Wah-Ho Chan, Ming Lu Dept. Of Civil and Structural Engineering Hong Kong Polytechnic University

12
Attaining Cost Efficiency Attaining Cost Efficiency In Constructing Sports In Constructing Sports Facilities For Beijing 2008 Facilities For Beijing 2008 Olympic Games By Use Of Olympic Games By Use Of Operations Simulation Operations Simulation Wah-Ho Chan, Ming Lu Wah-Ho Chan, Ming Lu Dept. Of Civil and Structural Dept. Of Civil and Structural Engineering Engineering Hong Kong Polytechnic University Hong Kong Polytechnic University Hong Kong, China Hong Kong, China Jian-Ping Zhang Jian-Ping Zhang Dept. Of Civil Engineering Dept. Of Civil Engineering Beijing, China Beijing, China Presented By: Vinh H. Truong Presented By: Vinh H. Truong

description

Jian-Ping Zhang Dept. Of Civil Engineering Beijing, China. Attaining Cost Efficiency In Constructing Sports Facilities For Beijing 2008 Olympic Games By Use Of Operations Simulation. Wah-Ho Chan, Ming Lu Dept. Of Civil and Structural Engineering Hong Kong Polytechnic University - PowerPoint PPT Presentation

Transcript of Wah-Ho Chan, Ming Lu Dept. Of Civil and Structural Engineering Hong Kong Polytechnic University

Attaining Cost Efficiency In Attaining Cost Efficiency In Constructing Sports Facilities For Constructing Sports Facilities For Beijing 2008 Olympic Games By Beijing 2008 Olympic Games By

Use Of Operations SimulationUse Of Operations SimulationWah-Ho Chan, Ming LuWah-Ho Chan, Ming Lu

Dept. Of Civil and Structural Dept. Of Civil and Structural EngineeringEngineering

Hong Kong Polytechnic UniversityHong Kong Polytechnic University

Hong Kong, ChinaHong Kong, China

Jian-Ping ZhangJian-Ping ZhangDept. Of Civil EngineeringDept. Of Civil Engineering

Beijing, ChinaBeijing, China

Presented By: Vinh H. TruongPresented By: Vinh H. Truong

Purpose Of The SimulationPurpose Of The Simulation

Evaluating Construction TimeEvaluating Construction Time Construction OperationsConstruction Operations Installation SequencesInstallation Sequences Varied Schedules For AssemblingVaried Schedules For Assembling

Cost Efficiency In Building The StructureCost Efficiency In Building The Structure

ConstructionConstruction Steel Pieces Hauled InSteel Pieces Hauled In AssemblyAssembly Two 600-Ton CranesTwo 600-Ton Cranes

Inner RingInner Ring Two 800-Ton CranesTwo 800-Ton Cranes

Outer RingOuter Ring 24 Steel Columns24 Steel Columns 86 Steel Frames86 Steel Frames

Work Flow ModelWork Flow Model

Column/FrameColumn/Frame Subassembly Reference CodeSubassembly Reference Code

Short ID Code Of The Steel ComponentShort ID Code Of The Steel Component Column Or FrameColumn Or Frame

0 = Frame, 1 = Column0 = Frame, 1 = Column Structural Complexity IndexStructural Complexity Index

Real Number Representing Work Content Real Number Representing Work Content and Complexity, Used For Adjusting and Complexity, Used For Adjusting Assembling and Installation DurationAssembling and Installation Duration

Installation Destination ZoneInstallation Destination Zone

1 Or 2 Representing The Installation Zone1 Or 2 Representing The Installation Zone Installation Sequence IndexInstallation Sequence Index

Smaller Value = Higher Priority For Smaller Value = Higher Priority For ProcessingProcessing

Activity Duration SummaryActivity Duration Summary

SDESASDESA Simplified Discrete-Event Simulation ApproachSimplified Discrete-Event Simulation Approach

Research Led By Ming LuResearch Led By Ming Lu Easy-To-Apply, Cost-Effective Methods Of Artificial Easy-To-Apply, Cost-Effective Methods Of Artificial

Intelligence And Computer Simulations For Intelligence And Computer Simulations For Construction Engineering And Project ManagementConstruction Engineering And Project Management

SDESASDESA

SDESASDESA

ResultsResults BaseBase

Areas 4,5,6 – StartAreas 4,5,6 – Start Areas 1,2,3,7 – 50 Days Areas 1,2,3,7 – 50 Days

LaterLater Areas 8,9 – 100 Days Areas 8,9 – 100 Days

LaterLater CrashCrash

Accelerate The Concrete Accelerate The Concrete ConstructionConstruction

AlternativeAlternative Areas 1,2,3 – StartAreas 1,2,3 – Start Areas 4,5,6,7 – 50 DaysAreas 4,5,6,7 – 50 Days

ResultsResults

Questions?Questions?