County: Prime Contractor:ALLENSTOWN 15991 MERRIMACKActive
15991
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Advanced Excavating & Paving Yes
BOBCAT/SKID STEER OPERATOR
HIGHWAY MERRIMACK
$16.16 $4.91 $16.16 $4.9115 APR 2015 15 APR 2015 15 APR 2015 13 MAY 2015 Rate approved as requested
County: Prime Contractor:BARRINGTON 16178 STRAFFORD American Excavating CorpActive
16178
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Continental Paving Inc Yes
COLD PLANE OPERATOR
HIGHWAY STRAFFORD
$26.82 $17.05 $26.82 $17.0518 AUG 2014 18 AUG 2014 20 AUG 2014 19 SEP 2014 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
CAMERON, A.J. SOD FARMS Yes
Hydro Seeder/Sprayer Operator
Highway STRAFFORD
$23.46 $2.91 $22.87 $5.4606 AUG 2014 20 AUG 2014 20 AUG 2014 19 SEP 2014 Higher rate stipulated by the USDOL
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
JCB COLBY, INC Yes
Mason Highway STRAFFORD $21.22 $0.00 $21.22 $0.0018 AUG 2014 22 AUG 2014 08 SEP 2014 30 SEP 2014 Rate approved as requested
Page 1 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:BERLIN 12958B COOS Alvin J Coleman & Son IncActive
12958B
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
CAPITAL ROCK DRILLING & BLASTING, LLC. Yes
Driller (rock for blasting) Highway
COOS
$14.40 $0.45 $17.96 $3.9007 APR 2014 08 APR 2014 09 APR 2014 01 MAY 2014 Higher rate stipulated by the USDOL
Blaster Highway COOS $14.40 $0.45 $18.63 $1.6107 APR 2014 08 APR 2014 09 APR 2014 01 MAY 2014 Higher rate stipulated by the USDOL
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
PIKE INDUSTRIES, INC Yes
Mechanic Highway COOS $15.82 $2.22 $17.96 $3.9003 MAR 2014 05 MAR 2014 07 MAR 2014 28 APR 2014 Higher rate stipulated by the USDOL
Screed Operator Highway COOS $15.82 $2.22 $17.65 $3.9003 MAR 2014 05 MAR 2014 07 MAR 2014 28 APR 2014 Higher rate stipulated by the USDOL
Transfer Machine Operator Highway
COOS
$17.65 $6.05 $17.65 $6.0503 MAR 2014 05 MAR 2014 07 MAR 2014 28 APR 2014 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Alvin J Coleman & Son Inc Yes
PIPE LAYER HIGHWAY COOS $14.40 $0.45 $14.40 $0.4507 APR 2014 07 APR 2014 16 APR 2014 01 MAY 2014 Rate approved as requested
County: Prime Contractor:BRADFORD 16032 MERRIMACKActive
16032
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
PIKE INDUSTRIES, INC Yes
Skid Steer Operator Highway
MERRIMACK
$15.65 $2.89 $15.65 $2.8905 SEP 2012 05 SEP 2012 20 SEP 2012 29 OCT 2012 Rate approved as requested
Screed Person Highway
MERRIMACK
$16.16 $4.91 $16.16 $4.9105 SEP 2012 05 SEP 2012 20 SEP 2012 29 OCT 2012 Rate approved as requested
Page 2 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:CANDIA-EPPING 26606 ROCKINGHAM Pike IndustriesActive
26606
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
John C Brown & Sons Yes
BRONTO MOWER OPERATOR
HIGHWAY ROCKINGHAM
$21.85 $3.02 $22.27 $6.5721 APR 2015 21 APR 2015 23 APR 2015 12 MAY 2015 Higher rate stipulated by the USDOL
BUCKET TRUCK OPERATOR
HIGHWAY ROCKINGHAM
$21.02 $3.33 $22.27 $6.5721 APR 2015 21 APR 2015 23 APR 2015 12 MAY 2015 Higher rate stipulated by the USDOL
SKIDDER OPERATOR HIGHWAY
ROCKINGHAM
$20.08 $2.52 $22.27 $6.5721 APR 2015 21 APR 2015 23 APR 2015 12 MAY 2015 Higher rate stipulated by the USDOL
TREE SHEAR OPERATOR
HIGHWAY ROCKINGHAM
$21.44 $3.36 $22.27 $6.5721 APR 2015 21 APR 2015 23 APR 2015 12 MAY 2015 Higher rate stipulated by the USDOL
WHOLE TREE CHIPPER
OPERATOR HIGHWAY
ROCKINGHAM
$22.21 $2.87 $22.27 $6.5721 APR 2015 21 APR 2015 23 APR 2015 12 MAY 2015 Higher rate stipulated by the USDOL
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
CAMERON, A.J. SOD FARMS Yes
Hay Mulcher Operator Highway
ROCKINGHAM
$27.72 $4.17 $27.72 $4.1720 APR 2015 29 APR 2015 29 APR 2015 21 MAY 2015 Rate approved as requested
Hydro Seeder/Sprayer Operator
Highway ROCKINGHAM
$27.72 $4.17 $27.72 $4.1720 APR 2015 29 APR 2015 29 APR 2015 21 MAY 2015 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Pike Industries Yes
MATERIAL TRANSFER VEHICLE
HIGHWAY ROCKINGHAM
$22.27 $6.57 $22.27 $6.5720 APR 2015 20 APR 2015 20 APR 2015 15 MAY 2015 Rate approved as requested
RECLAIM OPERATOR HIGHWAY
ROCKINGHAM
$22.27 $6.57 $22.27 $6.5720 APR 2015 20 APR 2015 20 APR 2015 15 MAY 2015 Rate approved as requested
BROOM OPERATOR HIGHWAY
ROCKINGHAM
$16.92 $3.44 $22.27 $6.5720 APR 2015 20 APR 2015 20 APR 2015 15 MAY 2015 Higher rate stipulated by the USDOL
SCREED OPERATOR HIGHWAY
ROCKINGHAM
$22.27 $6.57 $22.27 $6.5720 APR 2015 20 APR 2015 20 APR 2015 15 MAY 2015 Rate approved as requested
TRAFFIC COORDINATOR
HIGHWAY ROCKINGHAM
$16.92 $3.44 $16.92 $3.4420 APR 2015 20 APR 2015 20 APR 2015 15 MAY 2015 Rate approved as requested
COLD PLANE OPERATOR
HIGHWAY ROCKINGHAM
$22.27 $6.57 $22.27 $6.5720 APR 2015 20 APR 2015 20 APR 2015 15 MAY 2015 Rate approved as requested
Page 3 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:CANDIA-RAYMOND 28903 ROCKINGHAM Evroks CorpActive
28903
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Continental Paving Inc Yes
COLD PLANE OPERATOR
HIGHWAY ROCKINGHAM
$22.27 $6.57 $22.27 $6.5706 MAR 2015 13 MAR 2015 16 MAR 2015 07 APR 2015 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Nicom Coatings Corp Yes
BIG MEMBRANE MACHINE
OPERATOR HIGHWAY
ROCKINGHAM
$28.00 $0.00 $22.27 $6.5727 FEB 2015 31 MAR 2015 20 MAY 2015 16 JUN 2015 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Nicom Coatings Corp Yes
BIG MEMBRANE MACHINE
OPERATOR HIGHWAY
ROCKINGHAM
$28.00 $0.00 $22.27 $6.5727 FEB 2015 31 MAR 2015 20 MAY 2015 16 JUN 2015 Rate approved as requested
Page 4 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:CARROLL - JEFFERSON 25066 COOS Continental Paving IncActive
25066
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Alvin J Coleman & Son Inc Yes
MECHANIC HIGHWAY COOS $17.96 $3.90 $17.96 $3.9026 MAY 2014 09 JUN 2014 09 JUN 2014 23 JUN 2014 Rate approved as requested
PIPE LAYER HIGHWAY COOS $14.40 $0.45 $14.40 $0.4526 MAY 2014 09 JUN 2014 09 JUN 2014 23 JUN 2014 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
VERMONT RECREATIONAL SURFACING & FENCING Yes
Guardrail Installer Highway COOS $14.40 $0.45 $14.40 $0.4502 MAY 2014 07 MAY 2014 07 MAY 2014 30 MAY 2014 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Roadsafe Traffic Lp Yes
AUGER TRUCK HIGHWAY COOS $35.00 $20.00 $35.00 $20.0030 APR 2014 07 MAY 2014 07 MAY 2014 30 MAY 2014 Rate approved as requested
Page 5 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:CHARLESTOWN/CLAREMONT 28933 SULLIVAN Pike IndustriesActive
28933
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
CWS FENCE & GUARDRAIL Yes
GUARDRAIL INSTALLER
HIGHWAY SULLIVAN
$14.97 $1.76 $14.97 $1.7612 MAR 2015 13 MAR 2015 16 MAR 2015 07 APR 2015 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Pike Industries Yes
RECLAIM OPERATOR HIGHWAY
SULLIVAN
$17.28 $3.73 $20.00 $2.5203 MAR 2015 10 MAR 2015 12 MAR 2015 15 APR 2015 Higher rate stipulated by the USDOL
SKID STEER OPERATOR
HIGHWAY SULLIVAN
$17.28 $3.73 $20.00 $2.5203 MAR 2015 10 MAR 2015 12 MAR 2015 15 APR 2015 Higher rate stipulated by the USDOL
SCREED PERSON HIGHWAY
SULLIVAN
$17.28 $3.73 $17.28 $3.7303 MAR 2015 10 MAR 2015 12 MAR 2015 15 APR 2015 Rate approved as requested
TRANSFER MACHINE OPERATOR
HIGHWAY SULLIVAN
$17.28 $3.73 $20.00 $2.5203 MAR 2015 10 MAR 2015 12 MAR 2015 15 APR 2015 Higher rate stipulated by the USDOL
MECHANIC HIGHWAY SULLIVAN $14.97 $1.76 $20.00 $2.5203 MAR 2015 10 MAR 2015 12 MAR 2015 15 APR 2015 Higher rate stipulated by the USDOL
TRAFFIC CONTROL
COORDINATOR HIGHWAY
SULLIVAN
$14.97 $1.76 $14.97 $1.7602 MAR 2015 10 MAR 2015 12 MAR 2015 15 APR 2015 Rate approved as requested
PIPE LAYER HIGHWAY SULLIVAN $14.97 $1.76 $14.97 $1.7603 MAR 2015 10 MAR 2015 12 MAR 2015 15 APR 2015 Rate approved as requested
Page 6 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:CHESTERFIELD 13597 CHESHIRE Bur Construction LLCActive
13597
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
HS&G Erosion Conrol LLC Yes
HAY MULCHER OPERATOR
HIGHWAY CHESHIRE
$21.50 $0.00 $21.50 $0.0017 APR 2015 20 APR 2015 20 APR 2015 12 MAY 2015 Rate approved as requested
SKID STEER OPERATOR
HIGHWAY CHESHIRE
$21.50 $0.00 $21.50 $0.0017 APR 2015 20 APR 2015 20 APR 2015 12 MAY 2015 Rate approved as requested
HYDRO SEEDER/SPRAYER
OPERATOR HIGHWAY CHESHIRE
$21.50 $0.00 $21.50 $0.0017 APR 2015 20 APR 2015 20 APR 2015 12 MAY 2015 Rate approved as requested
MINI-EXCAVATOR OPERATOR
HIGHWAY CHESHIRE
$20.00 $0.00 $18.46 $3.0417 APR 2015 20 APR 2015 20 APR 2015 12 MAY 2015 Per USDOL: Rate already in WD
Page 7 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:CLAREMONT 14494 SULLIVANActive
14494
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Gallagher Tree Svs LLC Yes
MINI-SKID STEER OPERATOR
HIGHWAY SULLIVAN
$16.01 $2.52 $16.01 $2.5219 DEC 2012 19 DEC 2012 24 DEC 2012 23 JAN 2013 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
CWS FENCE & GUARDRAIL Yes
GUARDRAIL INSTALLER
HIGHWAY SULLIVAN
$14.97 $1.76 $14.97 $1.7623 OCT 2013 30 OCT 2013 05 NOV 2013 14 NOV 2013 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
New England Signal Systems Inc Yes
BUCKET TRUCK OPERATOR
HIGHWAY SULLIVAN
$19.00 $5.40 $19.00 $5.4006 JUN 2013 07 JUN 2013 10 JUN 2013 21 JUN 2013 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
CAMERON, A.J. SOD FARMS Yes
Hydro Seeder/Sprayer Operator
Highway SULLIVAN
$21.17 $2.26 $21.17 $2.2629 AUG 2013 03 SEP 2013 24 SEP 2013 26 SEP 2013 Rate approved as requested
Hay Mulcher Operator Highway
SULLIVAN
$21.17 $2.26 $21.17 $2.2629 AUG 2013 03 SEP 2013 24 SEP 2013 26 SEP 2013 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
SARGENT, HE INC Yes
Mechanic Highway SULLIVAN $21.10 $5.22 $21.10 $5.2207 JUN 2013 10 JUN 2013 10 JUN 2013 24 JUN 2013 Rate approved as requested
Page 8 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:CONWAY 29256 CARROLL Pike IndustriesActive
29256
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Moulison North Corp Yes
LINEMAN HIGHWAY CARROLL $28.00 $18.87 $0.00 $0.0006 JUN 2015 08 JUL 2015 10 JUL 2015
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Pike Industries Yes
SCREED OPERATOR HIGHWAY
CARROLL
$18.38 $3.42 $0.00 $0.0017 JUN 2015 17 JUN 2015 22 JUN 2015
SKID STEER OPERATOR
HIGHWAY CARROLL
$18.38 $3.42 $0.00 $0.0017 JUN 2015 17 JUN 2015 22 JUN 2015
MECHANIC HIGHWAY CARROLL $18.38 $3.42 $0.00 $0.0017 JUN 2015 17 JUN 2015 22 JUN 2015
TRANSFER MACHINE OPERATOR
HIGHWAY CARROLL
$18.38 $3.42 $0.00 $0.0017 JUN 2015 17 JUN 2015 22 JUN 2015
RECLAIM OPERATOR HIGHWAY
CARROLL
$18.38 $3.42 $0.00 $0.0017 JUN 2015 17 JUN 2015 22 JUN 2015
PIPE LAYER HIGHWAY CARROLL $15.82 $2.22 $0.00 $0.0017 JUN 2015 17 JUN 2015 22 JUN 2015
TRAFFIC COORDINATOR
HIGHWAY CARROLL
$15.82 $2.22 $0.00 $0.0017 JUN 2015 17 JUN 2015 22 JUN 2015
Page 9 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:DERRY 15690 ROCKINGHAM American Excavating CorpActive
15690
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
CAMERON, A.J. SOD FARMS Yes
Hydro Seeder/Sprayer Operator
Highway ROCKINGHAM
$23.95 $3.29 $22.27 $6.5706 JUN 2014 06 JUN 2014 12 JUN 2014 26 JUN 2014 Higher rate stipulated by the USDOL
Mulcher Operator Highway
ROCKINGHAM
$23.95 $3.29 $22.27 $6.5706 JUN 2014 06 JUN 2014 12 JUN 2014 26 JUN 2014 Higher rate stipulated by the USDOL
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Continental Paving Inc Yes
COLD PLANE OPERATOR
HIGHWAY ROCKINGHAM
$23.43 $0.00 $22.27 $6.5710 JUN 2014 10 JUN 2014 12 JUN 2014 26 JUN 2014 Higher rate stipulated by the USDOL
County: Prime Contractor:DOVER 15990 STRAFFORDActive
15990
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Tri-State Curb Inc Yes
CONCRETE FINISHER HIGHWAY
STRAFFORD
$19.93 $1.06 $20.16 $1.0624 JUN 2014 24 JUN 2014 03 JUL 2014 23 JUL 2014 Higher rate stipulated by the USDOL
Page 10 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:DURHAM - NEWMARKET 13080A ROCKINGHAM FL Merrill Construction; IncActive
13080A
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Continental Paving Inc Yes
COLD PLANE OPERATOR
HIGHWAY ROCKINGHAM
$22.27 $6.57 $22.27 $6.5722 SEP 2014 30 SEP 2014 30 SEP 2014 16 OCT 2014 Rate approved as requested
COLD PLANE OPERATOR
HIGHWAY STRAFFORD
$26.82 $17.05 $26.82 $17.0522 SEP 2014 30 SEP 2014 30 SEP 2014 16 OCT 2014 Rate approved as requested
MATERIAL TRANSFER VEHICLE
HIGHWAY ROCKINGHAM
$22.27 $6.57 $22.27 $6.5722 SEP 2014 30 SEP 2014 30 SEP 2014 16 OCT 2014 Rate approved as requested
MATERIAL TRANSFER VEHICLE
HIGHWAY STRAFFORD
$26.82 $17.05 $26.82 $17.0522 SEP 2014 30 SEP 2014 30 SEP 2014 16 OCT 2014 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
PRECISION DRILLING AND BLASTING, LLC Yes
Driller (rock for blasting) Highway
ROCKINGHAM
$20.00 $0.64 $22.27 $6.5730 SEP 2014 07 OCT 2014 23 OCT 2014 31 OCT 2014 Higher rate stipulated by the USDOL
Driller (rock for blasting) Highway
STRAFFORD
$20.00 $0.64 $22.87 $5.4630 SEP 2014 07 OCT 2014 08 OCT 2014 31 OCT 2014 Higher rate stipulated by the USDOL
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
FL Merrill Construction; Inc Yes
STONE MASON HIGHWAY
ROCKINGHAM
$16.99 $2.60 $20.57 $1.0602 APR 2015 02 APR 2015 03 APR 2015 23 APR 2015 Higher rate stipulated by the USDOL
STONE MASON HIGHWAY
STRAFFORD
$17.03 $2.60 $20.16 $1.0602 APR 2015 02 APR 2015 03 APR 2015 23 APR 2015 Higher rate stipulated by the USDOL
Page 11 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:EPSOM-NORTHWOOD 28356 ROCKINGHAM Continental Paving IncActive
28356
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
CAMERON, A.J. SOD FARMS Yes
Hay Mulcher Operator Highway
ROCKINGHAM
$23.95 $3.29 $22.27 $6.5730 MAY 2014 30 MAY 2014 05 JUN 2014 26 JUN 2014 Higher rate stipulated by the USDOL
Hydro Seeder/Sprayer Operator
Highway ROCKINGHAM
$23.95 $3.29 $22.27 $6.5730 MAY 2014 30 MAY 2014 05 JUN 2014 03 JUL 2014 Higher rate stipulated by the USDOL
Hay Mulcher Operator Highway
MERRIMACK
$22.08 $6.00 $22.08 $6.0030 MAY 2014 30 MAY 2014 05 JUN 2014 26 JUN 2014 Rate approved as requested
