Vlg Loss Prevention & Secruity Engels

17
Loss Prevention & Security confidential Building your future with Loss Prevention & Security

description

 

Transcript of Vlg Loss Prevention & Secruity Engels

Page 1: Vlg Loss Prevention & Secruity Engels

Loss Prevention & Security confidential

Building your futurewith Loss Prevention & Security

Page 2: Vlg Loss Prevention & Secruity Engels

Loss Prevention & Security confidential 2 08/04/23

• Why Loss Prevention & Security?

• What is Loss Prevention & Security?

• Authorities concerned

• Measures to be taken

• Project strategy

• Added value Van Looy Group

content

Page 3: Vlg Loss Prevention & Secruity Engels

Loss Prevention & Security confidential 3 08/04/23

• After the terrorist attacks of 11 September 2001 (New York), 11 March 2004 (Madrid), 7 July 2005 (London) and other attempts, security has become one of the top priorities world wide.

• Measures have been taken everywhere to protect people, transport means, objects and goods both preventive as operational as good as possible.

Why Loss Prevention & Security?

Page 4: Vlg Loss Prevention & Secruity Engels

Loss Prevention & Security confidential 4 08/04/23

Taking measures to guarantee the continuity of company processes of all sorts.

What is Loss Prevention & Security?

Example

• Prevention of stock loss

• Prevention of loss in transit

• Guarantee punctual delivery to clients

• Staff safety

• Environmental safety

Page 5: Vlg Loss Prevention & Secruity Engels

Loss Prevention & Security confidential 5 08/04/23

• Tapa Transported Asset Protection Association

• C-TPAT Customs-Trade Partnership Against Terrorism

• AEO Authorised Economic Operator

• ISPS International Ship and Port Facility Security Code

• Etc.

Official authorities who are providing regulations in the Supply Chain Security

Page 6: Vlg Loss Prevention & Secruity Engels

Loss Prevention & Security confidential 6 08/04/23

• Organisation measures

• Building measures

• Electronic measures

• Transport measures

Measures to be taken

Page 7: Vlg Loss Prevention & Secruity Engels

Loss Prevention & Security confidential 7 08/04/23

• Key management

• Procedures for:

• Income control of the location and the facilities

• Screening of existing and future staff

• File saving (30/60 storage of images)

• Maintenance of installations

• Guarding company

Etc.

Organisation measures

Page 8: Vlg Loss Prevention & Secruity Engels

Loss Prevention & Security confidential 8 08/04/23

• Fences with Gates and Barriers

• Walls, façades and roofs with a predefined security strength

• All locks following international classification

• Windows following international security standards

• Safe

Etc.

Building measures

Page 9: Vlg Loss Prevention & Secruity Engels

Loss Prevention & Security confidential 9 08/04/23

• Intrusion detection:

• Perimeter detection

• Movement detection

• Door contacts

• Access control

• Proximity

• Mifare

• Biometry

• CCTV via:

• Analogue solutions (coax with HD recording)

• IP solutions

• Intelligent video systems

• Track and Tracing of products

Etc.

Electronic measures

Page 10: Vlg Loss Prevention & Secruity Engels

Loss Prevention & Security confidential 10 08/04/23

• Hard side trailers

• Wheel lock

• King pin lock

• GPS devices

• Seals

• Predefined routes

• Road guarding

• Etc.

Transport measures

Page 11: Vlg Loss Prevention & Secruity Engels

Loss Prevention & Security confidential 11 08/04/23

Project strategy

ImplementationImplementationContractingContractingConceptual designConceptual design Design & engineeringDesign & engineering

Proposal evaluation

Contracting

Short list contractors

CO

NTR

AC

TS F

OR

EX

EC

UTI

ON

Assessment URD

Conceptual design

CO

NC

EP

TUA

L D

ES

IGN

RE

PO

RT

PR

OG

RA

M O

F R

EQ

UIR

EM

EN

TS

Design

SP

EC

IFIC

ATI

ON

SD

OC

UM

EN

TS

BU

ILD

ING

P

ER

MIT

FIL

E

Detailed Design

DE

SIG

N R

EP

OR

T

Construction

Commissioning

Moving

Qualification

ImplementationImplementationContractingContractingConceptual designConceptual design Design & engineeringDesign & engineering

Proposal evaluation

Contracting

Short list contractors

CO

NTR

AC

TS F

OR

EX

EC

UTI

ON

Assessment URD

Conceptual design

CO

NC

EP

TUA

L D

ES

IGN

RE

PO

RT

PR

OG

RA

M O

F R

EQ

UIR

EM

EN

TS

Assessment URD

Conceptual design

CO

NC

EP

TUA

L D

ES

IGN

RE

PO

RT

PR

OG

RA

M O

F R

EQ

UIR

EM

EN

TS

Design

SP

EC

IFIC

ATI

ON

SD

OC

UM

EN

TS

BU

ILD

ING

P

ER

MIT

FIL

E

Detailed Design

DE

SIG

N R

EP

OR

T

Construction

Commissioning

Moving

Qualification

Page 12: Vlg Loss Prevention & Secruity Engels

Loss Prevention & Security confidential 12 08/04/23

Conceptual design

• Risk Assessment

• Definition of operational requirements

• Involve other related divisions (logistics, facilities, HR and transportation)

