Multi-Sector General Permit (MSGP)
Spill Prevention Control and Countermeasures
(SPCC)
![Page 2: Waco Presentation - MSGP and SPCC 4](https://reader036.fdocuments.us/reader036/viewer/2022062400/58aa08cd1a28ab8a488b4a5b/html5/thumbnails/2.jpg)
Multi-Sector General Permit (MSGP)
![Page 3: Waco Presentation - MSGP and SPCC 4](https://reader036.fdocuments.us/reader036/viewer/2022062400/58aa08cd1a28ab8a488b4a5b/html5/thumbnails/3.jpg)
What is the Definition of “No Exposure?”
• All industrial materials or activities are protected by a storm resistant shelter to prevent exposure to rain, snow, snowmelt, and/or runoff.
• Storm resistant shelter not required for:– Sealed containers– Adequately maintained vehicles– Final products intended for outdoor use
![Page 4: Waco Presentation - MSGP and SPCC 4](https://reader036.fdocuments.us/reader036/viewer/2022062400/58aa08cd1a28ab8a488b4a5b/html5/thumbnails/4.jpg)
No Exposure Limitations• Available on a facility-wide basis only
• Permit required when condition of “no exposure” no longer exists
![Page 5: Waco Presentation - MSGP and SPCC 4](https://reader036.fdocuments.us/reader036/viewer/2022062400/58aa08cd1a28ab8a488b4a5b/html5/thumbnails/5.jpg)
Stormwater Pollution Prevention Plan
• Develop and Implement a Storm Water Pollution Prevention Plan (SWPPP)
• Facility specific• Develop, implement, and maintain
![Page 6: Waco Presentation - MSGP and SPCC 4](https://reader036.fdocuments.us/reader036/viewer/2022062400/58aa08cd1a28ab8a488b4a5b/html5/thumbnails/6.jpg)
Pollution Prevention Team
• Identify personnel responsible for developing and revising SWP3
• Clearly describe each member’s responsibility• Possible to list a position rather than person
![Page 7: Waco Presentation - MSGP and SPCC 4](https://reader036.fdocuments.us/reader036/viewer/2022062400/58aa08cd1a28ab8a488b4a5b/html5/thumbnails/7.jpg)
Inventory of Exposed Materials
• ALL materials handled that could be exposed to precipitation or runoff
• Update within 30 days following significant change– Significant change in type– Significant change in practice
![Page 8: Waco Presentation - MSGP and SPCC 4](https://reader036.fdocuments.us/reader036/viewer/2022062400/58aa08cd1a28ab8a488b4a5b/html5/thumbnails/8.jpg)
Spills and Leaks
Spills exposed to stormwater, or occurred within drainage area for an outfall
Reportable quantity: 30 TAC §327.4- Land: 25 gallons- Water: creates oil sheenPrevious 3 yearsUpdated quarterly
![Page 9: Waco Presentation - MSGP and SPCC 4](https://reader036.fdocuments.us/reader036/viewer/2022062400/58aa08cd1a28ab8a488b4a5b/html5/thumbnails/9.jpg)
Pollution Prevention Measures and Controls
–Best Management Practices (BMPs)–Good Housekeeping Measures– Erosion and Sedimentation Control Measures– Structural Controls– Spill Prevention and Response Measures
![Page 10: Waco Presentation - MSGP and SPCC 4](https://reader036.fdocuments.us/reader036/viewer/2022062400/58aa08cd1a28ab8a488b4a5b/html5/thumbnails/10.jpg)
Employee Training
• All employees responsible for SWP3• Annual training• Maintain records of training activities• Educate those not included in training activities
![Page 11: Waco Presentation - MSGP and SPCC 4](https://reader036.fdocuments.us/reader036/viewer/2022062400/58aa08cd1a28ab8a488b4a5b/html5/thumbnails/11.jpg)
Non-Stormwater Discharge
• Within 180 days of filing NOI• ID and evaluate all non-storm water discharges• Implement procedures for eliminating any
potential source not permitted• Document and certify this evaluation
![Page 12: Waco Presentation - MSGP and SPCC 4](https://reader036.fdocuments.us/reader036/viewer/2022062400/58aa08cd1a28ab8a488b4a5b/html5/thumbnails/12.jpg)
Routine Facility Inspections
• Qualified personnel• At least quarterly (sometimes monthly)• Use checklist• Maintain signed documentation in SWP3• Document any proposed revisions resulting
from inspection
![Page 13: Waco Presentation - MSGP and SPCC 4](https://reader036.fdocuments.us/reader036/viewer/2022062400/58aa08cd1a28ab8a488b4a5b/html5/thumbnails/13.jpg)
Annual Comprehensive Site Compliance Inspection
• Annual inspection by qualified personnel• Draft report within 30 days• Necessary revisions within 12 weeks of report• No need to report if compliant with all permit
conditions