Hydro Seeder/Sprayer Operator
Highway MERRIMACK
$22.08 $6.00 $22.08 $6.0030 MAY 2014 30 MAY 2014 05 JUN 2014 26 JUN 2014 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
HS&G Erosion Conrol LLC Yes
LANDSCAPE LABORER HIGHWAY
MERRIMACK
$14.65 $0.00 $14.73 $4.8104 JUN 2014 04 JUN 2014 06 JUN 2014 23 JUN 2014 Higher rate stipulated by the USDOL
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Continental Paving Inc Yes
COLD PLANE OPERATOR
HIGHWAY ROCKINGHAM
$23.43 $0.00 $22.27 $6.5710 JUN 2014 10 JUN 2014 12 JUN 2014 26 JUN 2014 Higher rate stipulated by the USDOL
Page 12 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:EXETER - HAMPTON 28535 ROCKINGHAM Delucca Fence Co IncActive
28535
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
HS&G Erosion Conrol LLC Yes
HYDRO SEEDER/SPRAYER
OPERATOR HIGHWAY
ROCKINGHAM
$28.84 $0.00 $28.84 $0.0013 MAY 2015 21 MAY 2015 22 MAY 2015 16 JUN 2015 Rate approved as requested
HAY MULCHER OPERATOR
HIGHWAY ROCKINGHAM
$28.84 $0.00 $28.84 $0.0013 MAY 2015 21 MAY 2015 22 MAY 2015 16 JUN 2015 Rate approved as requested
Page 13 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:FRANCONIA - LITTLETON 15931 GRAFTON Pike IndustriesActive
15931
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
JOHN BROWN & SONS, INC. Yes
Whole Tree Chipper Operator
Highway GRAFTON
$17.10 $3.06 $17.28 $3.7329 AUG 2013 04 SEP 2013 04 SEP 2013 16 SEP 2013 Higher rate stipulated by the USDOL
Bronto Mower Operator Highway
GRAFTON
$17.30 $2.96 $17.28 $3.7329 AUG 2013 04 SEP 2013 04 SEP 2013 16 SEP 2013 Higher rate stipulated by the USDOL
Skidder Operator Highway
GRAFTON
$17.30 $2.96 $17.28 $3.7329 AUG 2013 04 SEP 2013 04 SEP 2013 16 SEP 2013 Higher rate stipulated by the USDOL
Bucket Truck Operator Highway
GRAFTON
$17.29 $3.33 $17.28 $3.7329 AUG 2013 04 SEP 2013 04 SEP 2013 16 SEP 2013 Higher rate stipulated by the USDOL
Tree Shear Operator Highway
GRAFTON
$19.25 $3.36 $19.25 $3.3629 AUG 2013 04 SEP 2013 04 SEP 2013 16 SEP 2013 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
TRANS AMERICA HYDRO SEEDING Yes
Hydro Seeder/Sprayer Operator
Highway GRAFTON
$19.19 $0.00 $17.28 $3.7304 DEC 2013 04 DEC 2013 04 DEC 2013 05 DEC 2013 Higher rate stipulated by the USDOL
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
VERMONT RECREATIONAL SURFACING & FENCING Yes
Guardrail Installer Highway
GRAFTON
$15.82 $2.20 $15.82 $2.2016 SEP 2013 24 SEP 2013 25 SEP 2013 17 OCT 2013 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Roadsafe Traffic Lp Yes
AUGER TRUCK HIGHWAY
GRAFTON
$25.00 $5.00 $25.00 $5.0016 JUN 2015 17 JUN 2015 17 JUN 2015 26 JUN 2015 Rate approved as requested
Page 14 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:FRANCONIA - LITTLETON 15931 GRAFTON Pike IndustriesActive
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Pike Industries Yes
TRAFFIC COORDINATOR
HIGHWAY GRAFTON
$15.12 $2.96 $15.12 $2.9628 AUG 2013 28 AUG 2013 30 AUG 2013 10 SEP 2013 Rate approved as requested
RECLAIM OPERATOR HIGHWAY
GRAFTON
$17.28 $3.73 $17.28 $3.7328 AUG 2013 28 AUG 2013 30 AUG 2013 10 SEP 2013 Rate approved as requested
SCREED OPERATOR HIGHWAY
GRAFTON
$17.28 $3.73 $17.28 $3.7328 AUG 2013 28 AUG 2013 30 AUG 2013 10 SEP 2013 Rate approved as requested
MECHANIC HIGHWAY GRAFTON $17.28 $3.73 $17.28 $3.7328 AUG 2013 28 AUG 2013 30 AUG 2013 10 SEP 2013 Rate approved as requested
MATERIAL TRANSFER VEHICLE
HIGHWAY GRAFTON
$17.28 $3.73 $17.28 $3.7328 AUG 2013 28 AUG 2013 30 AUG 2013 10 SEP 2013 Rate approved as requested
PIPE LAYER HIGHWAY GRAFTON $15.82 $2.20 $15.82 $2.2028 AUG 2013 28 AUG 2013 30 AUG 2013 10 SEP 2013 Rate approved as requested
Page 15 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:HOOKSETT 12537A MERRIMACK Continental Paving IncActive
12537A
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
East Coast Signals Inc Yes
AUGER TRUCK HIGHWAY
MERRIMACK
$20.00 $2.60 $20.00 $2.6012 JUN 2013 13 JUN 2013 21 JUN 2013 28 JUN 2013 Rate approved as requested
ELECTRICIAN HIGHWAY
MERRIMACK
$23.22 $2.78 $23.22 $2.7812 JUN 2013 13 JUN 2013 21 JUN 2013 28 JUN 2013 Rate approved as requested
BUCKET TRUCK OPERATOR
HIGHWAY MERRIMACK
$20.00 $2.60 $20.00 $2.6012 JUN 2013 13 JUN 2013 21 JUN 2013 28 JUN 2013 Rate approved as requested
FIBER TECHNICIAN/SPLICER
HIGHWAY MERRIMACK
$23.22 $2.78 $23.22 $2.7808 MAY 2015 08 MAY 2015 08 MAY 2015 05 JUN 2015 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
LYNCH'S LANDSCAPING Yes
Hydro Seeder/Sprayer Operator
Highway MERRIMACK
$17.72 $2.60 $17.72 $2.6004 AUG 2014 06 AUG 2014 08 AUG 2014 09 SEP 2014 Rate approved as requested
Hay Mulcher Operator Highway
MERRIMACK
$17.72 $2.60 $17.72 $2.6010 DEC 2014 10 DEC 2014 11 DEC 2014 13 JAN 2015 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
GM DRILLING & BLASTING, INC. Yes
Blaster Highway MERRIMACK $31.25 $0.00 $31.25 $0.0009 APR 2013 16 APR 2013 19 APR 2013 30 APR 2013 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Continental Paving Inc Yes
DRILL OPERATOR HIGHWAY
MERRIMACK
$26.00 $0.00 $26.00 $0.0016 APR 2013 16 APR 2013 21 JUN 2013 28 JAN 2014 Rate approved as requested
Page 16 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:HOOKSETT 28435 MERRIMACK Beck & Bellucci IncActive
28435
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Moulison North Corp Yes
ELECTRICIAN HIGHWAY
MERRIMACK
$28.00 $18.87 $28.00 $18.8706 APR 2015 06 APR 2015 14 APR 2015 13 MAY 2015 Rate approved as requested
AUGER TRUCK HIGHWAY
MERRIMACK
$19.00 $4.61 $19.00 $4.6106 APR 2015 06 APR 2015 14 APR 2015 13 MAY 2015 Rate approved as requested
BUCKET TRUCK OPERATOR
HIGHWAY MERRIMACK
$19.00 $4.61 $19.00 $4.6106 APR 2015 06 APR 2015 14 APR 2015 13 MAY 2015 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Beck & Bellucci Inc Yes
SKID STEER OPERATOR
HIGHWAY MERRIMACK
$21.00 $0.00 $16.16 $4.9126 MAR 2015 26 MAR 2015 26 MAR 2015 17 APR 2015 Higher rate stipulated by the USDOL
County: Prime Contractor:KEENE 20812 CHESHIREActive
20812
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Roadsafe Traffic Lp Yes
AUGER TRUCK HIGHWAY
CHESHIRE
$30.00 $22.65 $30.00 $22.6512 JUN 2012 12 JUN 2012 18 JUN 2012 27 JUL 2012 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Park Construction Corp Yes
PIPE LAYER HIGHWAY CHESHIRE $19.50 $0.00 $19.50 $0.0001 JUN 2012 12 JUN 2012 12 JUN 2012 27 JUL 2012 Rate approved as requested
Page 17 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:KEENE 22272 CHESHIRE Evroks CorpActive
22272
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Continental Paving Inc Yes
TRIMMER OPERATOR HIGHWAY
CHESHIRE
$17.28 $3.73 $18.46 $3.0414 MAY 2013 16 MAY 2013 16 MAY 2013 20 MAY 2013 Higher rate stipulated by the USDOL
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
CWS FENCE & GUARDRAIL Yes
GUARDRAIL INSTALLER
HIGHWAY CHESHIRE
$14.96 $3.91 $14.96 $3.9125 APR 2013 01 MAY 2013 01 MAY 2013 13 MAY 2013 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
AD ROSSI CORPORATION Yes
Barrier Membrane Machine Operator
Highway CHESHIRE
$18.75 $1.75 $18.46 $3.0414 MAY 2013 16 MAY 2013 16 MAY 2013 20 MAY 2013 Higher rate stipulated by the USDOL
Forklift Operator Highway
CHESHIRE
$18.75 $1.75 $18.46 $3.0414 MAY 2013 16 MAY 2013 16 MAY 2013 20 MAY 2013 Higher rate stipulated by the USDOL
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Modern Protective Coatings Inc Yes
BRIDGE PAINTER HIGHWAY
CHESHIRE
$20.24 $0.00 $20.24 $0.0015 MAY 2014 21 MAY 2014 03 JUN 2014 16 JUN 2014 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Evroks Corp Yes
BOBCAT OPERATOR HIGHWAY
CHESHIRE
$19.25 $0.00 $18.46 $3.0406 MAY 2013 07 MAY 2013 10 MAY 2013 20 MAY 2013 Higher rate stipulated by the USDOL
Page 18 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:LACONIA 15303 BELKNAPActive
15303
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Modern Protective Coatings Inc Yes
BRIDGE PAINTER HIGHWAY
BELKNAP
$18.50 $0.00 $18.63 $1.6121 FEB 2014 24 FEB 2014 11 MAR 2014 24 MAR 2014 Higher rate stipulated by the USDOL
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
East Coast Signals Inc Yes
BUCKET TRUCK OPERATOR
HIGHWAY BELKNAP
$30.00 $0.00 $30.00 $0.0006 MAR 2014 27 MAR 2014 31 MAR 2014 04 APR 2014 Rate approved as requested
AUGER TRUCK HIGHWAY
BELKNAP
$23.21 $3.61 $23.21 $3.6106 MAR 2014 07 APR 2014 07 APR 2014 10 APR 2014 Rate approved as requested
ELECTRICIAN HIGHWAY
BELKNAP
$23.22 $2.78 $23.22 $2.7806 MAR 2014 07 MAR 2014 10 MAR 2014 24 MAR 2014 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
L&S Concrete Cutting Svcs LLC Yes
CONCRETE CUTTER HIGHWAY
BELKNAP
$13.54 $2.95 $13.54 $2.9517 MAR 2014 19 MAR 2014 21 MAR 2014 04 APR 2014 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Rm Piper Inc Yes
LEAD ABATEMENT HIGHWAY
BELKNAP
$18.50 $1.15 $18.50 $1.1508 DEC 2014 08 DEC 2014 08 DEC 2014 06 JAN 2015 Rate approved as requested
PIPE LAYER HIGHWAY BELKNAP $14.49 $2.00 $14.49 $2.0006 MAR 2014 06 MAR 2014 10 MAR 2014 24 MAR 2014 Rate approved as requested
MECHANIC HIGHWAY BELKNAP $19.00 $0.00 $16.16 $4.9102 MAY 2014 02 MAY 2014 08 MAY 2014 30 MAY 2014 Higher rate stipulated by the USDOL
CONCRETE PUMP OPERATOR
HIGHWAY BELKNAP
$18.77 $4.21 $18.77 $4.2122 MAY 2014 22 MAY 2014 05 JUN 2014 26 JUN 2014 Rate approved as requested
IRONWORKER (STRUCTURAL)
HIGHWAY BELKNAP
$18.63 $1.61 $18.63 $1.6106 MAR 2014 06 MAR 2014 10 MAR 2014 24 MAR 2014 Rate approved as requested
Page 19 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:LEBANON 13951 GRAFTON Rs Audley IncActive
13951
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
CWS FENCE & GUARDRAIL Yes
GUARDRAIL INSTALLER
HIGHWAY GRAFTON
$15.82 $2.20 $15.82 $2.2004 JUN 2014 19 JUN 2014 23 JUN 2014 07 JUL 2014 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
JOHN BROWN & SONS, INC. Yes
Whole Tree Chipper Operator
Highway GRAFTON
$20.17 $1.91 $20.17 $1.9120 JUN 2014 20 JUN 2014 23 JUN 2014 15 JUL 2014 Rate approved as requested
Bronto Mower Operator Highway
GRAFTON
$18.70 $1.75 $17.28 $3.7320 JUN 2014 20 JUN 2014 23 JUN 2014 15 JUL 2014 Higher rate stipulated by the USDOL
Bucket Truck Operator Highway
GRAFTON
$20.29 $2.10 $20.29 $2.1020 JUN 2014 20 JUN 2014 23 JUN 2014 15 JUL 2014 Rate approved as requested
Tree Shear Operator Highway
GRAFTON
$20.17 $1.91 $20.17 $1.9120 JUN 2014 20 JUN 2014 23 JUN 2014 15 JUL 2014 Rate approved as requested
Skidder Operator Highway
GRAFTON
$18.70 $1.75 $17.28 $3.7320 JUN 2014 20 JUN 2014 23 JUN 2014 15 JUL 2014 Higher rate stipulated by the USDOL
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
HS&G Erosion Conrol LLC Yes
HYDRO SEEDER/SPRAYER
OPERATOR HIGHWAY GRAFTON
$30.00 $0.00 $30.00 $0.0003 JUN 2014 20 JUN 2014 23 JUN 2014 15 JUL 2014 Rate approved as requested
SKID STEER OPERATOR
HIGHWAY GRAFTON
$22.00 $0.00 $22.00 $0.0022 JUL 2014 22 JUL 2014 22 JUL 2014 20 FEB 2015 Rate approved as requested
LANDSCAPE LABORER HIGHWAY
GRAFTON
$16.00 $0.00 $15.82 $2.2003 JUN 2014 20 JUN 2014 23 JUN 2014 15 JUL 2014 Higher rate stipulated by the USDOL
HAY MULCHER OPERATOR
HIGHWAY GRAFTON
$30.00 $0.00 $30.00 $0.0003 JUN 2014 20 JUN 2014 23 JUN 2014 15 JUL 2014 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Nicom Coatings Corp Yes
BIG MEMBRANE MACHINE
OPERATOR HIGHWAY GRAFTON
$21.00 $1.00 $21.00 $1.0020 JUN 2014 20 JUN 2014 23 JUN 2014 07 JUL 2014 Rate approved as requested
FORKLIFT OPERATOR HIGHWAY
GRAFTON
$21.00 $1.00 $21.00 $1.0020 JUN 2014 20 JUN 2014 23 JUN 2014 07 JUL 2014 Rate approved as requested
Page 20 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:LEBANON 13951 GRAFTON Rs Audley IncActive
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
NORTHEAST CONCRETE PUMPING CORP Yes
Concrete Pump Operator Highway
GRAFTON
$19.00 $1.00 $17.28 $3.7322 JAN 2015 22 JAN 2015 22 JAN 2015 20 FEB 2015 Higher rate stipulated by the USDOL
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Rs Audley Inc Yes
PIPE LAYER HIGHWAY GRAFTON $17.62 $0.55 $17.62 $0.5520 JUN 2014 20 JUN 2014 23 JUN 2014 15 JUL 2014 Rate approved as requested
IRONWORKER (STRUCTURAL)
HIGHWAY GRAFTON
$20.00 $1.72 $20.00 $1.7220 JUN 2014 20 JUN 2014 23 JUN 2014 15 JUL 2014 Rate approved as requested
GRADALL OPERATOR HIGHWAY
GRAFTON
$20.90 $3.52 $20.90 $3.5220 JUN 2014 20 JUN 2014 23 JUN 2014 15 JUL 2014 Rate approved as requested
Page 21 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:LEBANON 25194 GRAFTON Pike IndustriesActive
25194
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
CWS FENCE & GUARDRAIL Yes
GUARDRAIL INSTALLER
HIGHWAY GRAFTON
$15.82 $2.20 $0.00 $0.0016 JUN 2015 17 JUN 2015 18 JUN 2015
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Pike Industries Yes
TRAFFIC COORDINATOR
HIGHWAY GRAFTON
$15.12 $2.96 $15.12 $2.9611 JUN 2015 11 JUN 2015 12 JUN 2015 01 JUL 2015 Rate approved as requested
TRANSFER MACHINE OPERATOR
HIGHWAY GRAFTON
$17.28 $3.73 $17.28 $3.7311 JUN 2015 11 JUN 2015 12 JUN 2015 01 JUL 2015 Rate approved as requested
RECLAIM OPERATOR HIGHWAY
GRAFTON
$17.28 $3.73 $17.28 $3.7311 JUN 2015 11 JUN 2015 12 JUN 2015 01 JUL 2015 Rate approved as requested
PIPE LAYER HIGHWAY GRAFTON $15.82 $2.20 $15.82 $2.2011 JUN 2015 11 JUN 2015 12 JUN 2015 01 JUL 2015 Rate approved as requested
MECHANIC HIGHWAY GRAFTON $17.28 $3.73 $17.28 $3.7311 JUN 2015 11 JUN 2015 12 JUN 2015 01 JUL 2015 Rate approved as requested
SKID STEER OPERATOR
HIGHWAY GRAFTON
$17.28 $3.73 $17.28 $3.7311 JUN 2015 11 JUN 2015 12 JUN 2015 01 JUL 2015 Rate approved as requested
SCREED OPERATOR HIGHWAY
GRAFTON
$17.28 $3.73 $17.28 $3.7311 JUN 2015 11 JUN 2015 12 JUN 2015 01 JUL 2015 Rate approved as requested
Page 22 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:LEBANON, NH - HARTFORD, VT 14957 GRAFTON Cpm ConstructorsActive
14957
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
CAMERON, A.J. SOD FARMS Yes
Hydro Seeder/Sprayer Operator
Highway GRAFTON
$20.17 $1.90 $20.17 $1.9029 AUG 2013 17 OCT 2013 21 OCT 2013 29 OCT 2013 Rate approved as requested
