1

WASTEWATER FACILITIES GENERAL CONSTRUCTION

JOB ORDER CONTRACT

PROJECT NO. 4108JOC166

April 11, 2018

Pre-Submittal Meeting

Page 2: WASTEWATER FACILITIES GENERAL CONSTRUCTION JOB … · Support installations and/or replacement of mechanical equipment, such as pumps, motors, ... Canopy for Digester MCC ... Statement

2

Marcel Begay, P.E., Project ManagerWater Services Department

Trevor Bui, Deputy DirectorEqual Opportunity Department

George Goodale, Contracts Specialist

Design & Construction Procurement

[email protected]

602-534-8352

Welcome and Introductions

Page 3: WASTEWATER FACILITIES GENERAL CONSTRUCTION JOB … · Support installations and/or replacement of mechanical equipment, such as pumps, motors, ... Canopy for Digester MCC ... Statement

3

Sign-in please…copies of sign in sheet will be available on

website:

http://phoenix.gov/streets/procurement/current- opportunities

Please hold questions until the Q&A period.

This is the ONLY opportunity to discuss this project with

City staff.

Meeting Overview

Page 4: WASTEWATER FACILITIES GENERAL CONSTRUCTION JOB … · Support installations and/or replacement of mechanical equipment, such as pumps, motors, ... Canopy for Digester MCC ... Statement

4

Project Description

Project Scope of Work

Questions?

Submittal Requirements

Selection Schedule

Questions?

Agenda

Page 5: WASTEWATER FACILITIES GENERAL CONSTRUCTION JOB … · Support installations and/or replacement of mechanical equipment, such as pumps, motors, ... Canopy for Digester MCC ... Statement

Alternate Project Delivery Method

Qualifications-Based Selection (Not A Bid)

Projects On “As Needed” Basis

What Is A Job Order Contract?

Page 6: WASTEWATER FACILITIES GENERAL CONSTRUCTION JOB … · Support installations and/or replacement of mechanical equipment, such as pumps, motors, ... Canopy for Digester MCC ... Statement

Up to 3 contractors may be selected

For 36-Month Duration (or $15 million Per JOC

Whichever Occurs First)

Option To Renew For 24 Months (or Maximum

contract amount of $25 million)

What Is A Job Order Contract?

Page 7: WASTEWATER FACILITIES GENERAL CONSTRUCTION JOB … · Support installations and/or replacement of mechanical equipment, such as pumps, motors, ... Canopy for Digester MCC ... Statement

SBE Requirement is 5%

No SBE Documents Due at SOQ Submittal

This Solicitation Is Open To All Firms

SBE Utilization and Letters of Intent are due

with each Job Order Agreement

SBE Goal

Page 8: WASTEWATER FACILITIES GENERAL CONSTRUCTION JOB … · Support installations and/or replacement of mechanical equipment, such as pumps, motors, ... Canopy for Digester MCC ... Statement

Construction services, including, but not limited to:

Support installations and/or replacement of

mechanical equipment, such as pumps, motors,

chemical feed equipment, valves and/or

actuators;

Installations of instrumentation and electrical

equipment, such as analyzers, meters, sensors,

variable frequency drives, security upgrades, and

Supervisory Control and Data Acquisition (SCADA)

system components, including conduit and/or

wiring;

Project Description

Page 9: WASTEWATER FACILITIES GENERAL CONSTRUCTION JOB … · Support installations and/or replacement of mechanical equipment, such as pumps, motors, ... Canopy for Digester MCC ... Statement

Construction services, including, but not limited to:

Programming Remote Terminal Units (RTUs),

Programmable Logic Controllers (PLCs) and

instrumentation to control facilities in accordance

with City Operating Divisions control strategy;

General work such as building modifications,

structural repairs and/or repair modifications,

painting, specialized maintenance, and concrete,

masonry or structural steel work;

Emergency repair services;

Project Description

Page 10: WASTEWATER FACILITIES GENERAL CONSTRUCTION JOB … · Support installations and/or replacement of mechanical equipment, such as pumps, motors, ... Canopy for Digester MCC ... Statement

Pre-construction and post construction services;

Engineering design services when necessary or

required; and

Sewerline rehabilitation, repair or replacement.

Project Description

Page 11: WASTEWATER FACILITIES GENERAL CONSTRUCTION JOB … · Support installations and/or replacement of mechanical equipment, such as pumps, motors, ... Canopy for Digester MCC ... Statement

Paving for 23rd Ave WWTP

Scope of Work

Canopy for Digester MCC

Page 12: WASTEWATER FACILITIES GENERAL CONSTRUCTION JOB … · Support installations and/or replacement of mechanical equipment, such as pumps, motors, ... Canopy for Digester MCC ... Statement

Chlorine Injectors

Replacement

Scope of Work

Hot Water Circulating

Pump

Page 13: WASTEWATER FACILITIES GENERAL CONSTRUCTION JOB … · Support installations and/or replacement of mechanical equipment, such as pumps, motors, ... Canopy for Digester MCC ... Statement

Inclined Conveyer for

23rd Ave WWTP

Scope of Work

Repair of Non-Potable

Water Line

Page 14: WASTEWATER FACILITIES GENERAL CONSTRUCTION JOB … · Support installations and/or replacement of mechanical equipment, such as pumps, motors, ... Canopy for Digester MCC ... Statement

Clarifier Baffle Supports

Replacement

Scope of Work

Page 15: WASTEWATER FACILITIES GENERAL CONSTRUCTION JOB … · Support installations and/or replacement of mechanical equipment, such as pumps, motors, ... Canopy for Digester MCC ... Statement

