends on the human hearing system. It is obvious that the

    characteristics of human hearing system is to be taken advantage. The added secret

    information in the digital audio should have no any effect onto human ears. In our

    project work, an implementation of information hiding technology system which is

    based on digital audio encoding is proposed. First by analyzing knowledge of digital

    audio processing and the model of human hearing system, Here in this project the

    algorithm of substitution of lease significant bit has been discussed.

    ii

  • 8/14/2019 Water Preservation

    3/21

    ACKNOWLEDGEMENT

    We express our deep sense of gratitude to, Mr. XXX, Project Advisor, for his

    valuable guidance and constant unfailing encouragement for completing this project.

    We are also grateful to our friends for tirelessly and patiently pursuing us to finish this

    report without whose help completion of the project report was the next thing to

    impossible.

    Last, but not the least, We give our sincere thanks to XXX, for giving us the

    opportunity and creating a nice work environment for us to complete our BusinessPlan report within the stipulated period of time.

    Finally, I would like to thank XXX for providing us proper environment for the

    completion of the report.

    XXX

    XXX

    TABLE OF CONTENTS

    ABSTRACT....................................................................................................................i

    ACKNOWLEDGEMENT............................................................................................iii

    TABLE OF CONTENTS..............................................................................................iii

    1. GENERAL INFORMATION....................................................................................6

    iii

  • 8/14/2019 Water Preservation

    4/21

    1.1 Name of the Entreprenuers ................................................................................6

    1.2 Proposed Project .................................................................................................6

    1.3 Major Product / Services ....................................................................................6

    1.4 Proposed Locations ............................................................................................6

    1.5 Type of Organization .........................................................................................6

    2. ENTREPRENUER PROFILE ..................................................................................6

    3. TYPE OF THE PRODUCT / SERVICES ...............................................................8

    3.1 Type of the Project .............................................................................................8

    3.2 Product / Services Description ..........................................................................8

    3.3 Major Consumers ..............................................................................................8

    3.4 Promoters ...........................................................................................................8

    4. DETAILS OF THE PROPOSED PROJECT.............................................................9

    4.1 Land and Building...............................................................................................9

    4.2 Machineries / Equipments...................................................................................9

    4.3 Miscellaneous Fixed Assets................................................................................94.4 Preliminary and Pre Operative Expenses .........................................................10

    4.5 Working Capital................................................................................................10

    4.6 Raw Material.....................................................................................................11

    5. MARKET POTENTIAL..........................................................................................12

    5.1 Present Demand and Supply of the Product Competition ................................12

    5.2 Target Clients....................................................................................................13

    5.3 Marketing Strategy ...........................................................................................13

    6. MANUFACTURING PROCESS............................................................................14

    6.1 Technical Know How Availability...................................................................14

    6.2 Step by Step Description...................................................................................147. PRODUCTION SCHEDULE..................................................................................15

    7.1 Number of Working Days per Annum..............................................................15

    7.2 Number of Working Shifts ...............................................................................15

    7.2.1 Sales Revenue.............................................................................................15

    7.2.2 Utilities.......................................................................................................15

    7.2.3 Salaries/Wages ...........................................................................................16

    7.2.4 Repairs and Maintenance ..........................................................................16

    7.2.5 Selling and Distribution Expenses ............................................................16

    7.2.6 Interest.........................................................................................................16

    7.2.7 Depreciation................................................................................................177.2.8 Misc. Expenses............................................................................................17

    7.2.9 Total Cost of the Project..............................................................................17

    8. MEANS OF FINANCE...........................................................................................18

    9. PROFITABILTY PROJECTIONS PER PROJECT................................................19

    10. CONCLUSION......................................................................................................20

    REFERENCES ............................................................................................................21

