VO BREEDING ENVIRONMENT Introductory Training Program For New Network Partners
description
Transcript of VO BREEDING ENVIRONMENT Introductory Training Program For New Network Partners
ECOLEAD
1© Hamideh AfsarmaneshHamideh Afsarmanesh
VO BREEDING ENVIRONMENTIntroductory Training ProgramFor New Network Partners
WP2 - VBE
Hamideh AfsarmaneshUniversity of Amsterdam
Brussels – May 23-24, 2006
ECOLEAD
2© Hamideh AfsarmaneshHamideh Afsarmanesh
DYNAMIC CREATION OF VOs
VOO
ppor
tuni
ty
Many
Challenge
s!
“Open universeof organizations”
ECOLEAD
3© Hamideh AfsarmaneshHamideh Afsarmanesh
MANY CHALLENGES
Open Universe! OPPORTUNITY
Know about Existence/Abilities of potential partners in open universe
Dynamically Configure a new VO
from autonomous/heterogeneous organizations
Deal with incompatibility and heterogeneity of information sources
Acquire basic profile/competency information of organizations
Compare and select organizations to configure the VO
Establish common interoperability/integration platform
Build trust as the base for organization collaboration
Agree on common principles of sharing/working
Define roles and responsibilities of partners
Agree on rights & sharing benefits/losses
Resolve semantic heterogeneity in organizations information
. . .
ECOLEAD
4© Hamideh AfsarmaneshHamideh Afsarmanesh
Fluid creation of VOs
VOs AND VBEs
VOO
ppor
tuni
tyVBEVO Configuration
Open Universe
Controlled Border Universe
ECOLEAD
5© Hamideh AfsarmaneshHamideh Afsarmanesh
An association or alliance of organizations and their related supporting institutions,
that adhere to a base long term cooperation agreement, and adoption of common operating principles and infrastructures,
with the main goal of increasing both their chances and their preparedness
towards collaboration in potential future Virtual Organizations (VOs)
VBE – VIRTUAL ORGANIZATION BREEDING ENVIRONMENT
Very long term strategic alliances to facilitate brokerage of dynamic VOs - matching opportunities against the collection of existing competencies
-Industry Districts- Industry Clusters- SME Networks- …
ECOLEAD
6© Hamideh AfsarmaneshHamideh Afsarmanesh
FULL FLEDGE EU-wide VBEs IN ACTION
ECOLEAD WP2’s Aim - Excel and reach innovation necessary
for Fluid Creation of VOs- Define related concepts, reference
models and methodologies- Develop mechanisms, prototypes, and
proof of concepts
To be achieved afterwards …
- National / International laws
- Heavy public sponsorship
- Productization of ECOLEAD R&D results
- Global trust & acceptance
- …
ECOLEAD
7© Hamideh AfsarmaneshHamideh Afsarmanesh
•
Focused accomplished
work
D23.1: VO planning and launching (M15)
D21.2a: Specification of profile and competency mgmt. (M18)
D21.2b: Experimental e-Catalog for profile/competency mgmt (M18)
6 12 18 24 30 36 42 480
M1 M2 M3 M4CP1 CP2 CP3 CP4
VBE management system
VO creation framework
VBE models & mechanisms
6 12 18 24 30 36 42 480
M1 M2 M3 M4CP1 CP2 CP3 CP4
VBE management system
VO creation framework
VBE models & mechanisms
WHAT WE HAVE ACHIEVED SO FAR
D21.3: VBE common ontol0gy (M21)
D21.4a: Characterization of VBE value system and metrics (M21)
D21.4b: Creating and supporting trust culture in VBEs (M21)
D23.2: Specification of VO creation support tools (M24)
D22.1: VBE management system (M24)
ECOLEAD
8© Hamideh AfsarmaneshHamideh Afsarmanesh
TARGET AREA-EXISTING LONG-TERM ALLIANCES
PlasticsSlovenia>60Plasttechnics cluster
Automotive industrySlovenia54Automotive cluster
Process industryFinland12Verkko A
Motor-sportUK40Motorsport Valley
Mining industryChile-Mining Cluster
Textile / clothingItaly2068CARPI
TelecommunicationsFinland79Helsinki ICT cluster
Credit, lending, investmentsUSA>6Advanced Business Services
Agro-food, biotechnologyCanada>160Biotechnology cluster
BiotechnologyUSA411Biotechnology cluster
Electronics, metal & plastic Mexico>250Fenix Cluster
MouldsBrazil>12VIRFERBRAS
Telecommunications Canada-Regional Net for Ontario
PlasticsAustralia45PVC
BiotechnologyGermany>150Virtual Biotech Company
Life sciencesSwitzerland>13Bipolo Ticino
IT, Machinery, Bio-tech, e-LearningUK>25Virtual Enterprise Networks Yorkshire
Plastic mouldsPortugal136CEFAMOL
ManufacturingBrazil>9Virtec
Services, EnvironmentGermany>15Kiesel
Mechanical industrySwitzerland, Germany100Virtuelle Fabrik
DomainLocationMembersCase
PlasticsSlovenia>60Plasttechnics cluster
