Water Garage MEETING LANE Boon Walk · against a paper master copy issued by QMP. This drawing is...
Transcript of Water Garage MEETING LANE Boon Walk · against a paper master copy issued by QMP. This drawing is...
Water
W
ater
Water
S
T
O
C
K
'
S
L
A
N
E
B
o
o
n
W
a
lk
T
U
N
W
E
L
L
L
A
N
E
M
E
E
T
IN
G
L
A
N
E
M
E
E
T
IN
G
L
A
N
E
T
H
E
N
O
O
K
H
I
G
H
S
T
R
E
E
T
3
7
6
36
5
7
7
7
5
2
1
4
1
3
1
7
3
7
2
0
1
8
5
1
5
1
89
1
9
1
0
5
6
8
4
6
7
7
1
1
9
5
4
2
8
9
1
0
Garage
81
(PH)
6
8
H
a
ll
8
3
72
8
7
8
5
8
7
8
3
Ambulance
Hall
Garage
Nag's Head
1
7
3
7
1
6
9
75
75
1
3
9
Club
3
3
3
5
3
7
t
o
4
9
5
1
t
o
6
1
1
6
3
4
1
4
1
2
5
3
8
1
0
1
Corby Old Village
Primary School
Existing School Building
New Hall Extension
New Classroom
New Classroom Extension
Project
Drawing Title
Checked
Designed
Drawn
Drawing No.
Project No.
Scale Date
Client
Rev. No.
Amendment Date/By
Contractor must check all dimensions on site. Do not scale this drawing. All
discrepancies to be reported immediately to the Supervising Officer before
proceeding. If this drawing has been transmitted digitally, it must be checked
against a paper master copy issued by QMP. This drawing is the copyright
of QMP.
Spratton Road, Brixworth,
Northampton NN6 9DS
Tel: (01604) 880808 Fax: (01604) 881685
E-mail: [email protected]
Web site: www.qmp.co.uk
Northampton, Cambridge, London
Consultancy Services
Within The Built Environment
LEND LEASE CONSULTING
NORTHAMPTON
ALTERATIONS & EXTENSIONS
CORBY OLD VILLAGE
PRIMARY SCHOOL
PROPOSED LOCATION +
SITE PLANS
SCB
JRK
1:1250/1:500@A1 NOV 2014
M5496
M5496/A/200.0
Scale 1:500
50m30 4020
10
0
PLANNING ISSUE
LOCATION PLAN
Scale = 1:1250
1
SITE PLAN
Scale = 1:500
A-200
2
A-200
Scale 1:1250
125m7550250 100Area of site leased from
Rowlett Educational Foundation
Door and walls removed
to form new corridor
New corridor to
new classroom
Existing windows and door
removed and blocked up
Dummy window recess
8652.5
G04
NEW CLASSROOM
52m²
FE
FE
G01
ENTRANCE HALL
G01a
G03
BIRCH CLASSROOM
G06
ELM CLASSROOM
62m²
G02
Corridor
G07
NEW LIBRARY/ BREAKOUT AREA
G08
Store
G10
OAK CLASSROOM
59m²
G13
CLOAKROOM
G11
Corridor
G12
CORRIDOR
G14
DISABLED WC
G15
CHANGING ROOM/BOYS WC
G16
ASH CLASSROOM
G17
ACTIVITY ROOM
G18
WC
G19
CHESTNUT CLASSROOM
G20
WILLOW CLASSROOM
52m²
G21
CLOAKROOM
G22
CHANGING ROOM/GIRLS WC
G23
CLEANER'S STORE
G24
CLOAKROOM
G25
NEW HALL STORE / CLEANERS
G26
STORE
G27
HEAD TEACHER
G29
RECEPTION
G02
Corridor
G11
Corridor
7902.5
6487.5
PROPOSED EXTENSION
NEW DOOR
NEW
DOOR
1*
6862.5
11052
14990
NEW
DOOR
NEW
DOOR
2587.5
6627.5
2212.5
5877.5
FE
9050
4881.5
9050
4861.5
6230
6085
G30
NEW MAIN HALL
165.67m²
G24a
NEW STAFF WC
G21a
NEW STAFF WC
FE
11802
Wall and windows
removed to form
new opening
Wall and windows removed
to form new opening
Lower part of windows and wall
removed to form new openings
NEW FIRE
EXIT DOOR
NEW FIRE
EXIT DOOR
NEW FIRE
EXIT DOOR
NEW FIRE
EXIT DOOR
NEW FIRE
EXIT DOOR
Door removed and
replaced with new six
panel half glazed Fire
Door to match existing
Window and lower wall
replaced with new fire exit with
window above.