    iv

  • 8/14/2019 Water Preservation

    5/21

    v

  • 8/14/2019 Water Preservation

    6/21

    ENTREPRENEURSHIP PROJECT WATER PRESERVATION

    1. GENERAL INFORMATION

    1.1 Name of the Entreprenuers

    XXX

    XXX

    1.2 Proposed Project

    Water Supply System

    1.3 Major Product / Services

    Water resource management

    1.4 Proposed Locations

    Berhampur / Jamshedpur / Ranchi / Delhi / Nagpur/Bhubaneswar/Cuttack/Rourkela

    1.5 Type of Organization

    XXX

    2. ENTREPRENUER PROFILE

    6

  • 8/14/2019 Water Preservation

    7/21

    ENTREPRENEURSHIP PROJECT WATER PRESERVATION

    1. Name :XXX

    Educational Qualification :Bachelor of Technology

    Technical Skills :C,C++,Networking,Oracle

    2. Name:XXX

    Educational Qualification :Bachelor of Technology

    Technical Skills :C,C++,Networking,Oracle

    3. Name : XXX

    Educational Qualification :Bachelor of Technology

    Technical Skills :C,C++,Networking,Oracle

    4. Name : XXX

    Educational Qualification :Bachelor of Technology

    Technical Skills :C,C++,Networking,Oracle

    7

  • 8/14/2019 Water Preservation

    8/21

    ENTREPRENEURSHIP PROJECT WATER PRESERVATION

    3. TYPE OF THE PRODUCT / SERVICES

    3.1 Type of the Project

    Water Supply System

    3.2 Product / Services Description

    Here rain water is stored in the rainy season by the help of sinks placed under ground

    that are fed with water from the drains, which are so constructed so as to collect as

    much water as possible before any surface run-off occurs, and the sinks are then

    connected to a large tank or reservoir.Then the collected rain water is purified and it

    serves various purposes when people go through a water crisis in summer.

    3.3 Major Consumers

    Institutes, health organistions, office, companies and various kinds of human needs.

    3.4 Promoters

    1. Major Promoter of our project will be loans taken from banks.

    2. Capital from reliable and Supportive Capital Ventures.

    3. Mr. Asis Bose, civil engineer

    4. Mr. Abhishek Kumar, Sales Engineer, New Delhi

    8

  • 8/14/2019 Water Preservation

    9/21

    ENTREPRENEURSHIP PROJECT WATER PRESERVATION

    4. DETAILS OF THE PROPOSED PROJECT

    This Project is about water seepage system which stores the waste water and rain

    water by the help of several sinks placed in open ground and connected to a central

    tank and then this water collected is purified and serves various human purposes

    during water crisis.

    4.1 Land and Building

    Sr. No. Particular Area Required Total Value Remarks

    1.

    Land N.A.

    2. Office Building N.A. Rent

    4.2 Machineries / Equipments

    Sr. No. Description Nos. Required Rate(Rs.) Total Value(Rs.)

    1. Sanitary Pipe 20(50met) 50/met 50,000

    2. Sinks 20(5 cu m) 2000/sink 40,000

    3. Purifier 1 8,000 8,000

    4. Motor 1 25,000 25,000

    5. Tank 10(10 cu m) 15,000 15,000

    Total: 1,38,000

    4.3 Miscellaneous Fixed Assets

    Sr. No. Description Nos. Required Rate(Rs.) Total Value(Rs.)

    1. Furniture T(5),C(5) 1,000 5,000

    9

  • 8/14/2019 Water Preservation

    10/21

    ENTREPRENEURSHIP PROJECT WATER PRESERVATION

    4.4 Preliminary and Pre Operative Expenses

    Sr. No. Particulars Amount (Rs.) Remarks

    1.

    2.

    3.

    Interest during

    implementation

    Establishment

    Expenses

    Start-Up

    Expenses

    50,000

    4.5 Working Capital

    Sr.

    No.

    Item Rs. REMARKS

    1.

    2.

    4.

    Raw Material(refer table 2.6)

    Labour

    a. Excavation in soils (Rs 90

    per cu.m.)

    b. For construction and other

    requirements( Rs 80 per day)

    Analysis and designing

    31500.00

    36000.00

    8000.00

    5000.00

    Approx 400 cu.m

    10 people 10 days

    Total: 80,500.00 For 1 project

    10

  • 8/14/2019 Water Preservation

    11/21

    ENTREPRENEURSHIP PROJECT WATER PRESERVATION

    4.6 Raw Material

    Sl No. Item Qty Cost(Rs.)

