Wartsila SP Ppt 2012 Analysis LNG
-
Upload
swapneel-kulkarni -
Category
Documents
-
view
230 -
download
1
Transcript of Wartsila SP Ppt 2012 Analysis LNG
-
7/27/2019 Wartsila SP Ppt 2012 Analysis LNG
1/24
Yves Bui
AnalysisLNG Bunkeringinnortheurope
-
Yves Bu
Wrtsil Ship Power
Technology
Director Gas Applications
.
-
7/27/2019 Wartsila SP Ppt 2012 Analysis LNG
2/24
11-- LNG world overviewLNG world overview22 LNG bunkering stationsLNG bunkering stations
33 LNG needs methodologyLNG needs methodology
44 -- ConclusionConclusion
Wrtsil LNG Journal conference Oslo 21-22 March 2012
-
7/27/2019 Wartsila SP Ppt 2012 Analysis LNG
3/24
LNGala
inEuop
LNG importintheworldLNG import in the world
Wrtsil LNG Journal conference Oslo 21-22 March 2012
-
7/27/2019 Wartsila SP Ppt 2012 Analysis LNG
4/24
Dsonbl m
LNGalanoin
Euop
LogisticLogistic LNGLNG supplysupply
inEur
ope
Source:Gasprom
LNGavailabl
Wrtsil LNG Journal conference Oslo 21-22 March 2012
-
7/27/2019 Wartsila SP Ppt 2012 Analysis LNG
5/24
enton
LogisticLogistic LNGLNG supplysupply
efinIto
n
EU
Wrtsil LNG Journal conference Oslo 21-22 March 2012
Moto
rways
-
7/27/2019 Wartsila SP Ppt 2012 Analysis LNG
6/24
11-- LNG world overviewLNG world overview22 LNG bunkering stationsLNG bunkering stations
33 LNG needs methodologyLNG needs methodology
44 -- ConclusionConclusion
Wrtsil LNG Journal conference Oslo 21-22 March 2012
-
7/27/2019 Wartsila SP Ppt 2012 Analysis LNG
7/24
First country in Europe
LNGala
inEuop
LogisticLogistic LNL GNG sus pplypplu y
Norway:
Environmental taxes
- Small-scale distribution of LNG: Small LNG carriers Trucks Trains
First country in Europewith LNG refuelling stations
- End-users: Industries (about 85%)
Shipping
The small-scale distribution is governed bycompanies (Gasnor - Nordic LNG) that usesmall LNG carrier for the transport of volumes
directly to the final consumer.
inEur
ope
LNGavailabl
Wrtsil LNG Journal conference Oslo 21-22 March 2012
-
7/27/2019 Wartsila SP Ppt 2012 Analysis LNG
8/24
LNGala
inEuop
LogisticLogistic LNGLNG supplysupply
inEur
ope
LNGavailabl
Wrtsil LNG Journal conference Oslo 21-22 March 2012
-
7/27/2019 Wartsila SP Ppt 2012 Analysis LNG
9/24
LNGala
inEuop
LogisticLogistic LNL GNG sus pplypplu y
Terminal in Mosjen and in Sarpsborg near Oslo(Norway) supplied through small LNG carrierfrom plants of Gasnor in Kollsnes and in Karmy(increase production plant in Spain, Huelva).
Cost of 10.8 mEUR 5 x 700 m3 LNG tanks Gasification unit Fuelling station for LNG tank truck
- Safety: Accumulation pool 30 meters radius around accumulation pool
and 100m around the terminal
inEur
ope
LNGavailabl
Wrtsil LNG Journal conference Oslo 21-22 March 2012
-
7/27/2019 Wartsila SP Ppt 2012 Analysis LNG
10/24
LNGala
inEuop
LogisticLogistic LNL GNG sus pplypplu y
Terminal Halhejem Bergen (Norway):
Gasnor
Capacity bunkering station: 2x500 m3
inEur
ope
LNGavailabl
Wrtsil LNG Journal conference Oslo 21-22 March 2012
-
7/27/2019 Wartsila SP Ppt 2012 Analysis LNG
11/24
e un er stat on on oar s ps
LNGala
inEuop
LogisticLogistic LNL GNG sus pplypplu y
Terminal Aagotnes Bergen (Norway)(CCB Coast Centre Bunkering):
Bunkering rate: 40 t/h (102 m3/h) at 4.1 bar (75000 m3/year) LNG insulated pipeline: DN 150, DN 80 gas pipe return Storage tank 500 m3 (dimensions 5,5x35m)
Safety valve and a flexible hose to connect the bunker station Flare for the gas line return LNG storage tank in stainless steel, 300 ltabt. 0,2m deep, and covered with a grating
e un er stat on on oar s ps
are equipped with standard connectionswith universal flange (DN 100 - DN 65).
inEur
op
LNGavailabl
Wrtsil LNG Journal conference Oslo 21-22 March 2012
-
7/27/2019 Wartsila SP Ppt 2012 Analysis LNG
12/24
LNGala
inEuop
LNG
availabl
LogisticLogistic LNL GNG sus pplypplu y
Terminal Aagotnes Bergen (Norway)(CCB Coast Centre Bunkering):
Bunkering Sequence:
Vessel arrival/mooring Establishing hose connection Inerting the system Flashin coolin of the s stem abt.1h
Bunkering (102 m3/h) Flashing of the system Disconnecting bunkering hose Departure
Wrtsil LNG Journal conference Oslo 21-22 March 2012
inEur
ope
-
7/27/2019 Wartsila SP Ppt 2012 Analysis LNG
13/24
LNGala
inEuop
inEur
ope
LogisticLogistic LNL GNG sus pplypplu y
Terminal Risavika Stavanger (Norway):
Company Nordic LNG, production in 2010 abt. 300 000 t/year.With this terminal: duplicate the production.
