PROJECT : LPG PLANT PROJECT CLIENT : PT. SURYA ESA PERKASA JOB / NO : 053209 SUBJECT : ENGINEERING DATA BOOK LOCATION : PALEMBANG - SOTH SUMATRA 3. DRAWINGS NO. DOCUMENT / DRAWING TITLE REV. VOLUME BOOK 3.1 1 LPG - 10 - V3 - DW - 004 - R Fire and Gas Protection System Layout A 3 BOOK 1 OF 2 2 LPG - 10 - V9 - DW - 001 - R Nozzle Details and Arrangement for Oil Catcher 0 3 BOOK 1 OF 2 3 LPG - 10 - V9 - DW - 002 - R Skimmer Arrangement 0 3 BOOK 1 OF 2 4 LPG - 10 - V9 - DW - 003 - R Skimmer Details 0 3 BOOK 1 OF 2 DOCUMENT / DRAWING NO. DOCUMENT/ DRAWING LIST ENGINEERING DATA BOOK MECHANICAL DRAWINGS 12/10/2014 1 of 9

description

Vol.3. Document List

Transcript of Vol.3. Document List

Page 1: Vol.3. Document List

PROJECT : LPG PLANT PROJECT

CLIENT : PT. SURYA ESA PERKASA

JOB / NO : 053209

SUBJECT : ENGINEERING DATA BOOK

LOCATION : PALEMBANG - SOTH SUMATRA

3. DRAWINGS

NO. DOCUMENT / DRAWING TITLE REV. VOLUME BOOK

3.1

1 LPG - 10 - V3 - DW - 004 - R Fire and Gas Protection System Layout A 3 BOOK 1 OF 2

2 LPG - 10 - V9 - DW - 001 - R Nozzle Details and Arrangement for Oil Catcher 0 3 BOOK 1 OF 2

3 LPG - 10 - V9 - DW - 002 - R Skimmer Arrangement 0 3 BOOK 1 OF 2

4 LPG - 10 - V9 - DW - 003 - R Skimmer Details 0 3 BOOK 1 OF 2

DOCUMENT / DRAWING NO.

DOCUMENT/ DRAWING LIST ENGINEERING DATA BOOK

MECHANICAL DRAWINGS

12/10/2014 1 of 9

Page 2: Vol.3. Document List

PROJECT : LPG PLANT PROJECT

CLIENT : PT. SURYA ESA PERKASA

JOB / NO : 053209

SUBJECT : ENGINEERING DATA BOOK

LOCATION : PALEMBANG - SOTH SUMATRA

3. DRAWINGS

NO. DOCUMENT / DRAWING TITLE REV. VOLUME BOOK

3.2

PILING LAYOUT 3 BOOK 1 OF 2

1 LPG - 00 - A2 - DW - 001 - R General Piling Layout ( 1 of 6) 3

2 LPG - 00 - A2 - DW - 001 - R General Piling Layout ( 2 of 6) 3

3 LPG - 00 - A2 - DW - 001 - R General Piling Layout ( 3 of 6) 3

4 LPG - 00 - A2 - DW - 001 - R General Piling Layout ( 4 of 6) 3

5 LPG - 00 - A2 - DW - 001 - R General Piling Layout ( 4 of 6) 3

6 LPG - 00 - A2 - DW - 001 - R General Piling Layout ( 6 of 6) 3

FOUNDATION LAYOUT (Area 01 LPG Processing)

7 LPG - 01 - A3 - DW - 001 - RFractionation Package Foundation Plan, Section & Rabber

Arrangement (1 of 2)3

8 LPG - 01 - A3 - DW - 001 - RFractionation Package Foundation Plan, Section & Member Schedule

(2 of 2)3

9 LPG - 01 - A3 - DW - 002 - R Propane Refrigeration Compressors Foundation Plan, Section & Detail 5

10 LPG - 01 - A3 - DW - 003 - R Propane Accumulator Foundation (V-400) Plan, Section & Detail 4

11 LPG - 01 - A3 - DW - 004 - R Gas Processing Package Foundation Plan, Section & Detail 2

12 LPG - 01 - A3 - DW - 005 - R Gas Teg Azeq Dehyd (E-1437) Foundation Plan, Section & Detail 2

13 LPG - 01 - A3 - DW - 006 - R Hot Oil Heater (E-1442) Foundation Plan, Section & Detail 2

FOUNDATION LAYOUT (Area 02 Feed/Lean Gas Compressor)

