WALES - SPEnergyNetworks

6
P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! P ! VP1 VP10 VP 11 VP12 VP13 VP14 VP15 VP16 VP17 VP18 VP19 VP2 VP20 VP21 VP22 VP23 VP24 VP25 VP26 VP27 VP28 VP29 VP3 VP30 VP31 VP32 VP33 VP34 VP35 VP36 VP37 VP38 VP39 VP4 VP40 VP41 VP42 VP43 VP44 VP45 VP46 VP47 VP48 VP49 VP5 VP50 VP51 VP52 VP53 VP54 VP55 VP56 VP57 VP58 VP59 VP6 VP60 VP61 VP62 VP63 VP64 VP65 VP66 VP67 VP68 VP69 VP7 VP70 VP71 VP72 VP73 VP74 VP75 VP76 VP8 VP9 WALES Rev Date Description Chk'd Made App'd 0 14/11/2017 PEIR KC ZF SG Drawn: KC Date: Approved: Checked: ZF SG 14/11/2017 Document Type: Scale: Rev: Sheet Size: Sheet: FIGURE 0 1 OF 1 A3 (420 mm x 297 mm) 1:75,000 ° Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\PEIR Figures\P10787_PEIR_Figure_7.8_OV.mxd Scheme Name: PREFERRED LINE ROUTE (OF THE 132 kV OVERHEAD LINE) CONSTRUCTION AND OPERATIONS CORRIDOR 40m CONSULTATION BOUNDARY 200m STUDY AREA 1km STUDY AREA 5km STUDY AREA PROPOSED 132 kV UNDERGROUND CABLE PROPOSED TEMPORARY ACCESS PROPOSED TEMPORARY LAYDOWN AREAS PROPOSED UNDERGROUND ROUTE OF EXISTING LOWER VOLTAGE OVERHEAD LINE BEING REMOVED VIEWPOINTS: P ! SIGNIFICANT P ! NON-SIGNIFICANT P ! NO VIEW P ! NO ACCESS CHAPTER 7: LANDSCAPE AND VISUAL FIGURE 7.8 VIEWPOINT LOCATIONS OVERVIEW KEY Chapter: Document Title: REINFORCEMENT TO NORTH SHROPSHIRE ELECTRICITY DISTRIBUTION NETWORK: 132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding of the new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated. BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE. CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017. Notes: 0 1 2 0.5 Kilometres The study areas extend from the 25m Construction and Operations Corridor (Draft Order Limits), but only taking into account the Preferred Line Route (i.e. the proposed overhead line).

Transcript of WALES - SPEnergyNetworks

P! P!

P!P!

P!P!

P!P!

P! P!P!

P!

P!P!

P!

P!

P!

P!P!

P!

P!

P!

P!

P! P!

P!P!

P!

P!

P!P!P!

P!

P!

P!

P!

P!

P!

P!

P!

P!

P!

P!

P!

P!

P!P!

P!

P!P!

P!

P!

P!

P!

P!

P!

P!

P!

P!

P!P!

P!

P!

P!

P!

P!

P!P!

P!

P!

P!

P!

P!

P!

P!P!VP1 VP10

VP 11

VP12

VP13VP14

VP15VP16

VP17 VP18VP19

VP2

VP20VP21

VP22

VP23

VP24

VP25

VP26

VP27

VP28

VP29

VP3

VP30VP31

VP32

VP33

VP34

VP35

VP36VP37VP38

VP39

VP4

VP40

VP41

VP42

VP43

VP44

VP45

VP46

VP47

VP48

VP49

VP5

VP50

VP51

VP52

VP53

VP54

VP55

VP56

VP57

VP58

VP59

VP6

VP60

VP61

VP62

VP63

VP64

VP65

VP66

VP67

VP68

VP69

VP7

VP70

VP71

VP72

VP73

VP74

VP75

VP76

VP8

VP9

WALESRev Date Description Chk'dMade App'd

0 14/11/2017 PEIR KC ZF SG

Drawn:

KCDate:Approved:Checked:

ZF SG 14/11/2017

Document Type: Scale:

Rev:

Sheet Size:

Sheet:

FIGURE

01 OF 1

A3 (420 mm x 297 mm)1:75,000

°

Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\PEIR Figures\P10787_PEIR_Figure_7.8_OV.mxd

Scheme Name:

PREFERRED LINE ROUTE (OF THE 132 kVOVERHEAD LINE)

CONSTRUCTION AND OPERATIONSCORRIDOR

40m CONSULTATION BOUNDARY

200m STUDY AREA

1km STUDY AREA

5km STUDY AREA

PROPOSED 132 kV UNDERGROUND CABLE

PROPOSED TEMPORARY ACCESS

PROPOSED TEMPORARY LAYDOWN AREAS

PROPOSED UNDERGROUND ROUTE OFEXISTING LOWER VOLTAGE OVERHEADLINE BEING REMOVED

VIEWPOINTS:

P! SIGNIFICANT

P! NON-SIGNIFICANT

P! NO VIEW

P! NO ACCESSCHAPTER 7: LANDSCAPE AND VISUAL

FIGURE 7.8 VIEWPOINT LOCATIONSOVERVIEW

KEY

Chapter:

Document Title:

REINFORCEMENT TO NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:

132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM

The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding of the new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.

BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY

PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.

CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.

Notes:

0 1 20.5

Kilometres

The study areas extend from the 25m Construction and Operations Corridor (Draft Order Limits), but only taking into account the Preferred Line Route (i.e. the proposed overhead line).

P!

P!

P!

P!

P!

P!

P!

P!

P!

P!

P!

P!

P!

P!

P!CO

NTI

NU

ES O

NPA

GE

2 O

F 5

VP1

VP2

VP3

VP4

VP41

VP43

VP44

VP45

VP46

VP47

VP48

VP5

VP64

VP73

2 3 4 51

KEY

Rev Date Description Chk'dMade App'd

0 14/11/2017 PEIR KC ZF SG

FIGURE 7.8 VIEWPOINT LOCATIONS

Drawn:

KCDate:Approved:Checked:

ZF SG 14/11/2017

Document Type: Scale:

Rev:

Sheet Size:

Sheet:

FIGURE

01 OF 5

A3 (420 mm x 297 mm)1:30,000

°

Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\PEIR Figures\P10787_PEIR_Figure_7.8.mxd

Scheme Name:

PAGE 1 OF 5

PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)

CONSTRUCTION ANDOPERATIONS CORRIDOR

40m CONSULTATION BOUNDARY

200m STUDY AREA

1km STUDY AREA

5km STUDY AREA

PROPOSED 132 kVUNDERGROUND CABLE

PROPOSED TEMPORARY ACCESS

PROPOSED TEMPORARYLAYDOWN AREAS

PROPOSED UNDERGROUNDROUTE OF EXISTING LOWERVOLTAGE OVERHEAD LINE BEINGREMOVED

P! SIGNIFICANT

P! NON-SIGNIFICANT

P! NO VIEW

P! NO ACCESS

CHAPTER 7: LANDSCAPE AND VISUALChapter:

Document Title:

REINFORCEMENT TO NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:

132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM

The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding of the new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.

The study areas extend from the 25m Construction and Operations Corridor (Draft Order Limits), but only taking into account the Preferred Line Route (i.e. the proposed overhead line).

BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.

CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.

Notes:

0 0.5 10.25

Kilometres

P!

P!

P!

P!

P!P!

P!

P!

P!

P!

P!

P!

P!

P!

P!

P!

P!

P!

P!