Bunkering: ship to ship with multi carrier gas (LNG, Etylene, LPG),
6 to 10 000 m3 and 2 x 12 000 m3.
LNG
availabl
Wrtsil LNG Journal conference Oslo 21-22 March 2012
-
7/27/2019 Wartsila SP Ppt 2012 Analysis LNG
14/24
(preparations for a second tank)
LNGala
inEuop
LogisticLogistic LNL GNG sus pplypplu y
Terminal NynashamnStockholm (Sweden):
Jetty with two loading arms 20 000 m3 full containment tank(preparations for a second tank) Re-condenser with buffer tank Trailer filling for two trucks with trailers
Project approval Oct 2008Inauguration 27 May 2011
inEur
ope
LNG
availabl
Wrtsil LNG Journal conference Oslo 21-22 March 2012
-
7/27/2019 Wartsila SP Ppt 2012 Analysis LNG
15/24
LNGala
inEuop
LogisticLogistic LNL GNG sus pplypplu y
Project MAGALOG(Marin Gas Logistics)
Emissions in the Baltic Sea ports
Port of Lbeck (Germany):7000 m336 RoRo and RoPax dock regularly, can increasePurpose: shipping and industrial
Port of Swinoujsce (Poland) (Regas plant European funded end30.06.2014)
7 RoRo and RoPax dock regularly, can increase Ports Helsinki (Finland), Rostock (Germany), Hirtshals (Denmark)and Zeebrugge (Belgium):
Development of logistics services for LNG (import and export)
inEur
op
LNG
availabl
Wrtsil LNG Journal conference Oslo 21-22 March 2012
-
7/27/2019 Wartsila SP Ppt 2012 Analysis LNG
16/24
11-- LNG world overviewLNG world overview22 LNG bunkering stationsLNG bunkering stations
33 LNG needs methodologyLNG needs methodology
44 -- ConclusionConclusion
Wrtsil LNG Journal conference Oslo 21-22 March 2012
-
7/27/2019 Wartsila SP Ppt 2012 Analysis LNG
17/24
fuelsincludin renewable ener
FUEL TRADE OFF BEST CHOICE : WARTSILA DUAL FUEL
Fuel mixLNG
MajorityLow S
Majority
Abatement technologies not
completely accepted by themarket and/or regulators
Not sufficient supply of distillatesand/or high price premium of
distillates vs. other fuels LNG infrastructures developed:
terminals, bunkering facility Competitive LNG price Successful development of
technologies to use non-conventional marine fuels,including renewable energy
fuels
Stable or decreased demand fordistillates from road transportation
(electric cars)
Downstream investment in additionalrefining capacity (M-E, India, China);investments supported by availability
of engineering skills / materials Regulators or market not accepting
exhaust abatement technologies
Regulators + market acceptance ofexhaust abatement technologies
High demand from road transportationhigh pressure on refining capacity
high price of distillates Slow downstream investment
CO2 taxes limiting expansion of energyintensive refineries
Wrtsil LNGJournal conference
-
7/27/2019 Wartsila SP Ppt 2012 Analysis LNG
18/24
Wrtsil : Mechanical Dual Fuel (W34DF and W20DF)
2xLNGPac 176 m3 176 m3 at 90%fill-in
WRTSIL 4 x 9L34DF 4 050 kW each
CPP 8 700 kW 176 m3 at 90%
fill-in
WRTSIL 4x 9L20DF 1 314kW each
Thrusters
1x1850 kW +
PTO 2400 kW 1x 1850 kW
PTO 2400 kW
Total installed engine power: 21 456 kW
Wrtsil LNG Journal conference Oslo 21-22 March 2012
-
7/27/2019 Wartsila SP Ppt 2012 Analysis LNG
19/24
znvs
s
ExampleExample ofof aa rorororo
neves
sels
W38 HFO
0%
10%
20%
30%
40%
50%
60%
70%
Port ECA Port Manoeuvring
ECA
Manoeuvring At sea in ECA At sea
Ru
nninghours
Operating mode
Wrtsil LNG Journal conference Oslo 21-22 M arch 2012
Meth
odecaz
Fuels
prices
Euro/ton HFO MDO LNG
12
$/mmBTU
LNG/HFO HFO Scrub
SCR
Gas in ECA
HFO
outside
MDO in
ECA HFO
outside
All gas
Jul.09 418 606 477 114%
446 638 477 107%
477 676 477 100%
