WALES - SPEnergyNetworks
Transcript of WALES - SPEnergyNetworks
P! P!
P!P!
P!P!
P!P!
P! P!P!
P!
P!P!
P!
P!
P!
P!P!
P!
P!
P!
P!
P! P!
P!P!
P!
P!
P!P!P!
P!
P!
P!
P!
P!
P!
P!
P!
P!
P!
P!
P!
P!
P!P!
P!
P!P!
P!
P!
P!
P!
P!
P!
P!
P!
P!
P!P!
P!
P!
P!
P!
P!
P!P!
P!
P!
P!
P!
P!
P!
P!P!VP1 VP10
VP 11
VP12
VP13VP14
VP15VP16
VP17 VP18VP19
VP2
VP20VP21
VP22
VP23
VP24
VP25
VP26
VP27
VP28
VP29
VP3
VP30VP31
VP32
VP33
VP34
VP35
VP36VP37VP38
VP39
VP4
VP40
VP41
VP42
VP43
VP44
VP45
VP46
VP47
VP48
VP49
VP5
VP50
VP51
VP52
VP53
VP54
VP55
VP56
VP57
VP58
VP59
VP6
VP60
VP61
VP62
VP63
VP64
VP65
VP66
VP67
VP68
VP69
VP7
VP70
VP71
VP72
VP73
VP74
VP75
VP76
VP8
VP9
WALESRev Date Description Chk'dMade App'd
0 14/11/2017 PEIR KC ZF SG
Drawn:
KCDate:Approved:Checked:
ZF SG 14/11/2017
Document Type: Scale:
Rev:
Sheet Size:
Sheet:
FIGURE
01 OF 1
A3 (420 mm x 297 mm)1:75,000
°
Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\PEIR Figures\P10787_PEIR_Figure_7.8_OV.mxd
Scheme Name:
PREFERRED LINE ROUTE (OF THE 132 kVOVERHEAD LINE)
CONSTRUCTION AND OPERATIONSCORRIDOR
40m CONSULTATION BOUNDARY
200m STUDY AREA
1km STUDY AREA
5km STUDY AREA
PROPOSED 132 kV UNDERGROUND CABLE
PROPOSED TEMPORARY ACCESS
PROPOSED TEMPORARY LAYDOWN AREAS
PROPOSED UNDERGROUND ROUTE OFEXISTING LOWER VOLTAGE OVERHEADLINE BEING REMOVED
VIEWPOINTS:
P! SIGNIFICANT
P! NON-SIGNIFICANT
P! NO VIEW
P! NO ACCESSCHAPTER 7: LANDSCAPE AND VISUAL
FIGURE 7.8 VIEWPOINT LOCATIONSOVERVIEW
KEY
Chapter:
Document Title:
REINFORCEMENT TO NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:
132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM
The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding of the new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.
BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY
PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.
CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.
Notes:
0 1 20.5
Kilometres
The study areas extend from the 25m Construction and Operations Corridor (Draft Order Limits), but only taking into account the Preferred Line Route (i.e. the proposed overhead line).
P!
P!
P!
P!
P!
P!
P!
P!
P!
P!
P!
P!
P!
P!
P!CO
NTI
NU
ES O
NPA
GE
2 O
F 5
VP1
VP2
VP3
VP4
VP41
VP43
VP44
VP45
VP46
VP47
VP48
VP5
VP64
VP73
2 3 4 51
KEY
Rev Date Description Chk'dMade App'd
0 14/11/2017 PEIR KC ZF SG
FIGURE 7.8 VIEWPOINT LOCATIONS
Drawn:
KCDate:Approved:Checked:
ZF SG 14/11/2017
Document Type: Scale:
Rev:
Sheet Size:
Sheet:
FIGURE
01 OF 5
A3 (420 mm x 297 mm)1:30,000
°
Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\PEIR Figures\P10787_PEIR_Figure_7.8.mxd
Scheme Name:
PAGE 1 OF 5
PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)
CONSTRUCTION ANDOPERATIONS CORRIDOR
40m CONSULTATION BOUNDARY
200m STUDY AREA
1km STUDY AREA
5km STUDY AREA
PROPOSED 132 kVUNDERGROUND CABLE
PROPOSED TEMPORARY ACCESS
PROPOSED TEMPORARYLAYDOWN AREAS
PROPOSED UNDERGROUNDROUTE OF EXISTING LOWERVOLTAGE OVERHEAD LINE BEINGREMOVED
P! SIGNIFICANT
P! NON-SIGNIFICANT
P! NO VIEW
P! NO ACCESS
CHAPTER 7: LANDSCAPE AND VISUALChapter:
Document Title:
REINFORCEMENT TO NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:
132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM
The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding of the new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.