Existing doors and windows
removed and blocked up
Door removed to
form opening
Windows
removed and
blocked up
G09
New Corridor with flat roof above
@ 2500mm to underside of ceiling
FFL 101.12
NEW FIRE
EXIT DOOR
FE
FE
NEW FIRE
EXIT DOOR
2 No windows and
lower wall replaced
with new Fire Exit
with window above
NE
W M
I &
A
CC
ES
SIB
LE
W
C
NEW HALL
WITH 27 DEGREE
PITCHED ROOF
NEW LINK /
AMENITIES
WITH FLAT
ROOF ABOVE
FE
FE FE
FFL 101.12
COURTYARD
45m²
COURTYARD
45m²
FFL 101.12
FE
NEW FIRE
EXIT DOOR
PR
OP
OS
ED
E
XT
EN
SIO
N
PR
OP
OS
ED
E
XT
EN
SIO
N
Wall and windows removed
to form new opening
FFL 101.12
Window and lower
wall replaced with
new Fire Exit with
window above
New flat suspended ceiling
at approx. 2.8m from FFL
Dummy window
recesses
Classroom extended
into existing corridor
New walls and door for
extended classroom
Classroom extended
into existing corridor
New walls and door for
extended classroom
Wall and windows removed to
form access for new corridor
Wall and windows removed to
form access for new corridor
Windows
removed and
blocked up
FFL 101.12FFL 101.12
New raked ceiling
to extension
NEW LINK /
AMENITIES
WITH FLAT
ROOF ABOVE
New suspended
ceiling to Link at
2.5m approx.
from FFL
MAIN
ENTRANCE
3 No. new
rooflights to
extension
SOUTH
ELEVATION
NORTH
ELEVATION
S1
WEST
ELEVATION
EAST
ELEVATION
NEW FIRE
EXIT DOOR
NEW FIRE
EXIT DOOR
NEW
DOOR
1*
Cu
p'd
Cu
p'd
Cu
p'd
Cu
p'd
NEW
DOOR
1*
Indicative location of
new covered play
area. Final location
and size to be agreed.
G28b
MI Room
NEW DOOR
NEW DOOR
PRINTER
Door to be removed and
widened to double doors
subject to play equipment
size e.g. floor mats
NEW
DOOR
NEW
DOOR
HIG
H LE
VE
L H
OR
IZ
ON
TA
L
S
TR
IP
W
IN
DO
W
HIG
H LE
VE
L H
OR
IZ
ON
TA
L
S
TR
IP
W
IN
DO
W
VERTICAL
WINDOW
RWP
RWP
RWP
RWP
RWP
RWP
RWP
RWP
RWP
RWPRWP
SVP
HIGH LEVEL HORIZONTAL
STRIP WINDOW
Extension set back
one brick depth
from existing
building line
VERTICAL
WINDOW
G28a
DIS WC
G28b
Resources
New suspended
ceiling to Link at
2.5m approx.
from FFL
Extension to G02
New Corridor with flat roof above
@ ceiling height to match existing
Extension to G11
New Corridor with flat roof above
@ ceiling height to match existing
1* New six panel half glazed
Fire Doors to match existing
with glazed Georgian style
side screens.
NEW EXTERNAL WALL
EXISTING EXTERNAL WALL
EXISTING INTERNAL WALL
NEW INTERNAL WALL
KEY
Project
Drawing Title
Checked
Designed
Drawn
Drawing No.
Project No.
Scale Date
Client
Rev. No.
Amendment Date/By
Contractor must check all dimensions on site. Do not scale this drawing. All
discrepancies to be reported immediately to the Supervising Officer before
proceeding. If this drawing has been transmitted digitally, it must be checked
against a paper master copy issued by QMP. This drawing is the copyright
of QMP.
Spratton Road, Brixworth,
Northampton NN6 9DS
Tel: (01604) 880808 Fax: (01604) 881685
E-mail: [email protected]
Web site: www.qmp.co.uk
Northampton, Cambridge, London
Consultancy Services
Within The Built Environment
LEND LEASE CONSULTING
NORTHAMPTON
ALTERATIONS & EXTENSIONS
CORBY OLD VILLAGE
PRIMARY SCHOOL
PROPOSED GROUND FLOOR
KPM
SCB
1:100 @ A1 OCT 2014
M5496
M5496/A/201.0
10m7.52.50
Scale 1:100
5
New SVP concealed within IPS
duct system
Existing cupboard retained
Existing server unit at high level
to remain and enclosed
New location of existing
photcopier/printer
PLANNING ISSUE
PROPOSED GROUND FLOOR PLAN
1
A-201
RWPRWP
RWP
RWP
RWP
IC
DH
1.97
F-C 0.58
(BLOCKED)
COAL CHUTES SP 1.72
CR 1.82
FL 98.62
CL 100.91
FL 98.66
CL 100.94
DH
1.88
B01
Boiler Room
B02
Store
C-H 1.31
F-C 0.80
C-H 1.13
F-C 0.96
FL 00.00
CL 00.00
C-H 0.00
F-C 0.00
C-H 0.00
F-C 0.00
C-H 1.31
F-C 0.80
C-H 1.15
F-C 0.95
DH
1.96
DH
1.96
FL 00.00
CL 00.00
DH
0.00
DH
0.00
CEILING
PITCHED
SP
1
05
.1
6
CL 106.05
FL 103.55
SP
1
05
.1
6
CEILING
PITCHED
HATCH
HATCHHATCH
H 0.93
WALL
CEILING
PITCHED
CL 106.76
CEILING
PITCHED
SP 105.16
CEILING
PITCHED
SP
1
05
.1
5
CL 106.06
FL 103.55
CEILING
PITCHED
SP
1
05
.1
5
CL 105.89
FL 103.55
CL
0.00
CL
106.08CEILING
PITCHED
CEILING
PITCHED
CL 107.02
SP
1
05
.1
5
'VELUX'
'VELUX'
F01a
I.T. Room
F02
Staff Room
F03a
Staff Room
F01b
WC
F01c
F03b
WC
Project
Drawing Title
Checked
Designed
Drawn
Drawing No.