Automotive industrySlovenia54Automotive cluster
Process industryFinland12Verkko A
Motor-sportUK40Motorsport Valley
Mining industryChile-Mining Cluster
Textile / clothingItaly2068CARPI
TelecommunicationsFinland79Helsinki ICT cluster
Credit, lending, investmentsUSA>6Advanced Business Services
Agro-food, biotechnologyCanada>160Biotechnology cluster
BiotechnologyUSA411Biotechnology cluster
Electronics, metal & plastic Mexico>250Fenix Cluster
MouldsBrazil>12VIRFERBRAS
Telecommunications Canada-Regional Net for Ontario
PlasticsAustralia45PVC
BiotechnologyGermany>150Virtual Biotech Company
Life sciencesSwitzerland>13Bipolo Ticino
IT, Machinery, Bio-tech, e-LearningUK>25Virtual Enterprise Networks Yorkshire
Plastic mouldsPortugal136CEFAMOL
ManufacturingBrazil>9Virtec
Services, EnvironmentGermany>15Kiesel
Mechanical industrySwitzerland, Germany100Virtuelle Fabrik
DomainLocationMembersCaseSo far investigated in WP2: - Literature/case study
(reported in D21.1) 26- In-depth study - SME workshops (Helsinki) 6- Input from experts in the field – IAB meeting (Brussels) >8- Direct contact with networks (reported in D21.2a) 5-In-depth regional study (French networks) 19
Total >60(Plus many more individual Studies by partners)
Confirmed summary report: Alliances do alright, but can do much better!
ECOLEAD
9© Hamideh AfsarmaneshHamideh Afsarmanesh
MAIN BARRIERS TO WIDER DEPLOYMENT OF VBEs
1. Current VBE operational level Challenges• Market problems – not yet fully economically successful
– Proactive brokerage (seek COs), assist brokerage (search & suggestion)– Motivating members to become more active (by incentives)
• Governance principle – lacking or very informal– Transparent rules to assign partners to opportunities– Bidding and contracting regulations– Definition of working/sharing principles
• Updating competencies and other VBE & member information – how to cope– Ontology engineering– Semi-automatic (crawlers) data extraction from online corpora
• Member organizations trust & Performance measurement – how to do– Collect/analyze performance data and do performance-based trust appraisal– Information exchange between VO and the VBE– Accreditation
• Clear division of responsibilities, role, and their interactions – missing guidelines, procedures, written rules
– Clear transparent role definition and establishment of right/responsibilities
• Create the image and name – not very successful
– Marketing & Branding
• Absence of personal contact– Organization of Events and Special Interest Groups
ECOLEAD
10© Hamideh AfsarmaneshHamideh Afsarmanesh
MAIN BARRIERS TO WIDER DEPLOYMENT OF VBEs
1. Current VBE operational level Challenges• Market problems – not yet fully economically successful
– Proactive brokerage (seek COs), assist brokerage (search & suggestion)– Motivating members to become more active (by incentives)
• Governance principle – lacking or very informal– Transparent rules to assign partners to opportunities– Bidding and contracting regulations– Definition of working/sharing principles
• Updating competencies and other VBE & member information – how to cope– Ontology engineering– Semi-automatic (crawlers) data extraction from online corpora
• Member organizations trust & Performance measurement – how to do– Collect/analyze performance data and do performance-based trust appraisal– Information exchange between VO and the VBE– Accreditation
• Clear division of responsibilities, role, and their interactions – missing guidelines, procedures, written rules
– Clear transparent role definition and establishment of right/responsibilities
• Create the image and name – not very successful
– Marketing & Branding
• Absence of personal contact– Organization of Events and Special Interest Groups
ECOLEAD
11© Hamideh AfsarmaneshHamideh Afsarmanesh
1. Current VBE operation level problems• Market problems – not yet fully economically successful
– Proactive brokerage, – Motivate members to become more active
• Copying with updating of competencies and other information about members
– Data extraction through crawlers, from online corpora
• Copying with information about progress of work– Data extraction through crawlers, from online corpora
• Governance principle– Transparent rules for assignment of partners to opportunities– Bidding and contracting– Working/sharing principles