• Conceptual design of the security concept (OBET measures)

ImplementationImplementationContractingContractingConceptual designConceptual design Design & engineeringDesign & engineering

Proposal evaluation

Contracting

Short list contractors

CO

NTR

AC

TS F

OR

EX

EC

UTI

ON

Assessment URD

Conceptual design

CO

NC

EP

TU

AL

DE

SIG

N R

EP

OR

T

PR

OG

RA

M O

F R

EQ

UIR

EM

EN

TS

Design

SP

EC

IFIC

ATI

ON

SD

OC

UM

EN

TS

BU

ILD

ING

P

ER

MIT

FIL

E

Detailed Design

DE

SIG

N R

EP

OR

T

Construction

Commissioning

Moving

Qualification

ImplementationImplementationContractingContractingConceptual designConceptual design Design & engineeringDesign & engineering

Proposal evaluation

Contracting

Short list contractors

CO

NTR

AC

TS F

OR

EX

EC

UTI

ON

Assessment URD

Conceptual design

CO

NC

EP

TU

AL

DE

SIG

N R

EP

OR

T

PR

OG

RA

M O

F R

EQ

UIR

EM

EN

TS

Assessment URD

Conceptual design

CO

NC

EP

TU

AL

DE

SIG

N R

EP

OR

T

PR

OG

RA

M O

F R

EQ

UIR

EM

EN

TS

Design

SP

EC

IFIC

ATI

ON

SD

OC

UM

EN

TS

BU

ILD

ING

P

ER

MIT

FIL

E

Detailed Design

DE

SIG

N R

EP

OR

T

Construction

Commissioning

Moving

Qualification

Page 13: Vlg Loss Prevention & Secruity Engels

Loss Prevention & Security confidential 13 08/04/23

• Detailed design basis on the conceptual design

• Review design with the different divisions (security, facilities, HR, operations and transportation)

• Planning infrastructure and supplies

Design & engineering

ImplementationImplementationContractingContractingConceptual designConceptual design Design & engineeringDesign & engineering

Proposal evaluation

Contracting

Short list contractors

CO

NTR

AC

TS F

OR

EX

EC

UTI

ON

Assessment URD

Conceptual design

CO

NC

EP

TU

AL

DE

SIG

N R

EP

OR

T

PR

OG

RA

M O

F R

EQ

UIR

EM

EN

TS

Design

SP

EC

IFIC

ATI

ON

SD

OC

UM

EN

TS

BU

ILD

ING

P

ER

MIT

FIL

E

Detailed Design

DE

SIG

N R

EP

OR

T

Construction

Commissioning

Moving

Qualification

ImplementationImplementationContractingContractingConceptual designConceptual design Design & engineeringDesign & engineering

Proposal evaluation

Contracting

Short list contractors

CO

NTR

AC

TS F

OR

EX

EC

UTI

ON

Assessment URD

Conceptual design

CO

NC

EP

TU

AL

DE

SIG

N R

EP

OR

T

PR

OG

RA

M O

F R

EQ

UIR

EM

EN

TS

Assessment URD

Conceptual design

CO

NC

EP

TU

AL

DE

SIG

N R

EP

OR

T

PR

OG

RA

M O

F R

EQ

UIR

EM

EN

TS

Design

SP

EC

IFIC

ATI

ON

SD

OC

UM

EN

TS

BU

ILD

ING

P

ER

MIT

FIL

E

Detailed Design

DE

SIG

N R

EP

OR

T

Construction

Commissioning

Moving

Qualification

Page 14: Vlg Loss Prevention & Secruity Engels

Loss Prevention & Security confidential 14 08/04/23

• Develop Request for Quotation (RFQ):

• Program of requirements

• Drawings

• Planning

• Quotation procedure

• Evaluation quotations

• Advise on suppliers

• Support contract negotiation

Quotations

ImplementationImplementationContractingContractingConceptual designConceptual design Design & engineeringDesign & engineering

Proposal evaluation

Contracting

Short list contractors

CO

NTR

AC

TS F

OR

EX

EC

UTI

ON

Assessment URD

Conceptual design

CO

NC

EP

TU

AL

DE

SIG

N R

EP

OR

T

PR

OG

RA

M O

F R

EQ

UIR

EM

EN

TS

Design

SP

EC

IFIC

ATI

ON

SD

OC

UM

EN

TS

BU

ILD

ING

P

ER

MIT

FIL

E

Detailed Design

DE

SIG

N R

EP

OR

T

Construction

Commissioning

Moving

Qualification

ImplementationImplementationContractingContractingConceptual designConceptual design Design & engineeringDesign & engineering

