Wallingford CSO #147. How might we mitigate excessive number of overflows/year into Lk Union while embracing further high-density development?. CSO # 147 @ bottom of Stone Way Out of Compliance!. CSO#147 overflows more than any other, per 2010 Long term Plan ( Appendix C--Table C2 .). - PowerPoint PPT Presentation

Transcript of Wallingford CSO #147

Page 1: Wallingford CSO #147

Wallingford CSO #147

How might we mitigate excessive number of overflows/year into Lk Union

while embracing further high-density development?

Page 2: Wallingford CSO #147

CSO # 147 @ bottom of Stone Way

Out of Compliance!p. 66

Overflow Frequency (#/year) Overflow Event Duration (Hrs) Over Volume (Gallons/Year)

NPDES# 2007 2008 2009 2010 2011 2007 2008 2009 2010 2011 2007 2008 2009 2010 2011

145 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

146 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0Wallingford

147 30 50 45 63 40 363 536 617 801 392 24133148 9884390 25119846 23213300 9748238

Stone Way * * ** rounded to nearest whole #

Receiving Waters => Lake Union

2011 Annual Seattle CSO Report --

CSO#147 overflows more than any other, per 2010 Long term Plan (Appendix C--Table C2.)

Page 3: Wallingford CSO #147

NPDES permits

• The NPDES Permits allow wet weather discharges of untreated sewage & stormwater from CSO outfalls (like CSO#147) listed in the PERMIT to various receiving waters,e.g., Lake Union!

• Current NPDES permit allows for 1 overflow per year from CSO’s. (#147 averages 45 overflows/year.)

Page 4: Wallingford CSO #147

RCW 90.48.480Reduction of Sewer Overflows

• The department of ecology shall work with local governments to develop reasonable plans and compliance schedules for the greatest reasonable reduction of combined sewer overflows. The plan shall address various options, including construction of storage tanks for sewage and separation of sewage and stormwater transport systems. The compliance schedule shall be designed to achieve the greatest reasonable reduction of combined sewer overflows at the earliest possible date.

The plans & compliance schedules shall be completed by January 1, 1988. A compliance schedule will be a condition of any waste discharge permit issued or renewed after January 1, 1988.

Page 5: Wallingford CSO #147

• Blackline shows

borders of

Subbasin drainage

to CSO 147A

(blue dot)

Page 6: Wallingford CSO #147

What we know!

• 2007 - 2011 CSO #147 was significantly above the once/yr regulation overflow.

• Averaging 45.6 overflows per year!• Averaging 542 hrs of overflow per yr!

~12 hrs per event• Averaging 18,419,784 gallons/yr of EFFLUENT into

Lake Union.• Excessive overflows from #147 Stone Way N. -- likely

to be adversely impacted by future high-density additions, if not addressed. Currently low priority!!?

Page 7: Wallingford CSO #147

Stone Way Drainage

Page 8: Wallingford CSO #147

Stone Way @ 35th

Page 9: Wallingford CSO #147

Woodlawn Densmore drainage

Page 10: Wallingford CSO #147

What we don’t know…

• Given that Stone Way has been historically a commercial strip & as such has a lot of paved area & has a distinct grade from 45th to Lk Union, can green measures be effective in such an environment… (Most GSI swales, rain gardens, etc. tend to be on more level ground or in small gulleys in more leveled areas.) Will the Stone drainage need a more mechanical fix?

Page 11: Wallingford CSO #147

Long Term Control Plan

• #147 is "low priority" for City of Seattle CSO Capitol improvement Plan. May not be fixed for 10 or more years!

• Can Green Stormwater Infrastructure (GSI) control CSO#147 (with all the pavement in area) & how & when will this be implemented.

• http://www.seattle.gov/util/groups/public/@spu/@drainsew/documents/webcontent/01_026050.pdf

Page 12: Wallingford CSO #147

Overall Ammonia, Cyanide, Fecal coliform, etc.

Combined drainage days for all of Seattle represent approximately 30% of the year

Page 13: Wallingford CSO #147

Current Questions

• Can we get an expert from Seattle Public Utilities to come & clarify where lower Wallingford Main & Sanitary lines drain & if they contribute to CSO#147?

• How do they see further/future high-density impacting CSO#147?

• Can City move forward sooner with #147, if high-density is a value?

• Should further permits for h-d construction in subbasin 147A be approved prior to updating?

Page 14: Wallingford CSO #147

References• Combined Sewer Overflow Reduction Program -- 2011 Annual Report:

Sewage Overflow Prevention / Seattle Public Utilities. p. 5, 66: http://www.seattle.gov/util/groups/public/@spu/@usm/documents/webcontent/01_016565.pdf

• Seattle Side Sewer Cards & Maps: http://web1.seattle.gov/dpd/sidesewercardsv2/

• Protecting Seattle’s Waterways: Community Guide to the Plan; Issue 2, Spring 2013 / Seattle Public Utilities.(long term plans for CSO#147!) http://www.seattle.gov/util/groups/public/@spu/@drainsew/documents/webcontent/01_026050.pdf

• Sub-basin 147A Monitoring Site Location Map• CSO Overview & Issues of NWRO (PowerPt), 2010:

http://www.ecy.wa.gov/programs/wq/permits/csodocs/csoover.pdf• Focus on Sewage & Stormwater: Protecting our Waters from CSO (Feb.

2011): https://fortress.wa.gov/ecy/publications/publications/0010080.pdf• Major Lakes Monitoring -- Lake Union:

http://green.kingcounty.gov/lakes/lakeunion.aspx

Page 15: Wallingford CSO #147

Appendix

• GSI = Green Stormwater Infrastructure, e.g. roadside rain gardens, permeable pavements, downspout disconnects?

• Stormwater storage tanks: Fremont-Wallingford, 3 million gallons storage currently needed (SPU’s Protecting Seattle’s Waterways: Community Plan, 2013. p. 8)

• RainWise = Managing stormwater @ home: http://www.seattle.gov/util/MyServices/DrainageSewer/Projects/GreenStormwaterInfrastructure/RainWise/index.htm