• No clear division of responsibilities, role and their interactions / missing guidelines, procedures, written rules
– Clear role definition and right/responsibilities
2. Attracting new members and keeping them happy• Return on time / cost investment – fear of not having ROI
- Proactive opportunity brokerage• Loosing decision making power – a collaboration side effect
- Creating flexibility in decision making - Transparent rules/regulations
- Different levels of membership
• Trust and IPR problems - Mechanisms to establish trust / foresee trustworthiness
- Enhance trust in VBE establishment itself - transparent rules/regulations - Definition of incentives & sanctions
- Enforcement of the defined rules to be a “good citizen” in VBE• Fear of partner selection by a virtual system
- Neutral transparent definition of VO partner suggestion process• Required high commitment level
- Different levels of membership
MAIN BARRIERS TO WIDER DEPLOYMENT OF VBEs
ECOLEAD
12© Hamideh AfsarmaneshHamideh Afsarmanesh
1. Current VBE operation level problems• Market problems – not yet fully economically successful
– Proactive brokerage, – Motivate members to become more active
• Copying with updating of competencies and other information about members
– Data extraction through crawlers, from online corpora
• Copying with information about progress of work– Data extraction through crawlers, from online corpora
• Governance principle– Transparent rules for assignment of partners to opportunities– Bidding and contracting– Working/sharing principles
• No clear division of responsibilities, role and their interactions / missing guidelines, procedures, written rules
– Clear role definition and right/responsibilities
2. Attracting new members and keeping them happy• Return on time / cost investment – fear of not having ROI
- Proactive opportunity brokerage• Loosing decision making power – a collaboration side effect
- Creating flexibility in decision making - Transparent rules/regulations
- Different levels of membership
• Trust and IPR problems - Mechanisms to establish trust / foresee trustworthiness
- Enhance trust in VBE establishment itself - transparent rules/regulations - Definition of incentives & sanctions
- Enforcement of the defined rules to be a “good citizen” in VBE• Fear of partner selection by a virtual system
- Neutral transparent definition of VO partner suggestion process• Required high commitment level
- Different levels of membership
MAIN BARRIERS TO WIDER DEPLOYMENT OF VBEs
ECOLEAD
13© Hamideh AfsarmaneshHamideh Afsarmanesh
1. Current VBE operation level problems• Market problems – not yet fully economically successful
– Proactive brokerage, – Motivate members to become more active
• Copying with updating of competencies and other information about members
– Data extraction through crawlers, from online corpora
• Copying with information about progress of work– Data extraction through crawlers, from online corpora
• Governance principle– Transparent rules for assignment of partners to opportunities– Bidding and contracting– Working/sharing principles
• No clear division of responsibilities, role and their interactions / missing guidelines, procedures, written rules
– Clear role definition and right/responsibilities
2. Attracting new members and keeping them happy• Return on time / cost investment – fear of not having ROI
- Proactive opportunity brokerage
• Loosing decision making power – a collaboration side effect - Creating flexibility in decision making
- Transparent rules/regulations - Different levels of membership
• Trust and IPR problems - Mechanisms to establish trust and forecast other partners trustworthiness
- Enhance trust in VBE establishment itself - transparent rules/regulations - Definition of incentives & sanctions
- Enforcement of the defined rules to be a “good citizen” in VBE
3. Current VBE Creation stage problems• VBE creation methodology and tools – lacking - Replicable tools & mechanisms - Definition of VBE creation methodologies • Benefits founders expect when initiating a VBE – unclear - Power, role, …
• Huge efforts/costs needed to be invested – heavy and unclear - Business model - public sponsorship and/or private investment
• legal issues - National/international laws for VBEs and their operation
MAIN BARRIERS TO WIDER DEPLOYMENT OF VBEs