Feb.11 483 685 477 99%
Priority selection with 30% ECA
zone RoRo
-
7/27/2019 Wartsila SP Ppt 2012 Analysis LNG
20/24
LNGala
u ec
inEuop
LogisticLogistic LNGLNG supplysupply
inEur
ope
Total LNG
quantity yearlyneeds
Gas needs
potentialvolumes
2 016 3 670 168
1 578 172
Harbour Gas planned
business
Rotterdam Gate 1 358 643
Antwerp 559 873
Hamburg 494 623
Vessel category Vessel size Average
trip in days
% at sea
outside ECA
1&2
% time
at sea in
ECA 1
% time at
sea in ECA
2
% at
PORToutside
ECA 1&2
% at
PORT
ECA 1
% at
PORT
ECA 2
Number of
ship datalines
counted
Cruise Large Cruise Vessels 6,1 33% 3% 10% 40% 3% 10% 165
Cruise Medium Cruise Vessels 5,9 29% 7% 3% 47% 8% 4% 103
Cruise Panamax Cruise Vessels 6,2 23% 3% 14% 40% 4% 15% 233
Cruise Post-Panamax Cruise Vessels 8,6 38% 2% 5% 45% 3% 7% 151
Cruise Small Cruise Vessels 7,9 26% 3% 3% 59% 6% 3% 354
Passenger Large Passenger Vessels 8,1 33% 1% 2% 61% 1% 2% 65
Passenger Medium Passenger Vessels 14,0 26% 3% 5% 43% 8% 15% 165
Passenger Small Passenger Vessels 13,5 31% 5% 3% 50% 6% 5% 114
Passenger Very Small Passenger Vessels 15,1 38% 3% 3% 43% 5% 8% 356
Passenger & cargo Large Passenger & Cargo Vessels 5,4 16% 31% 2% 21% 27% 3% 123
Passenger & cargo Medium Passenger & Cargo Vessels 6,0 29% 10% 3% 41% 14% 4% 762
Passenger & cargo Small Passenger & Cargo Vessels 8,0 34% 5% 2% 46% 10% 3% 906
Passenger & cargo Very Small Passenger & Cargo Vessels 14,3 39% 2% 3% 45% 6% 5% 557
Yacht Yacht 14,5 12% 0% 0% 83% 4% 0% 36
Grand Total 9,3 33% 5% 4% 46% 8% 6% 4 090
LNG
availabl u ec 311 637
Zeebrugge 258 632Gothenburg 139 184
Helsinki 105 525
Rostock 91 457
Fredericia 87 165
Bergen 75 586
Stockholm 74 317
Swinoujscie 48 800
Stavanger 40 203
Nynashamn 11 477
Mosjoen 4 696
Hirtshals 4 401
Oslo 3 949
Feedermax Handy
Tankers
Handymax
Bulk
Carriers
Handysize
Bulk
Carriers
Handysize
Container
Vessels
Inland
Cargo
Inland
Pushboat
Inland
Tanker
Large
Cargo
Vessels
232124 327971 1426 6761 33563 1456 843 2345 1094
Wrtsil LNG Journal conference Oslo 21-22 March 2012
-
7/27/2019 Wartsila SP Ppt 2012 Analysis LNG
21/24
11-- LNG world overviewLNG world overview22 LNG bunkering stationsLNG bunkering stations
33 LNG needs methodologyLNG needs methodology
44 -- ConclusionConclusion
Wrtsil LNG Journal conference Oslo 21-22 March 2012
-
7/27/2019 Wartsila SP Ppt 2012 Analysis LNG
22/24
Coopaon
ation
Coope
WartsilapartnerWartsila partner frf oro glogl bab lo al sos lul tit onoo u i n Shell and Wrtsil will jointly promoting and accelerating the use
of liquefied natural gas (LNG) as a marine fuel in the USA
Wrtsil has contacts with strong players in the LNG supply chain
in Rotterdam area
or in Norway
Wrtsil as one system supplier :
LNG Supply go between
Supply of Gas system installation
(LNGPac) and Dual fuel engines
Marine Life Cycle solutions Wrtsil LNG Journal conference Oslo 21-22 March 2012
-
7/27/2019 Wartsila SP Ppt 2012 Analysis LNG
23/24
Wrtsil LNGPac- Contract references (March 2012)
Merchant
Chemical Tanker
Two LNGPacs
LNGPac capacity 500 m3
Total LNG capacityonboard 1000 m
3
3 segments
Offshore
PSV
One LNGPac per vessel
LNGPac capacity 290 m3
Cruiseand Ferry
LNG Ferries
Two LNGPacs pervessel
LNGPac capacity 200 m3
Total LNG capacityonboard 400 m
3
5+2 installations 10 LNGPac
Wrtsil LNG Journal conference Oslo 21-22 March 2012
-
7/27/2019 Wartsila SP Ppt 2012 Analysis LNG
24/24
Thank youThank you!!
Yves BuiYves Bui
[email protected]@wartsila.com
Wartsila.comWartsila.com
Wrtsil LNG Journal conference Oslo 21-22 March 2012