Wartsila SP Ppt 2012 Analysis LNG

download Wartsila SP Ppt 2012 Analysis LNG

of 24

Transcript of Wartsila SP Ppt 2012 Analysis LNG

  • 7/27/2019 Wartsila SP Ppt 2012 Analysis LNG

    1/24

    Yves Bui

    AnalysisLNG Bunkeringinnortheurope

    -

    Yves Bu

    Wrtsil Ship Power

    Technology

    Director Gas Applications

    .

  • 7/27/2019 Wartsila SP Ppt 2012 Analysis LNG

    2/24

    11-- LNG world overviewLNG world overview22 LNG bunkering stationsLNG bunkering stations

    33 LNG needs methodologyLNG needs methodology

    44 -- ConclusionConclusion

    Wrtsil LNG Journal conference Oslo 21-22 March 2012

  • 7/27/2019 Wartsila SP Ppt 2012 Analysis LNG

    3/24

    LNGala

    inEuop

    LNG importintheworldLNG import in the world

    Wrtsil LNG Journal conference Oslo 21-22 March 2012

  • 7/27/2019 Wartsila SP Ppt 2012 Analysis LNG

    4/24

    Dsonbl m

    LNGalanoin

    Euop

    LogisticLogistic LNGLNG supplysupply

    inEur

    ope

    Source:Gasprom

    LNGavailabl

    Wrtsil LNG Journal conference Oslo 21-22 March 2012

  • 7/27/2019 Wartsila SP Ppt 2012 Analysis LNG

    5/24

    enton

    LogisticLogistic LNGLNG supplysupply

    efinIto

    n

    EU

    Wrtsil LNG Journal conference Oslo 21-22 March 2012

    Moto

    rways

  • 7/27/2019 Wartsila SP Ppt 2012 Analysis LNG

    6/24

    11-- LNG world overviewLNG world overview22 LNG bunkering stationsLNG bunkering stations

    33 LNG needs methodologyLNG needs methodology

    44 -- ConclusionConclusion

    Wrtsil LNG Journal conference Oslo 21-22 March 2012

  • 7/27/2019 Wartsila SP Ppt 2012 Analysis LNG

    7/24

    First country in Europe

    LNGala

    inEuop

    LogisticLogistic LNL GNG sus pplypplu y

    Norway:

    Environmental taxes

    - Small-scale distribution of LNG: Small LNG carriers Trucks Trains

    First country in Europewith LNG refuelling stations

    - End-users: Industries (about 85%)

    Shipping

    The small-scale distribution is governed bycompanies (Gasnor - Nordic LNG) that usesmall LNG carrier for the transport of volumes

    directly to the final consumer.

    inEur

    ope

    LNGavailabl

    Wrtsil LNG Journal conference Oslo 21-22 March 2012

  • 7/27/2019 Wartsila SP Ppt 2012 Analysis LNG

    8/24

    LNGala

    inEuop

    LogisticLogistic LNGLNG supplysupply

    inEur

    ope

    LNGavailabl

    Wrtsil LNG Journal conference Oslo 21-22 March 2012

  • 7/27/2019 Wartsila SP Ppt 2012 Analysis LNG

    9/24

    LNGala

    inEuop

    LogisticLogistic LNL GNG sus pplypplu y

    Terminal in Mosjen and in Sarpsborg near Oslo(Norway) supplied through small LNG carrierfrom plants of Gasnor in Kollsnes and in Karmy(increase production plant in Spain, Huelva).

    Cost of 10.8 mEUR 5 x 700 m3 LNG tanks Gasification unit Fuelling station for LNG tank truck

    - Safety: Accumulation pool 30 meters radius around accumulation pool

    and 100m around the terminal

    inEur

    ope

    LNGavailabl

    Wrtsil LNG Journal conference Oslo 21-22 March 2012

  • 7/27/2019 Wartsila SP Ppt 2012 Analysis LNG

    10/24

    LNGala

    inEuop

    LogisticLogistic LNL GNG sus pplypplu y

    Terminal Halhejem Bergen (Norway):