Sanitary Sewer

Replacement

Scope of Work

Page 16: WASTEWATER FACILITIES GENERAL CONSTRUCTION JOB … · Support installations and/or replacement of mechanical equipment, such as pumps, motors, ... Canopy for Digester MCC ... Statement

Sanitary Sewer

Replacement and

Manhole Repair

Scope of Work

Page 17: WASTEWATER FACILITIES GENERAL CONSTRUCTION JOB … · Support installations and/or replacement of mechanical equipment, such as pumps, motors, ... Canopy for Digester MCC ... Statement

Lift Station Generator Replacement

Scope of Work

Page 18: WASTEWATER FACILITIES GENERAL CONSTRUCTION JOB … · Support installations and/or replacement of mechanical equipment, such as pumps, motors, ... Canopy for Digester MCC ... Statement

Lift Station Air

Release Valve

Replacement, Force

Main Repair, General

Concreter Repair,

Wet Well

Rehabilitation

Scope of Work

Page 19: WASTEWATER FACILITIES GENERAL CONSTRUCTION JOB … · Support installations and/or replacement of mechanical equipment, such as pumps, motors, ... Canopy for Digester MCC ... Statement

Lift Station

Electrical and

Instrumentation,

Valves and

Piping

Replacement

Scope of Work

Page 20: WASTEWATER FACILITIES GENERAL CONSTRUCTION JOB … · Support installations and/or replacement of mechanical equipment, such as pumps, motors, ... Canopy for Digester MCC ... Statement

Lift Station Pump

Replacement,

Facility

Rehabilitation

and Pavement

Repair

Scope of Work

Page 21: WASTEWATER FACILITIES GENERAL CONSTRUCTION JOB … · Support installations and/or replacement of mechanical equipment, such as pumps, motors, ... Canopy for Digester MCC ... Statement

21

General Information – 15 points

Experience of the Firm – 25 points

Experience of Key Personnel – 20 points

Approach To Performing Services - 30 points

Overall evaluation Of Firm – 10 points

Statement of Qualifications Criteria

Page 22: WASTEWATER FACILITIES GENERAL CONSTRUCTION JOB … · Support installations and/or replacement of mechanical equipment, such as pumps, motors, ... Canopy for Digester MCC ... Statement

22

Cover Letter (include full firm company name, address,

phone number, vendor number, and the name and email

address of your contact person for the project)

Evaluation Criteria (including project organizational chart)

Additional Content (resumes or other information)

MAXIMUM pages permitted is 14 pages:

+ Bonding Statement ( A- or better Prior Four Qtrs)

Separate Sealed Envelope

Statement of Qualifications Criteria (Continued)

Page 23: WASTEWATER FACILITIES GENERAL CONSTRUCTION JOB … · Support installations and/or replacement of mechanical equipment, such as pumps, motors, ... Canopy for Digester MCC ... Statement

23

Each page side with criteria information will be counted.

Pages that have photos, charts, and graphs will be counted toward maximum number of pages.

Front and back cover, Table of Contents and tab dividers will NOT be counted toward the maximum page limit, UNLESS they include information that may be considered by the selection panel.

Statement of Qualifications Criteria (Continued)

Page 24: WASTEWATER FACILITIES GENERAL CONSTRUCTION JOB … · Support installations and/or replacement of mechanical equipment, such as pumps, motors, ... Canopy for Digester MCC ... Statement

24

Submit 7 copies of the SOQ.

SOQ due: 12:00pm Noon – Phoenix local timeFriday, April 20, 2018Phoenix City Hall

200 West Washington Street, 6th Floor

Submittal Box

Statement of Qualifications Criteria (Continued)

Page 25: WASTEWATER FACILITIES GENERAL CONSTRUCTION JOB … · Support installations and/or replacement of mechanical equipment, such as pumps, motors, ... Canopy for Digester MCC ... Statement

25

Grounds for Disqualification:

Receipt of submittal after specified cut-off

date and time.

Too few copies of the submittal.

Deposit of submittal in the wrong location.

Violating “Contact with City Employees” policy.

Statement of Qualifications Criteria (Continued)

Page 26: WASTEWATER FACILITIES GENERAL CONSTRUCTION JOB … · Support installations and/or replacement of mechanical equipment, such as pumps, motors, ... Canopy for Digester MCC ... Statement

26

Selection Schedule

Pre-submittal Meeting April 11, 2018

SOQ due at noon April 20, 2018

Selection May 8, 2018

Council Approval June 2018

Page 27: WASTEWATER FACILITIES GENERAL CONSTRUCTION JOB … · Support installations and/or replacement of mechanical equipment, such as pumps, motors, ... Canopy for Digester MCC ... Statement

27

http://phoenix.gov/streets/procurement/current-opportunities

Request for Qualifications Notifications RFQ Holder List Pre-submittal Power Point Presentation and Sign-In Award

Design & Construction Procurement

Page 28: WASTEWATER FACILITIES GENERAL CONSTRUCTION JOB … · Support installations and/or replacement of mechanical equipment, such as pumps, motors, ... Canopy for Digester MCC ... Statement

28

Contact for RFQ Questions:

George Goodale 602-534-8352

[email protected]

Contact for SBE Questions:

Trevor Bui, Deputy Director

602-262-7502

[email protected]

QUESTIONS AFTER TODAY

Page 29: WASTEWATER FACILITIES GENERAL CONSTRUCTION JOB … · Support installations and/or replacement of mechanical equipment, such as pumps, motors, ... Canopy for Digester MCC ... Statement

29

Thank You

&

Open for Questions