Proposal evaluation

Contracting

Short list contractors

CO

NTR

AC

TS F

OR

EX

EC

UTI

ON

Assessment URD

Conceptual design

CO

NC

EP

TU

AL

DE

SIG

N R

EP

OR

T

PR

OG

RA

M O

F R

EQ

UIR

EM

EN

TS

Assessment URD

Conceptual design

CO

NC

EP

TU

AL

DE

SIG

N R

EP

OR

T

PR

OG

RA

M O

F R

EQ

UIR

EM

EN

TS

Design

SP

EC

IFIC

ATI

ON

SD

OC

UM

EN

TS

BU

ILD

ING

P

ER

MIT

FIL

E

Detailed Design

DE

SIG

N R

EP

OR

T

Construction

Commissioning

Moving

Qualification

Page 15: Vlg Loss Prevention & Secruity Engels

Loss Prevention & Security confidential 15 08/04/23

• Look after the clients interests

• Budget control

• Planning control

• Control of Building measures following the specifications

• Control of Electronic measures following the specifications

• Write out organizational procedures

Implementation (I)

ImplementationImplementationContractingContractingConceptual designConceptual design Design & engineeringDesign & engineering

Proposal evaluation

Contracting

Short list contractors

CO

NTR

AC

TS F

OR

EX

EC

UTI

ON

Assessment URD

Conceptual design

CO

NC

EP

TU

AL

DE

SIG

N R

EP

OR

T

PR

OG

RA

M O

F R

EQ

UIR

EM

EN

TS

Design

SP

EC

IFIC

ATI

ON

SD

OC

UM

EN

TS

BU

ILD

ING

P

ER

MIT

FIL

E

Detailed Design

DE

SIG

N R

EP

OR

T

Construction

Commissioning

Moving

Qualification

ImplementationImplementationContractingContractingConceptual designConceptual design Design & engineeringDesign & engineering

Proposal evaluation

Contracting

Short list contractors

CO

NTR

AC

TS F

OR

EX

EC

UTI

ON

Assessment URD

Conceptual design

CO

NC

EP

TU

AL

DE

SIG

N R

EP

OR

T

PR

OG

RA

M O

F R

EQ

UIR

EM

EN

TS

Assessment URD

Conceptual design

CO

NC

EP

TU

AL

DE

SIG

N R

EP

OR

T

PR

OG

RA

M O

F R

EQ

UIR

EM

EN

TS

Design

SP

EC

IFIC

ATI

ON

SD

OC

UM

EN

TS

BU

ILD

ING

P

ER

MIT

FIL

E

Detailed Design

DE

SIG

N R

EP

OR

T

Construction

Commissioning

Moving

Qualification

Page 16: Vlg Loss Prevention & Secruity Engels

Loss Prevention & Security confidential 16 08/04/23

• Test of the installations

• Procedures for handing over the installations

• Creation and follow up of punch list

• Revision of documents

• Maintenance contracts

Implementation (II)

ImplementationImplementationContractingContractingConceptual designConceptual design Design & engineeringDesign & engineering

Proposal evaluation

Contracting

Short list contractors

CO

NTR

AC

TS F

OR

EX

EC

UTI

ON

Assessment URD

Conceptual design

CO

NC

EP

TU

AL

DE

SIG

N R

EP

OR

T

PR

OG

RA

M O

F R

EQ

UIR

EM

EN

TS

Design

SP

EC

IFIC

ATI

ON

SD

OC

UM

EN

TS

BU

ILD

ING

P

ER

MIT

FIL

E

Detailed Design

DE

SIG

N R

EP

OR

T

Construction

Commissioning

Moving

Qualification

ImplementationImplementationContractingContractingConceptual designConceptual design Design & engineeringDesign & engineering

Proposal evaluation

Contracting

Short list contractors

CO

NTR

AC

TS F

OR

EX

EC

UTI

ON

Assessment URD

Conceptual design

CO

NC

EP

TU

AL

DE

SIG

N R

EP

OR

T

PR

OG

RA

M O

F R

EQ

UIR

EM

EN

TS

Assessment URD

Conceptual design

CO

NC

EP

TU

AL

DE

SIG

N R

EP

OR

T

PR

OG

RA

M O

F R

EQ

UIR

EM

EN

TS

Design

SP

EC

IFIC

ATI

ON

SD

OC

UM

EN

TS

BU

ILD

ING

P

ER

MIT

FIL

E

Detailed Design

DE

SIG

N R

EP

OR

T

Construction

Commissioning

Moving

Qualification

Page 17: Vlg Loss Prevention & Secruity Engels

Loss Prevention & Security confidential 17 08/04/23

Added value Van Looy Group in Loss Prevention & Security

• Looks after the clients interests

• Knows the latest state of the art technologies

• Knows the newest standardisations

• Integrated design of building, techniques, logistic and operations