Volume: XII Chapter: 4 Page No: 181
TABLE NO:1
GENERAL DESCRIPTION
CATCHMENT WATERSHED NO
MICRO WATERSHED NO AREA(HA) DISTRICT NAME TEHSIL/BLOCK VILLAGE PHOTO
Satluj Sq4 Sq4a 1476 Shimla Rampur Bushahr
Tyawal, Majhgaon, Sarahan, Kalai, Bonda, Jeori, Revshal,
C:\MWS_21\Photo\SQ4A\Table 1\Table1.jpg
LATITUDE LONGITUDE ALTITUDE SLOPE IN DEGREE RAINFALL(mm) SNOWFALL(mm) TEMPERATURE(Cen) NO OF HOUSE HOLD
31' 29' to 31'33'
77'46' to 77'50'
1150m to 3655m 30' to 80' NA NA NA 2146
POPULATION MALE FEMALE
CATTLE PROPOSED NO/NAME
PLACE OF INTEREST LIKE TOURISM OR ECOTOURISM DESCRIPTION MILTCH OTHER
10728 6428 4300 710 226 NA Bhima Kali Temple at
Sarahan NA
TABLE 1 PHOTO
Sq4a
Volume: XII Chapter: 4 Page No: 182
TABLE NO:2
A. STATUS OF LAND USE IN MICRO WATERSHED(HA) B.AREA UNDER FOREST CATEGORY WISE :
LAND USE GOVT AREA PRIVATE AREA COMMU AREA TOTAL CATEGORY DPF/RESERVE UPF PASTURE OTHERS
AGRICULTURE LAND 0 423 0 423 NAME Sarahan Kundlu-6C NA NA
FOREST LAND 916 0 0 916 AREA (HA) 625.75 290.25 NA NA
WASTE LAND 137 0 0 137 SPECIES
Deodar, Rai, Tohs, Cheel, Kail, Robinia
Deodar, Rai, Tohs, Cheel, Kail, Robinia NA NA
OTHERS LAND 0 0 0 0 DENSITY .1 to .8 .1 to .3 NA NA
TOTAL 1053 423 0 1476 TABLE NO:3
AREA UNDER PLANTATIONS FOR LAST 15 YEARS
NAME LATITUDE
AND LONGITUDE
TOTAL AREA (HA)
SAMPLE AREA (HA)
SPECIES PLANTED
SAMPLE GAP
FILLING AREA(HA)
SURVIVAL %
TOTAL GAP
FILLING AREA(H
A)
AREA NEEDED NEW
PLANTATION (HA)
FENCING
REQUIRED (RM)
REASONS FOR FAILURE
FINAL PRESCRIPTION(Enrichment(HA))
RATE/ HAC
COST (Rs)
Banda 31'32'02" 77'47'28"
126
5 Cheel,
Broadleaves 1 80
28 30 29400
Due to drought. Enrichme
nt = 40 27900 1116000
Kandidhar 31'30'31" 77'47'13"
10 Deodar 2 80 Due to drought.
Kingri 31'31'50" 77'47'48"
5 Deodar 1 80 Due to drought.
Energy Plantation = 10
112300 1123000
Shalabag 31'32'03" 77'47'27"
10 Cheel,
Broadleaves 6 40
Due to drought.
TOTAL : 126 30 10 28 30 29400 2239000
Volume: XII Chapter: 4 Page No: 183
TABLE 3 PHOTOS
Kandidhar Kingri Shalabag Banda
TABLE NO:4
SOIL & MOISTURE CONSERVATION MEASURES NEEDED IN FOREST AREAS
NAME OF AREA
LATITUDE/LONGITUDE PRESCRIPTION QUANTITY
AVAILABILTY OF LOCAL MATERIAL
OLD WORK NEED REPAIRING(QUANTITY)
FINAL PRESCRIPTION
RATE/CUM COST(Rs)
NEW PRESCRIPTION NEW QUANTITY
Bonda
31'32'02"77'
47'28"
CheckDams 3x1.5x1.5m = 18 Nos
Stone & local
species NA
Trenching
1x.30x.30m=
2000 Nos
9.9
19800
Live Hedge 100 Rms
CheckDams 2x1.5x1.5m = 29 Nos
Trenching 1x.50x.30m=1000Nos
Kandidhar
31'30'31"77'47'13"
Trenching 1x.50x.30m=800Nos
Stone & local species NA
Trenching
1x.30x.30m= 2000 Nos
9.9
19800
CheckDams 3x1.5x1.5m = 19 Nos
Live Hedge 60 Rms
CheckDams 2x1.5x1.5m = 24 Nos
Kingri 31'31'50"77'47'48"
CheckDams 2x1.5x1.5m = 32 Nos
Stone & local species NA
Trenching
1x.30x.30m= 2400 Nos
9.9
23760
Live Hedge 60 Rms
CheckDams 3x1.5x1.5m = 28 Nos
Trenching 1x.50x.30m=800Nos
Shalabag 31'32'03"77'47'27"
CheckDams
3x1.5x1.5m = 24 Nos
Stone & local species NA
Trenching
1x.30x.30m= 1600 Nos