Hay Mulcher Operator Highway
GRAFTON
$20.17 $1.90 $20.17 $1.9029 AUG 2013 17 OCT 2013 21 OCT 2013 29 OCT 2013 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
CASE FOUNDATION COMPANY Yes
Mechanic Highway GRAFTON $50.10 $14.45 $50.10 $14.4509 OCT 2014 17 OCT 2014 21 OCT 2014 14 NOV 2014 Rate approved as requested
Oiler Highway GRAFTON $24.45 $14.45 $24.45 $14.4509 OCT 2014 17 OCT 2014 21 OCT 2014 14 NOV 2014 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Rd Edmunds & Sons Inc Yes
PIPE LAYER HIGHWAY WINDSOR,
VT
$14.43 $0.00 $14.43 $0.0010 MAR 2014 12 MAR 2014 12 MAR 2014 15 APR 2014 Rate approved as requested
PIPE LAYER HIGHWAY GRAFTON $15.82 $2.20 $15.82 $2.2010 MAR 2014 12 MAR 2014 12 MAR 2014 24 MAR 2014 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Thomas Drilling & Blasting Co Yes
DRILL OPERATOR HIGHWAY
GRAFTON
$15.00 $4.03 $17.28 $3.7322 AUG 2014 22 AUG 2014 21 OCT 2014 12 NOV 2014 Higher rate stipulated by the USDOL
Page 23 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:LEBANON, NH - HARTFORD, VT 14957 GRAFTON Cpm ConstructorsActive
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Cpm Constructors Yes
GUARDRAIL INSTALLER
HIGHWAY GRAFTON
$15.82 $2.20 $15.82 $2.2012 MAR 2014 12 MAR 2014 12 MAR 2014 24 MAR 2014 Rate approved as requested
IRONWORKER (STRUCTURAL)
HIGHWAY GRAFTON
$19.00 $3.00 $19.00 $3.0009 APR 2014 09 APR 2014 09 APR 2014 22 APR 2014 Rate approved as requested
DIVER TENDER HIGHWAY
GRAFTON
$16.00 $2.00 $17.80 $1.3509 APR 2014 17 APR 2014 18 APR 2014 13 MAY 2014 Higher rate stipulated by the USDOL
PILE DRIVER HIGHWAY
WINDSOR, VT
$19.00 $1.50 $19.00 $1.5008 MAY 2014 09 MAY 2014 09 MAY 2014 16 JUN 2014 Rate approved as requested
PILE DRIVER HIGHWAY
GRAFTON
$19.00 $1.50 $19.00 $1.5008 MAY 2014 08 MAY 2014 09 MAY 2014 12 JUN 2014 Rate approved as requested
CONCRETE PUMP OPERATOR
HIGHWAY GRAFTON
$19.00 $1.00 $17.28 $3.7320 OCT 2014 20 OCT 2014 21 OCT 2014 12 MAY 2015 Higher rate stipulated by the USDOL
HYDRO SEEDER/SPRAYER
OPERATOR HIGHWAY WINDSOR,
VT
$19.29 $0.00 $20.55 $0.0021 MAR 2014 21 MAR 2014 21 MAR 2014 15 APR 2014 Higher rate stipulated by the USDOL
HAY MULCHER OPERATOR
HIGHWAY WINDSOR, VT
$19.29 $0.00 $20.55 $0.0021 MAR 2014 21 MAR 2014 21 MAR 2014 15 APR 2014 Higher rate stipulated by the USDOL
DIVER HIGHWAY GRAFTON $16.00 $2.00 $17.80 $2.0009 APR 2014 09 APR 2014 09 APR 2014 16 APR 2014 Higher rate stipulated by the USDOL
Page 24 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:LEE 15692 STRAFFORD Sur Construction IncActive
15692
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
CAMERON, A.J. SOD FARMS Yes
Hydro Seeder/Sprayer Operator
Highway STRAFFORD
$19.25 $0.00 $22.87 $5.4610 APR 2014 10 APR 2014 21 APR 2014 02 MAY 2014 Higher rate stipulated by the USDOL
Hay Mulcher Operator Highway
STRAFFORD
$19.25 $0.00 $22.87 $5.4610 APR 2014 10 APR 2014 21 APR 2014 02 MAY 2014 Higher rate stipulated by the USDOL
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
JCB COLBY, INC Yes
Concrete Finisher Highway
STRAFFORD
$20.16 $1.06 $20.16 $1.0621 MAY 2014 21 MAY 2014 05 JUN 2014 23 JUN 2014 Rate approved as requested
Page 25 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:LINCOLN 15755 GRAFTON Continental Paving IncActive
15755
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Alvin J Coleman & Son Inc Yes
MECHANIC HIGHWAY GRAFTON $17.28 $3.73 $17.28 $3.7317 APR 2014 17 APR 2014 21 APR 2014 14 MAY 2014 Rate approved as requested
IRONWORKER (STRUCTURAL)
HIGHWAY GRAFTON
$24.64 $0.90 $24.64 $0.9028 MAY 2014 28 MAY 2014 03 JUN 2014 16 JUN 2014 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
CAMERON, A.J. SOD FARMS Yes
Hydro Seeder/Sprayer Operator
Highway GRAFTON
$20.17 $1.90 $20.17 $1.9025 FEB 2014 04 MAR 2014 05 MAR 2014 24 MAR 2014 Rate approved as requested
Hay Mulcher Operator Highway
GRAFTON
$20.17 $1.90 $20.17 $1.9025 FEB 2014 04 MAR 2014 05 MAR 2014 24 MAR 2014 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Coleman Concrete Inc Yes
PUMP TRUCK OPERATOR
HIGHWAY GRAFTON
$18.77 $4.21 $18.77 $4.2106 MAY 2014 08 MAY 2014 09 MAY 2014 30 MAY 2014 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Nicom Coatings Corp Yes
FORKLIFT OPERATOR HIGHWAY
GRAFTON
$17.28 $3.73 $17.28 $3.7314 MAR 2014 14 MAR 2014 14 MAR 2014 01 APR 2014 Rate approved as requested
BIG MEMBRANE MACHINE
OPERATOR HIGHWAY GRAFTON
$17.28 $3.73 $17.28 $3.7314 MAR 2014 14 MAR 2014 14 MAR 2014 01 APR 2014 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
CWS FENCE & GUARDRAIL Yes
GUARDRAIL INSTALLER
HIGHWAY GRAFTON
$15.82 $2.20 $15.82 $2.2012 FEB 2014 12 FEB 2014 12 FEB 2014 18 FEB 2014 Rate approved as requested
Page 26 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:LINCOLN 15755 GRAFTON Continental Paving IncActive
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Moulison North Corp Yes
ELECTRICIAN HIGHWAY
GRAFTON
$27.75 $18.11 $27.75 $18.1121 FEB 2014 24 FEB 2014 24 FEB 2014 28 FEB 2014 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Roadsafe Traffic Lp Yes
AUGER TRUCK HIGHWAY
GRAFTON
$25.00 $5.00 $25.00 $5.0016 JUN 2015 17 JUN 2015 17 JUN 2015 26 JUN 2015 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Nicom Coatings Corp Yes
FORKLIFT OPERATOR HIGHWAY
GRAFTON
$17.28 $3.73 $17.28 $3.7314 MAR 2014 14 MAR 2014 14 MAR 2014 01 APR 2014 Rate approved as requested
BIG MEMBRANE MACHINE
OPERATOR HIGHWAY GRAFTON
$17.28 $3.73 $17.28 $3.7314 MAR 2014 14 MAR 2014 14 MAR 2014 01 APR 2014 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Continental Paving Inc Yes
RECLAIM OPERATOR HIGHWAY
GRAFTON
$17.28 $3.73 $17.28 $3.7306 MAR 2014 06 MAR 2014 07 MAR 2014 24 MAR 2014 Rate approved as requested
BOBCAT OPERATOR HIGHWAY
GRAFTON
$16.01 $2.52 $17.28 $3.7306 MAR 2014 06 MAR 2014 07 MAR 2014 24 MAR 2014 Higher rate stipulated by the USDOL
SCREED OPERATOR HIGHWAY
GRAFTON
$18.53 $4.96 $18.53 $4.9606 MAR 2014 06 MAR 2014 07 MAR 2014 24 MAR 2014 Rate approved as requested
MATERIAL TRANSFER VEHICLE
HIGHWAY GRAFTON
$17.28 $3.73 $17.28 $3.7306 MAR 2014 06 MAR 2014 07 MAR 2014 24 MAR 2014 Rate approved as requested
Page 27 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:LOUDON 24902 MERRIMACK Pike IndustriesActive
24902
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Pike Industries Yes
MECHANIC HIGHWAY
MERRIMACK
$15.65 $2.89 $16.16 $4.9103 APR 2014 03 APR 2014 07 APR 2014 16 APR 2014 Higher rate stipulated by the USDOL
SCREED PERSON HIGHWAY
MERRIMACK
$15.65 $2.89 $16.16 $4.9103 APR 2014 03 APR 2014 07 APR 2014 16 APR 2014 Higher rate stipulated by the USDOL
TRAFFIC COORDINATOR
HIGHWAY MERRIMACK
$14.73 $4.81 $14.73 $4.8103 APR 2014 03 APR 2014 07 APR 2014 16 APR 2014 Rate approved as requested
PIPE LAYER HIGHWAY
MERRIMACK
$14.73 $4.81 $14.73 $4.8103 APR 2014 03 APR 2014 07 APR 2014 16 APR 2014 Rate approved as requested
SKID STEER OPERATOR
HIGHWAY MERRIMACK
$15.65 $2.89 $16.16 $4.9103 APR 2014 03 APR 2014 07 APR 2014 16 APR 2014 Higher rate stipulated by the USDOL
TRANSFER MACHINE OPERATOR
HIGHWAY MERRIMACK
$15.65 $2.89 $16.16 $4.9103 APR 2014 03 APR 2014 07 APR 2014 16 APR 2014 Higher rate stipulated by the USDOL
Page 28 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:LOUDON 24941 MERRIMACK American Excavating CorpActive
24941
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
CAMERON, A.J. SOD FARMS Yes
Hay Mulcher Operator Highway
MERRIMACK
$22.08 $6.00 $22.08 $6.0010 MAR 2015 16 MAR 2015 16 MAR 2015 07 APR 2015 Rate approved as requested
Hydro Seeder/Sprayer Operator
Highway MERRIMACK
$22.08 $6.00 $22.08 $6.0010 MAR 2015 16 MAR 2015 16 MAR 2015 07 APR 2015 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
East Coast Signals Inc Yes
ELECTRICIAN HIGHWAY
MERRIMACK
$23.22 $2.78 $23.22 $2.7831 MAR 2015 02 APR 2015 03 APR 2015 21 APR 2015 Rate approved as requested
BUCKET TRUCK OPERATOR
HIGHWAY MERRIMACK
$25.00 $2.78 $25.00 $2.7831 MAR 2015 02 APR 2015 03 APR 2015 21 APR 2015 Rate approved as requested
AUGER TRUCK HIGHWAY
MERRIMACK
$25.00 $2.78 $25.00 $2.7831 MAR 2015 02 APR 2015 03 APR 2015 21 APR 2015 Rate approved as requested
Page 29 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:MANCHESTER TO CONCORD 14510Z MERRIMACK Liddell Brothers Inc.Active
14510Z
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
CAMERON, A.J. SOD FARMS Yes
Hydro Seeder/Sprayer Operator
Highway MERRIMACK
$17.63 $2.41 $16.16 $4.9107 MAR 2013 12 MAR 2013 15 MAR 2013 20 MAR 2013 Higher rate stipulated by the USDOL
Hydro Seeder/Sprayer Operator
Highway HILLSBOROUGH
$23.14 $2.08 $25.79 $5.4207 MAR 2013 12 MAR 2013 15 MAR 2013 20 MAR 2013 Higher rate stipulated by the USDOL
Hay Mulcher Operator Highway
HILLSBOROUGH
$23.14 $2.08 $25.79 $5.4207 MAR 2013 12 MAR 2013 15 MAR 2013 20 MAR 2013 Higher rate stipulated by the USDOL
Hay Mulcher Operator Highway
MERRIMACK
$17.63 $2.41 $16.16 $4.9107 MAR 2013 12 MAR 2013 15 MAR 2013 20 MAR 2013 Higher rate stipulated by the USDOL
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Green Mountain Communications Yes
ELECTRICIAN HIGHWAY
MERRIMACK
$23.22 $2.78 $23.22 $2.7809 JUL 2013 09 JUL 2013 15 JUL 2013 24 JUL 2013 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Green Mountain Communications Yes
ELECTRICIAN HIGHWAY
MERRIMACK
$23.22 $2.78 $23.22 $2.7809 JUL 2013 09 JUL 2013 15 JUL 2013 24 JUL 2013 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Ed Swett Inc Yes
MAN LIFT OPERATOR HIGHWAY
HILLSBOROUGH
$24.10 $0.00 $25.79 $5.4230 JUL 2013 31 JUL 2013 02 AUG 2013 13 AUG 2013 Higher rate stipulated by the USDOL
MAN LIFT OPERATOR HIGHWAY
MERRIMACK
$24.55 $0.00 $24.55 $0.0030 JUL 2013 31 JUL 2013 02 AUG 2013 13 AUG 2013 Rate approved as requested
Page 30 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:MANCHESTER TO CONCORD 14510Z MERRIMACK Liddell Brothers Inc.Active
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Liddell Brothers Inc. Yes
DRILL TRACKER HIGHWAY
MERRIMACK
$17.00 $2.00 $17.00 $2.0003 MAY 2013 03 JUN 2013 06 JUN 2013 19 JUN 2013 Rate approved as requested
FIBER TECHNICIAN/SPLICER
HIGHWAY MERRIMACK
$17.98 $2.28 $17.98 $2.2821 JAN 2013 21 JAN 2013 22 JAN 2013 21 FEB 2013 Rate approved as requested
GROUNDMAN/UNSKILLED
LABORER HIGHWAY
HILLSBOROUGH
$17.23 $2.60 $0.00 $0.0021 JAN 2013 21 JAN 2013 22 JAN 2013 21 FEB 2013 Per USDOL: Rate already in WD
FIBER TECHNICIAN/SPLICER
HIGHWAY HILLSBOROUGH
$17.23 $2.60 $20.73 $1.0621 JAN 2013 21 JAN 2013 22 JAN 2013 21 FEB 2013 Higher rate stipulated by the USDOL
DRILL OPERATOR HIGHWAY
MERRIMACK
$21.00 $2.00 $21.00 $2.0003 MAY 2013 03 JUN 2013 06 JUN 2013 19 JUN 2013 Rate approved as requested
GROUNDMAN/UNSKILLED
LABORER HIGHWAY
MERRIMACK
$12.79 $4.81 $0.00 $0.0021 JAN 2013 21 JAN 2013 22 JAN 2013 21 FEB 2013 Per USDOL: Rate already in WD
County: Prime Contractor:NASHUA 14432 HILLSBOROUGHActive
14432
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
FIBER OPTIC SPLICING & TESTING, INC. Yes
Fiber Optic Technician/Lineman
Highway HILLSBOROUGH
$23.22 $2.78 $23.22 $2.7809 AUG 2013 13 AUG 2013 14 AUG 2013 22 AUG 2013 Rate approved as requested
Page 31 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:NASHUA 16110B HILLSBOROUGHActive
16110B
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Nicom Coatings Corp Yes
BIG MEMBRANE MACHINE
OPERATOR HIGHWAY
HILLSBOROUGH
$23.00 $2.00 $23.16 $6.3204 DEC 2013 04 DEC 2013 04 DEC 2013 11 DEC 2013 Higher rate stipulated by the USDOL
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
JOHN BROWN & SONS INC Yes
Tree Shear Operator Highway
HILLSBOROUGH
$21.37 $3.36 $23.16 $6.3222 OCT 2013 23 OCT 2013 23 OCT 2013 31 JAN 2014 Higher rate stipulated by the USDOL
Bronto Mower Operator Highway
HILLSBOROUGH
$20.25 $3.02 $23.16 $6.3222 OCT 2013 23 OCT 2013 23 OCT 2013 31 JAN 2014 Higher rate stipulated by the USDOL
Whole Tree Chipper Operator
Highway HILLSBOROUGH
$19.79 $2.87 $23.16 $6.3222 OCT 2013 23 OCT 2013 23 OCT 2013 31 JAN 2014 Higher rate stipulated by the USDOL
Skidder Operator Highway
HILLSBOROUGH
$19.52 $2.52 $23.16 $6.3222 OCT 2013 23 OCT 2013 23 OCT 2013 31 JAN 2014 Higher rate stipulated by the USDOL
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
JCB COLBY, INC Yes
Concrete Finisher Highway
HILLSBOROUGH
$19.59 $0.00 $19.93 $1.0620 OCT 2013 25 OCT 2013 29 OCT 2013 14 NOV 2013 Higher rate stipulated by the USDOL
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
A J CAMERON SOD FARMS Yes
Hydro Seeder/Sprayer Operator
Highway HILLSBOROUGH
$25.19 $0.00 $23.16 $6.3223 OCT 2013 25 OCT 2013 29 OCT 2013 14 NOV 2013 Higher rate stipulated by the USDOL
Hay Mulcher Operator Highway
HILLSBOROUGH
$25.19 $0.00 $23.16 $6.3223 OCT 2013 25 OCT 2013 29 OCT 2013 14 NOV 2013 Higher rate stipulated by the USDOL
Page 32 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:NASHUA 16110B HILLSBOROUGHActive
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Rs Audley Inc Yes
CONCRETE PUMP OPERATOR
HIGHWAY HILLSBOROUGH
$22.27 $6.57 $23.16 $6.3210 MAR 2014 10 MAR 2014 10 MAR 2014 24 MAR 2014 Higher rate stipulated by the USDOL
GRADALL OPERATOR HIGHWAY
HILLSBOROUGH
$24.98 $6.56 $24.98 $6.5622 OCT 2013 23 OCT 2013 23 OCT 2013 24 JAN 2014 Rate approved as requested
MATERIAL TRANSFER VEHICLE
HIGHWAY HILLSBOROUGH
$25.23 $9.69 $25.23 $9.6922 OCT 2013 23 OCT 2013 23 OCT 2013 24 JAN 2014 Rate approved as requested
Page 33 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:NASHUA 16110C HILLSBOROUGHActive
16110C
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
JCB COLBY, INC Yes
Mason Highway HILLSBOROUGH $20.99 $0.00 $20.99 $0.0022 JAN 2014 22 JAN 2014 23 JAN 2014 24 JAN 2014 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
JOHN BROWN & SONS INC Yes
Tree Shear Operator Highway
HILLSBOROUGH
$19.37 $3.36 $23.16 $6.3222 JAN 2014 22 JAN 2014 23 JAN 2014 31 JAN 2014 Higher rate stipulated by the USDOL
Whole Tree Chipper Operator
Highway HILLSBOROUGH
$19.09 $2.87 $23.16 $6.3222 JAN 2014 22 JAN 2014 23 JAN 2014 31 JAN 2014 Higher rate stipulated by the USDOL