Project No.
Scale Date
Client
Rev. No.
Amendment Date/By
Contractor must check all dimensions on site. Do not scale this drawing. All
discrepancies to be reported immediately to the Supervising Officer before
proceeding. If this drawing has been transmitted digitally, it must be checked
against a paper master copy issued by QMP. This drawing is the copyright
of QMP.
Spratton Road, Brixworth,
Northampton NN6 9DS
Tel: (01604) 880808 Fax: (01604) 881685
E-mail: [email protected]
Web site: www.qmp.co.uk
Northampton, Cambridge, London
Consultancy Services
Within The Built Environment
LEND LEASE CONSULTING
NORTHAMPTON
ALTERATIONS & EXTENSIONS
CORBY OLD VILLAGE
PRIMARY SCHOOL
PROPOSED BASEMENT +
FIRST FLOOR PLANS
KPM
SCB
1:100 @ A1 OCT 2014
M5496
M5496/A/202.0
10m7.52.50
Scale 1:100
5
BASEMENT
FIRST FLOOR
New Flat Roof
New Flat Roof New Flat Roof
PLANNING ISSUE
FIRST FLOOR PLAN
2
A-202
BASEMENT PLAN
1
A-202
DATUM LEVEL 97.00
WEST ELEVATION
NEW
FIRE
EXIT
FFL 101.12
PROPOSED EXTENSION
3 17 6
4
7 1112
BRICK
RWP
RWPRWP
BRICK
PROPOSED HALL EXTENSION
SOUTH ELEVATION
DATUM LEVEL 97.00
FFL 101.12FFL 101.12
PROPOSED
EXTENSION
PROPOSED
LINK/ AMENITIES
PROPOSED
LINK/ AMENITIES
NEW LOCATION OF
EXISTING DATE STONE
NEW LOCATION
OF EXISTING BELL
FEATURE COURSING:
20mm PROJECTION
CEILING WITHIN HALL
SET AT UNDERSIDE OF
WARM ROOF
CONSTRUCTION
1a
DATE
STONE
4275.0
4200.0
2
7
°
NEW
FIRE
EXIT
7 7
NEW
FIRE
EXIT
67 61
476
11 12
4a
3
NORTH ELEVATION
DATUM LEVEL 97.00
NEW
FIRE
EXIT
NEW
FIRE
EXIT
FFL 101.12
NEW RAMP/
STEPS
PROPOSED EXTENSION
7 7
4
2 3106
EAST ELEVATION
DATUM LEVEL 97.00
RL RL RL
FFL 101.12
EXISTING SVP &
RWP'S TO BE
RELOCATED
PROPOSED EXTENSION
6 2 3 7 7
7 4
12
8652.5
G04
NEW CLASSROOM
52m²
FE
FE
C-H 2.60
F-C 1.01
C-H 2.51
F-C 1.07
C-H 0.86
F-C 1.17
C-H 0.84
F-C 1.17
DH
1.99
DH
1.99
DH
1.98
DH
2.12
DH
2.12
DH
2.04
C-H 1.13
F-C 1.07
C-H 2.40
F-C 1.27
C-H 2.48
F-C 1.08
C-H 0.96
F-C 1.18
C-H 0.83
F-C 1.19
C-H 0.85
F-C 1.19
C-H 0.00
F-C 0.00
C-H 1.01
F-C 1.08
C-H 1.02
F-C 1.10
C-H 1.02
F-C 1.10
CL 105.06
C-H 0.89
F-C 1.04
C-H 1.22
F-C 1.17
DH
2.03
DH
2.10
DH
2.04
DH
2.04
DH
1.99
DH
1.99
DH
1.99
DH
1.99
DH
2.06
DH
2.03
DH
2.14
DH
2.12
DH
1.98
DH
1.93
C-H 1.00
F-C 1.10
C-H 1.22
F-C 1.16
C-H 1.23
F-C 1.17
C-H 0.91
F-C 1.17
(INTERNAL)
C-H 2.60
F-C 1.01
C-H 2.60
F-C 1.01
SP 1.65
CR 1.74
2.09
DH
2.06
FL 101.12
SP 1.65
CR 1.77
SP 1.65
CR 1.77
C-H 1.33
F-C 0.77
DH 2.13
(WINDOW ABOVE)
C-H 1.33
F-C 0.77
C-H 1.33
F-C 0.77
C-H 1.33
F-C 0.77
C-H 1.22
F-C 0.99
(WINDOW ABOVE)
DH
(WINDOW ABOVE)
2.09
DH 2.14
(WINDOW ABOVE)
CL 103.68
FL 101.12
CL 105.03
FL 101.12
CL 103.31
FL 101.12
CL 103.36
FL 101.12
CL 103.34
FL 101.12
US
103.21
US
103.21
US
103.21
CL 103.68
FL 101.12
CL 106.82
FL 101.12
CEILING
PITCHED
CEILING
PITCHED
CEILING
PITCHED
CEILING
PITCHED
CL 104.21
FL 101.12
SP
1
06
.0
2
SP
1
06
.0
2
SP 2.16
CR 2.64
SP 2.16
CR 2.64
SP 4.59
CR 5.05
C-H 1.13
F-C 1.07
CL 105.02
FL 101.12
CL 105.02
FL 101.12
C-H 2.51
F-C 1.07
CL 105.03
FL 101.12
C-H 0.78
F-C 1.00
CL 105.03
