Volume: X Chapter: 4 Page No: 79
TABLE NO:1
GENERAL DESCRIPTION
CATCHMENT
WATERSHED NO
MICRO WATERSHED NO
AREA(HA)
DISTRICT NAME TEHSIL/BLOCK VILLAGE PHOTO
Satluj Sn2 Sn2a 1715 Shimla
Rampur Bushahr/Kumarsain
Bhutti, Bhargaon, Kainthla, Karangla, Kalmog, Delath, Darol, Chiltu, Bahli, Saroga
C:\MWS_21\Photo\SN2A\Table 1\Table1.jpg
LATITUDE LONGITUDE ALTITUDE SLOPE IN DEGREE
RAINFALL (mm) SNOWFALL (mm) TEMPERATURE(Cen) NO OF HOUSE HOLD
31'15' to 31'21'
77'30' to 77'35' 810m to 2670m
35' to 80' NA NA NA 1218
CATTLE PROPOSED NO/NAME
PLACE OF INTEREST LIKE TOURISM OR ECOTOURISM
DESCRIPTION
POPULATION MALE FEMALE MILTCH OTHER 6029 3032 2997 381 120 NA NA NA
TABLE 1 PHOTO
Sn2a
Volume: X Chapter: 4 Page No: 80
TABLE NO:2 A. STATUS OF LAND USE IN MICRO WATERSHED(HA) B.AREA UNDER FOREST CATEGORY WISE :
LAND USE GOVT AREA
PRIVATE AREA
COMMU AREA Total CATEGORY DPF/RESERVE UPF PASTURE OTHERS
AGRICULTURE LAND 0 583 0 583 NAME Tikker, Chiltu, Saroga Saroga, Naula, Kunda, Bhargaon NA NA
FOREST LAND 914 0 0 914 AREA (HA) 414.03 669.06 NA NA
WASTE LAND 49 0 0 49 SPECIES Deodar, Kail, Cheel, Baan, Rai Tosh Deodar, Kail, Cheel, Baan, Rai Tosh NA NA
OTHERS LAND 169 0 0 169 DENSITY 0.1 to 0.6 0 to 0.4 NA NA
TOTAL 1132 583 0 1715 TABLE NO:3
AREA UNDER PLANTATIONS FOR LAST 15 YEARS
NAME
LATITUDE AND
LONGITUDE
TOTAL AREA (HA)
SAMPLE AREA (HA)
SPECIES PLANTED
SAMPLE GAP
FILLING AREA(HA)
SURVIVAL %
TOTAL GAP
FILLING AREA (HA)
AREA NEEDED NEW
PLANTATION(HA)
FENCING
REQUIRED (RM)
REASONS FOR FAILURE
FINAL PRESCRIPTION(Enrichment(HA))
RATE/ HAC
COST (Rs)
Dhanapani
31'18'52" 77'31'39"
147
10 Cheel 5 50
40 50 39000
Due to fire burn and drought. Energy
Plantation = 4
112300 449200 Lambi Dhar
31'20'08" 77'31'53"
10 Cheel,
Euqaplitus, Dedonia,
2 80 Due to fire burn and drought.
Saroga 31'18'46" 77'30'38"
10 Cheel, Kail 5 50 Due to fire burn and drought.
Enrichment = 40
27900 1116000 Tamberd
har 31'23'38" 77'35'34"
5 Cheel, Daru, Drake
1 80 Due to fire burn and drought.