    1. Cement 100 bags 15,000

    2. Iron Rods 50 kg 10,000

    3. Bricks 1 trip 5,000

    4. Sand 2 trips 500

    5. Chips 10 Bags 1,000

    Total 31,500

    11

  • 8/14/2019 Water Preservation

    12/21

    ENTREPRENEURSHIP PROJECT WATER PRESERVATION

    5. MARKET POTENTIAL

    5.1 Present Demand and Supply of the Product Competition

    Information hiding in a .WAV file is a new technology which integrates with theories

    and technologies of many academic and technical subjects. For information hiding,

    digital media are used as the carrier of the information to be hidden. The carrier

    conceals secret messages by covering the form of their existence. The information

    hiding technology based on digital audio processing is closely related to Human

    Auditory System. When the messages are having been concealed, the human ears are

    due to verify the existence of hidden messages. That is, the status of information

    coverage depends on the Human Auditory System. It is obvious that the

    characteristics of Human Auditory System are to be taken advantage. The added

    secret information in the digital audio has no effect onto human ears. In our product,

    an implementation of information hiding technology system which is based on digital

    audio encoding is proposed. First by analyzing knowledge of digital audio processing

    and the model of Human Auditory System the product has been considered.

    Looking at the present trend various companies provide various security software for

    the transfer of data but no software is safe and secure because they can be detected by

    various means and thus their hidden messages can be retrieved by any expert

    computer professional by cracking the password. So our product is prepared by

    keeping in mind these visible and audible aspects of product security. As the

    technology what we are providing makes it very much difficult for any expert to crack

    it as it has no effect on Human ears and thus it cant be detected whether the productcontain any hidden message or not. Right now no such product is available in market.

    If this product will be introduced in the market then it will be of great demand.

    12

  • 8/14/2019 Water Preservation

    13/21

    ENTREPRENEURSHIP PROJECT WATER PRESERVATION

    5.2 Target Clients

    Our main target clients are Educational institutes, Health care centers and some of

    villages where water is a measure problem.

    5.3 Marketing Strategy

    The Marketing Strategy will be advertising the product in the media and by

    companys representatives by visiting various target clients and by making them

    aware of the features water problem, application and the type of technology used in

    system.

    13

  • 8/14/2019 Water Preservation

    14/21

    ENTREPRENEURSHIP PROJECT WATER PRESERVATION

    6. MANUFACTURING PROCESS

    6.1 Technical Know How Availability

    Books related to water resource management, civil engineering books for

    construction, environmental study for knowing the system effect on environment..

    6.2 Step by Step Description

    1) First we have to place numerous sinks in open spaces of the campus which

    must be under ground.

    2) The drains must be so constructed so as to place them in slope areas so that all

    the rain water will be collected there.

    3) There must be a reservoir placed centrally to which all the sinks are connected

    through pipes.

    4) All the water will be collected in the reservoir after it is collected by numerous

    sinks.

    5) There must be a purifier which will purify the water after it is gathered in thereservoir.

    6) A motor will be there which will pump up the water from the reservoir and

    serve various purposes.

    14

  • 8/14/2019 Water Preservation

    15/21

    ENTREPRENEURSHIP PROJECT WATER PRESERVATION

    7. PRODUCTION SCHEDULE

    7.1 Number of Working Days per Annum

    It will take around 10 days to complete a 10,000 litres rainwater supply system.

    7.2 Number of Working Shifts

    There is only one shift of 8 hours duration.

    7.2.1 Sales Revenue

    The sales revenue of the business depends on the number of clients it has dealt with in

    the present year.

    SALE REVENUE

    Year No. of clients Business

    Idea

    Sold/Year

    Rate Per Unit

    (%)

    Sales

    Realization

    (Rs)

    1 10 10 5,00,000 50,00,000

    7.2.2 Utilities

    Sr. No. Particulars Annual Expenditure(Rs) Remarks

    1.

    2.

    3.

    4.

    5.