Skidder Operator Highway
HILLSBOROUGH
$18.56 $2.52 $23.16 $6.3222 JAN 2014 22 JAN 2014 23 JAN 2014 31 JAN 2014 Higher rate stipulated by the USDOL
Bronto Mower Operator Highway
HILLSBOROUGH
$19.25 $3.02 $23.16 $6.3222 JAN 2014 22 JAN 2014 23 JAN 2014 31 JAN 2014 Higher rate stipulated by the USDOL
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Nicom Coatings Corp Yes
BIG MEMBRANE MACHINE
OPERATOR HIGHWAY
HILLSBOROUGH
$23.16 $6.32 $23.16 $6.3210 JUN 2014 10 JUN 2014 12 JUN 2014 26 JUN 2014 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
LYNCH'S LANDSCAPING Yes
Hay Mulcher Operator Highway
HILLSBOROUGH
$16.99 $2.60 $23.16 $6.3211 JUL 2014 15 JUL 2014 16 JUL 2014 31 JUL 2014 Higher rate stipulated by the USDOL
Hydro Seeder/Sprayer Operator
Highway HILLSBOROUGH
$16.99 $2.60 $23.16 $6.3211 JUL 2014 15 JUL 2014 16 JUL 2014 31 JUL 2014 Higher rate stipulated by the USDOL
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Independent Concrete Pumping Corp Yes
Concrete Pump Operator Highway
HILLSBOROUGH
$31.96 $7.05 $31.96 $7.0508 JAN 2014 17 JAN 2014 22 APR 2014 14 MAY 2014 Rate approved as requested
Page 34 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:NASHUA 16110C HILLSBOROUGHActive
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Nicom Coatings Corp Yes
BIG MEMBRANE MACHINE
OPERATOR HIGHWAY
HILLSBOROUGH
$23.16 $6.32 $23.16 $6.3210 JUN 2014 10 JUN 2014 12 JUN 2014 26 JUN 2014 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
JCB COLBY, INC Yes
Mason Highway HILLSBOROUGH $20.99 $0.00 $20.99 $0.0022 JAN 2014 22 JAN 2014 23 JAN 2014 24 JAN 2014 Rate approved as requested
County: Prime Contractor:NEW IPSWICH 14465 HILLSBOROUGH Beck & Bellucci IncActive
14465
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
HS&G Erosion Conrol LLC Yes
HAY MULCHER OPERATOR
HIGHWAY HILLSBOROUGH
$28.84 $0.00 $23.16 $6.3219 SEP 2014 19 SEP 2014 29 SEP 2014 16 OCT 2014 Higher rate stipulated by the USDOL
HYDRO SEEDER/SPRAYER
OPERATOR HIGHWAY
HILLSBOROUGH
$28.84 $0.00 $23.16 $6.3219 SEP 2014 19 SEP 2014 29 SEP 2014 16 OCT 2014 Higher rate stipulated by the USDOL
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
All States Asphalt Inc Yes
RECLAIM OPERATOR HIGHWAY
HILLSBOROUGH
$24.00 $6.63 $24.00 $6.6301 APR 2015 01 APR 2015 13 APR 2015 13 MAY 2015 Rate approved as requested
Page 35 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:NEW LONDON-GRANTHAM 26603 SULLIVAN Pike IndustriesActive
26603
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
JOHN BROWN & SONS INC Yes
Whole Tree Chipper Operator
Highway SULLIVAN
$22.21 $2.87 $22.21 $2.8703 APR 2015 03 APR 2015 06 APR 2015 23 APR 2015 Rate approved as requested
Skidder Operator Highway
MERRIMACK
$20.08 $2.52 $20.08 $2.5203 APR 2015 03 APR 2015 06 APR 2015 23 APR 2015 Rate approved as requested
Tree Shear Operator Highway
SULLIVAN
$21.44 $3.36 $21.44 $3.3603 APR 2015 03 APR 2015 06 APR 2015 23 APR 2015 Rate approved as requested
Bucket Truck Operator Highway
MERRIMACK
$21.02 $3.33 $21.02 $3.3303 APR 2015 03 APR 2015 06 APR 2015 23 APR 2015 Rate approved as requested
Skidder Operator Highway
SULLIVAN
$20.08 $2.52 $20.08 $2.5203 APR 2015 03 APR 2015 06 APR 2015 23 APR 2015 Rate approved as requested
Bucket Truck Operator Highway
SULLIVAN
$21.02 $3.33 $21.02 $3.3303 APR 2015 03 APR 2015 06 APR 2015 23 APR 2015 Rate approved as requested
Bronto Mower Operator Highway
SULLIVAN
$21.85 $3.02 $21.85 $3.0203 APR 2015 03 APR 2015 06 APR 2015 23 APR 2015 Rate approved as requested
Whole Tree Chipper Operator
Highway MERRIMACK
$22.21 $2.87 $22.21 $2.8703 APR 2015 03 APR 2015 06 APR 2015 23 APR 2015 Rate approved as requested
Tree Shear Operator Highway
MERRIMACK
$21.44 $3.36 $21.44 $3.3603 APR 2015 03 APR 2015 06 APR 2015 23 APR 2015 Rate approved as requested
Bronto Mower Operator Highway
MERRIMACK
$21.85 $3.02 $21.85 $3.0203 APR 2015 03 APR 2015 06 APR 2015 23 APR 2015 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
CWS FENCE & GUARDRAIL Yes
GUARDRAIL INSTALLER
HIGHWAY SULLIVAN
$14.97 $1.76 $14.97 $1.7603 APR 2015 03 APR 2015 06 APR 2015 23 APR 2015 Rate approved as requested
Page 36 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:NEW LONDON-GRANTHAM 26603 SULLIVAN Pike IndustriesActive
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Pike Industries Yes
SCREED PERSON HIGHWAY
SULLIVAN
$17.28 $3.73 $17.28 $3.7323 MAR 2015 23 MAR 2015 23 MAR 2015 17 APR 2015 Rate approved as requested
SKID STEER OPERATOR
HIGHWAY SULLIVAN
$17.28 $3.73 $20.00 $2.5223 MAR 2015 23 MAR 2015 23 MAR 2015 17 APR 2015 Higher rate stipulated by the USDOL
TRANSFER MACHINE OPERATOR
HIGHWAY SULLIVAN
$17.28 $3.73 $20.00 $2.5223 MAR 2015 23 MAR 2015 23 MAR 2015 17 APR 2015 Higher rate stipulated by the USDOL
TRAFFIC COORDINATOR
HIGHWAY SULLIVAN
$14.97 $1.76 $14.97 $1.7623 MAR 2015 23 MAR 2015 23 MAR 2015 17 APR 2015 Rate approved as requested
SCREED PERSON HIGHWAY
MERRIMACK
$17.83 $2.41 $17.83 $2.4123 MAR 2015 23 MAR 2015 23 MAR 2015 17 APR 2015 Rate approved as requested
TRANSFER MACHINE OPERATOR
HIGHWAY MERRIMACK
$17.83 $2.41 $16.16 $4.9123 MAR 2015 23 MAR 2015 23 MAR 2015 17 APR 2015 Higher rate stipulated by the USDOL
PIPE LAYER HIGHWAY SULLIVAN $14.97 $1.76 $14.97 $1.7623 MAR 2015 23 MAR 2015 23 MAR 2015 17 APR 2015 Rate approved as requested
MECHANIC HIGHWAY SULLIVAN $14.97 $1.76 $20.00 $2.5223 MAR 2015 23 MAR 2015 23 MAR 2015 17 APR 2015 Higher rate stipulated by the USDOL
MECHANIC HIGHWAY
MERRIMACK
$17.83 $2.41 $16.16 $4.9123 MAR 2015 23 MAR 2015 23 MAR 2015 17 APR 2015 Higher rate stipulated by the USDOL
PIPE LAYER HIGHWAY
MERRIMACK
$14.73 $4.81 $14.73 $4.8123 MAR 2015 23 MAR 2015 23 MAR 2015 17 APR 2015 Rate approved as requested
RECLAIM OPERATOR HIGHWAY
MERRIMACK
$17.83 $2.41 $16.16 $4.9123 MAR 2015 23 MAR 2015 23 MAR 2015 17 APR 2015 Higher rate stipulated by the USDOL
TRAFFIC COORDINATOR
HIGHWAY MERRIMACK
$14.73 $4.81 $14.73 $4.8123 MAR 2015 23 MAR 2015 23 MAR 2015 17 APR 2015 Rate approved as requested
SKID STEER OPERATOR
HIGHWAY MERRIMACK
$17.83 $2.41 $16.16 $4.9123 MAR 2015 23 MAR 2015 23 MAR 2015 17 APR 2015 Higher rate stipulated by the USDOL
RECLAIM OPERATOR HIGHWAY
SULLIVAN
$17.28 $3.73 $20.00 $2.5223 MAR 2015 23 MAR 2015 23 MAR 2015 17 APR 2015 Higher rate stipulated by the USDOL
Page 37 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:NEWINGTON - DOVER 11238L STRAFFORD Cianbro CorpActive
11238L
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Severino Trucking Co Inc Yes
5/6 AXLE TRUCK DRIVER
HIGHWAY STRAFFORD
$14.77 $2.21 $14.77 $2.2129 DEC 2010 30 DEC 2010 04 JAN 2011 31 JAN 2011 Rate approved as requested
5/6 AXLE TRUCK DRIVER
HIGHWAY ROCKINGHAM
$14.77 $2.21 $14.77 $2.2129 DEC 2010 30 DEC 2010 04 JAN 2011 31 JAN 2011 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
JOHN BROWN & SONS, INC. Yes
Grapple Skidder Operator Highway
ROCKINGHAM
$15.01 $1.96 $15.01 $1.9621 JUL 2010 02 AUG 2010 21 SEP 2010 13 OCT 2010 Rate approved as requested
Tree Shear Operator Heavy
ROCKINGHAM
$17.12 $2.01 $17.12 $2.0121 JUL 2010 02 AUG 2010 02 AUG 2010 02 SEP 2010 Rate approved as requested
Tree Shear Operator Highway
ROCKINGHAM
$17.12 $2.01 $17.12 $2.0121 JUL 2010 02 AUG 2010 21 SEP 2010 13 OCT 2010 Rate approved as requested
Mower Operator Heavy
ROCKINGHAM
$15.51 $1.86 $15.51 $1.8621 JUL 2010 02 AUG 2010 02 AUG 2010 08 SEP 2010 Rate approved as requested
Whole Tree Chipper Operator
Highway STRAFFORD
$14.20 $1.94 $14.20 $1.9421 JUL 2010 02 AUG 2010 02 AUG 2010 21 SEP 2010 Rate approved as requested
Tree Shear Operator Highway
STRAFFORD
$17.12 $2.01 $17.12 $2.0121 JUL 2010 02 AUG 2010 02 AUG 2010 21 SEP 2010 Rate approved as requested
Grapple Skidder Operator Heavy
ROCKINGHAM
$15.01 $1.96 $15.01 $1.9621 JUL 2010 02 AUG 2010 02 AUG 2010 02 SEP 2010 Rate approved as requested
Bucket Truck Operator Highway
STRAFFORD
$19.29 $3.33 $19.29 $3.3317 JAN 2013 22 JAN 2013 04 FEB 2013 08 MAR 2013 Rate approved as requested
Whole Tree Chipper Operator Heavy
ROCKINGHAM
$14.20 $1.94 $14.20 $1.9421 JUL 2010 02 AUG 2010 02 AUG 2010 02 SEP 2010 Rate approved as requested
Whole Tree Chipper Operator
Highway ROCKINGHAM
$14.20 $1.94 $14.20 $1.9421 JUL 2010 02 AUG 2010 21 SEP 2010 13 OCT 2010 Rate approved as requested
Grapple Skidder Operator Highway
STRAFFORD
$15.01 $1.96 $15.01 $1.9621 JUL 2010 02 AUG 2010 02 AUG 2010 21 SEP 2010 Rate approved as requested
Mower Operator Highway
STRAFFORD
$15.51 $1.86 $15.51 $1.8621 JUL 2010 02 AUG 2010 02 AUG 2010 21 SEP 2010 Rate approved as requested
Mower Operator Highway
ROCKINGHAM
$15.51 $1.86 $15.51 $1.8621 JUL 2010 02 AUG 2010 21 SEP 2010 18 OCT 2010 Rate approved as requested
Page 38 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:NEWINGTON - DOVER 11238L STRAFFORD Cianbro CorpActive
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
A J CAMERON SOD FARMS Yes
Hydro Seeder/Sprayer Operator
Highway STRAFFORD
$18.50 $2.69 $18.50 $2.6906 AUG 2013 12 AUG 2013 13 AUG 2013 28 AUG 2013 Rate approved as requested
Hay Mulcher Operator Highway
STRAFFORD
$18.50 $2.69 $18.50 $2.6906 AUG 2013 12 AUG 2013 13 AUG 2013 28 AUG 2013 Rate approved as requested
Hydro Seeder/Sprayer Operator
Highway ROCKINGHAM
$17.66 $1.90 $17.66 $1.9006 AUG 2013 12 AUG 2013 13 AUG 2013 29 AUG 2013 Rate approved as requested
Hay Mulcher Operator Highway
ROCKINGHAM
$17.66 $1.90 $17.66 $1.9006 AUG 2013 12 AUG 2013 13 AUG 2013 29 AUG 2013 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Roadsafe Traffic Lp Yes
AUGER TRUCK HIGHWAY
STRAFFORD
$16.00 $1.50 $16.00 $1.5022 JUL 2010 02 AUG 2010 03 AUG 2010 21 SEP 2010 Rate approved as requested
AUGER TRUCK HIGHWAY
ROCKINGHAM
$16.00 $1.50 $16.00 $1.5022 JUL 2010 02 AUG 2010 04 JAN 2013 06 FEB 2013 Rate approved as requested
AUGER TRUCK HEAVY
ROCKINGHAM
$16.00 $1.50 $16.00 $1.5022 JUL 2010 02 AUG 2010 02 AUG 2010 02 SEP 2010 Rate approved as requested
Page 39 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:NEWINGTON - DOVER 11238L ROCKINGHAM Cianbro CorpActive
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Continental Paving Inc Yes
ROLLER OPERATOR HEAVY
ROCKINGHAM
$14.17 $0.00 $24.57 $21.3222 JUL 2010 02 AUG 2010 02 AUG 2010 15 SEP 2010 Higher rate stipulated by the USDOL
COLD PLANE OPERATOR HEAVY
ROCKINGHAM
$15.00 $2.79 $24.57 $21.3222 JUL 2010 02 AUG 2010 02 AUG 2010 15 SEP 2010 Higher rate stipulated by the USDOL
COLD PLANE OPERATOR
HIGHWAY STRAFFORD
$15.00 $2.79 $15.00 $2.7920 SEP 2010 21 SEP 2010 22 SEP 2010 20 OCT 2010 Rate approved as requested
PAVER OPERATOR HEAVY
STRAFFORD
$15.65 $0.00 $19.67 $6.0622 JUL 2010 02 AUG 2010 02 AUG 2010 09 NOV 2010 Higher rate stipulated by the USDOL
MATERIAL TRANSFER VEHICLE
HIGHWAY STRAFFORD
$15.65 $0.00 $15.65 $0.0020 SEP 2010 21 SEP 2010 22 SEP 2010 20 OCT 2010 Rate approved as requested
ROLLER OPERATOR HEAVY
STRAFFORD
$16.66 $5.16 $19.67 $6.0622 JUL 2010 02 AUG 2010 02 AUG 2010 09 NOV 2010 Higher rate stipulated by the USDOL
RECLAIM OPERATOR HIGHWAY
ROCKINGHAM
$15.00 $2.79 $15.00 $2.7921 SEP 2010 21 SEP 2010 22 SEP 2010 13 OCT 2010 Rate approved as requested
COLD PLANE OPERATOR
HIGHWAY ROCKINGHAM
$15.00 $2.79 $15.00 $2.7920 SEP 2010 20 SEP 2010 22 SEP 2010 13 OCT 2010 Rate approved as requested
MATERIAL TRANSFER VEHICLE
HIGHWAY ROCKINGHAM
$15.69 $0.00 $15.69 $0.0020 SEP 2010 21 SEP 2010 22 SEP 2010 13 OCT 2010 Rate approved as requested
COLD PLANE OPERATOR HEAVY
STRAFFORD
$15.00 $2.79 $19.67 $6.0622 JUL 2010 02 AUG 2010 02 AUG 2010 09 NOV 2010 Higher rate stipulated by the USDOL
RECLAIM OPERATOR HIGHWAY
STRAFFORD
$15.00 $2.79 $15.00 $2.7920 SEP 2010 21 SEP 2010 22 SEP 2010 20 OCT 2010 Rate approved as requested
PAVER OPERATOR HEAVY
ROCKINGHAM
$15.69 $0.00 $24.57 $21.3222 JUL 2010 02 AUG 2010 02 AUG 2010 15 SEP 2010 Higher rate stipulated by the USDOL
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
WEEKS MARINE INC Yes
Dive Tender Heavy STRAFFORD $25.22 $15.10 $25.22 $15.1015 SEP 2010 15 SEP 2010 22 SEP 2010 13 OCT 2010 Rate approved as requested
Dive Tender Heavy ROCKINGHAM $25.22 $15.10 $25.22 $15.1015 SEP 2010 15 SEP 2010 22 SEP 2010 13 OCT 2010 Rate approved as requested
Diver Heavy STRAFFORD $32.62 $15.10 $32.62 $15.1015 SEP 2010 15 SEP 2010 22 SEP 2010 13 OCT 2010 Rate approved as requested
Diver Heavy ROCKINGHAM $32.62 $15.10 $32.62 $15.1015 SEP 2010 15 SEP 2010 22 SEP 2010 13 OCT 2010 Rate approved as requested
Page 40 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:NEWINGTON - DOVER 11238L STRAFFORD Cianbro CorpActive
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
New Hampshire Boring Inc Yes
DRILLER (ROCK FOR BLASTING)
HEAVY STRAFFORD
$21.00 $0.00 $19.67 $6.0613 SEP 2010 15 SEP 2010 22 SEP 2010 26 OCT 2010 Higher rate stipulated by the USDOL
DRILLER (ROCK FOR BLASTING)
HEAVY ROCKINGHAM
$21.00 $0.00 $24.57 $21.3213 SEP 2010 15 SEP 2010 22 SEP 2010 26 OCT 2010 Higher rate stipulated by the USDOL
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Thomas Drilling & Blasting Co Yes
DRILL OPERATOR HIGHWAY
STRAFFORD
$14.00 $1.92 $14.00 $1.9203 MAR 2011 09 MAR 2011 28 MAR 2011 13 JUL 2011 Rate approved as requested
DRILL OPERATOR HIGHWAY
ROCKINGHAM
$14.00 $1.92 $14.00 $1.9203 MAR 2011 09 MAR 2011 28 MAR 2011 25 JUL 2011 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Venture Construction Inc Yes
SHOT BLAST MACHINE
OPERATOR HEAVY STRAFFORD
$20.00 $0.00 $19.67 $6.0615 OCT 2012 19 OCT 2012 29 OCT 2012 17 DEC 2012 Higher rate stipulated by the USDOL
SHOT BLAST MACHINE
OPERATOR HEAVY
ROCKINGHAM
$20.00 $0.00 $24.57 $21.3217 OCT 2012 19 OCT 2012 29 OCT 2012 02 DEC 2012 Higher rate stipulated by the USDOL
BARRIER MEMBRANE MACHINE
OPERATOR HEAVY STRAFFORD
$20.00 $0.00 $19.67 $6.0615 OCT 2012 19 OCT 2012 29 OCT 2012 17 DEC 2012 Higher rate stipulated by the USDOL
BARRIER MEMBRANE MACHINE
OPERATOR HEAVY
ROCKINGHAM
$20.00 $0.00 $24.37 $21.3217 OCT 2012 19 OCT 2012 29 OCT 2012 02 DEC 2012 Higher rate stipulated by the USDOL