14 LPG - 02 - A3 - DW - 001 - R Gas Section Scrubber (V-004) Foundation Plan & Section 2

15 LPG - 02 - A3 - DW - 002 - R Feed Gas Compressor Package Foundation Plan, Section & Detail 2

16 LPG - 02 - A3 - DW - 004 - R LPG Storage Tanks ( V-008 A-D ) Plan, Section & Detail 2

17 LPG - 02 - A3 - DW - 005 - RPropane Storage Foundation (V-010) Plan, Detail, Section & Member

Schedule3

18 LPG - 02 - A3 - DW - 006 - RCondensate Storage Foundation (V-009) Plan, Detail, Section &

Member Schedule3

19 LPG - 02 - A3 - DW - 007 - RCondenser Foundation (E-410A-B.) Plan, Section Elevation, Detail and

Member Schedule (1 of 2)3

20 LPG - 02 - A3 - DW - 007 - R Foundation Plan, Rebar Arrangement and Section (2 of 2) 3

21 LPG - 02 - A3 - DW - 008 - R Off Spec Product Recycle Pump P-595 Foundation Plan & Section 1

22 LPG - 02 - A3 - DW - 009 - ROdodrizing Unit (M-010) Foundation Plan, Section, Rebar Arrangement

and Detail1

23 LPG - 02 - A3 - DW - 010 - R Dike for Condensate Storage V-009 Plan, Detail, Section (1 of 2) 2

24 LPG - 02 - A3 - DW - 010 - R Dike for Condensate Storage V-009 Plan, Detail, Section (2 of 2) 2

EQUIPMENT FOUNDATION LAYOUT (Area 10 General Utility & Offsite)

25 LPG - 10 - A3 - DW - 002 - R Sump Tank (V-006) Foundation Plan, Section & Detail 3

26 LPG - 10 - A3 - DW - 002 - R Handrail Detail for Sump Tank 3

27 LPG - 10 - A3 - DW - 003 - R Oil Catcher (Z-01) and Oil Cather Pump (P-07) Foundation 4

28 LPG - 10 - A3 - DW - 004 - RInstrument Air Receiver (V-012) Foundation Plan, Section Rebar

Arrangement and Detail1

29 LPG - 10 - A3 - DW - 008 - R Diesel Storage Tank (T-03) Foundation Plan, Section & Detail 1

30 LPG - 10 - A3 - DW - 009 - RFire Water (P-106 & P-107) & Jocky Pump (P-105) Foundation Plan,

Detail & Section3

31 LPG - 10 - A3 - DW - 010 - R Fire Water Pond (WP-01) Plan, Section and Detail (1 of 3) 2

32 LPG - 10 - A3 - DW - 010 - R Fire Water Pond (WP-01) Plan, Section and Detail (2 of 3) 2

33 LPG - 10 - A3 - DW - 010 - R Fire Water Pond (WP-01) Plan, Section and Detail (3 of 3) 2

34 LPG - 10 - A3 - DW - 012 - R Lightning Tower Foundation Section & Elevation 3

35 LPG - 10 - A3 - DW - 014 - R Oil Catcher Pump (P-07) Foundation Plan & Section 1 3 BOOK 1 OF 2

DOCUMENT / DRAWING NO.

DOCUMENT/ DRAWING LIST ENGINEERING DATA BOOK

CIVIL DRAWINGS

12/10/2014 2 of 9

Page 3: Vol.3. Document List

PROJECT : LPG PLANT PROJECT

CLIENT : PT. SURYA ESA PERKASA

JOB / NO : 053209

SUBJECT : ENGINEERING DATA BOOK

LOCATION : PALEMBANG - SOTH SUMATRA

3. DRAWINGS

NO. DOCUMENT / DRAWING TITLE REV. VOLUME BOOK DOCUMENT / DRAWING NO.