TOTAL : 147 35 13 40 50 39000 1565200
Volume: X Chapter: 4 Page No: 81
TABLE 3 PHOTOS Tamberdhar Lambi Dhar Dhanapani Saroga
TABLE NO:4
SOIL & MOISTURE CONSERVATION MEASURES NEEDED IN FOREST AREAS
NAME OF AREA
LATITUDE/LONGITUDE PRESCRIPTION QUANTITY
AVAILABILTY OF LOCAL MATERIAL
OLD WORK NEED REPAIRING(QUANTITY)
FINAL PRESCRIPTION
RATE/CUM COS(Rs)
NEW PRESCRIPTION NEW QUANTITY
Dhanapani 31'18'52" 77'31'39"
CheckDams 3x1.5x1.5m=22 Nos
Stone & local species NA
Trenching
1x.30x.30m= 5000 Nos
9.9
49500
Live Hedge 70 Rms
Trenching 1x.50x.30m=700 Nos
CheckDams 2x1.5x1.5m=30 Nos
Lambi Dhar 31'20'08" 77'31'53"
Trenching 1x.50x.30m=800 Nos
Stone & local species NA
Trenching
1x.30x.30m= 4000 Nos
9.9
39600
CheckDams 2x1.5x1.5m=28 Nos
Live Hedge 60 Rms
CheckDams 3x1.5x1.5m=20 Nos
Saroga 31'18'46" 77'30'38"
Live Hedge 80 Rms
Stone & local species NA
Trenching
1x.30x.30m= 3000 Nos
9.9
29700
Trenching 1x.50x.30m=800 Nos
CheckDams
3x1.5x1.5m=32 Nos
2x1.5x1.5m=38 Nos
Tamberdhar
31'23'38" 77'35'34"
CheckDams
3x1.5x1.5m=28 Nos
Stone & local species NA
Trenching
1x.30x.30m= 4000 Nos
9.9
39600
2x1.5x1.5m=36 Nos
Live Hedge 80 Rms
Trenching 1x.50x.30m=800 Nos
Volume: X Chapter: 4 Page No: 82
TABLE 4 PHOTOS
Tamberdhar Lambi Dhar Dhanapani Saroga
TABLE NO:5
AGROFORESTRY
PRESENT STATUS FUTURE REQUIREMENT
TYPE OF TREE PRESENT NOs PRESENT SPECIES FUTURE NOs FUTURE SPECIES
NEED FOR EXTENSION
SOURCE OF PLANTING STOCK(Nearest Nursery)
TREES 2500 Cheel, Kail, Baan, deodar 6500 Cheel, Kail, Baan, deodar Y Naula Forest Nursery.
WILD FRUIT 1800 Daru, Chulli, Bemi, Walnut, Paja, 5100 Daru, Chulli, Bemi, Walnut, Paja, Y Naula Forest Nursery.
MEDICINAL 2000 Timber, Kashmal, Kakkarsingi, Guchhi 4000 Timber, Kashmal, Kakkarsingi, Guchhi Y Naula Forest Nursery.
TABLE NO:6
GRAZING LANDS
Name LATITUDE/LONGITUDE AREA(HA) SPECIES
WEED REMOVAL SEEDING CLOSURES Other
PEOPLES SUGGESTION
Rate/ Hac (Rs)
Cost (Rs)
NA 006-01-NoPSn2a 25
Grass &
Bushes Yes Yes Yes
Requirement of 7500
fodder plants NA 21700 542500
TABLE NO:7
TEMPLE/PRIVATE/COMMUNITY/PANCHAYAT FOREST AREA NAME AREA(HA) LATITUDE/LONGITUDE SPECIES GAP FILLING MAINTENANCE NEW PLANTATION SOIL CONSERVATION MEASURES(QUANTITY)
NA NA NA NA NA NA NA NA
Volume: X Chapter: 4 Page No: 83
TABLE NO:8
PERFORMA FOR SOIL AND WATER CONSERVATION FOR NON-FOREST AREA(Nala & Khads)
NAME OF AREA
LATITUDE/LONGITUDE
PRESCRIPTION QUANTITY
AVAILABILITY OF LOCAL MATERIAL
OLD WORKS NEEDING REPAIR (QUANTITY)
LIFT IRRIGATION(HT/ACERAGE)
FINAL PRESCRIPTION
RATE/ UNIT
COST (Rs)
NEW PRESCRIPTION NEW QUANTITY
Kathi Gad-Upper (3
Kms) 31'17'06" 77'35'33"
Live Hedge 200 Rms
Stone & local
species NA NA
Live Hedge 900 Rms 9.6 8640
CheckDams
8x1.5x1.5m=7 Nos
CheckDams
8x1.5x1.5m=2 Nos 10033 160528
5x1.5x1.5m=16 Nos 5x1.5x1.5m=5 Nos 10033 250825
3x1.5x1.5m=12 Nos 3x1.5x1.5m=4 Nos 10033 120396
Brushwood 30 Rms Brushwood 150 Rms 62 9300
Tikker Nala (3.5 Kms)
31'18'48" 77'31'32"
Retaining Wall Gabion 15x3x4m=4 Nos
Stone & local
species NA NA
Retaining Wall Gabion 15x3x4m=2 Nos 29131 873930
Live Hedge 1050 Rms 9.6 10080
Live Hedge 300 Rms
CheckDams
7x1.5x1.5m=6 Nos 10033 421386
CheckDams
7x1.5x1.5m=18 Nos 10x1.5x1.5m=4 Nos 10033 401320
10x1.5x1.5m=12 Nos Brushwood 175 Rms 62 10850
TABLE 8 PHOTOS
Kathi Gad-Upper Tikker Nala
Volume: X Chapter: 4 Page No: 84
TABLE NO:9
PERFORMA FOR LANDSLIDE
NAME OF AREA/LOCATION