Page 41 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:NEWINGTON - DOVER 11238L ROCKINGHAM Cianbro CorpActive
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Cianbro Corp Yes
BOAT PILOT HEAVY
ROCKINGHAM
$15.50 $2.92 $19.67 $6.0626 JUL 2010 02 AUG 2010 02 AUG 2010 13 SEP 2010 Higher rate stipulated by the USDOL
CONCRETE FINISHER HEAVY
STRAFFORD
$15.50 $2.92 $20.00 $4.3030 JUL 2010 02 AUG 2010 02 AUG 2010 09 NOV 2010 Higher rate stipulated by the USDOL
TRUCK DRIVER HEAVY
STRAFFORD
$14.06 $2.92 $14.06 $2.9227 DEC 2010 29 DEC 2010 04 JAN 2011 10 FEB 2011 Rate approved as requested
CONCRETE FINISHER HEAVY
ROCKINGHAM
$15.50 $2.92 $20.00 $4.3026 JUL 2010 02 AUG 2010 02 AUG 2010 13 SEP 2010 Higher rate stipulated by the USDOL
BRIDGE PAINTER HEAVY
ROCKINGHAM
$17.00 $0.00 $19.10 $3.9006 SEP 2011 06 SEP 2011 14 SEP 2011 01 NOV 2011 Higher rate stipulated by the USDOL
BRIDGE PAINTER HEAVY
STRAFFORD
$17.00 $0.00 $20.00 $4.3006 SEP 2011 06 SEP 2011 14 SEP 2011 01 NOV 2011 Higher rate stipulated by the USDOL
IRONWORKER HEAVY
STRAFFORD
$18.00 $2.92 $20.00 $4.3026 JUL 2010 02 AUG 2010 02 AUG 2010 09 NOV 2010 Higher rate stipulated by the USDOL
IRONWORKER HEAVY
ROCKINGHAM
$18.00 $2.92 $20.00 $4.3026 JUL 2010 02 AUG 2010 02 AUG 2010 13 SEP 2010 Higher rate stipulated by the USDOL
BIDWELL OPERATOR HEAVY
STRAFFORD
$15.50 $2.92 $19.67 $6.0626 JUL 2010 02 AUG 2010 02 AUG 2010 13 SEP 2010 Higher rate stipulated by the USDOL
ELECTRICIAN HEAVY
STRAFFORD
$18.00 $2.92 $20.00 $4.3026 JUL 2010 02 AUG 2010 02 AUG 2010 09 NOV 2010 Higher rate stipulated by the USDOL
IRONWORKER (REINFORCING)
HEAVY STRAFFORD
$15.50 $2.92 $20.00 $4.3026 JUL 2010 02 AUG 2010 02 AUG 2010 09 NOV 2010 Higher rate stipulated by the USDOL
BOAT PILOT HEAVY STRAFFORD $15.50 $2.92 $19.67 $6.0626 JUL 2010 02 AUG 2010 02 AUG 2010 09 NOV 2010 Higher rate stipulated by the USDOL
BIDWELL OPERATOR HEAVY
ROCKINGHAM
$15.50 $2.92 $19.67 $6.0626 JUL 2010 02 AUG 2010 02 AUG 2010 09 NOV 2010 Higher rate stipulated by the USDOL
PILE DRIVER HEAVY
ROCKINGHAM
$15.50 $2.92 $19.67 $6.0626 JUL 2010 02 AUG 2010 02 AUG 2010 13 SEP 2010 Higher rate stipulated by the USDOL
ELECTRICIAN HEAVY
ROCKINGHAM
$18.00 $2.92 $20.00 $4.3026 JUL 2010 02 AUG 2010 02 AUG 2010 13 SEP 2010 Higher rate stipulated by the USDOL
PILE DRIVER HEAVY STRAFFORD $15.50 $2.92 $19.67 $6.0626 JUL 2010 02 AUG 2010 02 AUG 2010 09 NOV 2010 Higher rate stipulated by the USDOL
CONCRETE PUMP OPERATOR
HEAVY STRAFFORD
$20.00 $0.00 $19.67 $6.0601 SEP 2011 06 SEP 2011 14 SEP 2011 01 NOV 2011 Higher rate stipulated by the USDOL
CONCRETE PUMP OPERATOR
HEAVY ROCKINGHAM
$20.00 $0.00 $24.57 $21.3201 SEP 2011 06 SEP 2011 14 SEP 2011 12 JAN 2012 Higher rate stipulated by the USDOL
IRONWORKER (REINFORCING)
HEAVY ROCKINGHAM
$15.50 $2.92 $20.00 $4.3026 JUL 2010 02 AUG 2010 02 AUG 2010 13 SEP 2010 Higher rate stipulated by the USDOL
Page 42 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:NEWINGTON - DOVER 11238L ROCKINGHAM Cianbro CorpActive
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Cianbro Corp Yes
TRUCK DRIVER HEAVY
ROCKINGHAM
$12.84 $2.92 $14.04 $2.2127 DEC 2010 29 DEC 2010 04 JAN 2011 02 FEB 2011 Higher rate stipulated by the USDOL
County: Prime Contractor:NORTHUMBERLAND, NH- GUILDHALL, VT
28454
COOS J.P. Sicard IncActive
28454
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Nicom Coatings Corp Yes
BIG MEMBRANE MACHINE
OPERATOR HIGHWAY COOS
$23.00 $2.00 $23.00 $2.0013 MAY 2015 13 MAY 2015 14 MAY 2015 11 JUN 2015 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Modern Protective Coatings Inc Yes
STRUCTURAL STEEL/BRIDGE
PAINTER HIGHWAY ESSEX, VT
$22.00 $4.00 $22.00 $4.0020 APR 2015 20 APR 2015 23 APR 2015 20 MAY 2015 Rate approved as requested
STRUCTURAL STEEL/BRIDGE
PAINTER HIGHWAY COOS
$22.00 $4.00 $22.00 $4.0020 APR 2015 20 APR 2015 23 APR 2015 12 MAY 2015 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
J.P. Sicard Inc Yes
SKID STEER OPERATOR
HIGHWAY COOS
$18.03 $0.00 $17.96 $3.9020 APR 2015 20 APR 2015 23 APR 2015 14 MAY 2015 Higher rate stipulated by the USDOL
Page 43 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:OSSIPEE-CONWAY 29514 CARROLL Pike IndustriesActive
29514
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Pike Industries Yes
SKID STEER OPERATOR
HIGHWAY CARROLL
$18.38 $3.42 $18.38 $3.4212 MAY 2015 13 MAY 2015 15 MAY 2015 11 JUN 2015 Rate approved as requested
TRANSFER MACHINE OPERATOR
HIGHWAY CARROLL
$18.38 $3.42 $18.38 $3.4212 MAY 2015 13 MAY 2015 15 MAY 2015 11 JUN 2015 Rate approved as requested
SCREED OPERATOR HIGHWAY
CARROLL
$18.38 $3.42 $18.38 $3.4212 MAY 2015 13 MAY 2015 15 MAY 2015 11 JUN 2015 Rate approved as requested
MECHANIC HIGHWAY CARROLL $18.38 $3.42 $18.38 $3.4212 MAY 2015 13 MAY 2015 15 MAY 2015 11 JUN 2015 Rate approved as requested
RECLAIM OPERATOR HIGHWAY
CARROLL
$18.38 $3.42 $18.38 $3.4212 MAY 2015 13 MAY 2015 15 MAY 2015 11 JUN 2015 Rate approved as requested
TRAFFIC COORDINATOR
HIGHWAY CARROLL
$15.82 $2.22 $15.82 $2.2212 MAY 2015 13 MAY 2015 15 MAY 2015 11 JUN 2015 Rate approved as requested
Page 44 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:PELHAM 14491 HILLSBOROUGH Continental Paving IncActive
14491
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
LYNCH'S LANDSCAPING Yes
Hydro Seeder/Sprayer Operator
Highway HILLSBOROUGH
$23.16 $6.32 $23.16 $6.3218 JUL 2014 05 AUG 2014 08 AUG 2014 03 SEP 2014 Rate approved as requested
Hay Mulcher Operator Highway
HILLSBOROUGH
$23.16 $6.32 $23.16 $6.3218 JUL 2014 05 AUG 2014 08 AUG 2014 03 SEP 2014 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
JCB COLBY, INC Yes
Mason Highway HILLSBOROUGH $20.99 $0.00 $20.99 $0.0026 AUG 2013 26 AUG 2013 04 SEP 2013 12 SEP 2013 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Continental Paving Inc Yes
COLD PLANE OPERATOR
HIGHWAY HILLSBOROUGH
$19.25 $2.37 $25.19 $0.0005 NOV 2012 06 NOV 2012 08 NOV 2012 11 DEC 2012 Higher rate stipulated by the USDOL
RECLAIM OPERATOR HIGHWAY
HILLSBOROUGH
$19.25 $2.37 $25.19 $0.0005 NOV 2012 06 NOV 2012 08 NOV 2012 11 DEC 2012 Higher rate stipulated by the USDOL
MATERIAL TRANSFER VEHICLE
HIGHWAY HILLSBOROUGH
$19.25 $2.37 $25.19 $0.0005 NOV 2012 06 NOV 2012 08 NOV 2012 11 DEC 2012 Higher rate stipulated by the USDOL
Page 45 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:PEMBROKE 14477A MERRIMACK Weaver Brothers ConstructionActive
14477A
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
JOHN BROWN & SONS, INC. Yes
Bucket Truck Operator Highway
MERRIMACK
$21.02 $3.33 $21.02 $3.3312 MAR 2015 13 MAR 2015 16 MAR 2015 07 APR 2015 Rate approved as requested
Tree Shear Operator Highway
MERRIMACK
$21.44 $3.36 $21.44 $3.3612 MAR 2015 13 MAR 2015 16 MAR 2015 07 APR 2015 Rate approved as requested
Skidder Operator Highway
MERRIMACK
$20.08 $2.52 $20.08 $2.5212 MAR 2015 13 MAR 2015 16 MAR 2015 07 APR 2015 Rate approved as requested
Whole Tree Chipper Operator
Highway MERRIMACK
$22.21 $2.87 $22.21 $2.8712 MAR 2015 13 MAR 2015 16 MAR 2015 07 APR 2015 Rate approved as requested
Bronto Mower Operator Highway
MERRIMACK
$21.85 $3.02 $21.85 $3.0212 MAR 2015 13 MAR 2015 16 MAR 2015 07 APR 2015 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
CAMERON, A.J. SOD FARMS Yes
Hay Mulcher Operator Highway
MERRIMACK
$22.08 $6.00 $22.08 $6.0012 MAR 2015 13 MAR 2015 16 MAR 2015 07 APR 2015 Rate approved as requested
Hydro Seeder/Sprayer Operator
Highway MERRIMACK
$22.08 $6.00 $22.08 $6.0012 MAR 2015 13 MAR 2015 16 MAR 2015 07 APR 2015 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Weaver Brothers Construction Yes
PIPE LAYER HIGHWAY
MERRIMACK
$14.73 $4.81 $14.73 $4.8119 MAR 2015 19 MAR 2015 19 MAR 2015 17 APR 2015 Rate approved as requested
Page 46 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:PITTSBURG 28251 COOS Pike IndustriesActive
28251
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
CAMERON, A.J. SOD FARMS Yes
Hydro Seeder/Sprayer Operator
Highway COOS
$22.08 $6.00 $22.08 $6.0024 JUL 2014 24 JUL 2014 28 AUG 2014 14 AUG 2014 Rate approved as requested
Hay Mulcher Operator Highway
COOS
$22.08 $6.00 $22.08 $6.0024 JUL 2014 24 JUL 2014 28 JUL 2014 14 AUG 2014 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Pike Industries Yes
MECHANIC HIGHWAY COOS $17.96 $3.90 $17.96 $3.9003 JUL 2014 03 JUL 2014 08 JUL 2014 28 JUL 2014 Rate approved as requested
RECLAIM OPERATOR HIGHWAY
COOS
$17.96 $3.90 $17.96 $3.9003 JUL 2014 03 JUL 2014 08 JUL 2014 28 JUL 2014 Rate approved as requested
PIPE LAYER HIGHWAY COOS $14.40 $0.45 $14.40 $0.4503 JUL 2014 03 JUL 2014 08 JUL 2014 28 JUL 2014 Rate approved as requested
TRAFFIC COORDINATOR
HIGHWAY COOS
$14.40 $0.45 $14.40 $0.4503 JUL 2014 03 JUL 2014 08 JUL 2014 28 JUL 2014 Rate approved as requested
TRANSFER MACHINE OPERATOR
HIGHWAY COOS
$17.96 $3.90 $17.96 $3.9003 JUL 2014 03 JUL 2014 08 JUL 2014 28 JUL 2014 Rate approved as requested
SKID STEER OPERATOR
HIGHWAY COOS
$17.96 $3.90 $17.96 $3.9003 JUL 2014 03 JUL 2014 08 JUL 2014 28 JUL 2014 Rate approved as requested
SCREED OPERATOR HIGHWAY
COOS
$17.96 $3.90 $17.96 $3.9003 JUL 2014 03 JUL 2014 08 JUL 2014 28 JUL 2014 Rate approved as requested
Page 47 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:PORTSMOUTH 13455B ROCKINGHAM Ed Swett IncActive
13455B
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
AD ROSSI CORPORATION Yes
Barrier Membrane Machine Operator
Highway ROCKINGHAM
$20.50 $2.50 $22.27 $6.5726 JUN 2013 26 JUN 2013 27 JUN 2013 10 JUL 2013 Higher rate stipulated by the USDOL
Forklift Operator Highway
ROCKINGHAM
$20.50 $2.50 $22.27 $6.5725 JUN 2013 26 JUN 2013 27 JUN 2013 10 JUL 2013 Higher rate stipulated by the USDOL
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
HS&G Erosion Conrol LLC Yes
HAY MULCHER OPERATOR
HIGHWAY ROCKINGHAM
$20.54 $0.00 $22.27 $6.5724 JUN 2013 25 JUN 2013 27 JUN 2013 12 JUL 2013 Higher rate stipulated by the USDOL
HYDRO SEEDER/SPRAYER
OPERATOR HIGHWAY
ROCKINGHAM
$20.54 $0.00 $22.27 $6.5724 JUN 2013 25 JUN 2013 04 JUL 2013 12 JUL 2013 Higher rate stipulated by the USDOL
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Independent Concrete Pumping Corp Yes
Concrete Pump Operator Highway
ROCKINGHAM
$30.00 $6.00 $30.00 $6.0013 MAY 2013 17 MAY 2013 21 MAY 2013 23 MAY 2013 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
JCB COLBY, INC Yes
Cement Mason Highway
ROCKINGHAM
$18.00 $0.00 $20.57 $1.0609 MAY 2013 09 MAY 2013 10 MAY 2013 20 MAY 2013 Higher rate stipulated by the USDOL
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
JCB COLBY, INC Yes
Cement Mason Highway
ROCKINGHAM
$18.00 $0.00 $20.57 $1.0609 MAY 2013 09 MAY 2013 10 MAY 2013 20 MAY 2013 Higher rate stipulated by the USDOL
Page 48 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:PORTSMOUTH 13455C ROCKINGHAM Ed Swett IncActive
13455C
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
JCB COLBY, INC Yes
Concrete Finisher Highway
ROCKINGHAM
$20.51 $1.06 $20.51 $1.0617 JAN 2014 20 JAN 2014 22 JAN 2014 27 JAN 2014 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Continental Paving Inc Yes
COLD PLANE OPERATOR
HIGHWAY ROCKINGHAM
$22.27 $6.57 $22.27 $6.5707 OCT 2014 07 OCT 2014 08 OCT 2014 15 DEC 2014 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Independent Concrete Pumping Corp Yes
Concrete Pump Operator Highway
ROCKINGHAM
$31.96 $7.05 $31.96 $7.0506 JAN 2014 07 JAN 2014 09 JAN 2014 13 JAN 2014 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
HS&G Erosion Conrol LLC Yes
HYDRO SEEDER/SPRAYER
OPERATOR HIGHWAY
ROCKINGHAM
$28.84 $0.00 $28.84 $0.0031 DEC 2013 03 JAN 2014 09 JAN 2014 13 JAN 2014 Rate approved as requested
HAY MULCHER OPERATOR
HIGHWAY ROCKINGHAM
$28.84 $0.00 $28.84 $0.0031 DEC 2013 06 JAN 2014 09 JAN 2014 13 JAN 2014 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Nicom Coatings Corp Yes
BIG MEMBRANE MACHINE
OPERATOR HIGHWAY
ROCKINGHAM
$24.31 $5.69 $24.31 $5.6925 APR 2014 30 APR 2014 01 MAY 2014 14 MAY 2014 Rate approved as requested
Page 49 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:PORTSMOUTH 14417 ROCKINGHAMActive
14417
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
JOHN BROWN & SONS, INC. Yes
Whole Tree Chipper Operator
Highway ROCKINGHAM
$19.09 $2.87 $22.27 $6.5711 NOV 2013 11 NOV 2013 18 NOV 2013 21 NOV 2013 Higher rate stipulated by the USDOL
Tree Shear Operator Highway
ROCKINGHAM
$19.37 $3.36 $22.27 $6.5711 NOV 2013 11 NOV 2013 18 NOV 2013 21 NOV 2013 Higher rate stipulated by the USDOL
Bucket Truck Operator Highway
ROCKINGHAM
$19.59 $3.33 $22.27 $6.5711 NOV 2013 11 NOV 2013 18 NOV 2013 21 NOV 2013 Higher rate stipulated by the USDOL
Bronto Mower Operator Highway
ROCKINGHAM
$19.25 $3.02 $22.27 $6.5711 NOV 2013 11 NOV 2013 18 NOV 2013 21 NOV 2013 Higher rate stipulated by the USDOL
Skidder Operator Highway
ROCKINGHAM
$18.56 $2.52 $19.25 $0.0011 NOV 2013 11 NOV 2013 18 NOV 2013 21 NOV 2013 Per USDOL: Rate already in WD
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Continental Paving Inc Yes
COLD PLANE OPERATOR
HIGHWAY ROCKINGHAM
$23.43 $0.00 $22.27 $6.5718 AUG 2014 18 AUG 2014 03 SEP 2014 24 SEP 2014 Higher rate stipulated by the USDOL
Page 50 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:PORTSMOUTH 14493 ROCKINGHAMActive
14493
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
CWS FENCE & GUARDRAIL Yes
GUARDRAIL INSTALLER HEAVY
ROCKINGHAM
$17.24 $1.54 $17.24 $1.5422 OCT 2013 22 OCT 2013 07 NOV 2013 02 DEC 2013 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
New Hampshire Boring Inc Yes
DRILL OPERATOR HEAVY
ROCKINGHAM
$22.00 $7.10 $24.31 $5.6924 OCT 2013 24 OCT 2013 05 NOV 2013 14 NOV 2013 Higher rate stipulated by the USDOL
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Project Flagging, Inc. Yes
Flaggers Heavy ROCKINGHAM $10.42 $1.37 $17.24 $1.5404 NOV 2013 04 NOV 2013 07 NOV 2013 02 DEC 2013 Higher rate stipulated by the USDOL
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Nicom Coatings Corp Yes
BIG MEMBRANE MACHINE