FL 101.12
DH
2.05
US
3
.5
9
DH
2.1
4
(W
IN
DO
W A
BO
VE
)
SP
1
04
.8
7
SP
1
04
.8
7
HATCH
DH
2.13
(WINDOW ABOVE)
CL 105.05
FL 101.12
CL 103.92
C-H 2.40
F-C 1.27
C-H 2.48
F-C 1.08
US
103.21
C-H 1.22
F-C 1.17
CL 105.02
FL 101.12
C-H 2.52
F-C 1.05
C-H 2.56
F-C 0.98
CL 105.02
FL 101.12
C-H 103.40
CL
1
04
.3
9
CEILING
PITCHED
SP 103.37
FL 101.12
CL 103.31
FL 101.12
CL 103.31
FL 101.12
CL 103.41
FL 101.12
US 103.30
US
10
3.21
CEILING
PITCHED
FL 101.12
SP
1
03
.3
1
CL
1
05
.0
5
CL 105.05
FL 101.12
C-H 2.51
F-C 1.07
US
103.21
CL 103.30
FL 101.12
C-H 0.77
F-C 1.32
CL 103..30
FL 101.12
CL 103.31
FL 101.12
C-H 0.77
F-C 1.32
C-H 1.00
F-C 1.10
C-H 1.18
F-C 0.99
(WINDOW ABOVE)
C-H 1.18
F-C 0.99
(WINDOW ABOVE)
C-H 1.18
F-C 0.99
(WINDOW ABOVE)
DH 2.14
(WINDOW ABOVE)
DH
2.14
(WINDOW ABOVE)
DH 2.14
(WINDOW ABOVE)
G01
ENTRANCE HALL
G01a
G03
BIRCH CLASSROOM
G06
ELM CLASSROOM
62m²
G02
Corridor
G07
NEW LIBRARY/ BREAKOUT AREA
G08
Store
G10
OAK CLASSROOM
59m²
G13
CLOAKROOM
G11
Corridor
G12
CORRIDOR
G14
DISABLED WC
G15
CHANGING ROOM/BOYS WC
G16
ASH CLASSROOM
G17
ACTIVITY ROOM
G18
WC
G19
CHESTNUT CLASSROOM
G20
WILLOW CLASSROOM
52m²
G21
CLOAKROOM
G22
CHANGING ROOM/GIRLS WC
G23
CLEANER'S STORE
G24
CLOAKROOM
G25
NEW HALL STORE / CLEANERS
G26
STORE
G27
HEAD TEACHER
G29
RECEPTION
G02
Corridor
G11
Corridor
777.5 885 1022.5 890 1022.5 3027.5
7902.5
64
87
.5
1022.5
10
22
.5
89
01
02
2.5
89
01
02
2.5
10
02
.5
10
12
.5
PROPOSED EXTENSION
NEW DOOR
NEW
DOOR
1*
68
62
.5
1115 2035 6515
11052
14
99
0
2035 1115
74
5
NEW
DOOR
NEW
DOOR
7120
71057456.5
19
25
19
80
19
80
53
7.5
2587.5
66
27
.5
89
01
02
2.5
89
01
02
2.5
89
01
02
2.5
89
0
2212.5
58
77
.5
FE
2200
15
00
31
69
3755
36
37
2325
7425 7065
1080
600
1175.5
1319.5
20
52
.5
3451.5
3451.5
31
67
.5
90
50
4881.5
90
50
4861.5
3451.5
31
67
.5
3451.5
20
52
.5
6230
60
85
63906400
731.5 910 1650 15901570 1650 910 731.5
956.515854501585330
G30
NEW MAIN HALL
165.67m²
G24a
NEW STAFF WC
G21a
NEW STAFF WC
FE
492.51022.5490
18
99
.1
1305
11802
NEW FIRE
EXIT DOOR
NEW FIRE
EXIT DOOR
NEW FIRE
EXIT DOOR
NEW FIRE
EXIT DOOR
NEW FIRE
EXIT DOOR
573.81022.5548.8
Wheelchair turning
circle
2945
2035 450
G09
New Corridor with flat roof above
@ 2500mm to underside of ceiling
FFL 101.12
NEW FIRE
EXIT DOOR
FE
FE
NEW FIRE
EXIT DOOR
NE
W M
I &
A
CC
ES
SIB
LE
W
C
FE
FE FE
FFL 101.12
COURTYARD
45m²
COURTYARD
45m²
FFL 101.12
FE
NEW FIRE
EXIT DOOR
PR
OP
OS
ED
E
XT
EN
SIO
N
PR
OP
OS
ED
E
XT
EN
SIO
N
FFL 101.12
FFL 101.12FFL 101.12
MAIN
ENTRANCE
S1
NEW FIRE
EXIT DOOR
NEW FIRE
EXIT DOOR
NEW
DOOR
1*
NEW
DOOR
1*
G28b
MI Room
NEW DOOR
NEW DOOR
PRINTER
NEW
DOOR
NEW
DOOR
HIG
H L
EV
EL
H
OR
IZ
ON
TA
L
S
TR
IP
W
IN
DO
W
HIG
H L
EV
EL
H
OR
IZ
ON
TA
L
S
TR
IP
W
IN
DO
W
VERTICAL
WINDOW
HIGH LEVEL HORIZONTAL
STRIP WINDOW
VERTICAL
WINDOW
G28a
DIS WC
G28b
Resources
Extension to G02
New Corridor with flat roof above
@ ceiling height to match existing
Extension to G11
New Corridor with flat roof above
@ ceiling height to match existing
External walls - Facing brickwork, colour TBC.