DOCUMENT/ DRAWING LIST ENGINEERING DATA BOOK

36 LPG - 10 - A3 - DW - 015 - RDrain Pot & Flare Pot Pump (P-013) Foundation Plan, Section Detail

and Member Schedule (1 of 21

37 LPG - 10 - A3 - DW - 015 - R Handrail Detail for Drain Pot & Flare Pot Pump 3 3 BOOK 1 OF 2

EQUIPMENT FOUNDATION LAYOUT (Area 11 Natural Gas Receiving and Fuel Gas System)

38 LPG - 11 - A3 - DW - 001 - RFuel Gas Filter (V-003) Foundation Plan, Section, Rebar Arrangement

and Deatil2

39 LPG - 11 - A3 - DW - 002 - R Loading Pump Foundations Plan, Section, Detail 4

EQUIPMENT FOUNDATION LAYOUT (Area 12 Instrument Air / Plant Air System)

40 LPG - 12 - A3 - DW - 002 - RAir Receiver (V-007) Foundation Plan, Section, Rebar Arrangement

and Detail2

41 LPG - 12 - A3 - DW - 101 - R Air Compressor Foundation Plan, Detail Section & Member Schedule 1

42 LPG - 12 - A4 - DW - 101 - R Air Compressor Framing Plan, Section & Detail 1

EQUIPMENT FOUNDATION LAYOUT (Area 13 Power Distribution & Back-up System)

