Campus-wideExterior Lighting RetrofitA Prop 39 Funded Project
Project DescriptionA detailed review of the exterior lighting on the main campus and at the Regional Public Safety Training Center was conducted by Compass Energy Solutions (CES). The analysis showed that retrofitting existing fluorescent technology to LED lighting technology would not only add significant lighting benefits for visitors, students and staff, but would also save the district on operational expenses.
The project includes retrofitting parking lot lights, wallpacks, security lights, and walkway lighting.
Project Benefits
This project is an outstanding example of state-of-the-art lighting design and construction. It is attractive, fully automatic, safe and reliable. LEDs are highly efficient, typically using 85% less than an incandescent blub and 50% less than a compact fluorescent bulb.
LEDs last a very long time up to 100,000 hours or more. Because of their long life, they come with excellent warranties, making them a smart investment for educational facilities.
Title 24 CompliantQualifies for SCE Incentive RebatesSensors provide significant energy savings 367,247 kWh annuallySignificant annual cost savings20-year life cycleCost avoidance from maintenance savingsEnhanced light distribution = better security
Project Funding BreakdownTotal Project Cost$1,116,804
Project Economics
Projected Annual Savings
Year(A) Est. Annual Energy Savings(B) Maintenance & Re-lamp Savings(C) Est. SCE Rebate(D) Est. Annual Savings (A) -+(B) + (C)(E) Two YearsProp 39(F) Est. Annual Cash Flow(D) + (E) 170,9212,43278,505151,858596,156747,741275,1762,432077,60877,608379,6872,432082,11982,119484,4682,432086,90086,900589,5362,432091,96891,968694,9082,432097,34097,3407100,6032,4320103,035103,0358106,6392,4320109,071109,0719113,0372,4320115,469115,46910119,8202,4320122,252122,25211127,0092,4320129,441129,44112134,6292,4320137,061137,06113142,7072,4320145,139145,13914151,2692,4320153,701153,70115160,3462,4320162,778162,77816169,9662,4320172,398172,39817180,1642,4320182,596182,59618190,9742,4320193,406193,40619202,4332,4320204,865204,86520214,5792,4320217,011217,01120 Year Projected Savings$3,331,899
Exterior building lightingTechnology CenterLibrary Entrance
Humanities Portables
Exterior Building Lighting
Building Lighting at Art and Music
Regional Public Safety Training Center
RPSTC court yard and parking lot
Student Feedback
Incentives & Rebates 2015 / 2016 (totals are approximate)2015 2016 Fiscal YearTotal Rebates / Incentives to the District1 MegaWatt PV Solar Generating Facility$ 452,916Solar Covered Canopies (Main Campus & RPSTC)$ 68,993Savings by Design Dr. Prem Reddy Health & Sciences Building$ 51,419TOTAL Incentives & Rebates 2015 / 2016 Fiscal Year$ 573,328