KEY: External Material Finishes
Pitched roof - Plain Clay Tiles, to match
existing. Allow for 100mm min. headlap to
low pitch below 20°.
Flat roof - Single ply membrane finish.
timber fascias and soffits to match existing.
New Main Hall only - Flat roof to be single
ply membrane with aluminium fascia and
rainwater system.
External walls - Blue Engineering brick
plinth up to DPC level, colour TBC.
Rainwater - Plastic rainwater gutters and
downpipes, colour to match existing.
PVC-U double glazed external doors,
windows, louvres and rooflights, colour to
match existing.
Stone window sills to match existing.
Georgian style glazing bars to match existing.
External walls - Render, colour TBC.
Columns - Painted Structural Timber circular
columns on steel supports, colour TBC.
Column and fixing detail to engineers design.
Vents and ductwork exhausts - refer to M&E
Engineers dwgs for details. Colour TBC.
Dummy brickwork window recess. Brickwork to
match existing. Stone window sills to match existing.
Contemporary effect composite cladding, colour TBC.
Door hoop guards.
Pitched roof - Modern Concrete Tiles, colour TBC
1
2
3
4
5
6
7
8
9
10
11
12
4a
External walls - Brick quoins projecting 20mm,
colour to match facing brickwork.
1a
Classroom extended
into existing corridor
New wall for extended
classroom
New suspended ceiling to Link
at 2.5m approx. from FFL
NEW STAFF WCCORRIDORELM CLASSROOM
Wall and windows removed
to form new opening
New flat roof
FFL 101.12
PROPOSED
LINK/ AMENITIES
PROPOSED HALL EXTENSIONNEW CORRIDOR
SECTION ELEVATION S1
New flat roof
COURTYARD
31
7 4a
11
66 6
Project
Drawing Title
Checked
Designed
Drawn
Drawing No.
Project No.
Scale Date
Client
Rev. No.
Amendment Date/By
Contractor must check all dimensions on site. Do not scale this drawing. All
discrepancies to be reported immediately to the Supervising Officer before
proceeding. If this drawing has been transmitted digitally, it must be checked
against a paper master copy issued by QMP. This drawing is the copyright
of QMP.
Spratton Road, Brixworth,
Northampton NN6 9DS
Tel: (01604) 880808 Fax: (01604) 881685
E-mail: [email protected]
Web site: www.qmp.co.uk
Northampton, Cambridge, London
Consultancy Services
Within The Built Environment
LEND LEASE CONSULTING
NORTHAMPTON
ALTERATIONS & EXTENSIONS
CORBY OLD VILLAGE
PRIMARY SCHOOL
PROPOSED ELEVATIONS
KPM
SCB
1:100 @ A1 OCT 2014
M5496
M5496/A/203.0
10m7.52.50
Scale 1:100
5
SOUTH ELEVATION
NORTH ELEVATION
WEST ELEVATION
EAST ELEVATION
PLANNING ISSUE
NORTH SECTIONAL SECTION S2
DATUM LEVEL 97.00
TILE
TILE
142
5
1585
216
0
4020
97
5
DH
1.98
DH
2.12
DH
2.12
DH
2.04
C-H 1.13
F-C 1.07
C-H 2.40
F-C 1.27
C-H 2.48
F-C 1.08
C-H 0.96
F-C 1.18
C-H 0.89
F-C 1.04
C-H 1.22
F-C 1.17
DH
2.03
DH
2.10
DH
2.04
DH
2.04
DH
1.99
DH
2.03
DH
2.14
DH
2.12
DH
1.98
C-H 1.22
F-C 1.16
C-H 1.23
F-C 1.17
2.09
DH
2.06
C-H 1.33
F-C 0.77
(WINDOW ABOVE)
C-H 1.33
F-C 0.77
C-H 1.33
F-C 0.77
C-H 1.33
F-C 0.77
(WINDOW ABOVE)