43 LPG - 13 - A3 - DW - 001 - R Gas Engine Generator Foundation Plan, Section & Detail 2

44 LPG - 13 - A3 - DW - 002 - R Diesel Engine Foundation Plan & Section 2

CONTROL ROOM, AIR COMPRESSOR & GENSET

45 LPG - 10 - A3 - DW - 101 - RControl Room & Genset Building - Foundation Plan, Section & Detail (1

of 4)4

46 LPG - 10 - A3 - DW - 101 - RControl Room & Genset Building - Foundation Plan, Section & Detail (2

of 4)4

47 LPG - 10 - A3 - DW - 101 - RControl Room & Genset Building - Foundation Plan, Section & Detail (3

of 4)3

48 LPG - 10 - A3 - DW - 101 - RControl Room & Genset Building - Foundation Plan, Section & Detail (4

of 4)3

49 LPG - 10 - A3 - DW - 102 - RControl Room & Genset Building - Concrete Framing Plan & Elevation

(1 of 2)2

50 LPG - 10 - A3 - DW - 102 - RControl Room & Genset Building - Concrete Framing Plan & Elevation

(2 of 2)2

51 LPG - 10 - A4 - DW - 101 - RControl Room & Genset Building - Steel Framing Plan & Elevation (1 of

4)3

52 LPG - 10 - A4 - DW - 101 - RControl Room & Genset Building - Steel Framing Plan & Elevation (2 of

4)3

53 LPG - 10 - A4 - DW - 101 - RControl Room & Genset Building - Steel Framing Plan & Elevation (3 of

4)3

54 LPG - 10 - A4 - DW - 101 - RControl Room & Genset Building - Steel Framing Plan & Elevation (4 of

4)3

55 LPG - 10 - A5 - DW - 101 - R Control Room & Genset Building Floor Plan & Roof Plan 3

56 LPG - 10 - A5 - DW - 102 - R Control Room & Genset Building Elevation 3

57 LPG - 10 - A5 - DW - 103 - R Control Room & Genset Building Section & Finishing Schedule 3

58 LPG - 10 - A5 - DW - 104 - R Door-Window Keyplan & Schedule Control Room & Genset Building 2

59 LPG - 10 - A5 - DW - 105 - RControl Room & Genset Building Toilet & Pantry Plan, Section and

Detail1

60 LPG - 10 - A5 - DW - 106 - RPartition Keyplan, Schedule & Detail for Control Room & Genset

Building1

GAS COMPRESSOR SHELTER

61 LPG - 02 - A3 - DW - 101 - R Gas Compressor Shelter - Foundation Plan, Section & Detail (1 of 2) 2

62 LPG - 02 - A3 - DW - 101 - R Gas Compressor Shelter - Foundation Plan, Section & Detail (2 of 2) 2

63 LPG - 02 - A4 - DW - 101 - R Gas Compressor Shelter - Steel Framing Plan & Elevation (1 of 3) 2

64 LPG - 02 - A4 - DW - 101 - R Gas Compressor Shelter - Steel Framing Plan & Elevation (2 of 3) 2

65 LPG - 02 - A4 - DW - 101 - R Gas Compressor Shelter Drawing Detail (3 of 3) 2

66 LPG - 02 - A5 - DW - 101 - R Gas Compressor Shelter Fool Plan, Roof Plan & Finishing Schedule 2

67 LPG - 02 - A5 - DW - 102 - R Gas Compressor Shelter Elevation Section 2

3 BOOK 1 OF 2

12/10/2014 3 of 9

Page 4: Vol.3. Document List

PROJECT : LPG PLANT PROJECT

CLIENT : PT. SURYA ESA PERKASA

JOB / NO : 053209

SUBJECT : ENGINEERING DATA BOOK

LOCATION : PALEMBANG - SOTH SUMATRA

3. DRAWINGS

NO. DOCUMENT / DRAWING TITLE REV. VOLUME BOOK DOCUMENT / DRAWING NO.