The study areas extend from the 25m Construction and Operations Corridor (Draft Order Limits), but only taking into account the Preferred Line Route (i.e. the proposed overhead line).
BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.
CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.
Notes:
0 0.5 10.25
Kilometres
P!
P!
P!
P!
P!P!
P!
P!
P!
P!
P!
P!
P!
P!
P!
P!
P!
P!
P!
CON
TIN
UES
ON
PAG
E 1
OF
5
CON
TIN
UES
ON
PAG
E 3
OF
5
VP10
VP 11
VP3
VP4VP48
VP49
VP5
VP6
VP62
VP63
VP65
VP69
VP7
VP74
VP8
VP9
13 4 52
KEY
Rev Date Description Chk'dMade App'd
0 14/11/2017 PEIR KC ZF SG
FIGURE 7.8 VIEWPOINT LOCATIONS
Drawn:
KCDate:Approved:Checked:
ZF SG 14/11/2017
Document Type: Scale:
Rev:
Sheet Size:
Sheet:
FIGURE
02 OF 5
A3 (420 mm x 297 mm)1:30,000
°
Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\PEIR Figures\P10787_PEIR_Figure_7.8.mxd
Scheme Name:
PAGE 2 OF 5
PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)
CONSTRUCTION ANDOPERATIONS CORRIDOR
40m CONSULTATION BOUNDARY
200m STUDY AREA
1km STUDY AREA
5km STUDY AREA
PROPOSED 132 kVUNDERGROUND CABLE
PROPOSED TEMPORARY ACCESS
PROPOSED TEMPORARYLAYDOWN AREAS
PROPOSED UNDERGROUNDROUTE OF EXISTING LOWERVOLTAGE OVERHEAD LINE BEINGREMOVED
P! SIGNIFICANT
P! NON-SIGNIFICANT
P! NO VIEW
P! NO ACCESS
CHAPTER 7: LANDSCAPE AND VISUALChapter:
Document Title:
REINFORCEMENT TO NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:
132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM
The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding of the new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.
The study areas extend from the 25m Construction and Operations Corridor (Draft Order Limits), but only taking into account the Preferred Line Route (i.e. the proposed overhead line).
BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.
CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.
Notes:
0 0.5 10.25
Kilometres
P!
P!
P!
P!
P!
P!
P! P!
P!
P!
P!
P!
P!
P!
P!
P!
P!
P!
P!
P!
P!
CON
TIN
UES
ON
PAG
E 2
OF
5
CON
TIN
UES
ON
PAG
E 4
OF
5VP12
VP13
VP14
VP15
VP16
VP17 VP18
VP19
VP20
VP21
VP50
VP51
VP52
VP59
VP60
VP61
VP69
VP70
VP71
VP75
1 24 53
KEY
Rev Date Description Chk'dMade App'd
0 14/11/2017 PEIR KC ZF SG
FIGURE 7.8 VIEWPOINT LOCATIONS
Drawn:
KCDate:Approved:Checked:
ZF SG 14/11/2017
Document Type: Scale:
Rev:
Sheet Size:
Sheet:
FIGURE
03 OF 5
A3 (420 mm x 297 mm)1:30,000
°
Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\PEIR Figures\P10787_PEIR_Figure_7.8.mxd
Scheme Name:
PAGE 3 OF 5
PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)
CONSTRUCTION ANDOPERATIONS CORRIDOR
40m CONSULTATION BOUNDARY
200m STUDY AREA
1km STUDY AREA
5km STUDY AREA
PROPOSED 132 kVUNDERGROUND CABLE
PROPOSED TEMPORARY ACCESS
PROPOSED TEMPORARYLAYDOWN AREAS
PROPOSED UNDERGROUNDROUTE OF EXISTING LOWERVOLTAGE OVERHEAD LINE BEINGREMOVED
P! SIGNIFICANT
P! NON-SIGNIFICANT
P! NO VIEW
P! NO ACCESS
CHAPTER 7: LANDSCAPE AND VISUALChapter:
Document Title:
REINFORCEMENT TO NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:
132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM
The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding of the new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.