    Gasnor

    Capacity bunkering station: 2x500 m3

    inEur

    ope

    LNGavailabl

    Wrtsil LNG Journal conference Oslo 21-22 March 2012

  • 7/27/2019 Wartsila SP Ppt 2012 Analysis LNG

    11/24

    e un er stat on on oar s ps

    LNGala

    inEuop

    LogisticLogistic LNL GNG sus pplypplu y

    Terminal Aagotnes Bergen (Norway)(CCB Coast Centre Bunkering):

    Bunkering rate: 40 t/h (102 m3/h) at 4.1 bar (75000 m3/year) LNG insulated pipeline: DN 150, DN 80 gas pipe return Storage tank 500 m3 (dimensions 5,5x35m)

    Safety valve and a flexible hose to connect the bunker station Flare for the gas line return LNG storage tank in stainless steel, 300 ltabt. 0,2m deep, and covered with a grating

    e un er stat on on oar s ps

    are equipped with standard connectionswith universal flange (DN 100 - DN 65).

    inEur

    op

    LNGavailabl

    Wrtsil LNG Journal conference Oslo 21-22 March 2012

  • 7/27/2019 Wartsila SP Ppt 2012 Analysis LNG

    12/24

    LNGala

    inEuop

    LNG

    availabl

    LogisticLogistic LNL GNG sus pplypplu y

    Terminal Aagotnes Bergen (Norway)(CCB Coast Centre Bunkering):

    Bunkering Sequence:

    Vessel arrival/mooring Establishing hose connection Inerting the system Flashin coolin of the s stem abt.1h

    Bunkering (102 m3/h) Flashing of the system Disconnecting bunkering hose Departure

    Wrtsil LNG Journal conference Oslo 21-22 March 2012

    inEur

    ope

  • 7/27/2019 Wartsila SP Ppt 2012 Analysis LNG

    13/24

    LNGala

    inEuop

    inEur

    ope

    LogisticLogistic LNL GNG sus pplypplu y

    Terminal Risavika Stavanger (Norway):

    Company Nordic LNG, production in 2010 abt. 300 000 t/year.With this terminal: duplicate the production.

    Bunkering: ship to ship with multi carrier gas (LNG, Etylene, LPG),

    6 to 10 000 m3 and 2 x 12 000 m3.

    LNG

    availabl

    Wrtsil LNG Journal conference Oslo 21-22 March 2012

  • 7/27/2019 Wartsila SP Ppt 2012 Analysis LNG

    14/24

    (preparations for a second tank)

    LNGala

    inEuop

    LogisticLogistic LNL GNG sus pplypplu y

    Terminal NynashamnStockholm (Sweden):

    Jetty with two loading arms 20 000 m3 full containment tank(preparations for a second tank) Re-condenser with buffer tank Trailer filling for two trucks with trailers

    Project approval Oct 2008Inauguration 27 May 2011

    inEur

    ope

    LNG

    availabl

    Wrtsil LNG Journal conference Oslo 21-22 March 2012

  • 7/27/2019 Wartsila SP Ppt 2012 Analysis LNG

    15/24

    LNGala

    inEuop

    LogisticLogistic LNL GNG sus pplypplu y

    Project MAGALOG(Marin Gas Logistics)

    Emissions in the Baltic Sea ports

    Port of Lbeck (Germany):7000 m336 RoRo and RoPax dock regularly, can increasePurpose: shipping and industrial

    Port of Swinoujsce (Poland) (Regas plant European funded end30.06.2014)

    7 RoRo and RoPax dock regularly, can increase Ports Helsinki (Finland), Rostock (Germany), Hirtshals (Denmark)and Zeebrugge (Belgium):

    Development of logistics services for LNG (import and export)

    inEur

    op

    LNG

    availabl

    Wrtsil LNG Journal conference Oslo 21-22 March 2012

  • 7/27/2019 Wartsila SP Ppt 2012 Analysis LNG

    16/24

    11-- LNG world overviewLNG world overview22 LNG bunkering stationsLNG bunkering stations