DOCUMENT/ DRAWING LIST ENGINEERING DATA BOOK

SECURITY / GUARD HOUSE

68 LPG - 10 - A3 - DW - 201 - RSecurity / Guard House B Foundation Plan, Floor Plan, Section &

Detail2 3 BOOK 1 OF 2

69 LPG - 10 - A3 - DW - 202 - R Security / Guard House Concrete Framing Plan & Elevation 2

70 LPG - 10 - A5 - DW - 201 - R Guard Hose Floor Plan, Roof Plan & Elevation 1

71 LPG - 10 - A5 - DW - 202 - R Guard Hose Section & Finishing Schedule 1

72 LPG - 10 - A5 - DW - 203 - R Guard Hose Door-Window Keyplan & Schedule 1

73 LPG - 10 - A5 - DW - 204 - R Guard Hose Toilet Plan, Section and Detail 1

FIRE WATER & JOCKY PUMP SHELTER

74 LPG - 10 - A3 - DW - 301 - R Fire Water Pump, Pit & Shelter Pit Plan, section & Detail (1 of 4) 3

75 LPG - 10 - A3 - DW - 301 - R Fire Water Pump, Pit & Shelter Pit Plan, section & Detail (2 of 4) 2

76 LPG - 10 - A3 - DW - 301 - R Fire Water Pump, Pit & Shelter Pit Plan, section & Detail (3 of 4) 3

77 LPG - 10 - A3 - DW - 301 - R Fire Water Pump, Pit & Shelter Pit Plan, section & Detail (4 of 4) 2

78 LPG - 10 - A4 - DW - 301 - RFire Water Pump, Pit & Shelter Steel Framing Plan, Section Detail (1 of

3)2

79 LPG - 10 - A4 - DW - 301 - RFire Water Pump, Pit & Shelter Steel Framing Plan, Section Detail (2 of

3)2

80 LPG - 10 - A4 - DW - 301 - RFire Water Pump, Pit & Shelter Steel Framing Plan, Section Detail (3 of

3)2

81 LPG - 10 - A5 - DW - 301 - R Fire Water Pump Shelter Plan & Finishing Schedule 1

82 LPG - 10 - A5 - DW - 302 - R Fire Water Pump Shelter Elevation & Section 1

FILING SECTION

83 LPG - 11 - A3 - DW - 101 - R Filling Stations - Foundation Plan, Section & Detail 2

84 LPG - 11 - A4 - DW - 101 - R Filling Stations - Steel Framing Plan & Elevation (1 of 2) 2

85 LPG - 11 - A4 - DW - 104 - R Filling Stations - Stair way - Plan & Section (2 of 2) 2

86 LPG - 11 - A5 - DW - 101 - R Filling Station Floor Plan, Roof Plan & Finishing Schedule 1

87 LPG - 11 - A5 - DW - 102 - R Filling Station Elevation & Section 1

PIPE SUPPORT

88 LPG - 00 - A3 - DW - 101 - R Pipe Support Pipe Sleeper Detail (1 of 2) 2

89 LPG - 00 - A3 - DW - 101 - R Pipe Support Pipe Sleeper Detail & Section (2 of 2) 2

90 LPG - 00 - A3 - DW - 102 - R Pipe Support & Local Foundation Detail & Schedule (1 of 3) 2

91 LPG - 00 - A3 - DW - 102 - R Pipe Support & Local Foundation Detail & Schedule (2 of 3) 2

92 LPG - 00 - A3 - DW - 102 - R Pipe Support & Local Foundation Detail & Schedule (3 of 3) 2

93 LPG - 00 - A3 - DW - 103 - R Pipe Stanchion for ST-118 Foundation Plan & Section 1

94 LPG - 00 - A3 - DW - 104 - R Pipe Sleeper Foundation Plan, Section, Detail & Member Schedule 1

95 LPG - 00 - A3 - DW - 105 - R Pipe Sleeper & Stanchion Foundation Plan for Lembak 2

96 LPG - 00 - A4 - DW - 102 - R Stanchion Detail (1 of 2) 2

97 LPG - 00 - A4 - DW - 102 - R Stanchion Detail (2 of 2) 1

WEIGHING BRIDGE

98 LPG - 10 - A3 - DW - 402 - R Weighing Bridge Foundation Plan, Section, Detail & Member Schedule 2

99 LPG - 10 - A3 - DW - 601 - R Weighing Room Foundation Plan Floor Plan, Section & Detail 1

100 LPG - 10 - A3 - DW - 602 - R Weighing Room Concrete Framing Plan & Elevation 1

101 LPG - 10 - A3 - DW - 651 - R Driver Room Foundation Plan, Section & Detail 3 3 BOOK 1 OF 2

102 LPG - 10 - A3 - DW - 652 - R Driver Room Concrete Framing Plan & Elevation 3

12/10/2014 4 of 9

Page 5: Vol.3. Document List

PROJECT : LPG PLANT PROJECT

CLIENT : PT. SURYA ESA PERKASA

JOB / NO : 053209

SUBJECT : ENGINEERING DATA BOOK

LOCATION : PALEMBANG - SOTH SUMATRA

3. DRAWINGS

NO. DOCUMENT / DRAWING TITLE REV. VOLUME BOOK DOCUMENT / DRAWING NO.