9.9
15840
2x1.5x1.5m = 36 Nos
Live Hedge 50 Rms
Trenching 1x.50x.30m=600Nos
Volume: XII Chapter: 4 Page No: 184
TABLE 4 PHOTOS Kandidhar Kingri Shalabag Banda
TABLE NO:5
AGROFORESTRY
PRESENT STATUS FUTURE REQUIREMENT TYPE OF TREE
PRESENT NOs PRESENT SPECIES
FUTURE NOs FUTURE SPECIES
NEED FOR EXTENSION
SOURCE OF PLANTING STOCK(Nearest Nursery)
TREES 2500 Cheel, Baan, Deodar, Kail, Willow, Kunish, Poplar 9000
Cheel, Baan, Deodar, Kail, Willow, Kunish, Poplar Y Forest Nursery Sarahan
WILD FRUIT 1500 Walnut, Bemi, Chulli, Khanor, Paja, Shegul 3000
Walnut, Bemi, Chulli, Khanor, Paja, Shegul Y Forest Nursery Sarahan
MEDICINAL 1000
Mohru, Patish, Dhoop, Hathpanja, Chukri, Chora, Bankakri, Kashmal Pathartod, Tirmur, Banafsha 5000
Mohru, Patish, Dhoop, Hathpanja, Chukri, Chora, Bankakri, Kashmal Pathartod, Tirmur, Banafsha Y Forest Nursery Sarahan
TABLE NO:6
GRAZING LANDS
Name LATITUDE/LONGITUDE AREA(HA) SPECIES
WEED REMOVAL SEEDING CLOSURES Other
PEOPLES SUGGESTION
Rate/ Hac (Rs)
Cost (Rs)
Overall MWS NA 15
Grass & Bushes Yes Yes Yes
4500 BL plants are required to be planted. No suggestion. 21700 325500
TABLE NO:7
TEMPLE/PRIVATE/COMMUNITY/PANCHAYAT FOREST AREA
NAME AREA(HA) LATITUDE/LONGITUDE SPECIES GAP FILLING MAINTENANCE NEW PLANTATION
SOIL CONSERVATION MEASURES(QUANTITY)
NA NA NA NA NA NA NA NA
Volume: XII Chapter: 4 Page No: 185
TABLE NO:8
PERFORMA FOR SOIL AND WATER CONSERVATION FOR NON-FOREST AREA(Nala & Khads)
NAME OF AREA
LATITUDE/LONGITUDE
PRESCRIPTION QUANTITY
AVAILABILITY OF LOCAL MATERIAL
OLD WORKS NEEDING REPAIR (QUANTITY)
LIFT IRRIGATION(HT/ACERAGE)
FINAL PRESCRIPTION
RATE/ UNIT
COST (Rs)
NEW PRESCRIPTION NEW QUANTITY
Raigad (6Kms)
31'30'52" 77'47'47"
Water Harvesting Structure 15x2x4m = 03 Nos
Stone & local
species NA NA
Water Harvesting Structure 15x2x4m = 2 Nos 62290 1868700
Live Hedge 1800 Rms 9.6 17280
Live Hedge 800 Rms CheckDams
7x1.5x1.5m = 3 Nos 10033 210693
10x1.5x1.5m = 4 Nos 10033 401320
CheckDams
7x1.5x1.5m = 09 Nos
Retaining Wall Gabion
18x1.5x1.5m = 3 Nos 10033 541782
10x1.5x1.5m = 12 Nos 15x1.5x1.5m = 2 Nos 10033 300990
Check Walls
15x1.5x1.5m = 07 Nos 12x1.5x1.5m = 3 Nos 10033 361188
12x1.5x1.5m = 09 Nos Brushwood 300 Rms 62 18600
Ravshal Nala (1Kms)
31'30'56" 77'47'48"
Retaining Wall in Gabion 5x1.5x1.5m = 10 Nos Stone &
local species NA NA
Retaining Wall Gabion 5x1.5x1.5m = 3 Nos 10033 150495
Live Hedge 120 Rms Live Hedge 300 Rms 9.6 2880
Brushwood 15 Rms Brushwood 50 Rms 62 3100
TABLE 8 PHOTOS
Raigad Ravshal
Volume: XII Chapter: 4 Page No: 186
TABLE NO:9
PERFORMA FOR LANDSLIDE
NAME OF AREA/LOCATION
LATITUDE/LONGITUDE
DAMAGE/RISK TO LIFE & PROPERTY
MEASURES TAKEN
TYPE OF SOIL AND ROCK
DEGREE OF SLOPES/SEVERITY
OCCURRENCE(Season)
ROAD CONSTRUCTION
QUARRY
OTHER CONSTRUCTIONS
NATURAL
FINAL PRESCRIPTION
RATE/UNIT COST(Rs)
NEW PRESCRIPTION
NEW QUANTITY
Majhgaon (20mx50m)
31'30'28" 77'46'59" Property NA Clay Moderate Rainy Yes No No Yes
Retaining Wall Gabion