ECOLEAD
14© Hamideh AfsarmaneshHamideh Afsarmanesh
1. Current VBE operation level problems• Market problems – not yet fully economically successful
– Proactive brokerage, – Motivate members to become more active
• Copying with updating of competencies and other information about members
– Data extraction through crawlers, from online corpora
• Copying with information about progress of work– Data extraction through crawlers, from online corpora
• Governance principle– Transparent rules for assignment of partners to opportunities– Bidding and contracting– Working/sharing principles
• No clear division of responsibilities, role and their interactions / missing guidelines, procedures, written rules
– Clear role definition and right/responsibilities
2. Attracting new members and keeping them happy• Return on time / cost investment – fear of not having ROI
- Proactive opportunity brokerage
• Loosing decision making power – a collaboration side effect - Creating flexibility in decision making
- Transparent rules/regulations - Different levels of membership
• Trust and IPR problems - Mechanisms to establish trust and forecast other partners trustworthiness
- Enhance trust in VBE establishment itself - transparent rules/regulations - Definition of incentives & sanctions
- Enforcement of the defined rules to be a “good citizen” in VBE
3. Current VBE Creation stage problems• VBE creation methodology and tools – lacking - Replicable tools & mechanisms - Definition of VBE creation methodologies • Benefits founders expect when initiating a VBE – unclear - Power, role, …
• Huge efforts/costs needed to be invested – heavy and unclear - Business model - public sponsorship and/or private investment
• legal issues - National/international laws for VBEs and their operation
MAIN BARRIERS TO WIDER DEPLOYMENT OF VBEs
ECOLEAD
15© Hamideh AfsarmaneshHamideh Afsarmanesh
ELEMENTS OF VBE REFERENCE FRAMEWORK
- How to “reform the role of breeding environments”?
- In a VBE, What to do and when, to support the fluid creation of VOs?
-Identification/specification of needed methodologies & mechanisms for VBEs
- Next step: Selection of
Primary (hot) issues to develop in ECOLEAD
Empower, Boost, and Replicate
How to build the Whole greater than the sum of its Parts!
ECOLEAD
16© Hamideh AfsarmaneshHamideh Afsarmanesh
3-DIMENSIONS VBE FUNCTIONAL FRAMEWORK
2.Boost
1.Empower
3.Replicate
Identify infrastructure and mechanisms for replication- Methodologies for opportunity discovery and creation- Defining accreditation strategy - Competence ontology extraction and evolution- Value systems (regulation & guidelines generation)- Dynamic trust management (based and identified criteria)- Business model development
Address already identified needs - ICT base infrastructure - Competence management - Trust management - Performance management - History inheritance
Extend support for new discovered potentials - Proactive discovery of opportunities - Creation of new opportunities - Discovery of emerging new competencies - bag of assets - Support institution facilitation - Accreditation (sector quality, activity costs, business processes) - System of incentives
ECOLEAD
17© Hamideh AfsarmaneshHamideh Afsarmanesh
VBE concepts
Top-level• Generic CNO-related info,Core-level• VBE (self), • VBE Participant/Actor, • VO, • Profile & competency, • History, • Evidence, • Bag of Assets, • VBE Management System, • Values System,• Trust,Domain level• Classification of domains/industries• Domain-dependent subclasses of core-level
classes (e.g. Competency subclasses such as manufacturing, tourism)
Application levels• VBE application-dependent subclasses of
domain-level classes (e.g. Manufacturing Competency subclasses such as metal plumping)
1. VBE
2. VBE Participant
3. VO
4. Profile
5. History
6. Evidence
9. VBE Governance
10. Value System
11. Trust System
7. Bag of Assets
8. Management System
Objectives of ontologies in VBEs:1. common understanding of VBE-related
concepts,2. common understanding of the VBE model
(e.g. the main components of the VBE),3. classification of knowledge (e.g.
competencies) and support for interoperability of knowledge among the VBE participants and among different VBEs,
4. development of the VBE databases, 5. implementation and support of the
functionality of the VBE Management System.