DOCUMENT/ DRAWING LIST ENGINEERING DATA BOOK

103 LPG - 10 - A5 - DW - 601 - R Weighing Room Floor Plan, Roof Plan & Elevations 1

104 LPG - 10 - A5 - DW - 602 - R Weighing Room Section & Finishing Schedule 1 3 BOOK 1 OF 2

105 LPG - 10 - A5 - DW - 603 - R Weighing Room Door-Window Keyplan & Schedule 1

106 LPG - 10 - A5 - DW - 651 - R Dreiver Shelter Floor Plan, Roof Plan & Elevation 1

107 LPG - 10 - A5 - DW - 652 - R Dreiver Shelter Section and Finishing Schedule 1

108 LPG - 10 - A5 - DW - 653 - R Dreiver Shelter Door-Window Keyplan & Schedule 1

109 LPG - 10 - A5 - DW - 654 - R Dreiver Shelter Toilet Plan, Section and Detail 1

110 LPG - 10 - A6 - DW - 010 - R Fence & Gate Layout Plan 1

111 LPG - 10 - A6 - DW - 011 - R Fence & Gate Plan, Elevation, Section & Details 1

ROAD & PAVEMNET

112 LPG - 00 - A6 - DW - 001 - R Road & Pavement General Layout (1 of 2) 3

113 LPG - 00 - A6 - DW - 001 - R Detail and Section (2 of 2) 3

114 LPG - 00 - A6 - DW - 002 - R Sewer & Drainage General Layout 2

115 LPG - 00 - A6 - DW - 003 - R Sewer & Drainage Sewer Line Schedule 2

116 LPG - 00 - A6 - DW - 004 - R General Underground Composite (1 of 2) 1

117 LPG - 00 - A6 - DW - 004 - R General Underground Composite (2 of 2) 1

118 LPG - 00 - A6 - DW - 005 - R Sewer & Drainage Sewer Manhole Schedule 1

WAREHOUSE & WORKSHOP

119 LPG - 10 - A3 - DW - 401 - R Warehouse Foundation Plan, Section & Detail (1 of 2) 3

120 LPG - 10 - A3 - DW - 401 - R Warehouse Foundation Plan, Section & Detail (2 of 2) 3

121 LPG - 10 - A3 - DW - 402 - R Warehouse Concrete Plan & Elevation (1 of 5) 3

122 LPG - 10 - A3 - DW - 402 - R Warehouse Concrete Plan & Elevation (2 of 5) 3

123 LPG - 10 - A3 - DW - 402 - R Warehouse Concrete Plan & Elevation (3 of 5) 3

124 LPG - 10 - A3 - DW - 402 - R Warehouse Concrete Plan & Elevation (4 of 5) 2

125 LPG - 10 - A3 - DW - 402 - R Warehouse Concrete Plan & Elevation (4 of 5) 2

126 LPG - 10 - A4 - DW - 401 - R Warehouse Steel Framing Roof Plan 3

127 LPG - 10 - A4 - DW - 402 - R WareHouse & Workshop Storage Detail 3

128 LPG - 10 - A5 - DW - 401 - RWareHouse & Workshop Plans, Elevations, Sections and Material

Finish Schedule6

129 LPG - 10 - A5 - DW - 402 - R WareHouse & Workshop Door & Window Key Plan & Schedule 5

SUMP TANK SHELTER

130 LPG - 10 - A4 - DW - 305 - R Warehouse Foundation Plan, Section & Detail (1 of 2) 1

LOCAL PLATFORM

131 LPG - 00 - A3 - DW - 201 - R Local Platform PF-1, PF-2 & PF-3 Foundation Plan, Section & Detail 1

132 LPG - 00 - A3 - DW - 202 - R Local Platform PF-4 Foundation Plan, Section & Detail 1

133 LPG - 00 - A3 - DW - 203 - R Local Platform PF-5 Foundation Plan, Section & Detail 1

134 LPG - 00 - A3 - DW - 300 - R Local Foundation Layout 1

135 LPG - 00 - A3 - DW - 301 - R Local Foundation Detail & Section 1

136 LPG - 00 - A4 - DW - 201 - RLocal Platform PF-1, PF-2 & PF-3 Steel Framing Plan & Elevation (1 of

4)2

137 LPG - 00 - A4 - DW - 201 - R Stairway & Foundation Plan PF-1 (2 of 4) 1

138 LPG - 00 - A4 - DW - 201 - R Stairway & Foundation Plan PF-1 (3of 4) 1 3 BOOK 1 OF 2

139 LPG - 00 - A4 - DW - 201 - R Stairway & Foundation Plan PF-1 (4 of 4) 1

12/10/2014 5 of 9

Page 6: Vol.3. Document List

PROJECT : LPG PLANT PROJECT

CLIENT : PT. SURYA ESA PERKASA

JOB / NO : 053209

SUBJECT : ENGINEERING DATA BOOK

LOCATION : PALEMBANG - SOTH SUMATRA

3. DRAWINGS

NO. DOCUMENT / DRAWING TITLE REV. VOLUME BOOK DOCUMENT / DRAWING NO.