15x1.5x1.5m = 02 Nos 10033 300990
Road from Jeori to Sarahan (800 mtr) NA Property NA NA NA NA Yes No No Yes
Retaining Wall Gabion
10x2.5x3m = 50 Nos 20177 10088500
Road from Majhgaon to
Sarahan (200 mtr) NA Property NA NA NA NA Yes No No Yes
Retaining
Wall Gabion
10x2.5x
3m = 20 Nos 20177 4035400
TABLE 9 PHOTO
Majhgaon
Volume: XII Chapter: 4 Page No: 187
TABLE NO:9A
INFORMATION ON (CULTIVATION / LIFE STOCK / FUEL / FODDER / MFP)
1.Fruits FRUIT NAME VARIETY(LOCAL/IMPROVED) USE OF FERTILISERS USE OF INSECTICIDES PROBLEMS FACED
Walnut Local No No
Monkey and Bear are destroying the crops.
Almond Kagzi, Semi Drek, IXL No No
Chulli Local No No
Khumani Local No No
Apple Royal, Golden, Red Royal, Red June, Delicious, Spur Yes Yes
Pears Local No No
2.CROPS : CROPS NAME VARIETY(LOCAL/IMPROVED) USE OF FERTILISERS USE OF INSECTICIDES PROBLEMS FACED
Ogla Local No No
Monkey and Bear are destroying the crops.
Bathu Local No No
Koda Local No No
Tulsi Local No No
Barley Local No No
Rajmash Local No No
Maize Local No No
Wheat Local No No
3.VEGETABLE : VEGETABLE NAME VARIETY(LOCAL/IMPROVED) USE OF FERTILISERS USE OF INSECTICIDES PROBLEMS FACED
Chilli Local No No
Monkey and bear are destroying the crops.
Cabbage Local No No
Cauliflower Local No No
Ladyfinger Local No No
Brinjal Local No No
Tomato Local No No
Capsicum Local No No
4. LIVE STOCK : LIVE STOCK(NO) BREED WHETHER SELLING THE PRODUCT PROBLEM FACED
Cow - 710 Jersey/Local Yes
NA
Sheep/Goat - 218 Local No
Ox - 08 Local No
Volume: XII Chapter: 4 Page No: 188
5.FUEL/FODDER : FUEL/FODDER MANAGEMENT REQUIREMENT AVAILABILITY GAP PERCENTAGE SOURCE
FUEL Yes 90% 10% Nearest Forest
FODDER Yes 80% 20% Nearest Forests.
MINOR FOREST PRODUCTS (MFP) MINOR FOREST PRODUCTS EXISTING NAME SUGGESTIONS
Guchhi Guchhi
Improvement is required in stocking and marketing of MFPs.
Dhoop Dhoop
Pathartod Pathartod
Tirmur Tirmur
Hathpanja Hathpanja
Chukri Chukri
Banafsha Banafsha
Kashmal Kashmal
Patish Patish
Chora Chora
Bankakri Bankakri
Mohru Mohru
PEOPLES PARTICIPATION: MAIN PROBLEMS SUGGESTION FOR IMPROVEMENT PEOPLES PRIORITIES
There is no rain shelter at bus stop. A rain shelter be made at road head for passangers.
Priority.
There is no playground for children in village Primary school.
Play ground be made for children at Primary School location.
There is no cremotorium in the area. Cremotorium be made in the areas.
There is no govt accomodation for Anganbari, Comunity Hall and Mahila Mandal.
Govt accomodation for Anganbari, Community Hall and Mahila Mandal be made in the village.
Drinking and irrigation water shortage exist. Drinking and irrigation water be supplied from Dalwati to Majhgaon approx 6Kms distance
Top Priority.
Status of village paths is very poor. Maintenance of village paths be done. Priority.
Volume: XII Chapter: 4 Page No: 189
PEOPLES PARTICIPATION
COSTING:
TABLES TABLE 3 TABLE 4 TABLE 6 TABLE 8 TABLE 9 TOTAL
COST 2239000 79200 325500 3877028 20479710 27000438