CL 103.68
FL 101.12
CL 103.36
FL 101.12
CL 103.34
FL 101.12
US
103.21
US
103.21
US
103.21
CL 103.68
FL 101.12
CL 106.82
FL 101.12
CEILING
PITCHED
CEILING
PITCHED
CEILING
PITCHED
CEILING
PITCHED
CL 104.21
FL 101.12
SP
1
06
.0
2
SP
1
06
.0
2
SP 2.16
CR 2.64
SP 2.16
CR 2.64
SP 4.59
CR 5.05
C-H 1.13
F-C 1.07
CL 105.02
FL 101.12
CL 105.02
FL 101.12
DH
2.1
4
(W
IN
DO
W A
BO
VE
)
SP
1
04
.8
7
SP
1
04
.8
7
HATCH
DH
2.13
(WINDOW ABOVE)
CL 105.05
FL 101.12
CL 103.92
C-H 2.40
F-C 1.27
C-H 2.48
F-C 1.08
US
103.21
C-H 1.22
F-C 1.17
C-H 103.40
CL 103.41
FL 101.12
US 103.30
US
103.21
C-H 1.18
F-C 0.99
(WINDOW ABOVE)
C-H 1.18
F-C 0.99
(WINDOW ABOVE)
C-H 1.18
F-C 0.99
(WINDOW ABOVE)
DH 2.14
(WINDOW ABOVE)
DH
2.14
(WINDOW ABOVE)
DH 2.14
(WINDOW ABOVE)
G01a
G06
ELM CLASSROOM
G02
Corridor
G07
NEW LIBRARY/ BREAKOUT AREA
G08
Store
G10
OAK CLASSROOM
G13
CLOAKROOM
G11
Corridor
G12
CORRIDOR
G21
CLOAKROOM
CHANGING ROOM/GIRLS WC
G24
CLOAKROOM
G02
Corridor
G11
Corridor
PROPOSED EXTENSION
NEW DOOR
NEW
DOOR
1*
NEW
DOOR
NEW
DOOR
G30
NEW MAIN HALL
G24a
NEW STAFF WC
G21a
NEW STAFF WC
FE
NEW FIRE
EXIT DOOR
NEW FIRE
EXIT DOOR
NEW FIRE
EXIT DOOR
FE
FE
NEW FIRE
EXIT DOOR
FE
FE FE
FFL 101.12
COURTYARDCOURTYARD
FFL 101.12
FE
NEW FIRE
EXIT DOOR
FFL 101.12FFL 101.12
S1
NEW FIRE
EXIT DOOR
NEW FIRE
EXIT DOOR
NEW
DOOR
1*
NEW
DOOR
1*
PRINTER
NEW
DOOR
NEW
DOOR
HIG
H L
EV
EL
H
OR
IZ
ON
TA
L
S
TR
IP
W
IN
DO
W
HIG
H L
EV
EL
H
OR
IZ
ON
TA
L
S
TR
IP
W
IN
DO
W
VERTICAL
WINDOW
HIGH LEVEL HORIZONTAL
STRIP WINDOW
VERTICAL
WINDOW
SOUTH SECTIONAL SECTION S3
DATUM LEVEL 97.00
RWP
RWP
BRICK
BRICK
BRICK
BRICK
BRICK
BRICK
BRICK
BRICK
BRICK
BRICK
BRICK
BRICK
TILE TILETILE
TILE
Project
Drawing Title
Checked
Designed
Drawn
Drawing No.
Project No.
Scale Date
Client
Rev. No.
Amendment Date/By
Contractor must check all dimensions on site. Do not scale this drawing. All
discrepancies to be reported immediately to the Supervising Officer before
proceeding. If this drawing has been transmitted digitally, it must be checked
against a paper master copy issued by QMP. This drawing is the copyright
of QMP.
Spratton Road, Brixworth,
Northampton NN6 9DS
Tel: (01604) 880808 Fax: (01604) 881685
E-mail: [email protected]
Web site: www.qmp.co.uk
Northampton, Cambridge, London
Consultancy Services
Within The Built Environment
LEND LEASE CONSULTING
NORTHAMPTON
ALTERATIONS & EXTENSIONS
CORBY OLD VILLAGE
PRIMARY SCHOOL
PROPOSED SECTIONS
S2 + S3
SCB
JRK
1:100 @ A1 NOV 2014
M5496
M5496/A/215.0
10m7.52.50
Scale 1:100
5
STAGE D
SOUTH ELEVATION
NORTH ELEVATION
S2
S3
C-H 2.60
F-C 1.01
C-H 2.51
F-C 1.07
C-H 0.86
F-C 1.17
C-H 0.84
F-C 1.17
DH
2.13
DH
1.99
DH
1.99
DH
1.98
DH
2.12
DH
2.12
DH
2.04
DH 2.17
DH
2.14
C-H 1.13
F-C 1.07
C-H 2.40
F-C 1.27
C-H 2.91
F-C 1.29
C-H 3.29
F-C 1.29
C-H 1.15
F-C 0.97
C-H 1.19
F-C 0.98
C-H 2.48
F-C 1.08
C-H 0.96
F-C 1.18
C-H 0.83
F-C 1.19
C-H 0.85
F-C 1.19
C-H 0.00
F-C 0.00
C-H 1.01
F-C 1.08
C-H 1.02
F-C 1.10
C-H 1.02
F-C 1.10
CL 105.06
C-H 0.89
