Vu Tran Khoa
Transcript of Vu Tran Khoa
(Resume .doc)
RESUME
Date: October 21, 2015
Full name : VU TRAN KHOA
Employee number : 05520
Date of Birth : 03 September 1986
Marital status : Single
Sex : Male
Nationality : Vietnamese
Present position : Geotechnical Engineer
EMERGENCY CONTACT
Contact name : VU MINH KHOI
Relationship : My Father
Address : Phu Nhi villages - Hung Loc - Hau Loc - Thanh Hoa.
Home phone :
Cell phone : 0972066738
EDUCATION & QUALIFICATION
• Road and bridge construction – University of transportation and communications (2005-
2010).
TRAINING PROGRAM
• Steel CAD training (04 hours).
• Static and machinery foundation design (20 hours).
• Slab on grade design (08 hours).
PROFESSIONAL EXPERIENCE AND POSITION:
• CIMAS Engineering Co., Ltd
- Page 1 of 3 -
(Resume .doc)
Jul/2015 - Present: Designer for Thai Binh Cooling Water System in CIMAS office
Responsibilities:
- Check calculation of culvert
- Provide truck loading for calculation of culvert
- Settlement calculation of culvert ( On soil, The settlement of pile
groups)
May/2014 – Jun/2014: Designer for PU Synthetic Leather Plant in Nhon Trach, Viet Nam
Responsibilities:
- Design for ground slab on grade.
- Design for Road and Paving.
Apr/2014 – Jun/2015: Designer for Urenco Project for an Industrial Waste Power
Generation System in Nam Son, Soc Son, Viet Nam.
Responsibilities:
- Design for ground slab on grade.
- Design for Road and Paving.
Dec/2013 – Apr/2015: Designer for Mong Duong II Project 7km slurry pipe line in Viet
Nam
Responsibilities:
- Calculation soil bearing capacity for shallow foundation
- Design square pile for pipe sleeper and support
- Design bored pile D600 for High Pedestal Pier of 240m Pipe
Bridge cross river
- Calculation soil bearing capacity for square pile foundation
design.
- Earth work, Excavation and backfill corridor for 7km pipe
line.
Oct/2013 – Dec/2013: Probation time
• Transportation Engineering Construction Consultant Company No.1 ( TECCO1)
May/2013 – Sep/2013: Designer for Project Highway 1A through the territory of Quang Tri
- Page 2 of 3 -
(Resume .doc)
Responsibilities:
- Alignment Design
- Chaired items soft soil treatment for embankment
- Calculation soil bearing capacity of pile of Abutment.
May/2012 – April/2013: Designer for Noi Bai airport to Nhat Tan bridge connecting road
construction project
Responsibilities:
- Alignment Design
- Soft soil treatment for Embankment
- Calculation soil bearing capacity of pile for Abutment.
- Calculation and Design retaining wall
Aug/2012 – April/2013: Investment Project XDCT expand National Highway 1 through
paragraph Km840 Hue province -: - Km854
Responsibilities:
- Chaired items soft soil treatment for embankment
Sep/2011 – May/2012: Designer for Upgrading, Improvement and Consolidation of Right
Song Thao Dyke with The Road from Co Tiet Village to Trung Ha
Bridge
Responsibilities:
- Alignment Design
- Soft soil treatment for Embankment
- Calculation soil bearing capacity of pile of Abutment.
- Calculation and Design retaining wall
Sep/2010 – Aug/2011: Designer for National Highway 15
Responsibilities:
- Alignment Design
- Design Culvert and Retaining wall
- Design For bored piles retaining walls
July/2010 – Sep/2011: Designer for Upgrading, Improvement and Consolidation of Right
- Page 3 of 3 -
(Resume .doc)
Song Thao Dyke with Road from Co Tiet Village to Trung Ha
Bridge
Responsibilities:
- The alignment about 20,5km with 2 at-grade intersections, 3
grade-separated junctions and many other bridges. Soft soil
treatment for Embankment
- Treatment and strengthening of weak embankment
- Page 4 of 3 -