OPERATOR HEAVY
ROCKINGHAM
$24.50 $0.50 $24.31 $5.6925 NOV 2013 25 NOV 2013 02 DEC 2013 04 DEC 2013 Higher rate stipulated by the USDOL
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Independent Concrete Pumping Corp Yes
Concrete Pump Operator Highway
ROCKINGHAM
$31.96 $7.05 $31.96 $7.0504 FEB 2014 04 FEB 2014 10 FEB 2014 12 FEB 2014 Rate approved as requested
Page 51 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:PORTSMOUTH 14493 ROCKINGHAMActive
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Weaver Brothers Construction Yes
DOZER HEAVY ROCKINGHAM $24.59 $6.11 $24.59 $6.1105 DEC 2013 05 DEC 2013 16 DEC 2013 19 DEC 2013 Rate approved as requested
BROOM OPERATOR HEAVY
ROCKINGHAM
$16.92 $3.44 $24.31 $5.6905 DEC 2013 05 DEC 2013 16 DEC 2013 19 DEC 2013 Higher rate stipulated by the USDOL
PIPE LAYER HEAVY
ROCKINGHAM
$18.29 $4.33 $18.29 $4.3305 DEC 2013 05 DEC 2013 16 DEC 2013 19 DEC 2013 Rate approved as requested
GRADER OPERATOR HEAVY
ROCKINGHAM
$25.16 $6.97 $25.16 $6.9705 DEC 2013 05 DEC 2013 16 DEC 2013 19 DEC 2013 Rate approved as requested
ROLLER OPERATOR HEAVY
ROCKINGHAM
$22.27 $6.57 $24.31 $5.6905 DEC 2013 05 DEC 2013 16 DEC 2013 19 DEC 2013 Higher rate stipulated by the USDOL
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
John C Brown & Sons Yes
SKIDDER OPERATOR HEAVY
ROCKINGHAM
$18.56 $2.52 $24.31 $5.6911 DEC 2013 12 DEC 2013 17 DEC 2013 20 DEC 2013 Higher rate stipulated by the USDOL
TREE SHEAR OPERATOR HEAVY
ROCKINGHAM
$19.37 $3.36 $24.31 $5.6911 DEC 2013 12 DEC 2013 17 DEC 2013 20 DEC 2013 Higher rate stipulated by the USDOL
WHOLE TREE CHIPPER
OPERATOR HEAVY
ROCKINGHAM
$19.09 $2.87 $24.31 $5.6911 DEC 2013 12 DEC 2013 17 DEC 2013 20 DEC 2013 Higher rate stipulated by the USDOL
BUCKET TRUCK OPERATOR
HEAVY ROCKINGHAM
$19.59 $3.33 $24.31 $5.6911 DEC 2013 12 DEC 2013 17 DEC 2013 20 DEC 2013 Higher rate stipulated by the USDOL
BRONTO MOWER OPERATOR
HEAVY ROCKINGHAM
$19.25 $3.02 $24.31 $5.6911 DEC 2013 12 DEC 2013 17 DEC 2013 20 DEC 2013 Higher rate stipulated by the USDOL
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
A J CAMERON SOD FARMS Yes
Hay Mulcher Operator Highway
ROCKINGHAM
$25.03 $5.35 $25.03 $5.3513 JAN 2014 13 JAN 2014 13 JAN 2014 27 JAN 2014 Rate approved as requested
Hydro Seeder/Sprayer Operator
Highway ROCKINGHAM
$25.03 $5.35 $25.03 $5.3513 JAN 2014 13 JAN 2014 13 JAN 2014 27 JAN 2014 Rate approved as requested
Page 52 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:PORTSMOUTH 14493 ROCKINGHAMActive
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Advanced Excavating & Paving Yes
PAVER OPERATOR HEAVY
ROCKINGHAM
$24.31 $5.69 $24.31 $5.6910 NOV 2014 10 NOV 2014 13 NOV 2014 12 DEC 2014 Rate approved as requested
ASPHALT TRIMMER OPERATOR
HEAVY ROCKINGHAM
$24.31 $5.69 $24.31 $5.6910 NOV 2014 10 NOV 2014 13 NOV 2014 12 DEC 2014 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Maine Drilling & Blasting Yes
DRILLER (ROCK FOR BLASTING)
HEAVY ROCKINGHAM
$18.24 $1.54 $24.31 $5.6910 JUL 2014 22 JUL 2014 22 JUL 2014 08 AUG 2014 Higher rate stipulated by the USDOL
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Pepperrell Cove Marine Svs Inc Yes
DIVER TENDER HEAVY
ROCKINGHAM
$20.40 $2.60 $20.40 $2.6002 DEC 2014 03 DEC 2014 04 DEC 2014 30 DEC 2014 Rate approved as requested
DIVER HEAVY ROCKINGHAM $24.31 $5.69 $24.31 $5.6902 DEC 2014 03 DEC 2014 04 DEC 2014 30 DEC 2014 Rate approved as requested
Page 53 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:PORTSMOUTH 14493 ROCKINGHAMActive
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Reed & Reed Inc Yes
PAINTER HEAVY ROCKINGHAM $24.31 $5.69 $24.31 $5.6923 SEP 2014 24 SEP 2014 29 SEP 2014 16 OCT 2014 Rate approved as requested
FORKLIFT OPERATOR HEAVY
ROCKINGHAM
$17.50 $1.50 $24.31 $5.6905 NOV 2013 05 NOV 2013 05 NOV 2013 14 NOV 2013 Higher rate stipulated by the USDOL
IRONWORKER (REINFORCING)
HEAVY ROCKINGHAM
$18.00 $2.50 $24.31 $5.6923 OCT 2013 23 OCT 2013 07 NOV 2013 19 NOV 2013 Higher rate stipulated by the USDOL
IRONWORKER (STRUCTURAL)
HEAVY ROCKINGHAM
$18.50 $2.75 $24.31 $5.6923 OCT 2013 23 OCT 2013 19 NOV 2013 19 NOV 2013 Higher rate stipulated by the USDOL
SKID STEER OPERATOR HEAVY
ROCKINGHAM
$17.50 $1.50 $24.31 $5.6905 NOV 2013 05 NOV 2013 05 NOV 2013 14 NOV 2013 Higher rate stipulated by the USDOL
CRANE OPERATOR HEAVY
ROCKINGHAM
$23.50 $3.50 $24.31 $5.6923 OCT 2013 23 OCT 2013 07 NOV 2013 19 NOV 2013 Higher rate stipulated by the USDOL
SCREED OPERATOR HEAVY
ROCKINGHAM
$24.31 $5.69 $24.31 $5.6922 OCT 2014 28 OCT 2014 29 OCT 2014 18 NOV 2014 Rate approved as requested
CARPENTER (ROUGH) HEAVY
ROCKINGHAM
$17.50 $2.00 $24.31 $5.6923 OCT 2013 23 OCT 2013 07 NOV 2013 19 NOV 2013 Higher rate stipulated by the USDOL
Barrier Membrane Machine Operator
Heavy ROCKINGHAM
$24.50 $0.50 $24.31 $5.6925 NOV 2013 25 NOV 2013 02 DEC 2013 03 DEC 2013 Higher rate stipulated by the USDOL
BACKHOE OPERATOR HEAVY
ROCKINGHAM
$18.00 $2.00 $24.31 $5.6905 NOV 2013 05 NOV 2013 05 NOV 2013 14 NOV 2013 Higher rate stipulated by the USDOL
PILE DRIVER HEAVY
ROCKINGHAM
$17.50 $2.00 $24.31 $5.6923 OCT 2013 23 OCT 2013 07 NOV 2013 19 NOV 2013 Higher rate stipulated by the USDOL
CONCRETE FINISHER HEAVY
ROCKINGHAM
$18.00 $2.00 $24.31 $5.6924 OCT 2013 24 OCT 2013 05 NOV 2013 14 NOV 2013 Higher rate stipulated by the USDOL
Page 54 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:PORTSMOUTH 20222B ROCKINGHAM Alvin J Coleman & Son IncActive
20222B
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Continental Paving Inc Yes
COLD PLANE OPERATOR
HIGHWAY ROCKINGHAM
$23.43 $0.00 $22.27 $6.5718 AUG 2014 18 AUG 2014 03 SEP 2014 30 SEP 2014 Higher rate stipulated by the USDOL
Page 55 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:PORTSMOUTH, NH - KITTERY, ME 13678F ROCKINGHAM Archer Western Contractors; LtActive
13678F
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
ALL Set Corp Yes
Lead Abatement Heavy
ROCKINGHAM
$25.00 $0.00 $25.00 $0.0005 MAR 2012 07 MAR 2012 14 MAR 2012 10 MAY 2012 Rate approved as requested
Lead Abatement Heavy York, ME $25.00 $0.00 $25.00 $0.0008 MAR 2012 12 MAR 2012 14 MAR 2012 14 NOV 2012 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Riverside Marine Construction, Inc. Yes
Tug Boat Captain > 1,000 HP Heavy
ROCKINGHAM
$40.00 $0.00 $40.00 $0.0010 FEB 2012 10 FEB 2012 16 FEB 2012 07 AUG 2012 Rate approved as requested
Boat Pilot Heavy ROCKINGHAM $25.00 $0.00 $24.31 $5.6910 FEB 2012 10 FEB 2012 16 FEB 2012 07 AUG 2012 Higher rate stipulated by the USDOL
Tug Boat Opr. Heavy York, ME $40.00 $0.00 $40.00 $0.0010 FEB 2012 10 FEB 2012 16 FEB 2012 29 MAR 2012 Rate approved as requested
Boat Pilot Heavy York, ME $25.00 $0.00 $19.38 $15.5010 FEB 2012 10 FEB 2012 16 FEB 2012 29 MAR 2012 Higher rate stipulated by the USDOL
Tug Boat Opr. Heavy ROCKINGHAM $40.00 $0.00 $40.00 $0.0010 FEB 2012 10 FEB 2012 16 FEB 2012 07 AUG 2012 Rate approved as requested
Tug Boat Captain > 1,000 HP Heavy
York, ME
$40.00 $40.00 $40.00 $40.0010 FEB 2012 10 FEB 2012 16 FEB 2012 29 MAR 2012 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
H L PATTEN CONSTRUCTION INC Yes
PAINTER HEAVY ROCKINGHAM $16.15 $0.00 $26.75 $15.2517 MAY 2013 20 MAY 2013 21 MAY 2013 29 MAY 2013 Higher rate stipulated by the USDOL
GLAZIER HEAVY ROCKINGHAM $20.25 $4.07 $26.75 $15.2517 MAY 2013 20 MAY 2013 21 MAY 2013 29 MAY 2013 Higher rate stipulated by the USDOL
PLUMBER HEAVY ROCKINGHAM $25.34 $5.85 $26.75 $15.2517 MAY 2013 20 MAY 2013 21 MAY 2013 29 MAY 2013 Higher rate stipulated by the USDOL
PLUMBER HIGHWAY
ROCKINGHAM
$25.34 $5.85 $25.34 $5.8530 MAY 2013 31 MAY 2013 06 JUN 2013 19 JUN 2013 Rate approved as requested
SHEET METAL WORKER HEAVY
ROCKINGHAM
$25.50 $13.90 $26.75 $15.2517 MAY 2013 20 MAY 2013 21 MAY 2013 29 MAY 2013 Higher rate stipulated by the USDOL
CONCRETE FINISHER HEAVY
ROCKINGHAM
$20.65 $0.00 $26.75 $15.2517 MAY 2013 20 MAY 2013 21 MAY 2013 29 MAY 2013 Higher rate stipulated by the USDOL
Page 56 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:PORTSMOUTH, NH - KITTERY, ME 13678F York, ME Archer Western Contractors; LtActive
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Palmer & Sicard Inc Yes
SHEET METAL WORKER HEAVY
YORK, ME
$18.47 $4.92 $18.47 $4.9221 MAY 2013 21 MAY 2013 05 AUG 2013 07 AUG 2013 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
HUB FOUNDATION CO., INC. Yes
Oiler Heavy ROCKINGHAM $35.86 $3.70 $35.86 $3.7031 AUG 2012 31 AUG 2012 10 SEP 2012 15 OCT 2012 Rate approved as requested
Pile Driver Heavy ROCKINGHAM $38.30 $3.70 $38.30 $3.7020 JUN 2012 20 JUN 2012 22 JUN 2012 02 AUG 2012 Rate approved as requested
Oiler Heavy York, ME $35.86 $3.70 $35.86 $3.7002 AUG 2012 31 AUG 2012 10 SEP 2012 05 DEC 2012 Rate approved as requested
Oiler Highway York, ME $35.86 $3.70 $35.86 $3.7002 AUG 2012 31 AUG 2012 10 SEP 2012 05 DEC 2012 Rate approved as requested
Pile Driver Highway York, ME $38.30 $3.70 $38.30 $3.7020 JUN 2012 20 JUN 2012 22 JUN 2012 06 SEP 2012 Rate approved as requested
Drill Rig Operator Highway York, ME $25.00 $19.00 $25.00 $19.0008 JUN 2012 08 JUN 2012 18 JUN 2012 16 AUG 2012 Rate approved as requested
Pile Driver Heavy York, ME $38.30 $3.70 $38.30 $3.7020 JUN 2012 20 JUN 2012 22 JUN 2012 17 AUG 2012
Drill Rig Operator Heavy
ROCKINGHAM
$38.00 $21.00 $38.00 $21.0008 JUN 2012 08 JUN 2012 12 JUN 2012 07 AUG 2012 Rate approved as requested
Pile Driver Highway ROCKINGHAM $38.30 $3.70 $38.30 $3.7020 JUN 2012 20 JUN 2012 22 JUN 2012 18 JUL 2012 Rate approved as requested
Drill Operator Highway York, ME $25.00 $19.00 $25.00 $19.0008 JUN 2012 08 JUN 2012 18 JUN 2012 16 AUG 2012 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
THE LYDON COMPANY Yes
Millwright Heavy York, ME $25.08 $19.32 $25.08 $19.3213 MAR 2013 13 MAR 2013 20 MAR 2013 01 APR 2013 Rate approved as requested
Millwright Heavy ROCKINGHAM $25.08 $19.32 $25.08 $19.3213 MAR 2013 13 MAR 2013 20 MAR 2013 26 MAR 2013 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
J. TROPEANO, INC. Yes
Gradall Operator Highway York, ME $30.00 $30.00 $30.00 $0.0022 JUL 2013 23 JUL 2013 25 JUL 2013 16 AUG 2013 Rate approved as requested
Gradall Operator Highway
ROCKINGHAM
$30.00 $30.00 $30.00 $0.0022 JUL 2013 23 JUL 2013 25 JUL 2013 01 AUG 2013 Rate approved as requested
Roller Operator Highway York, ME $17.76 $8.47 $17.76 $8.4702 AUG 2013 02 AUG 2013 05 AUG 2013 16 AUG 2013 Rate approved as requested
Page 57 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:PORTSMOUTH, NH - KITTERY, ME 13678F ROCKINGHAM Archer Western Contractors; LtActive
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
AD ROSSI CORPORATION Yes
Forklift Operator Heavy
ROCKINGHAM
$30.00 $0.00 $30.00 $0.0018 APR 2013 18 APR 2013 19 APR 2013 29 APR 2013 Rate approved as requested
Barrier Membrane Machine Operator
Heavy ROCKINGHAM
$30.00 $0.00 $30.00 $0.0018 APR 2013 18 APR 2013 19 APR 2013 19 APR 2013 Rate approved as requested
Barrier Membrane Machine Operator
Heavy York, ME
$18.75 $0.00 $18.54 $4.4918 APR 2013 18 APR 2013 19 APR 2013 17 JUN 2013 Higher rate stipulated by the USDOL
Forklift Operator Heavy York, ME $18.75 $0.00 $18.54 $4.4918 APR 2013 18 APR 2013 19 APR 2013 17 JUN 2013 Higher rate stipulated by the USDOL
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
CWS FENCE & GUARDRAIL Yes
GUARDRAIL INSTALLER HEAVY
ROCKINGHAM
$17.24 $1.54 $17.24 $1.5424 JUN 2013 24 JUN 2013 27 JUN 2013 10 JUL 2013 Rate approved as requested
GUARDRAIL INSTALLER HEAVY
YORK, ME
$14.49 $3.91 $14.49 $3.9125 JUN 2013 25 JUN 2013 27 JUN 2013 23 JUL 2013 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
CAMERON, A.J. SOD FARMS Yes
Hay Mulcher Operator Highway York,
ME
$11.87 $2.05 $12.38 $2.4819 SEP 2013 19 SEP 2013 19 SEP 2013 25 OCT 2013 Higher rate stipulated by the USDOL
Hydro Seeder/Sprayer Operator
Highway York, ME
$11.87 $2.05 $12.38 $2.4819 SEP 2013 19 SEP 2013 19 SEP 2013 25 OCT 2013 Higher rate stipulated by the USDOL
Hydro Seeder/Sprayer Operator
Highway ROCKINGHAM
$21.82 $4.32 $21.82 $4.3219 SEP 2013 19 SEP 2013 19 SEP 2013 23 SEP 2013 Rate approved as requested
Hay Mulcher Operator Highway
ROCKINGHAM
$21.82 $4.32 $21.82 $4.3219 SEP 2013 19 SEP 2013 19 SEP 2013 23 SEP 2013 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
SOEP PAINTING CORP Yes
Painter Heavy York, ME $12.98 $5.80 $20.00 $0.0009 DEC 2013 10 DEC 2013 16 DEC 2013 30 JAN 2014 Higher rate stipulated by the USDOL
Page 58 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:PORTSMOUTH, NH - KITTERY, ME 13678F ROCKINGHAM Archer Western Contractors; LtActive
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Archer Western Contractors; Lt Yes
BRIDGE LIFT OPERATOR HEAVY
ROCKINGHAM
$18.50 $0.00 $30.00 $0.0024 JAN 2012 25 JAN 2012 09 FEB 2012 21 MAR 2012 Higher rate stipulated by the USDOL
CONCRETE PUMP OPERATOR
HEAVY YORK, ME
$30.00 $0.00 $30.00 $0.0010 SEP 2012 10 SEP 2012 18 SEP 2012 09 OCT 2012 Rate approved as requested
CONCRETE PUMP OPERATOR
HEAVY ROCKINGHAM
$30.00 $0.00 $30.00 $0.0026 JUN 2012 26 JUN 2012 10 SEP 2012 15 OCT 2012 Rate approved as requested
CRANE OPERATOR HEAVY
ROCKINGHAM
$23.99 $3.05 $30.00 $0.0024 JAN 2012 25 JAN 2012 09 FEB 2012 21 MAR 2012 Higher rate stipulated by the USDOL
IRONWORKER (REINFORCING)
HEAVY ROCKINGHAM
$20.87 $20.32 $26.75 $14.8910 SEP 2012 10 SEP 2012 17 SEP 2012 12 OCT 2012 Higher rate stipulated by the USDOL
IRONWORKER (REINFORCING)
HIGHWAY YORK, ME
$20.87 $20.32 $20.87 $20.3210 SEP 2012 10 SEP 2012 17 SEP 2012 05 DEC 2012 Rate approved as requested
CONCRETE PUMP OPERATOR
HIGHWAY ROCKINGHAM
$30.00 $0.00 $30.00 $0.0026 JUN 2012 26 JUN 2012 10 SEP 2012 15 OCT 2012 Rate approved as requested
CARPENTER HEAVY
ROCKINGHAM
$19.90 $3.90 $42.01 $0.0024 JAN 2012 25 JAN 2012 09 FEB 2012 21 MAR 2012 Higher rate stipulated by the USDOL
IRONWORKER (STRUCTURAL)
HEAVY ROCKINGHAM
$20.87 $20.32 $26.75 $14.8906 AUG 2012 06 AUG 2012 05 SEP 2012 12 OCT 2012 Higher rate stipulated by the USDOL