DOCUMENT/ DRAWING LIST ENGINEERING DATA BOOK

140 LPG - 00 - A4 - DW - 202 - R Local Platform PF-4 Steel Framing Plan & Elevation 1 3 BOOK 1 OF 2

141 LPG - 00 - A4 - DW - 203 - R Local Platform PF-5 Steel Framing Plan & Elevation (1 of 2) 1

142 LPG - 00 - A4 - DW - 203 - R Local Platform PF-5 Steel Framing Plan & Elevation (2 of 2) 1

143 LPG - 00 - A4 - DW - 208 - R Local Platform PF-11 Steel Framing Plan & Elevation (1 of 2) 2

144 LPG - 00 - A4 - DW - 208 - R Local Platform PF-11 Steel Framing Plan & Elevation (2 of 2) 2

3 BOOK 1 OF 2

12/10/2014 6 of 9

Page 7: Vol.3. Document List

PROJECT : LPG PLANT PROJECT

CLIENT : PT. SURYA ESA PERKASA

JOB / NO : 053209

SUBJECT : ENGINEERING DATA BOOK

LOCATION : PALEMBANG - SOTH SUMATRA

3. DRAWINGS

NO. DOCUMENT / DRAWING TITLE REV. VOLUME BOOK

3.3

1 LPG - 00 - L0 - DW - 002 - R Piping Plan Fraction Gas and Processing Dehydration Area 2 3 BOOK 2 OF 2

2 LPG - 00 - L0 - DW - 003 - R Piping Plan Refrigeration Feed Gas Compressor Area 2

3 LPG - 00 - L0 - DW - 004 - R Piping Plan Fuel Gas and Dehydration Regen Area 2

4 LPG - 00 - L0 - DW - 005 - R Piping Plan Fire Water Pumps Area 2

5 LPG - 00 - L0 - DW - 006 - R Piping Plan Oil Cathcer Area 2

6 LPG - 00 - L0 - DW - 007 - R Piping Plan Pipe Sleeper Area (1 of 5) 2

7 LPG - 00 - L0 - DW - 008 - R Piping Plan Pipe Sleeper Area (2 of 5) 2

8 LPG - 00 - L0 - DW - 009 - R Piping Plan Pipe Sleeper Area (3 of 5) 2

9 LPG - 00 - L0 - DW - 010 - R Piping Plan Pipe Sleeper Area (4 of 5) 2

10 LPG - 00 - L0 - DW - 011 - R Piping Plan Pipe Sleeper Area (5 of 5) 2

11 LPG - 00 - L0 - DW - 012 - R Piping Plan LPG Storage Area (1 of 2) 2

12 LPG - 00 - L0 - DW - 013 - R Piping Plan LPG Storage Area (2 of 2) 2

13 LPG - 00 - L0 - DW - 014 - R Piping Plan Propane and Condensate Storage Area 2

14 LPG - 00 - L0 - DW - 015 - R Piping Plan Propane Condenser A Area 2

15 LPG - 00 - L0 - DW - 016 - R Piping Plan Propane Condenser B and IA/PA Compressor Area 2

16 LPG - 00 - L0 - DW - 017 - R Piping Plan Control Building Area 2

17 LPG - 00 - L0 - DW - 018 - R Piping Plan Genset Area 2

18 LPG - 00 - L0 - DW - 019 - R Piping Plan Filling Pumps Area 2

19 LPG - 00 - L0 - DW - 020 - R Piping Plan Offsite Area 2

20 LPG - 00 - L0 - DW - 021 - R Piping Plan Offsite Area 1 3 BOOK 2 OF 2

DOCUMENT / DRAWING NO.