    Power/Electricity

    Water

    Coal/Oil/Stream

    Any other item

    Phone

    25,000

    ---------

    ---------

    ----------

    5,000

    For motor

    & Purifier

    Total 30,000

    15

  • 8/14/2019 Water Preservation

    16/21

    ENTREPRENEURSHIP PROJECT WATER PRESERVATION

    7.2.3 Salaries/Wages

    Sr.

    No.

    Particulars No. Wages/Salaries per

    Month(Rs.)

    Monthly

    Expenses(Rs)1. Office Staff 3 5,000 15,000

    Total 15,000

    7.2.4 Repairs and Maintenance

    Sr.

    No.

    Particulars Amount(Rs)

    1. Motor and purifier 10,000

    7.2.5 Selling and Distribution Expenses

    Sr.

    No

    Particulars Amount(Rs) Remarks

    1.

    Traveling

    Total

    20,000

    20,000

    7.2.6 Interest

    Year Outstanding

    Loan Amount (Rs)

    Interest Installment(Rs)

    Per month

    1 2,00,000(10%) 20,000 25,000

    16

  • 8/14/2019 Water Preservation

    17/21

    ENTREPRENEURSHIP PROJECT WATER PRESERVATION

    7.2.7 Depreciation

    Sr.

    No.

    Type of Asset Cost of Asset Expected Life Depreciation

    1. Motor 25,000 5 yrs 4,000

    2. Sanitary Pipes 50,000 5 yrs 8,000

    3. Purifier 8,000 5 yrs 1,280

    4. Furniture 5,000 5 yrs 8,00

    Total 14,080

    7.2.8 Misc. Expenses

    Sr.

    No.

    Description Cost

    1. Furniture 5,000

    Total 5,000

    7.2.9 Total Cost of the Project

    Sr. No. Particulars Total Value(Rs.)

    1.

    2.

    3.

    4.

    Fixed Capital

    (Total if item No.2.1,2.2,2.3)

    Working Capital margin

    (Total of item No. 2.5)

    Preliminary & Pre-operative

    Expenses

    (Total of item No. 2.4)

    Contingencies

    1,43,000

    80,500

    50,000

    26,500

    Total 3,00,000

    17

  • 8/14/2019 Water Preservation

    18/21

    ENTREPRENEURSHIP PROJECT WATER PRESERVATION

    8. MEANS OF FINANCE

    Sr. No. Particulars Amount

    (Rs.)

    Remarks

    1.

    2.

    3.

    4.

    Own Investment

    Term Loan

    Working Capital Loan

    Any Other Source

    1,00,000

    2,00,000

    Total: 3,00,000

    18

  • 8/14/2019 Water Preservation

    19/21

    ENTREPRENEURSHIP PROJECT WATER PRESERVATION

    9. PROFITABILTY PROJECTIONS PER PROJECT

    Sr. No. Particulars Amount (Rs.)

    A.

    B.

    i)

    ii)

    iii)

    iv)

    v)

    vi)

    vii)

    viii)

    C.

    D.

    E.

    Sale Realization

    Cost of Manufacturing/

    Servicing

    Raw Material

    Utilities

    Salaries/Wages

    Repairs & Maintenance

    Selling & Distribution

    Expenses

    Interest

    Depreciation

    Misc. Expenses

    Total

    Gross Profit/Loss(A-B)

    Income-tax

    Net Profit/Loss

    5,00,000

    31,500

    30,000

    15,000

    10,000

    20,000

    20,000

    14,080

    5,000

    1,45,580

    3,54,420

    1,29,717

    2,24,703

    19

  • 8/14/2019 Water Preservation

    20/21

    ENTREPRENEURSHIP PROJECT WATER PRESERVATION

    10. CONCLUSION

    We hence conclude that this project of ours has a break even analysis of

    approximately 80% which is very much feasible. As this project has a comparatively

    low budget and yields good profits hence it can be taken as a feasible business plan.

    20

  • 8/14/2019 Water Preservation

    21/21

    ENTREPRENEURSHIP PROJECT WATER PRESERVATION

    REFERENCES

    [1] http//www.google.com

    [2] http//www.wikipedia.com

    21