CON

TIN

UES

ON

PAG

E 1

OF

5

CON

TIN

UES

ON

PAG

E 3

OF

5

VP10

VP 11

VP3

VP4VP48

VP49

VP5

VP6

VP62

VP63

VP65

VP69

VP7

VP74

VP8

VP9

13 4 52

KEY

Rev Date Description Chk'dMade App'd

0 14/11/2017 PEIR KC ZF SG

FIGURE 7.8 VIEWPOINT LOCATIONS

Drawn:

KCDate:Approved:Checked:

ZF SG 14/11/2017

Document Type: Scale:

Rev:

Sheet Size:

Sheet:

FIGURE

02 OF 5

A3 (420 mm x 297 mm)1:30,000

°

Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\PEIR Figures\P10787_PEIR_Figure_7.8.mxd

Scheme Name:

PAGE 2 OF 5

PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)

CONSTRUCTION ANDOPERATIONS CORRIDOR

40m CONSULTATION BOUNDARY

200m STUDY AREA

1km STUDY AREA

5km STUDY AREA

PROPOSED 132 kVUNDERGROUND CABLE

PROPOSED TEMPORARY ACCESS

PROPOSED TEMPORARYLAYDOWN AREAS

PROPOSED UNDERGROUNDROUTE OF EXISTING LOWERVOLTAGE OVERHEAD LINE BEINGREMOVED

P! SIGNIFICANT

P! NON-SIGNIFICANT

P! NO VIEW

P! NO ACCESS

CHAPTER 7: LANDSCAPE AND VISUALChapter:

Document Title:

REINFORCEMENT TO NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:

132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM

The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding of the new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.

The study areas extend from the 25m Construction and Operations Corridor (Draft Order Limits), but only taking into account the Preferred Line Route (i.e. the proposed overhead line).

BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.

CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.

Notes:

0 0.5 10.25

Kilometres

P!

P!

P!

P!

P!

P!

P! P!

P!

P!

P!

P!

P!

P!

P!

P!

P!

P!

P!

P!

P!

CON

TIN

UES

ON

PAG

E 2

OF

5

CON

TIN

UES

ON

PAG

E 4

OF

5VP12

VP13

VP14

VP15

VP16

VP17 VP18

VP19

VP20

VP21

VP50

VP51

VP52

VP59

VP60

VP61

VP69

VP70

VP71

VP75

1 24 53

KEY

Rev Date Description Chk'dMade App'd

0 14/11/2017 PEIR KC ZF SG

FIGURE 7.8 VIEWPOINT LOCATIONS

Drawn:

KCDate:Approved:Checked:

ZF SG 14/11/2017

Document Type: Scale:

Rev:

Sheet Size:

Sheet:

FIGURE

03 OF 5

A3 (420 mm x 297 mm)1:30,000

°

Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\PEIR Figures\P10787_PEIR_Figure_7.8.mxd

Scheme Name:

PAGE 3 OF 5

PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)

CONSTRUCTION ANDOPERATIONS CORRIDOR

40m CONSULTATION BOUNDARY

200m STUDY AREA

1km STUDY AREA

5km STUDY AREA

PROPOSED 132 kVUNDERGROUND CABLE

PROPOSED TEMPORARY ACCESS

PROPOSED TEMPORARYLAYDOWN AREAS

PROPOSED UNDERGROUNDROUTE OF EXISTING LOWERVOLTAGE OVERHEAD LINE BEINGREMOVED

P! SIGNIFICANT

P! NON-SIGNIFICANT

P! NO VIEW

P! NO ACCESS

CHAPTER 7: LANDSCAPE AND VISUALChapter:

Document Title:

REINFORCEMENT TO NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:

132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM

The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding of the new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.

The study areas extend from the 25m Construction and Operations Corridor (Draft Order Limits), but only taking into account the Preferred Line Route (i.e. the proposed overhead line).

BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.

CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.

Notes:

0 0.5 10.25

Kilometres

P!

P!

P!

P!

P!

P!

P!

P!

P!

P!

P!

P!P!

P!

P!

P!

P!

P!

P!

P!

P!

P!