DOCUMENT/ DRAWING LIST ENGINEERING DATA BOOK

PIPING DRAWINGS

12/10/2014 7 of 9

Page 8: Vol.3. Document List

PROJECT : LPG PLANT PROJECT

CLIENT : PT. SURYA ESA PERKASA

JOB / NO : 053209

SUBJECT : ENGINEERING DATA BOOK

LOCATION : PALEMBANG - SOTH SUMATRA

3. DRAWINGS

NO. DOCUMENT / DRAWING TITLE REV. VOLUME BOOK

3.4

GENERAL AREA

1 LPG - 00 - E3 - DW - 001 - R Cable Tray and Trench Layout for General Area 3 3 BOOK 2 OF 2

2 LPG - 00 - E3 - DW - 002 - R Power and Control Wiring Layout for General area 3

3 LPG - 00 - E3 - DW - 003 - R Section and Detail Power Wiring Layout for General Area 3

4 LPG - 00 - E3 - DW - 004 - R Schematic and Connection Diagram for Switchgear (58 Sheet) 1

5 LPG - 00 - E4 - DW - 001 - R Street Lighting Layout for General area 3

6 LPG - 00 - E4 - DW - 002 - R Lighting and Receptacle Wiring Layout for General Area (1 of 2) 3

7 LPG - 00 - E4 - DW - 002 - R Lighting and Receptacle Wiring Layout for General Area (2 of 2) 3

8 LPG - 00 - E4 - DW - 003 - R Connection Diagram for Lighting ( LP-02 ) 1 of 2 3

9 LPG - 00 - E4 - DW - 003 - R Connection Diagram for Lighting ( LP-03 ) 2 of 2 2

10 LPG - 00 - E4 - DW - 005 - R Panel Schedule for All Area (5 Sheet) 2

11 LPG - 00 - E5 - DW - 001 - R Grounding Wiring Layout for General area 3

12 LPG - 00 - E5 - DW - 002 - R Lightning Protection Layout for General Area 3

13 LPG - 00 - E6 - DW - 001 - R Telephone Wiring Layout for General Area 3

14 LPG Lighting, Receptacle and AC Wiring Layout for Warehouse and Workshop 0

15 LPG Panel Schedule for LP-05 1

CONTROL ROOM, ELECTRICAL ROOM AND GENERATOR SHELTER

16 LPG - 10 - E3 - DW - 001 - R Electrical equipment Layout for Electrical Room and Generator Shelter 3

17 LPG - 10 - E3 - DW - 002 - R Cable Pit and Tray Layout for Electrical Room and Generator Shelter 3

18 LPG - 10 - E3 - DW - 003 - R Base Frame for Electrical Room and Generator Shelter 3

19 LPG - 10 - E3 - DW - 004 - RPower and Control Wiring Layout for Control Room, Electrical Room

and Generator Shelter3

20 LPG - 10 - E4 - DW - 001 - RLighting, Receptacle and AC Wiring Layout for Control Room, Electrical

Room and Generator Shelter4

21 LPG - 10 - E4 - DW - 002 - R Connection Diagram for Lighting Panel ( LP-01 ) 2

22 LPG - 10 - E5 - DW - 001 - R Grounding Wiring Layout for Control Room, Electrical Room and Generator Shelter3

23 LPG - 10 - E6 - DW - 001 - R Telephone Wiring Layout for Control Room, Electrical Room and Generator Shelter2 3 BOOK 2 OF 2

DOCUMENT / DRAWING NO.

DOCUMENT/ DRAWING LIST ENGINEERING DATA BOOK

ELECTRICAL DRAWINGS

12/10/2014 8 of 9

Page 9: Vol.3. Document List

PROJECT : LPG PLANT PROJECT

CLIENT : PT. SURYA ESA PERKASA

JOB / NO : 053209

SUBJECT : ENGINEERING DATA BOOK

LOCATION : PALEMBANG - SOTH SUMATRA

3. DRAWINGS

NO. DOCUMENT / DRAWING TITLE REV. VOLUME BOOK

3.5

1 LPG - 00 - J1 - DG - 001 - R Key Plan for Instrument Layout Drawing 3 3 BOOK 2 OF 2

2 LPG - 00 - J1 - DG - 001 - R Symbol and Index for Instrument Installation Drawing (1 of 2) 3

3 LPG - 00 - J1 - DG - 001 - R Symbol and Index for Instrument Installation Drawing (2 of 2) 3

4 LPG - 00 - J1 - DG - 002 - R L/O of Central Control Room Panel Arrangement 3

5 LPG - 00 - J1 - DG - 003 - R L/O of Central Control Room Panel Acable Pit and Hole Opening 3

6 LPG - 00 - J1 - DG - 004 - R L/O of Central Control Room Instrument Grounding System 3

7 LPG - 02 - J1 - DG - 002 - R Layout of Field Instrument Plot Plan (1/3) 3

8 LPG - 02 - J1 - DG - 003 - R Layout of Field Instrument Plot Plan (2/3) 3

9 LPG - 02 - J1 - DG - 004 - R Layout of Field Instrument Plot Plan (3/3) 3

10 LPG - 02 - J1 - DG - 101 - R Layout of Instrument Field Wiring (1/3) 3

11 LPG - 02 - J1 - DG - 102 - R Layout of Instrument Field Wiring (2/3) 3

12 LPG - 02 - J1 - DG - 103 - R Layout of Instrument Field Wiring (3/3) 3

13 LPG - 02 - J1 - DG - 201 - R Layout of Instrument Main Cable & Junction Box (1/1) 3

14 LPG - 02 - J1 - DG - 301 - R Layout of Instrument Main Cable Way (1/1) 3

15 LPG - 02 - J1 - DG - 401 - R Layout of Instrument Air Supply (1 of 2) 3

16 LPG - 02 - J1 - DG - 402 - R Layout of Instrument Air Supply (2 of 2) 3

17 LPG - 02 - J1 - DG - 501 - R Instrument Hook-Up for Pressure Piping & Tubing 3

18 LPG - 02 - J1 - DG - 502 - R Instrument Hook-Up for Air Supply Piping & Tubing 3

19 LPG - 02 - J1 - DG - 503 - R Instrument Boundary Work With Piping (8 Sheet) 3

3 BOOK 2 OF 2

DOCUMENT / DRAWING NO.

DOCUMENT/ DRAWING LIST ENGINEERING DATA BOOK

INSTRUMENT DRAWING