BLOCK/BRICK LAYER HIGHWAY
ROCKINGHAM
$17.15 $2.60 $21.06 $1.0602 DEC 2014 02 DEC 2014 02 DEC 2014 23 DEC 2014 Higher rate stipulated by the USDOL
CONCRETE PUMP OPERATOR
HIGHWAY YORK, ME
$30.00 $0.00 $30.00 $0.0010 SEP 2012 10 SEP 2012 18 SEP 2012 05 DEC 2012 Rate approved as requested
IRONWORKER (STRUCTURAL)
HEAVY YORK, ME
$20.87 $20.32 $20.87 $20.3206 AUG 2012 06 AUG 2012 05 SEP 2012 26 SEP 2012 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
CWS FENCE & GUARDRAIL Yes
GUARDRAIL INSTALLER HEAVY
YORK, ME
$14.49 $3.91 $14.49 $3.9125 JUN 2013 25 JUN 2013 27 JUN 2013 23 JUL 2013 Rate approved as requested
GUARDRAIL INSTALLER HEAVY
ROCKINGHAM
$17.24 $1.54 $17.24 $1.5424 JUN 2013 24 JUN 2013 27 JUN 2013 10 JUL 2013 Rate approved as requested
Page 59 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:PORTSMOUTH, NH - KITTERY, ME 13678F ROCKINGHAM Archer Western Contractors; LtActive
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
CAMERON, A.J. SOD FARMS Yes
Hay Mulcher Operator Highway
ROCKINGHAM
$21.82 $4.32 $21.82 $4.3219 SEP 2013 19 SEP 2013 19 SEP 2013 23 SEP 2013 Rate approved as requested
Hydro Seeder/Sprayer Operator
Highway ROCKINGHAM
$21.82 $4.32 $21.82 $4.3219 SEP 2013 19 SEP 2013 19 SEP 2013 23 SEP 2013 Rate approved as requested
Hydro Seeder/Sprayer Operator
Highway York, ME
$11.87 $2.05 $12.38 $2.4819 SEP 2013 19 SEP 2013 19 SEP 2013 25 OCT 2013 Higher rate stipulated by the USDOL
Hay Mulcher Operator Highway York,
ME
$11.87 $2.05 $12.38 $2.4819 SEP 2013 19 SEP 2013 19 SEP 2013 25 OCT 2013 Higher rate stipulated by the USDOL
Page 60 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:SALEM TO MANCHESTER 13933E ROCKINGHAM George R Cairns & Sons IncActive
13933E
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
JOHN BROWN & SONS, INC. Yes
Grapple Skidder Operator Highway
ROCKINGHAM
$19.76 $3.29 $19.76 $3.2902 AUG 2012 20 SEP 2012 20 SEP 2012 29 OCT 2012 Rate approved as requested
Mower Operator Highway
ROCKINGHAM
$19.75 $3.29 $19.75 $3.2902 AUG 2012 20 SEP 2012 20 SEP 2012 29 OCT 2012 Rate approved as requested
Tree Shear Operator Highway
ROCKINGHAM
$19.78 $3.31 $19.78 $3.3102 AUG 2012 20 SEP 2012 20 SEP 2012 29 OCT 2012 Rate approved as requested
Whole Tree Chipper Operator
Highway ROCKINGHAM
$19.77 $3.30 $19.77 $3.3002 AUG 2012 20 SEP 2012 20 SEP 2012 29 OCT 2012 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
HS&G Erosion Conrol LLC Yes
HYDRO SEEDER/SPRAYER
OPERATOR HIGHWAY
ROCKINGHAM
$20.54 $0.00 $22.27 $6.5724 JUN 2013 25 JUN 2013 27 JUN 2013 12 JUL 2013 Higher rate stipulated by the USDOL
HAY MULCHER OPERATOR
HIGHWAY ROCKINGHAM
$20.54 $0.00 $22.27 $6.5724 JUN 2013 25 JUN 2013 27 JUN 2013 12 JUL 2013 Higher rate stipulated by the USDOL
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Independent Concrete Pumping Corp Yes
Concrete Pump Operator Highway
ROCKINGHAM
$31.58 $6.70 $31.58 $6.7012 SEP 2012 17 SEP 2012 17 SEP 2012 23 MAY 2013 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
WOLCOTT CONSTRUCTION, INC Yes
Material Transfer Vehicle Highway
ROCKINGHAM
$20.25 $0.00 $20.25 $0.0016 OCT 2012 17 OCT 2012 18 OCT 2012 02 DEC 2012 Rate approved as requested
Page 61 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:SALEM TO MANCHESTER 13933E ROCKINGHAM George R Cairns & Sons IncActive
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
AD ROSSI CORPORATION Yes
Forklift Operator Highway
ROCKINGHAM
$19.25 $0.25 $22.27 $6.5715 MAY 2013 22 MAY 2013 06 JUN 2013 19 JUN 2013 Higher rate stipulated by the USDOL
Barrier Membrane Machine Operator
Highway ROCKINGHAM
$19.25 $0.50 $22.27 $6.5715 MAY 2013 22 MAY 2013 06 JUN 2013 19 JUN 2013 Higher rate stipulated by the USDOL
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
JCB COLBY, INC Yes
Concrete Finisher Highway
ROCKINGHAM
$16.99 $2.60 $16.99 $2.6001 JAN 0001 12 SEP 2012 20 SEP 2012 29 OCT 2012 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Brox Industries Inc Yes
COLD PLANE OPERATOR
HIGHWAY ROCKINGHAM
$26.00 $6.00 $26.00 $6.0023 MAY 2013 28 MAY 2013 06 JUN 2013 19 JUN 2013 Rate approved as requested
ASPHALT TRIMMER OPERATOR
HIGHWAY ROCKINGHAM
$26.00 $6.00 $26.00 $6.0023 MAY 2013 28 MAY 2013 06 JUN 2013 19 JUN 2013 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Maine Drilling & Blasting Yes
LABORER: DRILLER FOR ROCK
HIGHWAY ROCKINGHAM
$18.99 $2.60 $18.99 $2.6005 AUG 2013 05 AUG 2013 06 AUG 2013 05 DEC 2014 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Busby Construction Co Inc Yes
RECLAIM OPERATOR HIGHWAY
ROCKINGHAM
$26.07 $0.00 $22.27 $6.5715 OCT 2013 26 NOV 2013 03 DEC 2013 05 DEC 2013 Higher rate stipulated by the USDOL
Page 62 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:SALEM TO MANCHESTER 13933H ROCKINGHAM Weaver Brothers ConstructionActive
13933H
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
JOHN BROWN & SONS, INC. Yes
Tree Shear Operator Highway
ROCKINGHAM
$19.37 $3.36 $22.27 $6.5708 JAN 2014 08 JAN 2014 09 JAN 2014 13 JAN 2014 Higher rate stipulated by the USDOL
Bronto Mower Operator Highway
ROCKINGHAM
$19.25 $3.02 $22.27 $6.5708 JAN 2014 08 JAN 2014 09 JAN 2014 13 JAN 2014 Higher rate stipulated by the USDOL
Whole Tree Chipper Operator
Highway ROCKINGHAM
$19.09 $2.87 $22.27 $6.5708 JAN 2014 08 JAN 2014 09 JAN 2014 13 JAN 2014 Higher rate stipulated by the USDOL
Skidder Operator Highway
ROCKINGHAM
$18.56 $2.52 $19.25 $0.0008 JAN 2014 08 JAN 2014 02 JUN 2014 23 JUL 2014 Use Skid Steer Rate per USDOL
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
CAMERON, A.J. SOD FARMS Yes
Hay Mulcher Operator Highway
ROCKINGHAM
$19.05 $0.00 $22.27 $6.5702 JAN 2014 09 JAN 2014 09 JAN 2014 13 JAN 2014 Higher rate stipulated by the USDOL
Hydro Seeder/Sprayer Operator
Highway ROCKINGHAM
$19.05 $0.00 $22.27 $6.5702 JAN 2014 09 JAN 2014 09 JAN 2014 13 JAN 2014 Higher rate stipulated by the USDOL
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Brox Industries Inc Yes
COLD PLANE OPERATOR
HIGHWAY ROCKINGHAM
$26.00 $6.00 $26.00 $6.0025 APR 2014 28 APR 2014 30 APR 2014 14 OCT 2014 Rate approved as requested
ASPHALT TRIMMER OPERATOR
HIGHWAY ROCKINGHAM
$26.00 $6.00 $26.00 $6.0025 APR 2014 28 APR 2014 30 APR 2014 14 OCT 2014 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Advanced Excavating & Paving Yes
RECLAIM OPERATOR HIGHWAY
ROCKINGHAM
$22.27 $6.57 $22.27 $6.5704 DEC 2014 04 DEC 2014 08 DEC 2014 30 DEC 2014 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
JCB COLBY, INC Yes
Concrete Finisher Highway
ROCKINGHAM
$20.57 $1.06 $20.57 $1.0615 JAN 2014 15 JAN 2014 16 JAN 2014 27 JAN 2014 Rate approved as requested
Page 63 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:SALEM TO MANCHESTER 13933H ROCKINGHAM Weaver Brothers ConstructionActive
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
MARCOU CONSTRUCT CO INC Yes
ROCK CRUSHER OPERATOR
HIGHWAY ROCKINGHAM
$24.10 $3.49 $22.27 $6.5723 JAN 2014 23 JAN 2014 28 JAN 2014 30 JAN 2014 Higher rate stipulated by the USDOL
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
MAINE DRILLING & BLASTING Yes
LABORER: DRILLER FOR ROCK
HIGHWAY ROCKINGHAM
$17.99 $2.60 $17.99 $2.6002 MAY 2014 02 MAY 2014 08 MAY 2014 05 JAN 2015 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
CAPITAL WELL COMPANY, INC Yes
Plumber Highway ROCKINGHAM $16.00 $3.40 $20.57 $1.0606 MAY 2014 07 MAY 2014 12 MAY 2014 14 OCT 2014 Higher rate stipulated by the USDOL
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Weaver Brothers Construction Yes
SWEEPER OPERATOR HIGHWAY
ROCKINGHAM
$19.25 $0.00 $22.27 $6.5716 APR 2014 18 APR 2014 21 APR 2014 02 MAY 2014 Higher rate stipulated by the USDOL
MATERIAL TRANSFER VEHICLE
HIGHWAY ROCKINGHAM
$23.43 $0.00 $22.27 $6.5706 JAN 2014 16 JAN 2014 17 JAN 2014 27 JAN 2014 Higher rate stipulated by the USDOL
Page 64 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:SALEM TO MANCHESTER 13933I ROCKINGHAM Rs Audley IncActive
13933I
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
JOHN BROWN & SONS, INC. Yes
Mower Operator Highway
ROCKINGHAM
$19.28 $3.35 $19.28 $3.3529 NOV 2012 29 NOV 2012 04 DEC 2012 03 JAN 2013 Rate approved as requested
Tree Shear Operator Highway
ROCKINGHAM
$19.25 $3.36 $19.25 $3.3629 NOV 2012 29 NOV 2012 04 DEC 2012 03 JAN 2013 Rate approved as requested
Skidder Operator Highway
ROCKINGHAM
$19.26 $3.30 $19.26 $3.3029 NOV 2012 29 NOV 2012 04 DEC 2012 03 JAN 2013 Rate approved as requested
Chipper Operator Highway
ROCKINGHAM
$19.27 $3.34 $19.27 $3.3429 NOV 2012 29 NOV 2012 04 DEC 2012 03 JAN 2013 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
JCB COLBY, INC Yes
Mason Highway ROCKINGHAM $21.63 $0.00 $21.63 $0.0018 SEP 2014 24 SEP 2014 29 SEP 2014 29 SEP 2014 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
HS&G Erosion Conrol LLC Yes
HAY MULCHER OPERATOR
HIGHWAY ROCKINGHAM
$20.54 $0.00 $22.27 $6.5724 JUN 2013 25 JUN 2013 27 JUN 2013 01 AUG 2013 Higher rate stipulated by the USDOL
HYDRO SEEDER/SPRAYER
OPERATOR HIGHWAY
ROCKINGHAM
$20.54 $0.00 $22.27 $6.5724 JUN 2013 25 JUN 2013 27 JUN 2013 01 AUG 2013 Higher rate stipulated by the USDOL
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Busby Construction Co Inc Yes
RECLAIM OPERATOR HIGHWAY
ROCKINGHAM
$20.00 $0.00 $26.07 $0.0025 JAN 2013 25 JAN 2013 30 JAN 2013 11 MAR 2013 Higher rate stipulated by the USDOL
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Maine Drilling & Blasting Yes
DRILLER (ROCK FOR BLASTING)
HIGHWAY ROCKINGHAM
$18.99 $2.60 $18.99 $2.6016 MAR 2013 06 MAY 2013 10 MAY 2013 05 JAN 2015 Rate approved as requested
Page 65 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:SALEM TO MANCHESTER 13933I ROCKINGHAM Rs Audley IncActive
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Continental Paving Inc Yes
COLD PLANE OPERATOR
HIGHWAY ROCKINGHAM
$23.43 $0.00 $22.27 $6.5710 MAY 2013 10 MAY 2013 10 MAY 2013 16 MAY 2013 Higher rate stipulated by the USDOL
CRUSHER OPERATOR HIGHWAY
ROCKINGHAM
$22.04 $4.31 $22.27 $6.5722 AUG 2013 22 AUG 2013 27 AUG 2013 09 SEP 2013 Higher rate stipulated by the USDOL
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Rs Audley Inc Yes
GRADALL OPERATOR HIGHWAY
ROCKINGHAM
$24.00 $4.00 $22.27 $6.5703 DEC 2012 03 DEC 2012 16 APR 2013 26 APR 2013 Higher rate stipulated by the USDOL
CONCRETE PUMP OPERATOR
HIGHWAY ROCKINGHAM
$21.43 $6.30 $22.27 $6.5711 JUN 2013 11 JUN 2013 21 JUN 2013 02 JUL 2013 Higher rate stipulated by the USDOL
CRUSHER OPERATOR HIGHWAY
ROCKINGHAM
$22.04 $4.31 $22.27 $6.5723 AUG 2013 23 AUG 2013 27 SEP 2013 09 SEP 2013 Higher rate stipulated by the USDOL
Page 66 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:SALEM TO MANCHESTER 14633F ROCKINGHAM Severino Trucking Co IncActive
14633F
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Continental Paving Inc Yes
MATERIAL TRANSFER VEHICLE
HIGHWAY ROCKINGHAM
$15.69 $0.00 $15.69 $0.0005 APR 2011 05 APR 2011 13 APR 2011 20 JUN 2011 Rate approved as requested
COLD PLANE OPERATOR
HIGHWAY ROCKINGHAM
$15.00 $2.79 $15.00 $2.7905 APR 2011 05 APR 2011 13 APR 2011 20 JUN 2011 Rate approved as requested
RECLAIM OPERATOR HIGHWAY
ROCKINGHAM
$15.00 $2.79 $15.00 $2.7905 APR 2011 05 APR 2011 13 APR 2011 20 JUN 2011 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
CAMERON, A.J. SOD FARMS Yes
Mulcher Operator Highway
ROCKINGHAM
$14.17 $0.00 $17.66 $1.9026 MAR 2013 26 MAR 2013 29 MAR 2013 08 APR 2013 Higher rate stipulated by the USDOL
Hydro Seeder/Sprayer Operator
Highway ROCKINGHAM
$14.17 $0.00 $17.66 $1.9026 MAR 2013 26 MAR 2013 29 MAR 2013 08 APR 2013 Higher rate stipulated by the USDOL
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
JOHN BROWN & SONS, INC. Yes
Grapple Skidder Operator Highway
ROCKINGHAM
$14.71 $1.22 $14.71 $1.2222 MAR 2011 28 MAR 2011 28 MAR 2011 14 JUL 2011 Rate approved as requested
Tree Shear Operator Highway
ROCKINGHAM
$15.55 $1.61 $15.55 $1.6122 MAR 2011 28 MAR 2011 28 MAR 2011 14 JUL 2011 Rate approved as requested
Whole Tree Chipper Operator
Highway ROCKINGHAM
$15.05 $1.44 $15.05 $1.4422 MAR 2011 28 MAR 2011 28 MAR 2011 14 JUL 2011 Rate approved as requested
Mower Operator Highway
ROCKINGHAM
$14.18 $1.11 $14.18 $1.1122 MAR 2011 28 MAR 2011 28 MAR 2011 14 JUL 2011 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
AD ROSSI CORPORATION Yes
Forklift Operator Highway
ROCKINGHAM
$14.50 $1.00 $17.66 $1.9016 APR 2013 23 APR 2013 23 APR 2013 29 APR 2013 Higher rate stipulated by the USDOL
Barrier Membrane Machine Operator
Highway ROCKINGHAM
$14.50 $1.00 $17.66 $1.9016 APR 2013 23 APR 2013 23 APR 2013 29 APR 2013 Higher rate stipulated by the USDOL
Page 67 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:SALEM TO MANCHESTER 14633F ROCKINGHAM Severino Trucking Co IncActive
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Roadsafe Traffic Lp Yes
AUGER TRUCK HIGHWAY
ROCKINGHAM
$16.00 $1.50 $16.00 $1.5030 MAR 2011 04 APR 2011 04 APR 2011 20 JUN 2011 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
East Coast Signals Inc Yes
Bucket Truck Operator Highway
ROCKINGHAM
$15.00 $1.50 $15.00 $1.5029 MAR 2011 04 APR 2011 13 APR 2011 20 JUN 2011 Rate approved as requested
Mini-Skid Steer Operator Highway
ROCKINGHAM
$15.50 $1.50 $15.50 $1.5029 MAR 2011 04 APR 2011 13 APR 2011 20 JUN 2011 Rate approved as requested
Mini-Excavator Operator Highway
ROCKINGHAM
$15.50 $1.50 $15.50 $1.5029 MAR 2011 04 APR 2011 13 APR 2011 20 JUN 2011 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Pheonix Communications Yes
Fiber Technician/Splicer Highway
ROCKINGHAM
$23.22 $2.78 $23.22 $2.7807 JAN 2015 14 JAN 2015 14 JAN 2015 11 FEB 2015 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
PARMCO, INC. Yes
Ironworker (reinforcing) Highway
ROCKINGHAM
$21.00 $0.00 $21.00 $0.0015 NOV 2011 21 NOV 2011 28 NOV 2011 01 JAN 0001 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
MAINE DRILLING & BLASTING Yes
DRILLER (ROCK FOR BLASTING)
HIGHWAY ROCKINGHAM
$14.00 $1.92 $14.00 $1.9226 APR 2011 28 APR 2011 11 MAY 2011 27 MAY 2011 Rate approved as requested