    33 LNG needs methodologyLNG needs methodology

    44 -- ConclusionConclusion

    Wrtsil LNG Journal conference Oslo 21-22 March 2012

  • 7/27/2019 Wartsila SP Ppt 2012 Analysis LNG

    17/24

    fuelsincludin renewable ener

    FUEL TRADE OFF BEST CHOICE : WARTSILA DUAL FUEL

    Fuel mixLNG

    MajorityLow S

    Majority

    Abatement technologies not

    completely accepted by themarket and/or regulators

    Not sufficient supply of distillatesand/or high price premium of

    distillates vs. other fuels LNG infrastructures developed:

    terminals, bunkering facility Competitive LNG price Successful development of

    technologies to use non-conventional marine fuels,including renewable energy

    fuels

    Stable or decreased demand fordistillates from road transportation

    (electric cars)

    Downstream investment in additionalrefining capacity (M-E, India, China);investments supported by availability

    of engineering skills / materials Regulators or market not accepting

    exhaust abatement technologies

    Regulators + market acceptance ofexhaust abatement technologies

    High demand from road transportationhigh pressure on refining capacity

    high price of distillates Slow downstream investment

    CO2 taxes limiting expansion of energyintensive refineries

    Wrtsil LNGJournal conference

  • 7/27/2019 Wartsila SP Ppt 2012 Analysis LNG

    18/24

    Wrtsil : Mechanical Dual Fuel (W34DF and W20DF)

