1 | Program Name or Ancillary Text eere.energy.gov Water Power Peer Review 51-Mile Hydroelectric Power Project PI: Jim Gordon Earth By Design, Inc. Email: [email protected] (541) 385-1135 November, 2011 Demonstrating new methodologies and technology to reduce the LCOE for small, hydropower development Advanced Technologies and Methodologies for Small Hydropower Development

description

Water Power Peer Review. Advanced Technologies and Methodologies for Small Hydropower Development. PI: Jim Gordon. Earth By Design, Inc. Email: [email protected] (541) 385-1135 November, 2011. - PowerPoint PPT Presentation

Transcript of Water Power Peer Review

Page 1: Water Power Peer Review

1 | Program Name or Ancillary Text eere.energy.gov

Water Power Peer Review

51-Mile Hydroelectric Power Project PI: Jim GordonEarth By Design, Inc.Email: [email protected] (541) 385-1135November, 2011

Demonstrating new methodologies and technology to reduce the LCOE for small, hydropower development

Advanced Technologies and Methodologies for Small Hydropower Development

Page 2: Water Power Peer Review

2 | Wind and Water Power Program eere.energy.gov

Purpose, Objectives, & Integration

Project Purpose:• Promote cost effective, sustainable small hydropower through advanced

technologies & methodologies.• Reduce the LCOE to less than $0.07 per kWh.

• Capitalize on the undeveloped resource potential offered by sustainable, small hydropower

• Demonstrate the advanced project technologies and assessment of its cost, performance & reliability

Relation to Program Objectives:• Effectively transfer the technical and economic results of the project

based on real-world construction and operations to facilitate widespread adoption of this new technology with reduced costs, times, and risks to the industry.

• Demonstrate reliable, cost-effective, highly-efficient and flexible technology to capitalize on small scale hydropower opportunities previously unattainable.

Page 3: Water Power Peer Review

3 | Wind and Water Power Program eere.energy.gov

Technical Approach

Page 4: Water Power Peer Review

4 | Wind and Water Power Program eere.energy.gov

Technical Approach

Additional Key Issues:• Refining Levelized Cost of Energy model for hydropower using the

innovative methodologies in construction and advanced technology.

• Providing publications that can be used to develop cost-models for future hydro projects where previously considered cost-prohibitive due to capital costs and/or low-income.

• ORNL will review and comment on the computer tools developed by CleanPower, that are based on the empiric data from model testing.

Page 5: Water Power Peer Review

5 | Wind and Water Power Program eere.energy.gov

Plan, Schedule, & Budget

Schedule• Initiation date: 10/1/2011• Planned completion date: 10/1/2014

– [This is one month later than previously anticipated based on date of award received]• Milestones

– Preliminary Permitting, licensing, interconnection and financing by April 2012– Manufacturing and review of equipment by October 2012– Construction and commissioning by April 2013– Operations and testing by September 2014

• Go/no-go decision points – Project Financing by February 2012– Permitting and Licensing of project by April 2012– Construction completion by January 2013

Budget: • There have been no variances in the proposed budget to date.• [Identify what portion of the project budget has been expended to date.]

Proposed BudgetFY2011 FY2012 FY2013

DOE Cost-share DOE Cost-share DOE Cost-share

$1,096,574 $2,539,428 $221,456 986,527 $181,970