F-C 1.04
C-H 1.22
F-C 1.17
DH
2.03
DH
2.10
DH
2.04
DH
2.04
DH
1.99
DH
1.99
DH
1.99
DH
1.99
DH
2.06
DH
2.09
DH
2.09
DH
2.03
DH
2.03
DH
2.14
DH
2.12
DH
1.98
DH
1.93
C-H 1.00
F-C 1.10
C-H 1.22
F-C 1.16
C-H 1.23
F-C 1.17
C-H 0.91
F-C 1.17
(INTERNAL)
DH
2.03
C-H 2.60
F-C 1.01
C-H 2.60
F-C 1.01
SP 1.65
CR 1.74
DH
2.09
DH
2.06
FL 101.12
SP 1.65
CR 1.77
SP 1.65
CR 1.77
CL 105.06
FL 101.12
CL 105.06
FL 101.12
(WINDOW ABOVE)
C-H 1.33
F-C 0.77
DH 2.13
(WINDOW ABOVE)
C-H 1.33
F-C 0.77
C-H 1.33
F-C 0.77
C-H 1.33
F-C 0.77
C-H 1.33
F-C 0.77
C-H 1.33
F-C 0.77
C-H 1.22
F-C 0.99
DH2.14
(WINDOW ABOVE)
(WINDOW ABOVE)
DH
(WINDOW ABOVE)
2.09
DH2.14
(WINDOW ABOVE)
CL 103.68
FL 101.12
CL 105.03
FL 101.12
CL 103.31
FL 101.12
CL 103.36
FL 101.12
CL 103.34
FL 101.12
US
103.21
US
103.21
US
103.21
CL 103.68
FL 101.12
CL 106.82
FL 101.12
CEILING
PITCHED
CEILING
PITCHED
CEILING
PITCHED
CEILING
PITCHED
CL 104.21
FL 101.12
SP
1
06
.0
2
SP
1
06
.0
2
SP 2.16
CR 2.64
SP 2.16
CR 2.64
C-H 2.91
F-C 1.29
SP 4.59
CR 5.05
C-H 1.13
F-C 1.07
CL 105.02
FL 101.12
CL 105.02
FL 101.12
DH 2.14
(WINDOW ABOVE)
(WINDOW ABOVE)
DH 2.16
(WINDOW ABOVE)
C-H 2.51
F-C 1.07
CL 105.03
FL 101.12
CL 105.03
FL 101.12
C-H 0.78
F-C 1.00
CL 105.03
FL 101.12
DH
2.05
US
3
.5
9
DH
2.14
(W
IN
DO
W A
BO
VE
)
SP
1
04
.8
7
SP
1
04
.8
7
HATCH
DH2.13
(WINDOW ABOVE)
CL 105.05
FL 101.12
CL 103.92
C-H 2.40
F-C 1.27
C-H 2.48
F-C 1.08
US
103.21
C-H 1.22
F-C 1.17
CL 105.02
FL 101.12
C-H 2.52
F-C 1.05
C-H 2.56
F-C 0.98
CL 105.02
FL 101.12
C-H 103.40
CL
1
04
.3
9
CEILING
PITCHED
SP 103.37
FL 101.12
CL 103.31
FL 101.12
CL 103.31
FL 101.12
CL 103.41
FL 101.12
US 103.30
US
10
3.2
1
CEILING
PITCHED
FL 101.12
SP
1
03
.3
1
CL
1
05
.0
5
CL 105.05
FL 101.12
C-H 2.51
F-C 1.07
US
103.21
CL 103.30
FL 101.12
C-H 0.77
F-C 1.32
CL 103..30
FL 101.12
CL 103.31
FL 101.12
C-H 0.77
F-C 1.32
C-H 1.00
F-C 1.10
C-H 2.55
F-C 1.01
C-H 1.18
F-C 0.99
(WINDOW ABOVE)
C-H 1.18
F-C 0.99
(WINDOW ABOVE)
C-H 1.18
F-C 0.99
(WINDOW ABOVE)
DH2.14
(WINDOW ABOVE)
DH 2.14
(WINDOW ABOVE)
DH 2.14
(WINDOW ABOVE)
G01
Entrance Hall
G01a
G03
Birch Classroom
G05
CBD
G04
CBD
G06
Elm Classroom
G02
Corridor
G07
Hall
G08
Store
G10
Oak Classroom
G13
CLOAKROOM
G11
Corridor
G12
Corridor
G14
DISABLED WC
G15
CHANGING ROOM/BOYS WC
G16
ASH CLASSROOM
G17
ACTIVITY ROOM
G18
WC
G19
CHESTNUT CLASSROOM
G20
WILLOW CLASSROOM
G21
CLOAKROOM
G22
CHANGING ROOM/GIRLS WC
G23
CLEANER'S STORE
COVERED WALKWAY
G24
CLOAKROOM
G25
RESOURCES
G26
STORE
G27
HEAD TEACHER
G28
LIBRARY
G29
RECEPTION
G02
Corridor
G11
Corridor
(CANOPY ABOVE)
Project
Drawing Title
Checked
Designed
Drawn
Drawing No.
Project No.
Scale Date
Client
Rev. No.
Amendment Date/By
Contractor must check all dimensions on site. Do not scale this drawing. All
discrepancies to be reported immediately to the Supervising Officer before
proceeding. If this drawing has been transmitted digitally, it must be checked
against a paper master copy issued by QMP. This drawing is the copyright
of QMP.
