  • Nr. Crt. Picheti Pozitie Kilometrica

    Amplasament fata de DN

    Lungime (m) Tip rigola

    No.Cross

    sections Chainage Site location related to NR Length (m) Gutter type

    0 1 2 3 4 51 1632-1633 102+000 - 102+045 Stanga/Left 45 *

    TOTAL 45

  • Nr. Crt. Picheti Pozitie Kilometrica

    Amplasament fata de DN

    Lungime (m) Tip rigola

    No.Cross

    sections Chainage Site location related to NR Length (m) Gutter type

    0 1 2 3 4 51 1634-1658 102+045-102+480 Stanga/Left 435 *2 1634-1660 102+045-102+550 Dreapta/Right 505 *3 1669-1673 102+695-102+792 Stanga/Left 97 *

    TOTAL 1037

  • Nr. Crt. Picheti Pozitie Kilometrica

    Amplasament fata de DN

    Lungime (m)

    Tip rigola

    No.Cross

    sectionsChainage Site location

    related to NR Length (m) Gutter type0 1 2 3 4 51 1632-1633 102+000-102+045 Dreapta/Right 45 *2 1668 102+680-102+700 Dreapta/Right 20 *3 1659-1661 102+480-102+550 Stanga/Left 70 *4 1662-1664 102+550-102+600 Stanga/Left 50 **5 1667 102+635-102+670 Stanga/Left 35 *

    TOTAL 220TOTAL 222222222222222222222222222222222222222222222222222222222222000002000020000200000000000000020000002222222222222222222222222222222222222222222222222222222222

  • Nr. Crt. Picheti Pozitie Kilometrica

    Amplasament fata de DN

    Lungime (m) Tip rigola

    No.Cross

    sectionsChainage Site location

    related to NR Length (m) Gutter type0 1 2 3 4 51 1668 102+670-102+695 Stanga/Left 25 *

    TOTAL 25

  • PARAUL CRISUL NOU/ CRISUL NOU BROOK

    KM 102+617PLAN DE SITUATIE / PLAN

    Dw. no. H01Scara 1:500

    PARAUL CRISUL NOU / CRISUL NOU BROOKKM 102+617

    PLAN DE SITUATIE / LAYOUTScara / Scale 1:500

    Martie 2011

    Director proiect

    REABILITARE DN76DEVA - ORADEA

    km 0+000 - 184+390

    VerificatProiectat

    Ing. Valentin Giurca

    Ing. Angelo Perrone

    PTh+DETP+WD

    Faza

    Nr. contract : 92/59388/07.dec.2010

    BENEFICIAR

    COMPANIA NA IONAL DEAUTOSTRZI I DRUMURI NA IONALE

    DIN ROMNIA

    CONTRACT 5R12

    CONSULTANT Asocierea INOCSA INGENIERIA, S.L. siTECNIC Tecniche e Consulenze nellIngegneria Civile Consulting Engineers Societa per Azioni

    km 69+350 - km 102+660VARFURILE - STEI

    Ing. Tiberiu Cheran

  • PLAN DISPUNERE SALTELE DE GABIOANEGABIONS MATTRESS ARRAGEMENT

    SCARA 1:500 / SCALE 1:500

    Scara 1:500 Dw. no. H04

    PARAUL CRISUL NOU/ CRISUL NOU BROOK

    KM 102+617PLAN DISPUNERE SALTELE DE GABIOANE

    GABIONS MATTRESS ARRAGEMENT

    Martie 2011

    Director proiect

    REABILITARE DN76DEVA - ORADEA

    km 0+000 - 184+390

    VerificatProiectat

    Ing. Valentin Giurca

    Ing. Angelo Perrone

    PTh+DETP+WD

    Faza

    Nr. contract : 92/59388/07.dec.2010

    BENEFICIAR

    COMPANIA NA IONAL DEAUTOSTRZI I DRUMURI NA IONALE

    DIN ROMNIA

    CONTRACT 5R12

    CONSULTANT Asocierea INOCSA INGENIERIA, S.L. siTECNIC Tecniche e Consulenze nellIngegneria Civile Consulting Engineers Societa per Azioni

    km 69+350 - km 102+660VARFURILE - STEI

    Ing. Tiberiu Cheran

  • PLAN DISPUNERE CUTII DE GABIOANEGABIONS BOXES ARRAGEMENT

    SCARA 1:500 / SCALE 1:500

    Scara 1:500 Dw. no. H05

    PARAUL CRISUL NOU/ CRISUL NOU BROOK

    KM 102+617PLAN DISPUNERE CUTII DE GABIOANE

    GABIONS BOXES ARRAGEMENT

    Martie 2011

    Director proiect

    REABILITARE DN76DEVA - ORADEA

    km 0+000 - 184+390

    VerificatProiectat

    Ing. Valentin Giurca

    Ing. Angelo Perrone

    PTh+DETP+WD

    Faza

    Nr. contract : 92/59388/07.dec.2010

    BENEFICIAR

    COMPANIA NA IONAL DEAUTOSTRZI I DRUMURI NA IONALE

    DIN ROMNIA

    CONTRACT 5R12

    CONSULTANT Asocierea INOCSA INGENIERIA, S.L. siTECNIC Tecniche e Consulenze nellIngegneria Civile Consulting Engineers Societa per Azioni

    km 69+350 - km 102+660VARFURILE - STEI

    Ing. Tiberiu Cheran

  • Scara 1:500 Dw. no. H07

    PARAUL CRISUL NOU/ CRISUL NOU BROOK

    KM 102+617PLAN DE TRASARE

    SETTING OUT PLANE

    PARAUL CRISUL NOU / CRISUL NOU BROOKKM 102+617

    PLAN DE TRASARE / SETTING OUT PLANESCARA 1:500 / SCALE 1:500

    Martie 2011

    Director proiect

    REABILITARE DN76DEVA - ORADEA

    km 0+000 - 184+390

    VerificatProiectat

    Ing. Valentin Giurca

    Ing. Angelo Perrone

    PTh+DETP+WD

    Faza

    Nr. contract : 92/59388/07.dec.2010

    BENEFICIAR

    COMPANIA NA IONAL DEAUTOSTRZI I DRUMURI NA IONALE

    DIN ROMNIA

    CONTRACT 5R12

    CONSULTANT Asocierea INOCSA INGENIERIA, S.L. siTECNIC Tecniche e Consulenze nellIngegneria Civile Consulting Engineers Societa per Azioni

    km 69+350 - km 102+660VARFURILE - STEI

    Ing. Tiberiu Cheran