BLASTER HIGHWAY
ROCKINGHAM
$16.50 $1.92 $16.50 $1.9226 APR 2011 28 APR 2011 11 MAY 2011 27 MAY 2011 Rate approved as requested
Page 68 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:SALEM TO MANCHESTER 14633F ROCKINGHAM Severino Trucking Co IncActive
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Roadsafe Traffic Lp Yes
AUGER TRUCK HIGHWAY
ROCKINGHAM
$16.00 $1.50 $16.00 $1.5030 MAR 2011 04 APR 2011 04 APR 2011 20 JUN 2011 Rate approved as requested
County: Prime Contractor:SEABROOK TO PORTSMOUTH 11151E ROCKINGHAMActive
11151E
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
New Hampshire Boring Inc Yes
DRILLER (ROCK FOR BLASTING)
HIGHWAY ROCKINGHAM
$22.00 $0.00 $22.00 $0.0007 DEC 2010 10 DEC 2010 10 DEC 2010 07 JAN 2011 Rate approved as requested
DRILLER HELPER HIGHWAY
ROCKINGHAM
$17.00 $0.00 $0.00 $0.0007 DEC 2010 10 DEC 2010 10 DEC 2010 07 JAN 2011 Per USDOL: Rate already in WD
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Green Mountain Communications Yes
DRILL OPERATOR HIGHWAY
ROCKINGHAM
$15.00 $2.50 $15.00 $2.5018 NOV 2010 23 NOV 2010 24 NOV 2010 12 JAN 2011 Rate approved as requested
TELECOMMUNICATION
TECHNICIAN HIGHWAY
ROCKINGHAM
$16.50 $3.50 $16.50 $3.5018 NOV 2010 23 NOV 2010 24 NOV 2010 12 JAN 2011 Rate approved as requested
STEEL ERECTOR HIGHWAY
ROCKINGHAM
$16.35 $2.75 $16.35 $2.7518 NOV 2010 23 NOV 2010 24 NOV 2010 12 JAN 2011 Rate approved as requested
SIGN ERECTOR HIGHWAY
ROCKINGHAM
$16.35 $2.75 $16.35 $2.7518 NOV 2010 23 NOV 2010 24 NOV 2010 12 JAN 2011 Rate approved as requested
Page 69 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:SOMERSWORTH 16049 STRAFFORDActive
16049
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
JCB COLBY, INC Yes
Stone Mason Highway STRAFFORD $21.22 $0.00 $21.22 $0.0021 SEP 2014 30 SEP 2014 30 SEP 2014 16 OCT 2014 Rate approved as requested
Cement Mason Highway
STRAFFORD
$21.22 $0.00 $21.22 $0.0021 SEP 2014 30 SEP 2014 30 SEP 2014 16 OCT 2014 Rate approved as requested
County: Prime Contractor:STARK 20224 COOSActive
20224
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Androscoggin Electric, LLC Yes
Electrician Highway COOS $25.00 $0.00 $25.00 $0.0017 APR 2014 17 APR 2014 21 APR 2014 13 MAY 2014 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
John L Carter Sprinkler Co Inc Yes
SPRINKLER FITTER HIGHWAY
COOS
$22.91 $0.00 $22.92 $0.0009 APR 2015 09 APR 2015 14 APR 2015 12 MAY 2015 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
ALPINE CONSTRUCTION Yes
Concrete Pump Operator Highway
COOS
$26.82 $0.00 $26.82 $0.0006 AUG 2014 06 AUG 2014 08 AUG 2014 03 SEP 2014 Rate approved as requested
Page 70 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:STATEWIDE 26842 STRAFFORD Surface Preparation Tech IncActive
26842
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Surface Preparation Tech Inc Yes
BROOM OPERATOR HIGHWAY
STRAFFORD
$21.00 $0.00 $22.87 $5.4618 AUG 2014 19 AUG 2014 25 AUG 2014 30 JAN 2015 Higher rate stipulated by the USDOL
MILLING MACHINE OPERATOR
HIGHWAY STRAFFORD
$25.00 $0.00 $22.87 $5.4618 AUG 2014 19 AUG 2014 25 AUG 2014 30 JAN 2015 Higher rate stipulated by the USDOL
BROOM OPERATOR HIGHWAY
ROCKINGHAM
$21.00 $0.00 $22.27 $6.5718 AUG 2014 19 AUG 2014 25 AUG 2014 30 JAN 2015 Higher rate stipulated by the USDOL
MILLING MACHINE OPERATOR
HIGHWAY ROCKINGHAM
$25.00 $0.00 $22.27 $6.5718 AUG 2014 19 AUG 2014 25 AUG 2014 30 JAN 2015 Higher rate stipulated by the USDOL
MILLING MACHINE OPERATOR
HIGHWAY GRAFTON
$25.00 $0.00 $25.00 $0.0020 AUG 2014 21 AUG 2014 25 AUG 2014 30 JAN 2015 Rate approved as requested
MILLING MACHINE OPERATOR
HIGHWAY MERRIMACK
$25.00 $0.00 $25.00 $0.0018 AUG 2014 19 AUG 2014 25 AUG 2014 30 JAN 2015 Rate approved as requested
County: Prime Contractor:STATEWIDE 28653 GRAFTON Delucca Fence Co IncActive
28653
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Delucca Fence Co Inc Yes
GUARDRAIL INSTALLER
HIGHWAY GRAFTON
$30.90 $7.95 $30.90 $7.9519 MAR 2015 01 APR 2015 13 APR 2015 13 MAY 2015 Rate approved as requested
Page 71 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:STATEWIDE 28953 CARROLL Pike IndustriesActive
28953
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Pike Industries Yes
SKID STEER OPERATOR
HIGHWAY CARROLL
$18.38 $3.42 $18.38 $3.4205 SEP 2014 08 SEP 2014 10 SEP 2014 01 JAN 0001 Rate approved as requested
TRANSFER MACHINE OPERATOR
HIGHWAY CARROLL
$18.38 $3.42 $18.38 $3.4205 SEP 2014 08 SEP 2014 10 SEP 2014 01 JAN 0001 Rate approved as requested
SCREED PERSON HIGHWAY
CARROLL
$18.38 $3.42 $18.38 $3.4205 SEP 2014 08 SEP 2014 10 SEP 2014 01 JAN 0001 Rate approved as requested
RECLAIM OPERATOR HIGHWAY
CARROLL
$18.38 $3.42 $18.38 $3.4205 SEP 2014 08 SEP 2014 10 SEP 2014 01 JAN 0001 Rate approved as requested
TRAFFIC COORDINATOR
HIGHWAY CARROLL
$15.82 $2.22 $15.82 $2.2205 SEP 2014 08 SEP 2014 10 SEP 2014 01 JAN 0001 Rate approved as requested
MECHANIC HIGHWAY CARROLL $18.38 $3.42 $18.38 $3.4205 SEP 2014 08 SEP 2014 10 SEP 2014 01 JAN 0001 Rate approved as requested
Page 72 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:STODDARD-HILLSBOROUGH 23797 CHESHIRE Continental Paving IncActive
23797
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
CWS FENCE & GUARDRAIL Yes
GUARDRAIL INSTALLER
HIGHWAY CHESHIRE
$14.96 $3.91 $14.96 $3.9105 AUG 2013 05 AUG 2013 06 AUG 2013 14 AUG 2013 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
AD ROSSI CORPORATION Yes
Big Membrane Machine Operator
Highway HILLSBOROUGH
$19.50 $2.50 $23.16 $6.3204 SEP 2013 04 SEP 2013 05 SEP 2013 16 SEP 2013 Higher rate stipulated by the USDOL
Forklift Operator Highway
CHESHIRE
$19.00 $1.00 $18.46 $3.0404 SEP 2013 04 SEP 2013 05 SEP 2013 13 SEP 2013 Higher rate stipulated by the USDOL
Big Membrane Machine Operator
Highway CHESHIRE
$19.00 $1.00 $18.46 $3.0404 SEP 2013 04 SEP 2013 05 SEP 2013 13 SEP 2013 Higher rate stipulated by the USDOL
Forklift Operator Highway
HILLSBOROUGH
$19.50 $2.50 $23.16 $6.3204 SEP 2013 04 SEP 2013 05 SEP 2013 16 SEP 2013 Higher rate stipulated by the USDOL
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
LYNCH'S LANDSCAPING Yes
Hydro Seeder/Sprayer Operator
Highway HILLSBOROUGH
$16.99 $2.60 $23.16 $6.3201 JUL 2014 01 JUL 2014 07 JUL 2014 30 JUL 2014 Higher rate stipulated by the USDOL
Hay Mulcher Operator Highway
HILLSBOROUGH
$16.99 $2.60 $23.16 $6.3201 JUL 2014 01 JUL 2014 07 JUL 2014 30 JUL 2014 Higher rate stipulated by the USDOL
Hydro Seeder/Sprayer Operator
Highway CHESHIRE
$14.96 $3.91 $18.46 $3.0401 JUL 2014 01 JUL 2014 07 JUL 2014 28 JUL 2014 Higher rate stipulated by the USDOL
Hay Mulcher Operator Highway
CHESHIRE
$14.96 $3.91 $18.46 $3.0401 JUL 2014 01 JUL 2014 07 JUL 2014 28 JUL 2014 Higher rate stipulated by the USDOL
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Gemstone; LLC Yes
PAINTER HIGHWAY
HILLSBOROUGH
$18.50 $0.00 $19.93 $1.0624 SEP 2013 24 SEP 2013 25 SEP 2013 17 OCT 2013 Higher rate stipulated by the USDOL
PAINTER HIGHWAY CHESHIRE $18.50 $0.00 $17.55 $2.3724 SEP 2013 24 SEP 2013 25 SEP 2013 17 OCT 2013 Higher rate stipulated by the USDOL
Page 73 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:STODDARD-HILLSBOROUGH 23797 CHESHIRE Continental Paving IncActive
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
JOHN BROWN & SONS INC Yes
Tree Shear Operator Highway
CHESHIRE
$19.37 $3.36 $19.37 $3.3628 APR 2014 30 APR 2014 30 APR 2014 22 MAY 2014 Rate approved as requested
Bronto Mower Operator Highway
CHESHIRE
$19.25 $3.02 $19.25 $3.0228 APR 2014 30 APR 2014 30 APR 2014 22 MAY 2014 Rate approved as requested
Whole Tree Chipper Operator
Highway CHESHIRE
$19.09 $2.87 $19.09 $2.8728 APR 2014 30 APR 2014 30 APR 2014 22 MAY 2014 Rate approved as requested
Tree Shear Operator Highway
HILLSBOROUGH
$19.37 $3.36 $23.16 $6.3228 APR 2014 30 APR 2014 30 APR 2014 14 MAY 2014 Higher rate stipulated by the USDOL
Bronto Mower Operator Highway
HILLSBOROUGH
$19.25 $3.02 $23.16 $6.3228 APR 2014 30 APR 2014 30 APR 2014 14 MAY 2014 Higher rate stipulated by the USDOL
Skidder Operator Highway
HILLSBOROUGH
$18.56 $2.52 $23.16 $6.3228 APR 2014 30 APR 2014 30 APR 2014 14 MAY 2014 Higher rate stipulated by the USDOL
Bucket Truck Operator Highway
CHESHIRE
$19.59 $3.47 $19.59 $3.4728 APR 2014 30 APR 2014 30 APR 2014 22 MAY 2014 Rate approved as requested
Skidder Operator Highway
CHESHIRE
$18.56 $2.52 $18.46 $3.0428 APR 2014 30 APR 2014 30 APR 2014 22 MAY 2014 Higher rate stipulated by the USDOL
Whole Tree Chipper Operator
Highway HILLSBOROUGH
$19.09 $2.87 $23.16 $6.3228 APR 2014 30 APR 2014 30 APR 2014 14 MAY 2014 Higher rate stipulated by the USDOL
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Continental Paving Inc Yes
TRAFFIC CONTROL
COORDINATOR HIGHWAY
HILLSBOROUGH
$16.99 $2.60 $16.99 $2.6030 JUN 2014 01 JUL 2014 08 JUL 2014 28 JUL 2014 Rate approved as requested
TRAFFIC CONTROL
COORDINATOR HIGHWAY
CHESHIRE
$14.96 $3.91 $14.96 $3.9130 JUN 2014 01 JUL 2014 08 JUL 2014 28 JUL 2014 Rate approved as requested
COLD PLANE OPERATOR
HIGHWAY HILLSBOROUGH
$28.88 $17.05 $28.88 $17.0530 JUN 2014 01 JUL 2014 08 JUL 2014 28 JUL 2014 Rate approved as requested
Page 74 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:TAMWORTH 15831 CARROLLActive
15831
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Veno Electric Inc Yes
ELECTRICIAN HIGHWAY
CARROLL
$24.50 $3.50 $24.50 $3.5023 APR 2014 30 APR 2014 30 APR 2014 21 MAY 2014 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Bii Fence & Guard Rail Inc Yes
GUARDRAIL INSTALLER
HIGHWAY CARROLL
$13.45 $0.24 $13.45 $0.2403 SEP 2014 03 SEP 2014 08 SEP 2014 29 SEP 2014 Rate approved as requested
County: Prime Contractor:WHITEFIELD - LANCASTER 25068 COOS Continental Paving IncActive
25068
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
VERMONT RECREATIONAL SURFACING & FENCING Yes
Guardrail Installer Highway COOS $14.40 $0.45 $14.40 $0.4510 APR 2015 14 APR 2015 15 APR 2015 13 MAY 2015 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Continental Paving Inc Yes
PIPE LAYER HIGHWAY COOS $15.00 $0.50 $15.00 $0.5013 APR 2015 13 APR 2015 13 APR 2015 13 MAY 2015 Rate approved as requested
MATERIAL TRANSFER VEHICLE
HIGHWAY COOS
$17.65 $6.05 $17.65 $6.0513 APR 2015 13 APR 2015 13 APR 2015 13 MAY 2015 Rate approved as requested
Page 75 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:WINCHESTER - SWANZEY 12906 CHESHIRE Beck & Bellucci IncActive
12906
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Weaver Brothers Construction Yes
PIPE LAYER HIGHWAY CHESHIRE $14.96 $3.91 $14.96 $3.9117 APR 2014 17 APR 2014 21 APR 2014 14 MAY 2014 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
JOHN BROWN & SONS, INC. Yes
Bucket Truck Operator Highway
CHESHIRE
$18.02 $3.33 $18.02 $3.3313 MAR 2014 14 MAR 2014 14 MAR 2014 01 APR 2014 Rate approved as requested
Skidder Operator Highway
CHESHIRE
$18.56 $2.52 $18.56 $2.5213 MAR 2014 14 MAR 2014 14 MAR 2014 01 APR 2014 Rate approved as requested
Bronto Mower Operator Highway
CHESHIRE
$18.21 $3.02 $18.21 $3.0213 MAR 2014 14 MAR 2014 14 MAR 2014 01 APR 2014 Rate approved as requested
Whole Tree Chipper Operator
Highway CHESHIRE
$18.44 $2.87 $18.44 $2.8713 MAR 2014 14 MAR 2014 14 MAR 2014 01 APR 2014 Rate approved as requested
Tree Shear Operator Highway
CHESHIRE
$18.11 $3.36 $18.11 $3.3613 MAR 2014 14 MAR 2014 14 MAR 2014 01 APR 2014 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
CAMERON, A.J. SOD FARMS Yes
Hydro Seeder/Sprayer Operator
Highway CHESHIRE
$21.17 $2.26 $21.17 $2.2624 APR 2014 25 APR 2014 30 APR 2014 14 MAY 2014 Rate approved as requested
Hay Mulcher Operator Highway
CHESHIRE
$21.17 $2.26 $21.17 $2.2624 APR 2014 25 APR 2014 30 APR 2014 14 MAY 2014 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
CWS FENCE & GUARDRAIL Yes
GUARDRAIL INSTALLER
HIGHWAY CHESHIRE
$14.96 $3.91 $14.96 $3.9109 APR 2014 09 APR 2014 16 APR 2014 23 APR 2014 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Newport Sand & Gravel Co Inc Yes
CONCRETE PUMP OPERATOR
HIGHWAY CHESHIRE
$22.50 $0.00 $22.50 $0.0013 FEB 2014 24 FEB 2014 24 FEB 2014 28 FEB 2014 Rate approved as requested
Page 76 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:WINCHESTER - SWANZEY 12906 CHESHIRE Beck & Bellucci IncActive
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Frank W Whitcomb Construction Yes
SCREED OPERATOR HIGHWAY
CHESHIRE
$22.05 $3.89 $22.05 $3.8930 DEC 2014 30 DEC 2014 31 DEC 2014 16 JAN 2015 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Beck & Bellucci Inc Yes
IRONWORKER (STRUCTURAL)
HIGHWAY CHESHIRE
$21.59 $0.90 $21.59 $0.9015 MAY 2014 15 MAY 2014 15 MAY 2014 12 JUN 2014 Rate approved as requested
County: Prime Contractor:WINCHESTER 16034 CHESHIREActive
16034
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
CWS FENCE & GUARDRAIL Yes
GUARDRAIL INSTALLER
HIGHWAY CHESHIRE
$14.96 $3.91 $14.96 $3.9107 OCT 2013 07 OCT 2013 11 OCT 2013 29 OCT 2013 Rate approved as requested
Page 77 of 78Wednesday, July 15, 2015 Office of Federal Compliance
County: Prime Contractor:WOLFEBORO 16070 CARROLLActive
16070
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
Bii Fence & Guard Rail Inc Yes
GUARDRAIL INSTALLER
HIGHWAY CARROLL
$13.45 $0.24 $13.45 $0.2417 OCT 2012 17 OCT 2012 17 OCT 2012 07 NOV 2012 Rate approved as requested
Classification
Rate
Requested
Fringe
Rate Letter Date
Letter
Rec'd Date
Rate
Approved
Fringe
Rate
Sent To
DOL
Dol Reply
Date Outcome
John H Lyman & Sons Inc Yes
BUCKET TRUCK OPERATOR
HIGHWAY CARROLL
$14.45 $1.39 $15.82 $2.2224 FEB 2012 27 FEB 2012 02 MAR 2012 10 MAY 2012 Higher rate stipulated by the USDOL
TREE SHEAR OPERATOR
HIGHWAY CARROLL
$14.80 $1.40 $15.82 $2.2224 FEB 2012 27 FEB 2012 02 MAR 2012 10 MAY 2012 Higher rate stipulated by the USDOL
GRAPPLE OPERATOR HIGHWAY
CARROLL
$14.80 $1.40 $15.82 $2.2224 FEB 2012 27 FEB 2012 02 MAR 2012 10 MAY 2012 Higher rate stipulated by the USDOL
Page 78 of 78Wednesday, July 15, 2015 Office of Federal Compliance