ECOLEAD
18© Hamideh AfsarmaneshHamideh Afsarmanesh
Top & core levels (VBE common ontology)
ECOLEAD
19© Hamideh AfsarmaneshHamideh Afsarmanesh
VBE MANAGEMENT SYSTEM - VMS FUNCTIONALITIES
Initiation and
recruitingFoundation
Operation / Evolution
Creation phase
Metamorphosis
Dissolution
VO operation & dissolution Inheritance
Supports
Fee
dbac
k&
Inhe
rita
nce
Feedback and inheritance
Initiation and
recruiting
Initiation and
recruitingFoundation
Operation / Evolution
Creation phase
Metamorphosis
Dissolution
VO operation & dissolution Inheritance
Supports
Fee
dbac
k&
Inhe
rita
nce
Feedback and inheritance
1. Setup & run VBE systems
2. Load existing ontology & thesaurus
3. Parameterize domain & setup
links
Initiation and recruiting
2. Adapt database schema and create
repositories
3. Enter administrative &
assisting data
4. Register founding members
Foundation
Op
erati on
Creation phase
Metam
orphosisD
issolution
VO operation & dissolution In
heri
tan c
eSupports
Fee
dba
ck&
Inhe
rita
nce
Feedback and inheritance
1. Adapt VBE ontology
/ Evo
lutio
n
1. Setup & run VBE systems
2. Load existing ontology & thesaurus
3. Parameterize domain & setup
links
Initiation and recruiting
2. Adapt database schema and create
repositories
3. Enter administrative &
assisting data
4. Register founding members
Foundation
Op
erati on
Creation phase
Metam
orphosisD
issolution
VO operation & dissolution In
heri
tan c
eSupports
Fee
dba
ck&
Inhe
rita
nce
Feedback and inheritance
1. Adapt VBE ontology
/ Evo
lutio
n
1. New members
registration
2. Competency & Profile
management
3. Ontology engineering
4. Administrative and governance
6. Trust management
7. VO Inheritance
management
8. Performance management
5. Creation and registration of
VO
Init
iati
onan
dre
crui
ting
Fo
und
atio
n
Creation Operation / Evolution
Met
amor
phos
isD
isso
l uti
on
VO operation & dissolution I n
heri
tanc
e
Inherited tools, knowledge, etc.
Performance dataSupports
Feedback and inheritance
1. New members
registration
2. Competency & Profile
management
3. Ontology engineering
4. Administrative and governance
6. Trust management
7. VO Inheritance
management
8. Performance management
5. Creation and registration of
VO
Init
iati
onan
dre
crui
ting
Fo
und
atio
n
Creation Operation / Evolution
Met
amor
phos
isD
isso
l uti
on
VO operation & dissolution I n
heri
tanc
e
Inherited tools, knowledge, etc.
Performance dataSupports
Feedback and inheritance
Initi
atio
n an
d re
crui
ting
Foun
datio
n
Creation
Operation / E
volution
VO operation& dissolution
Supports
Fee
dbac
k &
Inhe
rita
nce
1. Revision ofgathered
knowledge
2. Transfer ofknowledge and
assets
1. Assignmentof rights &
responsibilities
2. Transition to neworganizational
structure
Inheritance
Metamorphosis
Dissolution
Feedback and inheritance
Initi
atio
n
Foun
dati
on
Re-creation
Initi
atio
n an
d re
crui
ting
Foun
datio
n
Creation
Operation / E
volution
VO operation& dissolution
Supports
Fee
dbac
k &
Inhe
rita
nce
1. Revision ofgathered
knowledge
2. Transfer ofknowledge and
assets
1. Assignmentof rights &
responsibilities
2. Transition to neworganizational
structure
Inheritance
Metamorphosis
Dissolution
Feedback and inheritance
Initi
atio
n
Foun
dati
on
Re-creation
Creation
Dissolution / Metamorphosis
Operation/Evolution
ECOLEAD
20© Hamideh AfsarmaneshHamideh Afsarmanesh
Structure / Membership Management (SMMS)
Member registration Member rewarding Registration of created
VOs
Supporting Information Management (INMS)
Bag of assets Support institution information Value sys. Guidelines /
incentives information Members
roles/rights/responsibilities Profiles, competency and
validation information Trust criteria and members’ trust
information VO inheritance information Historical performance
information
Profiling & Trust Management (PTMS)
Members profile / competency mgmt (PCMS)
Trust Appraisal & management (TRMS)
Ontology adaptation & evolution
VMS – SOME TOOLS / SYSTEMS
ADALL
AD IN
Managemnet Decision support (MDSS)
VBE competency gap identification
Members low trustworthiness warning
Lack of performance identification
ADNM
Stakeholders Short form
VBE member VM VBE support institution SP VO initiators IN VBE administrator AD New membership applicant NM Customer CS
ECOLEAD
21© Hamideh AfsarmaneshHamideh Afsarmanesh