Spratton Road, Brixworth,
Northampton NN6 9DS
Tel: (01604) 880808 Fax: (01604) 881685
E-mail: [email protected]
Web site: www.qmp.co.uk
Northampton, Cambridge, London
Consultancy Services
Within The Built Environment
LEND LEASE CONSULTING
NORTHAMPTON
ALTERATIONS & EXTENSIONS
CORBY OLD VILLAGE
PRIMARY SCHOOL
EXISTING GROUND FLOOR
KPM
SCB
1:100 @ A1 JAN 2014
M5496
M5496/A/A001.0
10m7.52.50
Scale 1:100
5
PLANNING ISSUE
IC
DH
1.97
F-C 0.58
(BLOCKED)
COAL CHUTES SP 1.72
CR 1.82
FL 98.62
CL 100.91
FL 98.66
CL 100.94
DH
1.88
B01
Boiler Room
B02
Store
C-H 1.31
F-C 0.80
C-H 1.13
F-C 0.96
FL 00.00
CL 00.00
C-H 0.00
F-C 0.00
C-H 0.00
F-C 0.00
C-H 1.31
F-C 0.80
C-H 1.15
F-C 0.95
DH
1.96
DH
1.96
FL 00.00
CL 00.00
DH
0.00
DH
0.00
CEILING
PITCHED
SP
1
05
.1
6
CL 106.05
FL 103.55
SP
1
05
.1
6
CEILING
PITCHED
HATCH
HATCHHATCH
H 0.93
WALL
CEILING
PITCHED
CL 106.76
CEILING
PITCHED
SP 105.16
CEILING
PITCHED
SP
1
05
.1
5
CL 106.06
FL 103.55
CEILING
PITCHED
SP
1
05
.1
5
CL 105.89
FL 103.55
CL
0.00
CL
106.08CEILING
PITCHED
CEILING
PITCHED
CL 107.02
SP
1
05.1
5
'VELUX'
'VELUX'
F01a
I.T. Room
F02
Staff Room
F03a
Staff Room
F01b
WC
F01c
F03b
WC
Project
Drawing Title
Checked
Designed
Drawn
Drawing No.
Project No.
Scale Date
Client
Rev. No.
Amendment Date/By
Contractor must check all dimensions on site. Do not scale this drawing. All
discrepancies to be reported immediately to the Supervising Officer before
proceeding. If this drawing has been transmitted digitally, it must be checked
against a paper master copy issued by QMP. This drawing is the copyright
of QMP.
Spratton Road, Brixworth,
Northampton NN6 9DS
Tel: (01604) 880808 Fax: (01604) 881685
E-mail: [email protected]
Web site: www.qmp.co.uk
Northampton, Cambridge, London
Consultancy Services
Within The Built Environment
LEND LEASE CONSULTING
NORTHAMPTON
ALTERATIONS & EXTENSIONS
CORBY OLD VILLAGE
PRIMARY SCHOOL
EXISTING BASEMENT +
FIRST FLOOR
KPM
JRK
1:100 @ A1 OCT 2014
M5496
M5496/A/A003.0
10m7.52.50
Scale 1:100
5
PLANNING ISSUE
DATUM LEVEL 97.00
WEST ELEVATION
RWP
RWP
RWP
BRICK
BRICK
BRICK BRICK BRICK
TILETILE
TILE
TILE
BRICK
BRICK
BRICK
BRICK
VP
SOUTH ELEVATION
DATUM LEVEL 97.00
RWP
RWP
RWP
RWPRWP
RWP
BRICK
BRICK
BRICK
BRICK
BRICK
BRICK
BRICK
STONE
BRICK
BRICK
BRICK
BRICK
BRICK
BRICK
BRICK
TILE TILE
TILE
TILE
TILE
NORTH ELEVATION
DATUM LEVEL 97.00
RWP
RWP
BRICK
BRICK
BRICK
BRICK
BRICK
BRICK
BRICK
BRICK
BRICK
TILE
TILE TILE
TILE
TILE
LIGHT
EAST ELEVATION
DATUM LEVEL 97.00
RWP
RWP
RWP
RWP
RWP
TILE
TILE
BRICK
BRICK
BRICK
BRICK
BRICK
BRICK
BRICK
BRICK
BRICK
VP
VP
VENT
Project
Drawing Title
Checked
Designed
Drawn
Drawing No.
Project No.
Scale Date
Client
Rev. No.
Amendment Date/By
Contractor must check all dimensions on site. Do not scale this drawing. All
discrepancies to be reported immediately to the Supervising Officer before
proceeding. If this drawing has been transmitted digitally, it must be checked
against a paper master copy issued by QMP. This drawing is the copyright
of QMP.
Spratton Road, Brixworth,
Northampton NN6 9DS
Tel: (01604) 880808 Fax: (01604) 881685
E-mail: [email protected]
Web site: www.qmp.co.uk
Northampton, Cambridge, London
Consultancy Services
Within The Built Environment
LEND LEASE CONSULTING
NORTHAMPTON
ALTERATIONS & EXTENSIONS
CORBY OLD VILLAGE
PRIMARY SCHOOL
EXISTING ELEVATIONS
KPM
SCB
1:100 @ A1 JAN 2014
M5496
M5496/A/002.0
10m7.52.50
Scale 1:100
5
PLANNING ISSUE