P!

P!

P!

P!

P!

CON

TIN

UES

ON

PAG

E 3

OF

5

CON

TIN

UES

ON

PAG

E 5

OF

5VP18

VP21

VP22

VP23

VP24

VP25

VP26

VP27

VP28

VP29

VP30

VP31

VP32

VP33

VP34

VP51

VP52

VP57

VP58

VP59

VP66

VP68

VP72

VP76

1 2 3 54

KEY

Rev Date Description Chk'dMade App'd

0 14/11/2017 PEIR KC ZF SG

FIGURE 7.8 VIEWPOINT LOCATIONS

Drawn:

KCDate:Approved:Checked:

ZF SG 14/11/2017

Document Type: Scale:

Rev:

Sheet Size:

Sheet:

FIGURE

04 OF 5

A3 (420 mm x 297 mm)1:30,000

°

Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\PEIR Figures\P10787_PEIR_Figure_7.8.mxd

Scheme Name:

PAGE 4 OF 5

PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)

CONSTRUCTION ANDOPERATIONS CORRIDOR

40m CONSULTATION BOUNDARY

200m STUDY AREA

1km STUDY AREA

5km STUDY AREA

PROPOSED 132 kVUNDERGROUND CABLE

PROPOSED TEMPORARY ACCESS

PROPOSED TEMPORARYLAYDOWN AREAS

PROPOSED UNDERGROUNDROUTE OF EXISTING LOWERVOLTAGE OVERHEAD LINE BEINGREMOVED

P! SIGNIFICANT

P! NON-SIGNIFICANT

P! NO VIEW

P! NO ACCESS

CHAPTER 7: LANDSCAPE AND VISUALChapter:

Document Title:

REINFORCEMENT TO NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:

132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM

The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding of the new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.

The study areas extend from the 25m Construction and Operations Corridor (Draft Order Limits), but only taking into account the Preferred Line Route (i.e. the proposed overhead line).

BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.

CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.

Notes:

0 0.5 10.25

Kilometres

P!

P!

P!

P!

P!

P!

P!P!

P!

P!

P!

P!

P!

P!

P!

P!

CON

TIN

UES

ON

PAG

E 4

OF

5

VP33

VP34

VP35

VP36

VP37VP38

VP39

VP40

VP53

VP54

VP55

VP56

VP67

1 2 3 4 5

KEY

Rev Date Description Chk'dMade App'd

0 14/11/2017 PEIR KC ZF SG

FIGURE 7.8 VIEWPOINT LOCATIONS

Drawn:

KCDate:Approved:Checked:

ZF SG 14/11/2017

Document Type: Scale:

Rev:

Sheet Size:

Sheet:

FIGURE

05 OF 5

A3 (420 mm x 297 mm)1:30,000

°

Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\PEIR Figures\P10787_PEIR_Figure_7.8.mxd

Scheme Name:

PAGE 5 OF 5

PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)

CONSTRUCTION ANDOPERATIONS CORRIDOR

40m CONSULTATION BOUNDARY

200m STUDY AREA

1km STUDY AREA

5km STUDY AREA

PROPOSED 132 kVUNDERGROUND CABLE

PROPOSED TEMPORARY ACCESS

PROPOSED TEMPORARYLAYDOWN AREAS

PROPOSED UNDERGROUNDROUTE OF EXISTING LOWERVOLTAGE OVERHEAD LINE BEINGREMOVED

P! SIGNIFICANT

P! NON-SIGNIFICANT

P! NO VIEW

P! NO ACCESS

CHAPTER 7: LANDSCAPE AND VISUALChapter:

Document Title:

REINFORCEMENT TO NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:

132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM

The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding of the new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.

The study areas extend from the 25m Construction and Operations Corridor (Draft Order Limits), but only taking into account the Preferred Line Route (i.e. the proposed overhead line).

BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.

CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.

Notes:

0 0.5 10.25

Kilometres