    2xLNGPac 176 m3 176 m3 at 90%fill-in

    WRTSIL 4 x 9L34DF 4 050 kW each

    CPP 8 700 kW 176 m3 at 90%

    fill-in

    WRTSIL 4x 9L20DF 1 314kW each

    Thrusters

    1x1850 kW +

    PTO 2400 kW 1x 1850 kW

    PTO 2400 kW

    Total installed engine power: 21 456 kW

    Wrtsil LNG Journal conference Oslo 21-22 March 2012

  • 7/27/2019 Wartsila SP Ppt 2012 Analysis LNG

    19/24

    znvs

    s

    ExampleExample ofof aa rorororo

    neves

    sels

    W38 HFO

    0%

    10%

    20%

    30%

    40%

    50%

    60%

    70%

    Port ECA Port Manoeuvring

    ECA

    Manoeuvring At sea in ECA At sea

    Ru

    nninghours

    Operating mode

    Wrtsil LNG Journal conference Oslo 21-22 M arch 2012

    Meth

    odecaz

    Fuels

    prices

    Euro/ton HFO MDO LNG

    12

    $/mmBTU

    LNG/HFO HFO Scrub

    SCR

    Gas in ECA

    HFO

    outside

    MDO in

    ECA HFO

    outside

    All gas

    Jul.09 418 606 477 114%

    446 638 477 107%

    477 676 477 100%

    Feb.11 483 685 477 99%

    Priority selection with 30% ECA

    zone RoRo

  • 7/27/2019 Wartsila SP Ppt 2012 Analysis LNG

    20/24

    LNGala

    u ec

    inEuop

    LogisticLogistic LNGLNG supplysupply

    inEur

    ope

    Total LNG

    quantity yearlyneeds

    Gas needs

    potentialvolumes

    2 016 3 670 168

    1 578 172

    Harbour Gas planned

    business

    Rotterdam Gate 1 358 643

    Antwerp 559 873

    Hamburg 494 623

    Vessel category Vessel size Average

    trip in days

    % at sea

    outside ECA

    1&2

    % time

    at sea in

    ECA 1

    % time at

    sea in ECA

    2

    % at

    PORToutside

    ECA 1&2

    % at

    PORT

    ECA 1

    % at

    PORT

    ECA 2

    Number of

    ship datalines

    counted

    Cruise Large Cruise Vessels 6,1 33% 3% 10% 40% 3% 10% 165

    Cruise Medium Cruise Vessels 5,9 29% 7% 3% 47% 8% 4% 103

    Cruise Panamax Cruise Vessels 6,2 23% 3% 14% 40% 4% 15% 233

    Cruise Post-Panamax Cruise Vessels 8,6 38% 2% 5% 45% 3% 7% 151

    Cruise Small Cruise Vessels 7,9 26% 3% 3% 59% 6% 3% 354

    Passenger Large Passenger Vessels 8,1 33% 1% 2% 61% 1% 2% 65

    Passenger Medium Passenger Vessels 14,0 26% 3% 5% 43% 8% 15% 165

    Passenger Small Passenger Vessels 13,5 31% 5% 3% 50% 6% 5% 114

    Passenger Very Small Passenger Vessels 15,1 38% 3% 3% 43% 5% 8% 356

    Passenger & cargo Large Passenger & Cargo Vessels 5,4 16% 31% 2% 21% 27% 3% 123

    Passenger & cargo Medium Passenger & Cargo Vessels 6,0 29% 10% 3% 41% 14% 4% 762

    Passenger & cargo Small Passenger & Cargo Vessels 8,0 34% 5% 2% 46% 10% 3% 906

    Passenger & cargo Very Small Passenger & Cargo Vessels 14,3 39% 2% 3% 45% 6% 5% 557

    Yacht Yacht 14,5 12% 0% 0% 83% 4% 0% 36

    Grand Total 9,3 33% 5% 4% 46% 8% 6% 4 090

    LNG

    availabl u ec 311 637

    Zeebrugge 258 632Gothenburg 139 184

    Helsinki 105 525

    Rostock 91 457

    Fredericia 87 165

    Bergen 75 586

    Stockholm 74 317

    Swinoujscie 48 800

    Stavanger 40 203

    Nynashamn 11 477

    Mosjoen 4 696

    Hirtshals 4 401

    Oslo 3 949

    Feedermax Handy

    Tankers

    Handymax

    Bulk

    Carriers

    Handysize

    Bulk

    Carriers

    Handysize

    Container

    Vessels

    Inland

    Cargo

    Inland

    Pushboat

    Inland

    Tanker

    Large

    Cargo

    Vessels

    232124 327971 1426 6761 33563 1456 843 2345 1094

    Wrtsil LNG Journal conference Oslo 21-22 March 2012

  • 7/27/2019 Wartsila SP Ppt 2012 Analysis LNG

    21/24

    11-- LNG world overviewLNG world overview22 LNG bunkering stationsLNG bunkering stations

    33 LNG needs methodologyLNG needs methodology

    44 -- ConclusionConclusion

    Wrtsil LNG Journal conference Oslo 21-22 March 2012

  • 7/27/2019 Wartsila SP Ppt 2012 Analysis LNG

    22/24

    Coopaon

    ation

    Coope

    WartsilapartnerWartsila partner frf oro glogl bab lo al sos lul tit onoo u i n Shell and Wrtsil will jointly promoting and accelerating the use

    of liquefied natural gas (LNG) as a marine fuel in the USA

    Wrtsil has contacts with strong players in the LNG supply chain

    in Rotterdam area

    or in Norway

    Wrtsil as one system supplier :

    LNG Supply go between

    Supply of Gas system installation

    (LNGPac) and Dual fuel engines

    Marine Life Cycle solutions Wrtsil LNG Journal conference Oslo 21-22 March 2012

  • 7/27/2019 Wartsila SP Ppt 2012 Analysis LNG

    23/24

    Wrtsil LNGPac- Contract references (March 2012)

    Merchant

    Chemical Tanker

    Two LNGPacs

    LNGPac capacity 500 m3

    Total LNG capacityonboard 1000 m

    3

    3 segments

    Offshore

    PSV

    One LNGPac per vessel

    LNGPac capacity 290 m3

    Cruiseand Ferry

    LNG Ferries

    Two LNGPacs pervessel

    LNGPac capacity 200 m3

    Total LNG capacityonboard 400 m

    3

    5+2 installations 10 LNGPac

    Wrtsil LNG Journal conference Oslo 21-22 March 2012

  • 7/27/2019 Wartsila SP Ppt 2012 Analysis LNG

    24/24

    Thank youThank you!!

    Yves BuiYves Bui

    [email protected]@wartsila.com

    Wartsila.comWartsila.com

    Wrtsil LNG Journal conference Oslo 21-22 March 2012