![Page 14: Waco Presentation - MSGP and SPCC 4](https://reader036.fdocuments.us/reader036/viewer/2022062400/58aa08cd1a28ab8a488b4a5b/html5/thumbnails/14.jpg)
Sampling
• Qualifying storm event• Rain gauge on-site• Sample within first 30 minutes of discharge• Substantially Similar Outfalls• Inability to sample does not necessarily negate
the requirement to sample
![Page 15: Waco Presentation - MSGP and SPCC 4](https://reader036.fdocuments.us/reader036/viewer/2022062400/58aa08cd1a28ab8a488b4a5b/html5/thumbnails/15.jpg)
Quarterly Visual Monitoring
• Each outfall authorized by this permit• Visual examination quarterly• Document results and review by storm water
pollution prevention team
![Page 16: Waco Presentation - MSGP and SPCC 4](https://reader036.fdocuments.us/reader036/viewer/2022062400/58aa08cd1a28ab8a488b4a5b/html5/thumbnails/16.jpg)
Discharge Monitoring Report (DMR)
• Document annual analytical monitoring results• Monitoring must have been completed by Dec. 31st
for each annual monitoring period• A copy of the DMR must be retained onsite or
readily available to TCEQ by March 31st of next year• DMR must be submitted if numeric limitation
exceeded
![Page 17: Waco Presentation - MSGP and SPCC 4](https://reader036.fdocuments.us/reader036/viewer/2022062400/58aa08cd1a28ab8a488b4a5b/html5/thumbnails/17.jpg)
Spill Prevention Control and
Countermeasures (SPCC)
![Page 18: Waco Presentation - MSGP and SPCC 4](https://reader036.fdocuments.us/reader036/viewer/2022062400/58aa08cd1a28ab8a488b4a5b/html5/thumbnails/18.jpg)
Do You Need a SPCC Plan?
• Store, process, transfer, distribute, use, produce, refine oil or oil based products– Any petroleum product
• Total storage capacity of oil storage is 1,320 gallons or greater – Only consider containers 55 gallons or larger
![Page 19: Waco Presentation - MSGP and SPCC 4](https://reader036.fdocuments.us/reader036/viewer/2022062400/58aa08cd1a28ab8a488b4a5b/html5/thumbnails/19.jpg)
SPCC Plan
• Outlines the type and location of petroleum products stored on-site
• Includes procedures for preventing spills • Includes procedures in case of spill or leak• Professional engineer must certify if more
than 10,000 gallon storage capacity• Recertify every 5 years
![Page 20: Waco Presentation - MSGP and SPCC 4](https://reader036.fdocuments.us/reader036/viewer/2022062400/58aa08cd1a28ab8a488b4a5b/html5/thumbnails/20.jpg)
Secondary Containment
• General vs. Specific• Adequacy of secondary containment• All containers with capacity of 55-gallons and
greater need secondary containment• Ensure secondary containment remains
effective
![Page 21: Waco Presentation - MSGP and SPCC 4](https://reader036.fdocuments.us/reader036/viewer/2022062400/58aa08cd1a28ab8a488b4a5b/html5/thumbnails/21.jpg)
Secondary Containment
![Page 22: Waco Presentation - MSGP and SPCC 4](https://reader036.fdocuments.us/reader036/viewer/2022062400/58aa08cd1a28ab8a488b4a5b/html5/thumbnails/22.jpg)
Poorly Maintained Secondary Containment
![Page 23: Waco Presentation - MSGP and SPCC 4](https://reader036.fdocuments.us/reader036/viewer/2022062400/58aa08cd1a28ab8a488b4a5b/html5/thumbnails/23.jpg)
Inspections
• Tank Containment• Leak Detection• Tank Equipment• Tank Attachments• Other Conditions
![Page 24: Waco Presentation - MSGP and SPCC 4](https://reader036.fdocuments.us/reader036/viewer/2022062400/58aa08cd1a28ab8a488b4a5b/html5/thumbnails/24.jpg)
Training
• Annual training focused on procedures on how to prevent a spill and in the event of a spill– During installation of a new aboveground storage
tank– New employee is assigned to oil handling,
transfer, or maintenance responsibilities• Records: log sheets and training materials
![Page 25: Waco Presentation - MSGP and SPCC 4](https://reader036.fdocuments.us/reader036/viewer/2022062400/58aa08cd1a28ab8a488b4a5b/html5/thumbnails/25.jpg)
Spill Reporting and Documentation
• SPCC Coordinator prepares report for spill of reportable limit– Land: 25 gallons– Water: creates oily sheen
• Notify within 24 hours– State Emergency Response Center– TCEQ Regional office (during business hours)– TCEQ 24-hour spill reporting number
![Page 26: Waco Presentation - MSGP and SPCC 4](https://reader036.fdocuments.us/reader036/viewer/2022062400/58aa08cd1a28ab8a488b4a5b/html5/thumbnails/26.jpg)
• Joshua Glubiak• 713-974-2272• [email protected]