LATITUDE/LONGITUDE
DAMAGE/RISK TO LIFE & PROPERTY
MEASURES TAKEN
TYPE OF SOIL AND ROCK
DEGREE OF SLOPES/SEVERITY
OCCURRENCE(Season)
ROAD CONSTRUCTION
QUARRY
OTHER CONSTRUCTIONS
NATURAL
FINAL PRESCRIPTION
RATE/UNIT
COST (Rs)
NEW PRESCRIPTION
NEW QUANTITY
Barawag (400mx300m)
31'19'25" 77'32'07" Property NA CLAY
MODERATE Rainy No No No Yes
Retaining Wall Gabion
10x2x2.5m=13 Nos 17277 2246010
Bhargaon Road (500 m) NA Property NA CLAY
MODERATE Rainy Yes No No Yes
Retaining Wall Gabion
20x2x2.5m=25 Nos 17277 8638500
Chaber (1000mx500m)
31'20'05" 77'31'56" Property NA Clay Moderate Rainy Yes No No Yes
Retaining Wall Gabion
10x2x2.5m=10 No 17277 1727700
Delath Road (400 m) NA Property NA CLAY
MODERATE Rainy Yes No No Yes
Retaining Wall Gabion
20x2x2.5m=20 Nos 17277 6910800
TABLE 9 PHOTOS
Barawag Chaber
Volume: X Chapter: 4 Page No: 85
TABLE NO:9A
INFORMATION ON (CULTIVATION / LIFE STOCK / FUEL / FODDER / MFP)
1.Fruits FRUIT NAME VARIETY(LOCAL/IMPROVED) USE OF FERTILISERS USE OF INSECTICIDES PROBLEMS FACED
Apple Royal, Golden, Delicious Yes Yes
Technical guidance is required. Monkey and birds destroying the crops.
Cherry Local No No
Almond Drake, Semi Drake, IXL, Kagzi No No
Peach Local No No
Walnut Local No No
Chulli Local No No
Bemi Local No No
2.CROPS : CROPS NAME VARIETY(LOCAL/IMPROVED) USE OF FERTILISERS USE OF INSECTICIDES PROBLEMS FACED
Wheat Local No No
Technical guidence is required. Monkey and birds destroying the crops.
Barley Local No No
Rajmash Local No No
Urd Local No No
Kolth Local No No
Maize Local No No
Paddy Local No No
3.VEGETABLE : VEGETABLE NAME VARIETY(LOCAL/IMPROVED) USE OF FERTILISERS USE OF INSECTICIDES PROBLEMS FACED
Cabbage Local Yes Yes
Technical guidence is required. Monkey destroying the crops.
Cauliflower Local Yes Yes
Brinjal Local Yes Yes
Tomato Local Yes Yes
Capsicum Local Yes Yes
4. LIVE STOCK : LIVE STOCK(NO) BREED WHETHER SELLING THE PRODUCT PROBLEM FACED
Cow - 361 Jersey & Local Yes
Healthcare system for cattle is at approx 2 Kms far from the village. Ox-38 Local No
Sheep/Goat-82 Local No
5.FUEL/FODDER : FUEL/FODDER MANAGEMENT REQUIREMENT AVAILABILITY GAP PERCENTAGE SOURCE
FUEL Yes 50% 50% LPG & Forest
FODDER Yes 80% 20% Forests
Volume: X Chapter: 4 Page No: 86
MINOR FOREST PRODUCTS (MFP) MINOR FOREST PRODUCTS EXISTING NAME SUGGESTIONS
Kashmal Kashmal
No suggestion. Timber Timber
Kakkarsingi Kakkarsingi
Guchhi Guchhi
PEOPLES PARTICIPATION: MAIN PROBLEMS SUGGESTION FOR IMPROVEMENT PEOPLES PRIORITIES
There is shortage of drinking and irrigation water. Drinking and irrigation water be supplied from Tikker Khad at approx 4 Kms span to cover 3 villages.
Priority.
The road approach is very far from villages. Link road be made to the villages.
The condition of village temple is poor. Repair of the village temple building is required.
Condition of Middle School building is poor and there is no playground for children. Building of the school be repaired and a plaground be made.
There is no vetnary facility nearby the village. Healthcare system for both human and cattle be managed.
The system of water supply to the houses is not satisfactory. Large storage tanks be made for equal distribution of water to the houses.
PEOPLES PARTICIPATION
COSTING:
TABLES TABLE 3 TABLE 4 TABLE 6 TABLE 8 TABLE 9 TOTAL
COST 1565200 158400 542500 2267255 23675544 28208899