- Data about competency, trust, and performance
- Profile/Competency data- Trust elements data
- New data / updates
- Competency / profile information- Trust appraisal information
VBE Admin.Managemnet Decision
Support (MDSS)
Profiling & Trust Management (PTMS)
Supporting Information Management (INMS)
VO Creation
Structure / Membership Management (SMMS)
- Members roles
- Register VO:- VO partners- VO Structure- VO contractsMembership
Applicant
VMS ARCHITECTURE– TOOLS & ACTORS
VO Initiator
-Competency management-Discovery of new competencies-Trust management
- Members roles / rights / responsibilities- Bag of assets
VBE Member
- Bag of assets-Support institution
- Membership & -members information
ECOLEAD
22© Hamideh AfsarmaneshHamideh Afsarmanesh
CO identification
Search and filter Calls for Tenders
Normalize representation Notify VBE / broker
CO characterization &VO rough planning
Required competencies Required collaboration
modalitiesCollab. business processCollab. projectCollab. problem solvingAd-hoc collaboration
Model plan of activities
Partners’ search & suggestion
List of potential VOsRisk analysisExpected performance
Human-based final decision
VO CREATION – SOME TOOLS
(Customer) Broker
BrokerVO Planner
VO PlannerVBE members
Negotiation wizard
Contract templates Virtual negotiation room Negotiation objects CSCW approach
VO PlannerVBE members
ECOLEAD
23© Hamideh AfsarmaneshHamideh Afsarmanesh
Instantiation ofNegotiation objects
-Needed Competencies- Nº of partners
pre-selected set of organizations
Negotiation result
- VO Detailed Plan / VO agreements- Selection & Negotiation history- VO Registration
VO PlannerCO Characterization
&VO Rough Planning
Negotiation
Wizard
Partners Searchand
Suggestion
VBE ManagementSystem
CO Identification
- CO Specification
- VO Rough Plan- VO Structure-Client information
Partners performance indicators
- VBE Competences
Opportunity Broker
VO CREATION – TOOLS & ACTORS
VO Member
ECOLEAD
24© Hamideh AfsarmaneshHamideh Afsarmanesh
VBEReference Framework
VBEReference Framework
VBEManagement
services
VBEManagement
services
DynamicVO creation assistance
tool
DynamicVO creation assistance
tool
ContractNegotiation
wizard
ContractNegotiation
wizard
Value system& metrics
for VBE
Value system& metrics
for VBE
Characteristicsof existing VBEs
& scenarios
VBE Typologies& Users
categorization
Competency Concept &Mgmt req.s
Trust elements / modeling
& requirements
VBEReference model
VBE Mgmt.Functionality
specs
VBEGovernanceprinciples
VBE Mgmt.Infrastructure
& base services
VO creationprocess
VO creationFunctionality
specs
Contract negotiation
process
VO creationFunctionality
services
ContractNegotiation
services
OntologyEvolutionsupport
VBE Businessstrategies
Time
Validation by Pilot demonstratorsValidation by external experts and SME networks
Completion level
100% 0%
VBE Mgmt. Requirements
and architecture
Common VBEontology
Basic life cycle Functionality
Sharing and operating principles
VBE instantiation mechanisms & methodologies
Basic elementsof value systems
PROGRESS ON VBE & VO CREATION
Validation By trials
ECOLEAD
25© Hamideh AfsarmaneshHamideh Afsarmanesh
IMPLEMENTATION AND DEMONSTRATION PLAN
M24 M30 M36 M42 M48
Take-up of subsystems at SME network site
Trials of A-service Prototype & Subsystem development
Trials of C-service prototypes
Prototypes development
M39
Trials at development environments
1st C-serviceprototype
M33
2nd C-service prototype
1st A-service prototype 2nd A-service
prototype
ECOLEAD
26© Hamideh AfsarmaneshHamideh Afsarmanesh
PRIMARY (HOT) FUNCTIONAL ISSUES
2.Boost
1.Empower
3.Replicate
Identify infrastructure and mechanisms for replication- Methodologies for opportunity discovery and creation
- Defining accreditation strategy - Competence ontology extraction and evolution- Value systems (regulation & guidelines generation)- Dynamic trust management (based and identified criteria) - Business model development
Address already identified needs - ICT base infrastructure
- Competence management - Trust management - Performance management - History inheritance
Extend support for new discovered potentials - Proactive discovery of opportunities - Creation of new opportunities
- Discovery of emerging new competencies - bag of assets - Support institutions
facilitation - Accreditation
- System of incentives