The study areas extend from the 25m Construction and Operations Corridor (Draft Order Limits), but only taking into account the Preferred Line Route (i.e. the proposed overhead line).
BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.
CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.
Notes:
0 0.5 10.25
Kilometres
P!
P!
P!
P!
P!
P!
P!
P!
P!
P!
P!
P!P!
P!
P!
P!
P!
P!
P!
P!
P!
P!
P!
P!
P!
P!
P!
CON
TIN
UES
ON
PAG
E 3
OF
5
CON
TIN
UES
ON
PAG
E 5
OF
5VP18
VP21
VP22
VP23
VP24
VP25
VP26
VP27
VP28
VP29
VP30
VP31
VP32
VP33
VP34
VP51
VP52
VP57
VP58
VP59
VP66
VP68
VP72
VP76
1 2 3 54
KEY
Rev Date Description Chk'dMade App'd
0 14/11/2017 PEIR KC ZF SG
FIGURE 7.8 VIEWPOINT LOCATIONS
Drawn:
KCDate:Approved:Checked:
ZF SG 14/11/2017
Document Type: Scale:
Rev:
Sheet Size:
Sheet:
FIGURE
04 OF 5
A3 (420 mm x 297 mm)1:30,000
°
Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\PEIR Figures\P10787_PEIR_Figure_7.8.mxd
Scheme Name:
PAGE 4 OF 5
PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)
CONSTRUCTION ANDOPERATIONS CORRIDOR
40m CONSULTATION BOUNDARY
200m STUDY AREA
1km STUDY AREA
5km STUDY AREA
PROPOSED 132 kVUNDERGROUND CABLE
PROPOSED TEMPORARY ACCESS
PROPOSED TEMPORARYLAYDOWN AREAS
PROPOSED UNDERGROUNDROUTE OF EXISTING LOWERVOLTAGE OVERHEAD LINE BEINGREMOVED
P! SIGNIFICANT
P! NON-SIGNIFICANT
P! NO VIEW
P! NO ACCESS
CHAPTER 7: LANDSCAPE AND VISUALChapter:
Document Title:
REINFORCEMENT TO NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:
132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM
The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding of the new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.
The study areas extend from the 25m Construction and Operations Corridor (Draft Order Limits), but only taking into account the Preferred Line Route (i.e. the proposed overhead line).
BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.
CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.
Notes:
0 0.5 10.25
Kilometres
P!
P!
P!
P!
P!
P!
P!P!
P!
P!
P!
P!
P!
P!
P!
P!
CON
TIN
UES
ON
PAG
E 4
OF
5
VP33
VP34
VP35
VP36
VP37VP38
VP39
VP40
VP53
VP54
VP55
VP56
VP67
1 2 3 4 5
KEY
Rev Date Description Chk'dMade App'd
0 14/11/2017 PEIR KC ZF SG
FIGURE 7.8 VIEWPOINT LOCATIONS
Drawn:
KCDate:Approved:Checked:
ZF SG 14/11/2017
Document Type: Scale:
Rev:
Sheet Size:
Sheet:
FIGURE
05 OF 5
A3 (420 mm x 297 mm)1:30,000
°
Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\PEIR Figures\P10787_PEIR_Figure_7.8.mxd
Scheme Name:
PAGE 5 OF 5
PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)
CONSTRUCTION ANDOPERATIONS CORRIDOR
40m CONSULTATION BOUNDARY
200m STUDY AREA
1km STUDY AREA
5km STUDY AREA
PROPOSED 132 kVUNDERGROUND CABLE
PROPOSED TEMPORARY ACCESS
PROPOSED TEMPORARYLAYDOWN AREAS
PROPOSED UNDERGROUNDROUTE OF EXISTING LOWERVOLTAGE OVERHEAD LINE BEINGREMOVED
P! SIGNIFICANT
P! NON-SIGNIFICANT
P! NO VIEW
P! NO ACCESS
CHAPTER 7: LANDSCAPE AND VISUALChapter:
Document Title:
REINFORCEMENT TO NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:
132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM
The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding of the new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.
The study areas extend from the 25m Construction and Operations Corridor (Draft Order Limits), but only taking into account the Preferred Line Route (i.e. the proposed overhead line).
BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.
CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.
Notes:
0 0.5 10.25
Kilometres