Water Allocation Committee River Basin Hydrologic Model Development Schedule
description
Transcript of Water Allocation Committee River Basin Hydrologic Model Development Schedule
Water Allocation CommitteeWater Allocation Committee
River Basin Hydrologic Model River Basin Hydrologic Model Development ScheduleDevelopment Schedule
Division of Water ResourcesDivision of Water Resources
July 13, 2011July 13, 2011
IMPROVE RIVER BASIN IMPROVE RIVER BASIN MODELING – SL 2010-143 MODELING – SL 2010-143
Models for all river basinsModels for all river basins Model componentsModel components
Report annually to the ERC Report annually to the ERC
Approval by the EMC Approval by the EMC
Status of River Basin Hydrologic Model Status of River Basin Hydrologic Model Development in North CarolinaDevelopment in North Carolina
Slide - Slide - 33
River Basin Water Resources Plans and River Basin Water Resources Plans and Hydrologic ModelsHydrologic Models
Water Resources Plans Water Resources Plans
(No EMC Approval)(No EMC Approval)
River Basin Hydrologic ModelsRiver Basin Hydrologic Models(EMC Approval)(EMC Approval)
Model Development ScheduleModel Development Schedule
1/2010 5/2011 9/2012 2/2014 6/2015 11/2016 3/2018 8/2019 12/2020 4/2022 9/2023
Yadkin-Pee Dee River Basin
Onslow Bay
Chowan River Basin
Albemarle Sound
Savannah River Basin
Catawba River Basin
Watauga River Basin
New River Basin
Lumber River Basin
French Broad River Basin
Hiwassee River Basin
Little Tennessee River Basin
Roanoke River Basin
Neuse River Basin
Cape Fear River Basin
Broad River Basin
Tar-Pamlico River Basin
Start Date
Model
Plan
For additional information on river For additional information on river basin modelsbasin models
Steve Reed at (919) 715-5424 or Steve Reed at (919) 715-5424 or
Neelufa Sarwar at (919) 715-0386 or Neelufa Sarwar at (919) 715-0386 or [email protected] . .
Or the DWR website at Or the DWR website at http://www.ncwater.org/Data_and_Modeling/